CN105862874A - Protection method for controlling deformation of building structure close to foundation pit - Google Patents

Protection method for controlling deformation of building structure close to foundation pit Download PDF

Info

Publication number
CN105862874A
CN105862874A CN201610231358.4A CN201610231358A CN105862874A CN 105862874 A CN105862874 A CN 105862874A CN 201610231358 A CN201610231358 A CN 201610231358A CN 105862874 A CN105862874 A CN 105862874A
Authority
CN
China
Prior art keywords
gasbag
structures
deformation
excavation
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610231358.4A
Other languages
Chinese (zh)
Other versions
CN105862874B (en
Inventor
程泽海
宋泽源
金炜枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Lover Health Science and Technology Development Co Ltd
Zhejiang University of Science and Technology ZUST
Original Assignee
Zhejiang Lover Health Science and Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Lover Health Science and Technology Development Co Ltd filed Critical Zhejiang Lover Health Science and Technology Development Co Ltd
Priority to CN201610231358.4A priority Critical patent/CN105862874B/en
Publication of CN105862874A publication Critical patent/CN105862874A/en
Application granted granted Critical
Publication of CN105862874B publication Critical patent/CN105862874B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution

Abstract

The invention relates to a protection method for controlling deformation of a building structure close to a foundation pit. The protection method comprises the following steps that (1) a soil pressure meter is buried in the side, close to the building structure, of a foundation, a foundation pit deformation inclinometer tube is buried in the side close to the foundation pit, and settlement observation points are distributed on the building structure; (2) holes are vertically drilled between the foundation pit and the building structure, air bags capable of being inflated/grouted are guided into the drilling holes through guide pipes, and the orifice sections are sealed; (3) when the foundation pit is excavated, pressurizing equipment is started according to the situations of soil pressure, surrounding ground displacement and settlement changes of the building structure, and the air bags are inflated by opening an air guide pipe so as to conduct pressure compensation on unloading caused by excavation; and (4) after excavation of the foundation pit is completed, the air bags are deflated one by one, grouting is conducted at the same time, and a pile body with certain rigidity is formed. The protection method has the advantages of being high in construction speed, high in adaptability, high in efficiency, small in disturbance, low in cost and the like, and is a very effective settlement control protection method.

Description

A kind of means of defence controlling closing foundation ditch construction of structures deformation
Technical field
The invention belongs to foundation pit construction technical field, concretely relate to a kind of control and close on base The means of defence of hole construction of structures deformation.
Background technology
In recent years, the urban construction and development of China is abnormal rapidly, and underground engineering gets more and more, and gushes Reveal substantial amounts of base pit engineering.These deep big foundation pit surroundings being positioned at down town are gathered all kinds of Underground utilities, close on the facilities such as all kinds of construction of structures and subway tunnel.Owing to down town is the biggest Foundation pit construction narrow field, the construction period is tight, excavation of foundation pit is deep (degree of depth is generally 15~25m), Excavation of foundation pit area is big, and execution conditions are complicated;In addition the stratum residing for engineering is essentially saturated containing Current are moulded or soft plastic clay layer, and hole when compressibility is big, shearing strength is low, sensitivity is high Feature.The off-load of deep basal pit inevitably results in the stress field of foundation ditch and surrounding soil and changes, Foundation ditch and foundation ditch surrounding soil strata deformation cause the uplift of soil in foundation ditch, the side of building enclosure To deformation and the sedimentation on foundation ditch periphery earth's surface.And in soft clay area deep pit excavation, not only want Meet intensity and the safety and stability of deep basal pit itself, but also caused by deep pit digging to be controlled Deformation and generation cheat outer earth's surface sedimentation, with the requirement of satisfied protection surrounding enviroment.
At present, employing routine isolation pile technical protection closes on the method for the construction of structures of excavation pit Obtain certain application, but when excavation of foundation pit has resulted in the construction of structures closing on excavation pit When sedimentation and deformation is excessive, conventional isolation pile technology just loses effect;It addition, when closing on excavation base When the construction of structures in hole uses pile foundation, also there is employing (i.e. away from foundation ditch side) outside isolation pile The protected mode of grouting and reinforcing, but the method is not suitable for shallow foundation facility, because noting outside stake The main purpose of slurry is to improve the side frictional resistance of the construction of structures pile foundation being closed on excavation pit by protection Power, improves its pile foundation non-deformability, and under shallow foundation facility, direct slip casting can cause on the contrary Lift on building is uneven, cause bulge fracture.
It addition, double-row pile technology has obtained certain development in recent years, at next-door neighbour's existing building base Hole slope retaining has some superiority, but Double-row Piles Support is relatively costly, the pattern foundation pit supporting structure degree of depth Also having certain limitations, supporting safety coefficient is relatively low, and the construction of rear campshed is by the environment shadow after side slope Ring bigger.
In sum, it is provided that a kind of means of defence controlling closing foundation ditch construction of structures deformation is this One important technological problems of skilled person.
Summary of the invention
In order to overcome defect present in prior art, the invention provides one and be prone to construction, Can control to close on the means of defence of excavation pit construction of structures deformation, close on excavation in order to protect Foundation ditch construction of structures.
A kind of means of defence controlling closing foundation ditch construction of structures deformation, comprises the following steps:
(1) in the ground of construction of structures side, earth pressure gauge is being buried underground, near foundation ditch one Side buries foundation pit deformation inclinometer pipe underground, and lays settlement observation point in construction of structures;
(2) vertically hole near foundation ditch side between foundation ditch and existing construction of structures, After pore-forming, utilizing guide pipe to be imported in boring by the gasbag of inflatable/slip casting, aperture section is entered Row seals;
(3) at excavation of foundation pit simultaneously, according to soil pressure, surrounding soil displacement and construction of structures Sedimentation situation of change, starts pressurized equipment, opens airway and be inflated gasbag, is formed One Exhaust airbag post, carries out pressure compensation with the off-load causing excavation;
(4) after excavation of foundation pit completes, one by one the air in release air bag, is carried out simultaneously Slip casting, forms the pile body with certain rigidity.
The setting of settlement observation point of the present invention should be by designing unit according to the engineering of ground The feature of geologic information and building structure determines, the mark burial place of settlement observation point should simultaneously Sight line is open, does not block.
As preferably, if described foundation ditch is spaced setting arterial highway cross-brace, described horizontal stroke from top to bottom Fluid pressure type telescopic pole is used and in uniformly laying to strut.Its quantity is according to construction of structures Long (wide) degree determines.
As preferably, boring aperture controls 100~300mm.Forming hole method does not limits.
As preferably, the gasbag of inflatable/slip casting uses the cloth bag of geotechnique's sealed air-tight; The colligation of two ends up and down of described gasbag is on guide pipe, and gasbag upper end colligation point is away from guide pipe Upper port 2~3m, imports in boring by guide pipe by gasbag, and gasbag imports in boring After, utilize bentonite to seal in the range of its aperture section 2~3 meters;Gasbag sends into boring It being carried out sealing propertytest, in the excavation stage, the valve of the exhaustor of gasbag is all the time before It is closed.
As preferably, guide pipe is steel pipe or the PE pipe with certain diameter, and internal diameter controls 100~200mm;Guide pipe bassets and is partly connected with subtube, and guide pipe passes air bag Part in Dai, perforate in the range of its pipe shaft bottom 1/2, aperture 50mm;Guide pipe hypomere Stretch out gasbag certain length, its sealed bottom.Guide pipe can also serve as gas tube and Grouting Pipe, Gas or serosity can enter gasbag by the eyelet on guide pipe.
As preferably, through the soil body sliding area foundation ditch and surrounding building bottom gasbag And embed the solum of bottom, soil body sliding area.
As preferably, earth pressure gauge is embedded between excavation pit and vertically disposed gasbag, The depth of burying determines according to the position of each excavation face during excavation of foundation pit;Described foundation pit deformation deviational survey Pipe is embedded between excavation pit and vertically disposed gasbag and is located close to foundation ditch side.
As preferably, described earth pressure gauge buries two rows underground in excavation base along excavation of foundation pit depth direction Between hole and vertically disposed gasbag;Wherein a casting piezometer is vertically buried underground, another draining Put down and bury underground;Described soil pressure meter is connected with real-time monitoring system.The earth pressure gauge vertically buried underground is used It is used for measuring vertical earth pressure to soil pressure, horizontally embedded earth pressure gauge in the level of measurement.
As preferably, described guide pipe is connected with pressurized equipment, and described pressurized equipment is air Compressor or grouting equipment.Realize inflating in pneumatophore by air compressor, pass through slip casting Equipment realizes slip casting in pneumatophore.
As preferably, the top of vertically disposed pneumatophore is by the steel pipe preset in the coupling beam of top Flexibly connect with top coupling beam.
The beneficial effects of the present invention is:
(1) this means of defence use the gasbag of inflatable/slip casting be inflated/slip casting, energy Uniformly diffuse to inflation/grouting pressure be protected in the foundation soil under construction of structures, can avoid Lift protuberance on the direct construction of structures that slip casting causes in ground is uneven, reduce the wave of slurry Take;
(2) grouting pressure, slip casting can be adjusted according to earth pressure gauge and Excavation Settlement measured result Amount and slip casting progress, carried out the Stress Release of the surrounding soil caused due to excavation of foundation pit in time Compensate, to control periphery construction of structures sedimentation, effectively reduce excavation of foundation pit and the construction closed on is built The disturbance of thing;
(3) can be by improving the body surface that the shear resistance of slide surface is provided with structure self Collateral resistance and rigidity limit the development of deformation of the soil body after means of defence, build after reducing means of defence The sedimentation of structures and deformation;
(4) certain anti-floating bearing capacity can be provided;
(5) simple for production, speed of application is fast, and strong adaptability, efficiency are high, low cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the vertically disposed inflatable/slip casting bag plane of arrangement schematic diagram of the present invention;
Fig. 3 is the structural representation of inflatable/slip casting bag.
Detailed description of the invention
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings, but institute of the present invention Scope of protection is not limited to this.
With reference to Fig. 1~3, a kind of means of defence controlling closing foundation ditch construction of structures deformation, bag Include following steps:
(1) in the ground of construction of structures 2 side, earth pressure gauge 6 is being buried underground, near base Cheat 1 side and bury foundation pit deformation inclinometer pipe 7 underground, and in construction of structures, lay settlement observation point 8, And carry out initial settlement observation, using the control reference as subsequent construction;Settlement observation point Setting should be determined according to the engineering geological data of ground and the feature of building structure by designing unit, The mark burial place of settlement observation point answers sight line open simultaneously, does not block;
Earth pressure gauge 6 is embedded between excavation pit 1 and vertically disposed gasbag 9, buries underground The degree of depth determines according to the position of each excavation face during excavation of foundation pit;Described foundation pit deformation inclinometer pipe 7 It is embedded between excavation pit 1 and vertically disposed gasbag 9 and is located close to foundation ditch 1 one Side;Concrete, described earth pressure gauge 6 buries two rows underground in excavation base along excavation of foundation pit depth direction Between hole and vertically disposed gasbag;Wherein a casting piezometer is vertically buried underground, is used for measuring Level is to soil pressure, and another row of horizontal is buried underground, is used for measuring vertical earth pressure;Described soil pressure meter It is connected with real-time monitoring system.
(2) building enclosure 4 is set intending excavation pit avris, simultaneously foundation ditch 1 with close on Vertically hole near foundation ditch 1 side between excavation pit construction of structures 2, boring aperture control System, 100~300mm, after pore-forming, utilizes guide pipe 10 by the gasbag of inflatable/slip casting 9 import in boring, carry out sealing formation with bentonite and seal in the range of aperture section 2~3 meters Section 3, it is ensured that exhaustor 11 upper valve of gasbag 9 is closed;
The gasbag 9 of inflatable/slip casting uses the cloth bag of geotechnique's sealed air-tight, described air bag The colligation of two ends up and down of bag is on guide pipe 10, and gasbag upper end colligation point is away from guide pipe upper end Mouth 2~3m;Gasbag carries out sealing propertytest to it before sending into boring, in the excavation stage, The valve of the exhaustor 11 of gasbag is closed all the time;
Guide pipe 10 is to have the steel pipe of certain diameter or PE pipe, internal diameter control 100~ 200mm;Guide pipe bassets and is partly connected with subtube 16, and guide pipe passes gasbag Interior part, perforate in the range of its pipe shaft bottom 1/2, aperture 50mm;Guide pipe hypomere is stretched Go out gasbag 60cm, its sealed bottom;Guide pipe 10 can also serve as gas tube and Grouting Pipe, gas Body or serosity can enter gasbag 9 by the eyelet 12 on guide pipe;
The pneumatophore 9 of described inflatable/slip casting is positioned close to foundation ditch 1 side, bottom it Through described foundation ditch 1 and the soil body sliding area closed on excavation pit construction of structures 2, and deeply Enter in the solum of bottom, soil body sliding area;Described foundation ditch 1 in digging process from top to bottom between If every arranging arterial highway cross-brace 5, described cross struts use fluid pressure type telescopic pole and in Uniformly lay.
(3) at excavation of foundation pit simultaneously, according to soil pressure, surrounding soil displacement and construction of structures Sedimentation situation of change, is inflated maintaining pressure stability;Guide pipe 10 is (empty with pressurized equipment 14 Air compressor) it is connected, start air compressor, open airway and gasbag 9 is filled Gas, making the gasbag 9 of inflatable/slip casting, micro-swollen (before excavation of foundation pit completes, guide pipe begins It is connected with pressurized equipment eventually, keeps the pressure after inflating each time steady in this process Fixed), form an Exhaust airbag post, gasbag 9 volumetric expansion of inflatable/slip casting is formed to be had relatively Major diameter and the pile body of certain rigidity, and adjust gas according to soil pressure and Excavation Settlement measured result Pressure in pouch, is carried out the Stress Release of the surrounding soil caused due to excavation of foundation pit in time Compensate;
The pneumatophore 9 of inflatable/slip casting can be according to condition of construction by pressurized equipment 14 (air Compressor/grouting equipment) it is allowed to full to swelling with total pipeline 15, subtube 16, simultaneously can The real-time pressure of each pneumatophore is known in real time, it is achieved to each by real-time monitoring system 17 Control alone or in combination, easy and simple to handle;
The pneumatophore 9 of vertically disposed inflatable/slip casting, its end utilizes and flexibly connects one Rise, and casting concrete, at earth's surface, form entirety;So, can improve vertically disposed The integral rigidity of the pneumatophore 9 of inflatable/slip casting, thus reduce foundation pit construction further to facing The impact of nearly excavation pit construction of structures 2;
The pneumatophore 9 of vertically disposed inflatable/slip casting is primarily subjected to excavation pit 1 excavation and executes Soil lateral pressure that work causes and the frictional resistance that ground relative settlement produces, and vertically disposed The pneumatophore 9 of inflatable/slip casting can reduce to a certain extent and acts on excavation pit 1 Soil pressure in building enclosure 4;When the soil body produces sliding deformation, pass through real-time monitoring system 17 inflate/slip casting to the pneumatophore 9 of vertically disposed inflatable/slip casting, by improving slide surface Shear resistance and the pile side resistance that provides of pile body and rigidity to limit the deformation of the soil body after stake Development, thus by sedimentation and the deformation of protection Architectural Equipment after reducing stake;
The closely connected arranged of pneumatophore 9 of vertically disposed inflatable/slip casting, each pneumatophore There is the most independent guide pipe 10, exhaustor 11, corresponding valve and respective real-time prison Examining system 17 (Pressure gauge).By to its inflation/slip casting, pneumatophore is made to form inflation/slip casting Utricule, it is possible to uniformly diffuse to close on excavation pit construction of structures 2 times by inflation/grouting pressure Foundation soil in, can avoid directly in ground inflation/slip casting cause close on excavation pit Protuberance is lifted on construction of structures 2 is uneven.
(4) after excavation of foundation pit completes, one by one the air in release air bag, is carried out simultaneously Slip casting, forms the pile body with certain rigidity;Concrete, total valve is closed, by total pipeline It is removed and connected to from air compressor on grouting equipment, opens total valve, slowly beat simultaneously Drive the exhaustor 11 of the pneumatophore 9 of inflation/slip casting, make slurry slowly be full of bag;The row for the treatment of After trachea 11 has slurry to overflow a period of time, i.e. it is believed that the pneumatophore 9 of this inflation/slip casting Already filled with, now close the valve in respective branch;Pneumatophore 9 in all inflation/slip castings After all filling slurry, the pneumatophore 9 of inflation/slip casting is carried out sealing of hole, and to all vertical rows The top of the pneumatophore of row is flexibly connected with top coupling beam by the steel pipe preset in the coupling beam of top.
The present invention is inflatable/and the gasbag volumetric expansion of slip casting is formed has larger diameter and certain The pile body of rigidity, and can open due to foundation ditch according to soil pressure and foundation pit deformation sedimentation measured result The Stress Release digging the surrounding soil caused compensates, to control periphery construction of structures sedimentation, Effectively reduce the disturbance of the excavation of foundation pit construction of structures to closing on.The present invention solves closing foundation ditch The problem that construction of structures settlement Control is difficult, overcomes other means of defences and there is cost height, disturbance The defects such as big and efficiency is low.The present invention has that speed of application is fast, strong adaptability, real-time, effect Rate is high, disturbance is little, low cost and other advantages, is a kind of very effective settlement Control means of defence.

Claims (10)

1. the means of defence controlling closing foundation ditch construction of structures deformation, it is characterised in that include following Step:
(1) in the ground of construction of structures side, burying earth pressure gauge underground, burying near foundation ditch side If foundation pit deformation inclinometer pipe, and in construction of structures, lay settlement observation point;
(2) vertically hole near foundation ditch side between foundation ditch and existing construction of structures, pore-forming After, utilize guide pipe to be imported in boring by the gasbag of inflatable/slip casting, aperture section carries out close Envelope;
(3) at excavation of foundation pit simultaneously, settle according to soil pressure, surrounding soil displacement and construction of structures Situation of change, starts pressurized equipment, opens airway and be inflated gasbag, and shape is in a row Air bag post;
(4) after excavation of foundation pit completes, one by one the air in release air bag, carries out slip casting simultaneously, Form the pile body with certain rigidity.
The means of defence of control closing foundation ditch construction of structures the most according to claim 1 deformation, its It is characterised by: if described foundation ditch is spaced setting arterial highway cross-brace, described horizontal support from top to bottom Bar uses fluid pressure type telescopic pole and in uniformly laying.
The means of defence of control closing foundation ditch construction of structures the most according to claim 1 deformation, its It is characterised by: boring aperture controls 100~300mm.
The means of defence of control closing foundation ditch construction of structures the most according to claim 1 deformation, its It is characterised by: the gasbag of inflatable/slip casting uses the cloth bag of geotechnique's sealed air-tight;Described The colligation of two ends up and down of gasbag is on guide pipe, and gasbag upper end colligation point is away from guide pipe upper end Mouth 2~3m, imports in boring by guide pipe by gasbag, after gasbag imports in holing, Bentonite is utilized to seal in the range of its aperture section 2~3 meters;Before gasbag sends into boring It is carried out sealing propertytest, and in the excavation stage, the valve of the exhaustor of gasbag is in all the time Closed mode.
The means of defence of control closing foundation ditch construction of structures the most according to claim 1 deformation, its Be characterised by: guide pipe is to have the steel pipe of certain diameter or PE pipe, internal diameter control 100~ 200mm;Guide pipe bassets and is partly connected with subtube, and guide pipe passes in gasbag Part, perforate in the range of its pipe shaft bottom 1/2, aperture 50mm;Guide pipe hypomere stretches out gas Pouch certain length, its sealed bottom.
The means of defence of control closing foundation ditch construction of structures the most according to claim 1 deformation, its It is characterised by: through the soil body sliding area foundation ditch and surrounding building embedding bottom gasbag Enter the solum of bottom, soil body sliding area.
The means of defence of control closing foundation ditch construction of structures the most according to claim 1 deformation, its It is characterised by: earth pressure gauge is embedded between excavation pit and vertically disposed gasbag, buries underground The degree of depth determines according to the position of each excavation face during excavation of foundation pit;Described foundation pit deformation inclinometer pipe buries It is located between excavation pit and vertically disposed gasbag and is located close to foundation ditch side.
The means of defence of control closing foundation ditch construction of structures the most according to claim 7 deformation, its Be characterised by: described earth pressure gauge along excavation of foundation pit depth direction bury underground two rows in excavation pit with Between vertically disposed gasbag;Wherein a casting piezometer is vertically buried underground, and another row of horizontal is buried If;Described soil pressure meter is connected with real-time monitoring system.
The means of defence of control closing foundation ditch construction of structures the most according to claim 1 deformation, its Being characterised by: described guide pipe is connected with pressurized equipment, described pressurized equipment is air compression Machine or grouting equipment.
The means of defence of control closing foundation ditch construction of structures the most according to claim 1 deformation, It is characterized in that: the top of vertically disposed pneumatophore by the steel pipe preset in the coupling beam of top with Top coupling beam flexibly connects.
CN201610231358.4A 2016-04-14 2016-04-14 A kind of means of defence for controlling closing foundation ditch construction of structures to deform Active CN105862874B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610231358.4A CN105862874B (en) 2016-04-14 2016-04-14 A kind of means of defence for controlling closing foundation ditch construction of structures to deform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610231358.4A CN105862874B (en) 2016-04-14 2016-04-14 A kind of means of defence for controlling closing foundation ditch construction of structures to deform

Publications (2)

Publication Number Publication Date
CN105862874A true CN105862874A (en) 2016-08-17
CN105862874B CN105862874B (en) 2017-09-19

Family

ID=56637828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610231358.4A Active CN105862874B (en) 2016-04-14 2016-04-14 A kind of means of defence for controlling closing foundation ditch construction of structures to deform

Country Status (1)

Country Link
CN (1) CN105862874B (en)

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120811A (en) * 2016-08-24 2016-11-16 中天建设集团有限公司天津分公司 A kind of foundation ditch periphery distortion preventing and deviation rectification construction method
CN106836236A (en) * 2017-02-24 2017-06-13 张继红 A kind of ultra-deep steel pipe concrete continuous underground wall structure and its construction method
CN108222015A (en) * 2018-01-25 2018-06-29 天津大学 A kind of device and method using active isolation pile control influence of foundation excavation
CN108755699A (en) * 2018-06-07 2018-11-06 上海勘察设计研究院(集团)有限公司 The deformation control method and device of a kind of foundation pit periphery soil body
CN108951718A (en) * 2018-06-08 2018-12-07 中国人民解放军63926部队 The physical experiments device and method of simulating excavation
CN109342698A (en) * 2018-12-20 2019-02-15 中国矿业大学(北京) Earthing body sedimentation analogue test platform and test method on a kind of shield tunnel
CN109457738A (en) * 2018-12-12 2019-03-12 宁波大学 A kind of inflatable column isolation pilework and its construction method
CN109457737A (en) * 2018-12-12 2019-03-12 宁波大学 A kind of orientation isolation soil mass displacement at the deep layer high pressure gas stanchion and construction method
CN109653208A (en) * 2019-01-07 2019-04-19 宁波工程学院 Orientation constantly regulates and controls the isolation pile and method of displacement
CN109797750A (en) * 2019-03-29 2019-05-24 长安大学 A kind of system and method obstructing influence of foundation excavation
CN110616602A (en) * 2019-09-17 2019-12-27 西安建筑科技大学 Sedimentation control device and method for construction of pipe jacking and downward passing existing operation railway
CN111335323A (en) * 2018-12-19 2020-06-26 上海勘察设计研究院(集团)有限公司 Hydraulic or pneumatic displacement servo type combined enclosure structure and construction method thereof
CN111424727A (en) * 2020-04-27 2020-07-17 中铁上海工程局集团华海工程有限公司 Structure for reducing influence of foundation pit construction on adjacent pile foundation and construction method
CN111472221A (en) * 2020-04-15 2020-07-31 陕西融创交通科技有限公司 Subgrade settlement treatment method
CN111810227A (en) * 2020-05-27 2020-10-23 中煤科工集团西安研究院有限公司 Device and method for filling empty hole type goaf through surface grouting by mold bag method
CN111817247A (en) * 2020-07-21 2020-10-23 虹海科技股份有限公司 Non-excavation pipeline UHPC pipeline construction technology
CN112323873A (en) * 2019-08-05 2021-02-05 张继红 Real-time pile driving protection method
CN112323807A (en) * 2019-08-05 2021-02-05 张继红 Soil body distributed steel support prestress application method and structure
CN112323772A (en) * 2019-08-05 2021-02-05 张继红 Real-time control method for displacement of protected object during pipe curtain method construction
CN112343082A (en) * 2019-08-09 2021-02-09 张继红 Real-time control method for displacement of protected object in underground engineering crossing process
CN112412099A (en) * 2019-08-05 2021-02-26 张继红 Geotechnical control method
CN112431184A (en) * 2020-11-10 2021-03-02 陕西省建筑科学研究院有限公司 Device and method for embedding and installing soil pressure cell through drilling and grouting
CN112482391A (en) * 2020-10-05 2021-03-12 姜洪友 Inner supporting structure for foundation pit
CN113431110A (en) * 2021-07-14 2021-09-24 中国矿业大学 Active protection method for eliminating influence of stratum settlement on existing building
CN113463619A (en) * 2021-07-07 2021-10-01 中铁大桥勘测设计院集团有限公司武汉分公司 Self-adaptation subtracts bloated dissipation structure
CN113565103A (en) * 2021-07-14 2021-10-29 曹彦军 Inner supporting structure for foundation pit
CN113638399A (en) * 2021-09-13 2021-11-12 天津大学 Method for controlling soil body deformation from side by real-time dynamic repeatable reversible grouting
CN113863279A (en) * 2021-09-13 2021-12-31 天津大学 Method for vertically controlling soil deformation through real-time dynamic repeatable reversible grouting
CN114136267A (en) * 2021-11-15 2022-03-04 天津大学 Measurement and control integrated soil deformation dynamic control system based on composite capsule
CN114293993A (en) * 2021-12-09 2022-04-08 中国建筑第五工程局有限公司 Vertical deformation repairing structure for construction of up-down overlapped tunnel and construction method
CN115341446A (en) * 2022-09-06 2022-11-15 山东高速集团有限公司创新研究院 Rapid and accurate grouting repair process for road base cavity diseases
CN116356815A (en) * 2023-04-23 2023-06-30 中铁隧道局集团有限公司 Soil deformation and vibration air bag isolation structure for deep soft soil area

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09144000A (en) * 1995-11-21 1997-06-03 Toudentsuu:Kk Method and device for retaining earth
CN202247899U (en) * 2011-07-09 2012-05-30 牛伟民 Foundation pit support air bag
CN103835277A (en) * 2012-11-22 2014-06-04 同济大学 Inflatable type multipoint displacement meter anchor head for soft soil stratums

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09144000A (en) * 1995-11-21 1997-06-03 Toudentsuu:Kk Method and device for retaining earth
CN202247899U (en) * 2011-07-09 2012-05-30 牛伟民 Foundation pit support air bag
CN103835277A (en) * 2012-11-22 2014-06-04 同济大学 Inflatable type multipoint displacement meter anchor head for soft soil stratums

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120811A (en) * 2016-08-24 2016-11-16 中天建设集团有限公司天津分公司 A kind of foundation ditch periphery distortion preventing and deviation rectification construction method
CN106836236A (en) * 2017-02-24 2017-06-13 张继红 A kind of ultra-deep steel pipe concrete continuous underground wall structure and its construction method
CN108222015A (en) * 2018-01-25 2018-06-29 天津大学 A kind of device and method using active isolation pile control influence of foundation excavation
CN108222015B (en) * 2018-01-25 2023-08-11 天津大学 Device and method for controlling foundation pit excavation influence by adopting active isolation piles
CN108755699A (en) * 2018-06-07 2018-11-06 上海勘察设计研究院(集团)有限公司 The deformation control method and device of a kind of foundation pit periphery soil body
CN108755699B (en) * 2018-06-07 2020-10-30 上海勘察设计研究院(集团)有限公司 Deformation control method and device for foundation pit peripheral soil body
CN108951718A (en) * 2018-06-08 2018-12-07 中国人民解放军63926部队 The physical experiments device and method of simulating excavation
CN109457738A (en) * 2018-12-12 2019-03-12 宁波大学 A kind of inflatable column isolation pilework and its construction method
CN109457737A (en) * 2018-12-12 2019-03-12 宁波大学 A kind of orientation isolation soil mass displacement at the deep layer high pressure gas stanchion and construction method
CN109457737B (en) * 2018-12-12 2023-08-29 宁波大学 Directional isolation deep soil displacement high-pressure air column pile and construction method
CN111335323A (en) * 2018-12-19 2020-06-26 上海勘察设计研究院(集团)有限公司 Hydraulic or pneumatic displacement servo type combined enclosure structure and construction method thereof
CN109342698A (en) * 2018-12-20 2019-02-15 中国矿业大学(北京) Earthing body sedimentation analogue test platform and test method on a kind of shield tunnel
CN109342698B (en) * 2018-12-20 2024-01-26 中国矿业大学(北京) Test platform and test method for simulating settlement of earth covering body on shield tunnel
CN109653208A (en) * 2019-01-07 2019-04-19 宁波工程学院 Orientation constantly regulates and controls the isolation pile and method of displacement
CN109797750B (en) * 2019-03-29 2024-01-02 长安大学 System and method for blocking foundation pit excavation influence
CN109797750A (en) * 2019-03-29 2019-05-24 长安大学 A kind of system and method obstructing influence of foundation excavation
CN112323807A (en) * 2019-08-05 2021-02-05 张继红 Soil body distributed steel support prestress application method and structure
CN112323873A (en) * 2019-08-05 2021-02-05 张继红 Real-time pile driving protection method
CN112323772A (en) * 2019-08-05 2021-02-05 张继红 Real-time control method for displacement of protected object during pipe curtain method construction
CN112412099A (en) * 2019-08-05 2021-02-26 张继红 Geotechnical control method
CN112343082A (en) * 2019-08-09 2021-02-09 张继红 Real-time control method for displacement of protected object in underground engineering crossing process
CN110616602A (en) * 2019-09-17 2019-12-27 西安建筑科技大学 Sedimentation control device and method for construction of pipe jacking and downward passing existing operation railway
CN111472221A (en) * 2020-04-15 2020-07-31 陕西融创交通科技有限公司 Subgrade settlement treatment method
CN111424727A (en) * 2020-04-27 2020-07-17 中铁上海工程局集团华海工程有限公司 Structure for reducing influence of foundation pit construction on adjacent pile foundation and construction method
CN111810227A (en) * 2020-05-27 2020-10-23 中煤科工集团西安研究院有限公司 Device and method for filling empty hole type goaf through surface grouting by mold bag method
CN111817247A (en) * 2020-07-21 2020-10-23 虹海科技股份有限公司 Non-excavation pipeline UHPC pipeline construction technology
CN112482391A (en) * 2020-10-05 2021-03-12 姜洪友 Inner supporting structure for foundation pit
CN112431184A (en) * 2020-11-10 2021-03-02 陕西省建筑科学研究院有限公司 Device and method for embedding and installing soil pressure cell through drilling and grouting
CN113463619A (en) * 2021-07-07 2021-10-01 中铁大桥勘测设计院集团有限公司武汉分公司 Self-adaptation subtracts bloated dissipation structure
CN113565103A (en) * 2021-07-14 2021-10-29 曹彦军 Inner supporting structure for foundation pit
CN113431110A (en) * 2021-07-14 2021-09-24 中国矿业大学 Active protection method for eliminating influence of stratum settlement on existing building
CN113638399A (en) * 2021-09-13 2021-11-12 天津大学 Method for controlling soil body deformation from side by real-time dynamic repeatable reversible grouting
CN113863279A (en) * 2021-09-13 2021-12-31 天津大学 Method for vertically controlling soil deformation through real-time dynamic repeatable reversible grouting
CN114136267A (en) * 2021-11-15 2022-03-04 天津大学 Measurement and control integrated soil deformation dynamic control system based on composite capsule
CN114293993A (en) * 2021-12-09 2022-04-08 中国建筑第五工程局有限公司 Vertical deformation repairing structure for construction of up-down overlapped tunnel and construction method
CN115341446A (en) * 2022-09-06 2022-11-15 山东高速集团有限公司创新研究院 Rapid and accurate grouting repair process for road base cavity diseases
CN116356815A (en) * 2023-04-23 2023-06-30 中铁隧道局集团有限公司 Soil deformation and vibration air bag isolation structure for deep soft soil area
CN116356815B (en) * 2023-04-23 2023-10-20 中铁隧道局集团有限公司 Soil deformation and vibration air bag isolation structure for deep soft soil area

Also Published As

Publication number Publication date
CN105862874B (en) 2017-09-19

Similar Documents

Publication Publication Date Title
CN105862874A (en) Protection method for controlling deformation of building structure close to foundation pit
CN105840207B (en) Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body
CN105275381B (en) Impact drill drilling construction method in rich water pebble layer
CN108086340A (en) Open caisson construction structure and its construction method
CN109882183A (en) A kind of rich water loose crushing coal and rock grouting reinforcement experimental provision and effect evaluation method
CN106759473A (en) The constructing structure and its construction method of underground pipe gallery and road
CN106836206A (en) Casing rotary digging bore forming method
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN106872334A (en) A kind of method of the prominent mud Excavation simulation device of gushing water and the prominent mud disaster of simulation gushing water
CN108979659A (en) The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN105421474A (en) Integral construction method of pile planting cofferdam platform used for rock strata low-pile cap
CN112627832A (en) Method for integrating detection, treatment and monitoring operation and maintenance of water inrush and mud inrush of karst tunnel
CN104480929B (en) A kind of pile wall interaction construction method that interlocking pile is applied to permanent outer wall of basement
CN107178077A (en) Overburden layer grouting and reinforcing structure and its design method on a kind of karst area solution cavity
CN104074195B (en) A kind of method controlling the outer surface subsidence of foundation ditch by horizontal grouting
CN105926594A (en) Double-pipe construction method for static pressure pipe-sinking carrier cast-in-place pile
CN109594565A (en) Large area circular deep foundation pit support and water-stopping method in weak water rich strata
CN102995647B (en) Underground water control method used for grouting and seepage insulation of pile hole
CN208605199U (en) The ruggedized construction of structures is worn under a kind of weak soil rich water large cross-section tunnel group
CN104763437B (en) A kind of highly permeable formation tunnel excavation method
CN206693258U (en) Hold type rigid pile composite foundation structure in a kind of end
CN205576990U (en) Cross section and wear bridge pier tunnel slip casting supporting construction
CN109322315A (en) A kind of retaining structure and its construction method for high Steep Slope Embankment location

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant