CN207774633U - Prefabricated piping lane fast hoisting construction system - Google Patents
Prefabricated piping lane fast hoisting construction system Download PDFInfo
- Publication number
- CN207774633U CN207774633U CN201820137423.1U CN201820137423U CN207774633U CN 207774633 U CN207774633 U CN 207774633U CN 201820137423 U CN201820137423 U CN 201820137423U CN 207774633 U CN207774633 U CN 207774633U
- Authority
- CN
- China
- Prior art keywords
- piping lane
- driving
- lifting
- prefabricated piping
- row
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses prefabricated piping lane fast hoisting construction systems, it includes the first row stay and the second driving column, the bottom of the first row stay is supported on the outer edge of piping lane foundation pit, the second driving upright supports are on level road, driving truss is installed in the top braces of the first row stay and the second driving column, it is provided with cross moving track at the top of the driving truss, cooperation is equipped with lifting machine on the cross moving track, it is connected with lifting rope on the bottom hook of lifting machine, the end of the lifting rope is connected with lifting cross bar, the bottom of the lifting cross bar is connected by steel wire rope with prefabricated piping lane;The prefabricated piping lane is transported by transport vehicle.This construction system can be used in fast transportation and the lifting assembly of prefabricated piping lane, and then greatly improve construction efficiency, ensure that construction quality, and ensure that the safety of construction.
Description
Technical field
The utility model belongs to underground pipe gallery technical field of construction, and in particular to a kind of prefabricated piping lane fast hoisting construction system
System.
Background technology
Urban Underground pipe gallery engineering refers to building a municipal administration in Urban Underground to share tunnel, by electric power, communication, confession
A variety of municipal pipelines such as water, combustion gas are integrated in one, and " unified planning, unified construction, unified management " are carried out, to accomplish the underground space
Comprehensive utilization and resource it is shared.It is the important infrastructure and " lifeline " for ensureing city operations.It is to implement unified rule
It draws, design, construct and safeguard, be built in public utility of the Urban Underground for laying municipal public use pipeline.Underground integrated pipe
Corridor is played an important role to meeting people's livelihood primary demand and improving city integrated bearing capacity.
The common mode of underground pipe gallery construction at present has:Excavation and cast-in-place construction technology, open cut precast assembly technology, wherein
It needs to carry out effective assembly to prefabricated single-unit piping lane in precast assembly work progress, but prefabricated single-unit piping lane weight compares
Weight, and also need to inside the foundation pit for being placed on having dug, traditional pedrail crane device for hoisting can not adapt to very well
Above-mentioned construction demand, therefore, it is necessary to design a kind of prefabricated piping lane fast hoisting construction system quickly hanging for prefabricated piping lane
Dress construction.
Utility model content
The purpose of this utility model is to provide prefabricated piping lane fast hoisting construction system, this construction system can be used in pre-
The fast transportation of tubulation corridor and lifting are assembled, and then greatly improve construction efficiency, ensure that construction quality, and ensure that
The safety of construction.
In order to realize above-mentioned technical characteristic, what the purpose of this utility model was realized in:Prefabricated piping lane fast hoisting
Construction system, it includes the first row stay and the second driving column, and the bottom of the first row stay is supported on piping lane base
The outer edge in hole, the second driving upright supports are on level road, on the top of the first row stay and the second driving column
Portion's support is equipped with driving truss, and cross moving track is provided at the top of the driving truss, coordinates installation on the cross moving track
There is lifting machine, lifting rope is connected on the bottom hook of lifting machine, the end of the lifting rope is connected with lifting cross bar, institute
The bottom for stating lifting cross bar is connected by steel wire rope with prefabricated piping lane;The prefabricated piping lane is transported by transport vehicle.
The top braces of the first row stay are equipped with the first Crane Rail, the top branch of the second driving column
Support is equipped with the second Crane Rail, and the both ends of the driving truss are respectively supported at the first Crane Rail and second by traveling wheel
On Crane Rail.
The bottom of the first row stay is equipped with the first row garage and walks component, the bottom peace of the second driving column
Equipped with the second driving walking component;Component is walked by the first row garage and the second driving walking component uses identical structure, all
Including movable motor, traveling wheel is installed on the movable motor output shaft.
First auxiliary suspension hook is installed at the top of the first row stay, is equipped at the top of the second driving column
Second auxiliary suspension hook.
The lifting machine uses walks elevator lifting machine, including movable motor and elevator motor automatically, the movable motor
Rail wheel is installed, the rail wheel coordinates with cross moving track, and steel wire rope is wound in the elevator motor on output shaft.
The suspension hook installation end surface symmetric of the prefabricated piping lane is provided with two groups of holes for hoist, and two groups of holes for hoist are arranged in same
On straight line.
It is equipped with the lumps of wood on the piping lane foundation pit, the both sides of piping lane foundation pit are provided with side slope.
The utility model has the advantages that:
1, above-mentioned lifting construction system can be used in the transport, lifting and overturning docking of prefabricated piping lane, and then improve
Construction efficiency shortens construction period.
2, above system, manual work intensity is low, and operational security is high, ensure that construction quality.
3, the suspension hook installation end surface symmetric of prefabricated piping lane is provided with two groups of holes for hoist, ensure that follow-up convenient using lifting
Machine its overturn.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the utility model overall structure diagram.
Fig. 2 is structural schematic diagram of the utility model during being lifted by crane to prefabricated piping lane.
Fig. 3 is structural schematic diagram of the utility model in lifting by crane translation motion to prefabricated piping lane.
Fig. 4 is the utility model to the structural schematic diagram in the placement process of prefabricated piping lane whereabouts.
Fig. 5 is the utility model to the structural schematic diagram in prefabricated piping lane switching process.
In figure:Piping lane foundation pit 1, the first row garage walk component 2, the first row stay 3, first assists suspension hook 4, first to drive a vehicle
Track 5, driving truss 6, cross moving track 7, bottom hook 8, lifting machine 9, lifting rope 10, lifting 11 second Crane Rail of cross bar
12, the second auxiliary driving driving walking of column 14, second of suspension hook 13, second component 15, prefabricated piping lane 16, transport vehicle 17, level
Road surface 18, side slope 19.
Specific implementation mode
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
As shown in Figs. 1-5, prefabricated piping lane fast hoisting construction system, it includes that the driving of the first row stay 3 and second is vertical
The bottom of column 14, the first row stay 3 is supported on the outer edge of piping lane foundation pit 1, and the second driving column 14 is supported on
On level road 18, driving truss 6, the row are installed in the top braces of the driving column 14 of the first row stay 3 and second
The top of vehicle truss 6 is provided with cross moving track 7, coordinates on the cross moving track 7 and is equipped with lifting machine 9, in the bottom of lifting machine 9
Lifting rope 10 is connected on hook 8, the end of the lifting rope 10 is connected with lifting cross bar 11, the bottom of the lifting cross bar 11
Portion is connected by steel wire rope with prefabricated piping lane 16;The prefabricated piping lane 16 is transported by transport vehicle 17.By using above-mentioned fast
Fast lifting construction system in the course of work, easily can be lifted by crane, be transported, be transferred and be overturn to prefabricated piping lane 16, in turn
Its working efficiency is greatly improved, the labor intensity of operating personnel is reduced.
Further, the top braces of the first row stay 3 are equipped with the first Crane Rail 5, second driving
The top braces of column 14 are equipped with the second Crane Rail 12, and the both ends of the driving truss 6 are respectively supported at by traveling wheel
On first Crane Rail 5 and the second Crane Rail 12.It is above-mentioned that lifting machine 9 can be moved along driving truss 6 ensure that structure.
Further, the bottom of the first row stay 3 is equipped with the first row garage and walks component 2, second driving
The bottom of column 14 is equipped with the second driving walking component 15;The driving walking component of component 2 and second is walked by the first row garage
15 use identical structure, all include movable motor, traveling wheel is equipped on the movable motor output shaft.Above structure ensures
The direction that entire lifting construction system can be laid with along piping lane translates, and then improves work efficiency.
Further, the top of the first row stay 3 is equipped with the first auxiliary suspension hook 4, the second driving column
14 top is equipped with the second auxiliary suspension hook 13.Play the role of auxiliary lifting by auxiliary hanging hook.
Further, the lifting machine 9 uses and walks elevator lifting machine, including movable motor and elevator motor automatically, described
Rail wheel is installed, the rail wheel coordinates with cross moving track 7, is wound in the elevator motor on the output shaft of movable motor
Steel wire rope.Prefabricated piping lane 16 can be lifted by crane by the elevator motor.
Further, the suspension hook installation end surface symmetric of the prefabricated piping lane 16 is provided with two groups of holes for hoist, two groups of holes for hoist
It is arranged on same straight line.It ensure that subsequently easily it is overturn using lifting machine 9.
Further, it is equipped with the lumps of wood 20 on the piping lane foundation pit 1, the both sides of piping lane foundation pit 1 is provided with side slope 19.
The course of work and operation principle of the utility model:
Prefabricated piping lane 16 first, the underface of lifting machine 9 is transported by transport vehicle 17 by the first step referring to Fig. 1, and
Four suspension hooks for lifting by crane 11 bottom of cross bar are connected on two groups of holes for hoist being arranged symmetrically of prefabricated piping lane 16, ensure to connect
The reliability connect;
Second step starts lifting machine 9, is lifted by crane to prefabricated piping lane 16 referring to Fig. 2, and transport vehicle 17 is removed after lifting;
Third walks, and referring to Fig. 3, starts the movable motor of lifting machine 9, driving lifting machine 9 is translated along driving truss 6;
4th step, referring to Fig. 4, after prefabricated piping lane 16 is located at the surface of position to be installed, lower section lifting machine 9 will be prefabricated
Piping lane 16 is positioned on the lumps of wood 20;
5th step takes down the one of which suspension hook that lifting machine 9 is connected with prefabricated piping lane 16, restarts lifting referring to Fig. 5
Machine 9 continues to lift by crane, and then completes the overturning of prefabricated piping lane 16, it is finally carried out translation with installed piping lane and is docked.
6th step, repeats the above steps, and completes the installation of entire piping lane.
Above-described embodiment is used for illustrating the utility model, rather than limits the utility model, in this practicality
In novel spirit and scope of the claims, to any modifications and changes that the utility model is made, this reality is both fallen within
With novel protection domain.
Claims (7)
1. prefabricated piping lane fast hoisting construction system, it is characterised in that:It includes the first row stay(3)With the second driving column
(14), the first row stay(3)Bottom be supported on piping lane foundation pit(1)Outer edge, it is described second driving column(14)
It is supported on level road(18)On, in the first row stay(3)With the second driving column(14)Top braces driving is installed
Truss(6), the driving truss(6)Top be provided with cross moving track(7), the cross moving track(7)Upper cooperation has been equipped with
Loop wheel machine(9), in lifting machine(9)Bottom hook(8)On be connected with lifting rope(10), the lifting rope(10)End connection
There is lifting cross bar(11), the lifting cross bar(11)Bottom pass through steel wire rope and prefabricated piping lane(16)It is connected;The prefabricated pipe
Corridor(16)Pass through transport vehicle(17)Transport.
2. prefabricated piping lane fast hoisting construction system according to claim 1, it is characterised in that:The first row stay
(3)Top braces the first Crane Rail is installed(5), the second driving column(14)Top braces the second row is installed
Track road(12), the driving truss(6)Both ends the first Crane Rail is respectively supported at by traveling wheel(5)With the second driving
Track(12)On.
3. prefabricated piping lane fast hoisting construction system according to claim 1, it is characterised in that:The first row stay
(3)Bottom the first row garage be installed walk component(2), the second driving column(14)Bottom the second driving row is installed
Walk component(15);Component is walked by the first row garage(2)With the second driving walking component(15)Using identical structure, all include
Movable motor is equipped with traveling wheel on the movable motor output shaft.
4. prefabricated piping lane fast hoisting construction system according to claim 1, it is characterised in that:The first row stay
(3)Top the first auxiliary suspension hook is installed(4), the second driving column(14)Top the second auxiliary suspension hook is installed
(13).
5. prefabricated piping lane fast hoisting construction system according to claim 1, it is characterised in that:The lifting machine(9)It adopts
With elevator lifting machine, including movable motor and elevator motor is walked automatically, rail wheel is installed on the output shaft of the movable motor,
The rail wheel and cross moving track(7)Coordinate, steel wire rope is wound in the elevator motor.
6. prefabricated piping lane fast hoisting construction system according to claim 1, it is characterised in that:The prefabricated piping lane(16)
Suspension hook installation end surface symmetric be provided with two groups of holes for hoist, two groups of holes for hoist are arranged on same straight line.
7. prefabricated piping lane fast hoisting construction system according to claim 1, it is characterised in that:The piping lane foundation pit(1)
On be equipped with the lumps of wood(20), in piping lane foundation pit(1)Both sides be provided with side slope(19).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820137423.1U CN207774633U (en) | 2018-01-26 | 2018-01-26 | Prefabricated piping lane fast hoisting construction system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820137423.1U CN207774633U (en) | 2018-01-26 | 2018-01-26 | Prefabricated piping lane fast hoisting construction system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207774633U true CN207774633U (en) | 2018-08-28 |
Family
ID=63210783
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820137423.1U Active CN207774633U (en) | 2018-01-26 | 2018-01-26 | Prefabricated piping lane fast hoisting construction system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207774633U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208639A (en) * | 2018-10-25 | 2019-01-15 | 中铁工程机械研究设计院有限公司 | Underground pipe gallery tube coupling assembly equipment and its construction |
CN112938773A (en) * | 2021-04-01 | 2021-06-11 | 上海振华重工(集团)股份有限公司 | Installation method and installation system of underground engineering segment and installation crane |
CN113482047A (en) * | 2021-07-21 | 2021-10-08 | 中交二公局第六工程有限公司 | Pipe gallery installation method |
CN113666260A (en) * | 2021-09-02 | 2021-11-19 | 中国水利水电第三工程局有限公司 | Method for dismounting and mounting pressure steel pipe under complex terrain condition |
CN114197530A (en) * | 2022-01-12 | 2022-03-18 | 中国建筑土木建设有限公司 | Accurate positioning and mounting equipment for oversized-diameter pipeline in pipe gallery and construction method thereof |
CN114250777A (en) * | 2021-12-10 | 2022-03-29 | 中交二公局第六工程有限公司 | Double-span type feeding corridor system and double-span type feeding corridor method thereof |
-
2018
- 2018-01-26 CN CN201820137423.1U patent/CN207774633U/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109208639A (en) * | 2018-10-25 | 2019-01-15 | 中铁工程机械研究设计院有限公司 | Underground pipe gallery tube coupling assembly equipment and its construction |
CN109208639B (en) * | 2018-10-25 | 2024-10-18 | 中铁科工集团装备工程有限公司 | Underground pipe gallery pipe joint assembling equipment and construction method thereof |
CN112938773A (en) * | 2021-04-01 | 2021-06-11 | 上海振华重工(集团)股份有限公司 | Installation method and installation system of underground engineering segment and installation crane |
CN112938773B (en) * | 2021-04-01 | 2024-05-17 | 上海振华重工(集团)股份有限公司 | Method and system for installing underground engineering section and installation crane |
CN113482047A (en) * | 2021-07-21 | 2021-10-08 | 中交二公局第六工程有限公司 | Pipe gallery installation method |
CN113666260A (en) * | 2021-09-02 | 2021-11-19 | 中国水利水电第三工程局有限公司 | Method for dismounting and mounting pressure steel pipe under complex terrain condition |
CN113666260B (en) * | 2021-09-02 | 2023-10-31 | 中国水利水电第三工程局有限公司 | Method for dismantling and installing pressure steel pipe under complex terrain condition |
CN114250777A (en) * | 2021-12-10 | 2022-03-29 | 中交二公局第六工程有限公司 | Double-span type feeding corridor system and double-span type feeding corridor method thereof |
CN114197530A (en) * | 2022-01-12 | 2022-03-18 | 中国建筑土木建设有限公司 | Accurate positioning and mounting equipment for oversized-diameter pipeline in pipe gallery and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207774633U (en) | Prefabricated piping lane fast hoisting construction system | |
CN103123016B (en) | Construction method for laying gas pipelines along bridge | |
CN111794754B (en) | Pipe piece assembled derrick and construction method thereof | |
CN205711757U (en) | Section assembling truss double beam girder erecting machine | |
CN204000830U (en) | Merogenesis take-over type sand drain machine | |
CN208413709U (en) | Unit type glass curtain wall double-ring track hoisting system | |
CN202144677U (en) | Quadrilateral stereoscopic garage with swaying arms | |
CN110510527A (en) | Installation system of high slope variable cross-section slope precast block and construction method thereof | |
CN201339209Y (en) | Top-down construction earth excavation earth-moving device | |
CN208932821U (en) | A kind of erecting beam construction height leg gantry crane | |
CN201882805U (en) | Underground self-moving type multifunctional assembling machine | |
CN214738249U (en) | Prefabricated piping lane sliding device of adjustable hoisting point of multi-angle | |
CN203684019U (en) | Height and span adjustable track laying machine for subway construction | |
CN210737607U (en) | A hang braced system for reverse construction method beam slab construction | |
CN208684247U (en) | A kind of prefabricated subsection hanging apparatus | |
CN202611340U (en) | Self-propelled road bed protective barrier transportation and installation all-in-one machine | |
CN204608602U (en) | Novel bridge maintenance protection installation work car | |
CN205934730U (en) | Installation device of wave form steel web | |
CN105603882A (en) | Continuous beam mid-span closure construction method achieving uninterrupted power of contact line and structure of method | |
CN201647844U (en) | Beam lifting station without abutments | |
CN207312994U (en) | Power station major diameter surge shaft steel lining cantilevered annular track boom hoisting | |
CN215591798U (en) | Curtain wall plate traction transfer device for tower crane dismantling part | |
CN205712111U (en) | One is applicable to subway work moving concrete material distributing machine under small space | |
CN205477626U (en) | Middle -size and small -size section shaft is gone into well and is taken off sediment device | |
CN203321344U (en) | Heightened and improved V-type vertical shaft sinking headframe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |