CN105822313A - Method and device for removing obstacle foreign matter in shield section based on transverse channel - Google Patents

Method and device for removing obstacle foreign matter in shield section based on transverse channel Download PDF

Info

Publication number
CN105822313A
CN105822313A CN201610332247.2A CN201610332247A CN105822313A CN 105822313 A CN105822313 A CN 105822313A CN 201610332247 A CN201610332247 A CN 201610332247A CN 105822313 A CN105822313 A CN 105822313A
Authority
CN
China
Prior art keywords
shield
interconnection
interval
free
preventer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610332247.2A
Other languages
Chinese (zh)
Other versions
CN105822313B (en
Inventor
张加冕
马勇
卞广勇
张探
董承朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tai'an Daizong Electrical And Mechanical Technology Development Co Ltd
Original Assignee
Tai'an Daizong Electrical And Mechanical Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tai'an Daizong Electrical And Mechanical Technology Development Co Ltd filed Critical Tai'an Daizong Electrical And Mechanical Technology Development Co Ltd
Publication of CN105822313A publication Critical patent/CN105822313A/en
Application granted granted Critical
Publication of CN105822313B publication Critical patent/CN105822313B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

一种基于横向通道对盾构区间内障碍性异物进行移除的方法及装置,其步骤是:在盾构掘进机的盾构区间的断面中,设置有沿盾构掘进机的掘进路线分布的横向通道(2),在横向通道(2)中对异物进行移除,通过横向通道(2)与盾构掘进机的盾构区间内的障碍性异物相连通,在横向通道(2)中对障碍性异物移除,不再需要操作人员进入到盾构掘进机的前端高压仓中进行锚索或锚杆的移除,因此提高了盾构掘进机的工作效率,保障了操作人员的人身安全。

A method and device for removing obstructive foreign matter in a shield tunneling section based on a transverse channel, the steps of which are: in the section of the shield tunneling machine of a shield tunneling machine, there are installed along the tunneling route of the shield tunneling machine Transverse channel (2), in which the foreign matter is removed, through the transverse channel (2) it is connected with the obstructive foreign matter in the shield section of the shield tunneling machine, and in the transverse channel (2) Obstacle foreign body removal, no longer need the operator to enter the front high-pressure chamber of the shield tunneling machine to remove the anchor cable or bolt, thus improving the working efficiency of the shield tunneling machine and ensuring the personal safety of the operator .

Description

基于横向通道对盾构区间内障碍性异物进行移除的方法及装置Method and Device for Removing Obstacle Foreign Objects in Shield Tunneling Section Based on Transverse Channel

一、技术领域1. Technical field

本发明涉及一种对盾构区间内障碍性异物进行移除的方法及装置,尤其是一种基于横向通道对盾构区间内障碍性异物进行移除的方法及装置。The invention relates to a method and a device for removing obstructive foreign objects in a shield tunneling section, in particular to a method and a device for removing obstructive foreign objects in a shield tunneling section based on a transverse channel.

二、背景技术2. Background technology

在进行地下工程作业时,为了提高工程作业速度,需要使用盾构掘进机,但在高层建筑基坑防护施工遗留的大量锚索、锚杆、围护桩和钢腰梁,严重影响了地下盾构区间施工,当盾构掘进机在推进过程中,锚索、锚杆、围护桩和钢腰梁绞入盾构机前舱刀盘,造成盾构掘进机无法施工,需要操作人员进入到盾构掘进机的前端高压仓中进行锚索、锚杆、围护桩和钢腰梁的移除,影响了盾构掘进机的工作效率,并且对操作人员产生人身伤害,因此基于横向通道对盾构区间内障碍性异物进行移除的方法及装置是一种重要的施工方法和施工装置,现在还没有一种基于横向通道对盾构区间内障碍性异物进行移除的方法及装置。In underground engineering operations, in order to increase the speed of engineering operations, it is necessary to use shield tunneling machines, but a large number of anchor cables, anchor rods, enclosure piles and steel waist beams left over from the protection construction of high-rise building foundation pits have seriously affected the underground shield. During the construction of the shield tunneling machine, when the shield tunneling machine is advancing, the anchor cables, anchor rods, surrounding piles and steel waist beams are twisted into the front cabin cutter head of the shield tunneling machine, which makes the shield tunneling machine unable to construct and requires operators to enter The removal of anchor cables, anchor rods, surrounding piles and steel waist beams in the front high-pressure chamber of the shield tunneling machine affects the working efficiency of the shield tunneling machine and causes personal injury to the operator. Therefore, based on the transverse passage The method and device for removing obstructive foreign matter in the shield tunneling section is an important construction method and construction device. At present, there is no method and device for removing obstructive foreign matter in the shield tunneling section based on the transverse channel.

三、发明内容3. Contents of the invention

本发明的客体是一种基于横向通道对盾构区间内障碍性异物进行移除的方法,The object of the present invention is a method for removing obstructive foreign matter in the shield interval based on the transverse channel,

本发明的客体是一种基于横向通道对盾构区间内障碍性异物进行移除的装置。The object of the present invention is a device for removing obstructive foreign matter in the shield section based on the transverse channel.

为了克服上述技术缺点,本发明的目的是提供一种基于横向通道对盾构区间内障碍性异物进行移除的方法及装置,因此提高了盾构掘进机的工作效率,保障了操作人员的人身安全。In order to overcome the above-mentioned technical shortcomings, the object of the present invention is to provide a method and device for removing obstructive foreign objects in the shield tunneling section based on the transverse channel, thereby improving the working efficiency of the shield tunneling machine and ensuring the personal safety of the operators. Safety.

为达到上述目的,本发明采取的技术方案是:一种基于横向通道对盾构区间内障碍性异物进行移除的方法,其步骤是:在盾构掘进机的盾构区间的断面中,设置有沿盾构掘进机的掘进路线分布的横向通道,在横向通道中对异物进行移除。In order to achieve the above object, the technical solution adopted by the present invention is: a method for removing obstructive foreign matter in the shield section based on the transverse channel, the steps of which are: in the section of the shield section of the shield tunneling machine, set There are transverse passages distributed along the tunneling route of the shield boring machine, in which foreign objects are removed.

由于设计了横向通道,通过横向通道与盾构掘进机的盾构区间内的障碍性异物相连通,在横向通道中对障碍性异物移除,不再需要操作人员进入到盾构掘进机的前端高压仓中进行锚索或锚杆的移除,因此提高了盾构掘进机的工作效率,保障了操作人员的人身安全。Due to the design of the transverse channel, the barrier foreign matter in the shield section of the shield tunneling machine is connected through the transverse channel, and the obstacle foreign matter is removed in the transverse channel, so that the operator no longer needs to enter the front end of the shield tunneling machine The anchor cables or bolts are removed in the high-pressure chamber, thus improving the working efficiency of the shield tunneling machine and ensuring the personal safety of the operators.

本发明的优选方案一:Preferred option one of the present invention:

横向通道的轮廓线设置为拱形门状体,The outline of the transverse passage is set as an arched portal,

或沿盾构掘进机的掘进路线的段状横向通道的横向截面设置为呈变面积分布,Or the transverse section of the segmented transverse channel along the excavation route of the shield tunneling machine is set to be distributed in variable area,

或横向通道的中心设置为与盾构掘进机的盾构区间的中心重合分布,Or the center of the transverse channel is set to coincide with the center of the shield section of the shield tunneling machine,

或横向通道的中心设置为与盾构掘进机的盾构区间的中心错位分布,Or the center of the transverse channel is set to be misaligned with the center of the shield section of the shield tunneling machine,

或横向通道的断面面积与盾构区间的断面面积的比例设置为0.28-0.38:1,Or the ratio of the cross-sectional area of the transverse channel to the cross-sectional area of the shield section is set to 0.28-0.38:1,

或横向通道的直径与盾构掘进机的盾构区间的直径的比例设置为0.3-0.5,Or the ratio of the diameter of the transverse channel to the diameter of the shield section of the shield boring machine is set to 0.3-0.5,

或横向通道的直径设置为2.5-4.0m。Or the diameter of the transverse channel is set to 2.5-4.0m.

由于使用了拱形门状体的横向通道,方便了横向通道的开挖和在横向通道中防护的安装,通过横向通道与盾构掘进机的盾构区间的错位,保留盾构区间外的锚索、围护桩和钢腰梁,提高了地基的稳定性能,通过面积的比例和直径的比例的设计,减少了横向通道的开挖量并且横向通道与盾构区间的开挖量的匹配最好,试验结果表明,横向通道的直径为2.5-4.0m,施工效率更高。Due to the use of the transverse channel of the arched door-shaped body, the excavation of the transverse channel and the installation of protection in the transverse channel are facilitated. Through the dislocation of the transverse channel and the shield section of the shield tunneling machine, the anchors outside the shield section are retained. Cables, retaining piles and steel waist beams improve the stability of the foundation. Through the design of the ratio of the area and the ratio of the diameter, the excavation volume of the transverse passage is reduced and the excavation volume of the transverse passage and the shield section is matched best. Well, the test results show that the diameter of the transverse channel is 2.5-4.0m, and the construction efficiency is higher.

本发明的优选方案二:Preferred scheme two of the present invention:

在对盾构区间内障碍性异物进行移除时,移除障碍性异物的通道是指横向通道,当为了实现连续性地移除障碍性异物,横向通道延伸为与地面连通的竖向通道也是移除障碍性异物的通道,当处于盾构区间内的障碍性异物没有裸露在横向通道中时,横向通道延伸为与障碍性异物连通的竖向工作井也是移除障碍性异物的通道,移除通道设置为包含有至少一条开挖的横向通道。When removing obstructive foreign matter in the shield section, the passage for removing obstructive foreign matter refers to the horizontal passage. In order to achieve continuous removal of obstructive foreign matter, the horizontal passage extends to the vertical passage connected to the ground. The channel for removing obstructive foreign matter. When the obstructive foreign matter in the shield interval is not exposed in the transverse channel, the vertical working shaft extending from the transverse channel to communicate with the obstructive foreign matter is also the channel for removing obstructive foreign matter. The removal channel is configured to include at least one excavated transverse channel.

由于设计了移除障碍性异物的通道,通过竖向通道,实现了横向通道在盾构区间的连续性延伸,提高了移除障碍性异物的效率,通过竖向工作井,增大了盾构区间内的异物的裸露面积,在移除通道中方便对残留在岩土体中的异物进行作业,使对异物移除的更彻底。Due to the design of the channel for removing obstructive foreign matter, the continuous extension of the horizontal channel in the shield section is realized through the vertical channel, which improves the efficiency of removing obstructive foreign matter. Through the vertical working shaft, the shield machine is enlarged The exposed area of foreign matter in the interval facilitates the operation of foreign matter remaining in the rock and soil mass in the removal channel, making the removal of foreign matter more thorough.

本发明的优选方案三:Preferred scheme three of the present invention:

竖向通道设置为井状体,The vertical channel is set as a well-shaped body,

或竖向工作井设置为U字形槽体并且竖向工作井的敞口部设置在横向通道的侧壁上。Or the vertical working well is set as a U-shaped trough and the opening of the vertical working well is set on the side wall of the transverse channel.

由于设计了竖向通道,方便了横向通道和竖向工作井的施工和物质的的转运,提高了施工效率,也改善了横向通道中的空气环境,由于设计了竖向工作井,满足了对盾构区间内的异物的发现和移除要求,也提高了对盾构区间内的异物的发现和移除的工作效率。Due to the design of the vertical channel, the construction of the horizontal channel and the vertical working well and the transfer of materials are facilitated, the construction efficiency is improved, and the air environment in the horizontal channel is also improved. The requirements for the discovery and removal of foreign objects in the shield section also improve the work efficiency of the discovery and removal of foreign objects in the shield section.

本发明的优选方案四:Preferred scheme four of the present invention:

在横向通道和竖向通道中,设置有无障碍性防护装置。In the horizontal and vertical passages, barrier-free protection devices are provided.

由于设计了无障碍性防护装置,保证了横向通道和竖向通道的安全,满足了横向通道和竖向通道的长距离的开挖的需要。Due to the design of the barrier-free protection device, the safety of the horizontal passage and the vertical passage is guaranteed, and the need for long-distance excavation of the horizontal passage and the vertical passage is met.

本发明的优选方案五:Preferred scheme five of the present invention:

无障碍性防护装置包含有基体加固装置和外支撑装置,基体加固装置设置为混凝土层体、格栅和锚杆并且在需要支护的壁上喷射有混凝土层体,在混凝土层体上覆盖格栅,格栅通过锚杆固定在需要支护的壁上,外支撑装置设置为包含有拱梁、支撑横梁、侧梁和支撑块并且拱梁的两端端面部分别设置有侧梁,在两个侧梁之间设置有支撑横梁并且在侧梁的内侧面部设置有支撑块,拱梁和侧梁支护在需要支护的壁上,通过伸缩缸作用在支撑块上,对拱梁和侧梁进行安装和移除。The barrier-free protection device includes a matrix reinforcement device and an external support device. The matrix reinforcement device is set as a concrete layer, a grid and an anchor rod, and a concrete layer is sprayed on the wall to be supported, and the concrete layer is covered with a grid. grid, the grid is fixed on the wall to be supported through anchor rods, the external support device is set to include arch beams, support beams, side beams and support blocks, and the ends of the arch beams are respectively provided with side beams. A support beam is set between the two side beams and a support block is provided on the inner side of the side beam. The arch beam and the side beam are supported on the wall to be supported, and the telescopic cylinder acts on the support block. Beams are installed and removed.

或当在需要支护的侧壁上安装了锚杆,就不需要在两个侧梁之间设置有支撑横梁。Or when the anchor rod is installed on the side wall that needs to be supported, it is not necessary to be provided with a supporting crossbeam between the two side beams.

由于设计了无障碍性防护装置,通过基体加固装置保证了横向通道和竖向通道的壁体的稳定性能,通过外支撑装置,防止横向通道和竖向通道的壁体的垮塌,通过支撑横梁的外支撑力,提高了外支撑装置的可靠性能。Due to the design of the barrier-free protection device, the stability of the walls of the horizontal passage and the vertical passage is guaranteed through the matrix reinforcement device, and the collapse of the walls of the horizontal passage and the vertical passage is prevented through the external support device. The external support force improves the reliability of the external support device.

本发明的优选方案六:Preferred scheme six of the present invention:

设置在横向通道的无障碍性防护装置设置为包含有超前无障碍性防护装置和无障碍性防护装置,The barrier-free protection device arranged in the transverse passage is set to include the advanced barrier-free protection device and the barrier-free protection device,

或超前无障碍性防护装置设置为由塑料格栅和可回收锚杆或非金属锚杆组成的防护体,在横向通道开挖部位的顶壁上覆盖塑料格栅,通过可回收锚杆或非金属锚杆把塑料格栅固定在横向通道开挖部位中,Or the advanced barrier-free protection device is set as a protective body composed of plastic grids and recyclable anchor rods or non-metallic anchor rods. Metal anchors fix the plastic grating in the excavation of the transverse passage,

或横向通道的无障碍性防护装置设置为由格栅和混凝土层体组成的防护层及由撑钢拱架、液压支柱和方撑木组成的可拆卸支撑体,把混凝土层体喷射到横向通道的顶壁上再覆盖格栅,形成防护层,在横向通道的底端壁上放上方撑木并且通过液压支柱把撑钢拱架作用在格栅上,形成支撑体,Or the barrier-free protective device of the transverse channel is set as a protective layer composed of grids and concrete layers and a detachable support body composed of steel arches, hydraulic props and square braces, and the concrete layer is sprayed to the horizontal channel The top wall of the grid is covered with a grid to form a protective layer, and the upper support wood is placed on the bottom end wall of the transverse passage, and the steel arch frame acts on the grid through hydraulic props to form a support body.

或混凝土层体设置为厚度为80-400mm、强度小于C20的混凝土层体,在厚度为80-400mm、强度小于C20的混凝土层体中设置有速凝剂,Or the concrete layer is set as a concrete layer with a thickness of 80-400mm and a strength less than C20, and an accelerator is arranged in the concrete layer with a thickness of 80-400mm and a strength less than C20,

或竖向通道的无障碍性防护装置设置为由塑钢格栅和混凝土层体组成的防护层。Or the barrier-free protection device for vertical passage is set as a protective layer composed of plastic steel grid and concrete layer.

由于设计了无障碍性防护装置,通过塑料格栅、混凝土层体和可回收锚杆或非金属锚杆防止对盾构机前舱刀盘产生危害,通过撑钢拱架、液压支柱和方撑木满足了盾构机前舱刀盘的工作需要,不会对盾构机前舱刀盘产生损坏。Due to the design of barrier-free protection devices, plastic grids, concrete layers and recyclable anchors or non-metallic anchors are used to prevent damage to the front cabin cutter head of the shield machine, and steel arches, hydraulic props and square bracing are used. The wood meets the working needs of the front cabin cutter head of the shield machine, and will not cause damage to the front cabin cutter head of the shield machine.

本发明的优选方案七:Preferred scheme seven of the present invention:

对障碍性异物进行移除的方法设置为包含有全套管套取方法、减摩拔除方法和人工挖除方法,The method of removing obstructive foreign bodies is set to include the method of full casing sleeve extraction, anti-friction extraction and manual excavation.

或全套管套取方法:使用分体式液压钻机和套筒钻杆在锚索的周边进行环绕在锚索的孔体,把锚索与周围土体剥离,通过外力把锚索和套筒钻杆一起拔出,回填锚孔,Or full casing casing method: use split hydraulic drilling rig and casing drill pipe to make a hole around the anchor cable around the anchor cable, strip the anchor cable from the surrounding soil, and use external force to separate the anchor cable and casing drill pipe Pull out together, backfill the anchor hole,

或减摩拔除的方法:采用高压水对锚索周围土体进行切割剥离,利用外力将锚索拔出,回填锚孔,Or the method of friction reduction and extraction: use high-pressure water to cut and strip the soil around the anchor cable, use external force to pull out the anchor cable, and backfill the anchor hole.

或人工挖除的方法:采用洛阳铲,沿锚索方向将周围土体挖除,利用钻机将钢绞线与锚固体剥离,再采用切断器将钢绞线切断。Or the method of manual excavation: use Luoyang shovel to excavate the surrounding soil along the direction of the anchor cable, use a drilling rig to separate the steel strand from the anchor, and then use a cutter to cut the steel strand.

由于设计了对障碍性异物进行移除的方法,通过全套管套取方法、减摩拔除方法和人工挖除方法,对盾构区间内的异物进行拔出或粉碎,提高了对异物移除的效率,实现了对锚索、围护桩和钢腰梁的回收。Due to the design of the method for removing obstructive foreign matter, the foreign matter in the shield interval is pulled out or crushed through the method of full-sleeve sleeve extraction, friction-reducing pulling out and manual digging, which improves the efficiency of foreign matter removal. Efficiency, realizing the recycling of anchor cables, retaining piles and steel waist beams.

本发明的优选方案八:Preferred option eight of the present invention:

对盾构区间内的锚索进行移除的方法,其步骤是:The method for removing the anchor cable in the shield interval, the steps are:

一、移除锚索的通道的开挖1. Excavation of the channel to remove the anchor cable

a、在盾构区间内中,沿盾构掘进机的掘进路线上通过金属探测器确定锚索,在盾构掘进机的盾构区间的断面中,沿盾构掘进机的掘进路线开挖横向通道;a. In the shield section, along the tunneling route of the shield tunneling machine, determine the anchor cable through a metal detector, and in the section of the shield section of the shield tunneling machine, excavate horizontally along the tunneling route of the shield tunneling machine aisle;

b、在横向通道中,沿盾构掘进机的盾构区间的断面的径线方向开挖与地面相通的竖向通道;b. In the horizontal channel, excavate a vertical channel connected with the ground along the radial direction of the section of the shield section of the shield tunneling machine;

c、在横向通道中,通过金属探测器确定锚索,沿盾构掘进机的盾构区间的断面的径线方向开挖与锚索相通的竖向工作井;c. In the transverse channel, the anchor cable is determined by the metal detector, and the vertical working well connected with the anchor cable is excavated along the radial direction of the section of the shield section of the shield tunneling machine;

二、防护的安装Second, the installation of protection

a、横向通道的防护:在横向通道开挖部位使用超前无障碍性防护装置,对已经形成的横向通道使用可无障碍性防护装置;a. Protection of transverse passages: use advanced barrier-free protective devices at the excavation site of the transverse passages, and use barrier-free protective devices for the formed transverse passages;

b、竖向通道:在竖向通道的内壁上使用无障碍性防护装置。b. Vertical passage: use barrier-free protective devices on the inner wall of the vertical passage.

三、锚索的移除3. Removal of anchor cables

切除在横向通道、竖向通道和竖向工作井中的锚索部分,对于存在岩土体中的锚索,通过对锚索全套管套取、减摩拔除和人工挖除的方式把岩土体中的锚索进行移除,Cut off the anchor cable part in the transverse channel, vertical channel and vertical working well. The anchor cables in the

沿盾构掘进机的掘进路线上在地面和横向通道之间设置有竖向通道并且在横向通道中设置有垂直向下的竖向工作井。Along the tunneling route of the shield boring machine, a vertical passage is arranged between the ground and the transverse passage, and a vertical working shaft vertically downward is arranged in the transverse passage.

在盾构掘进机的掘进路线上通过金属探测器确定锚索,在盾构掘进机的盾构区间的断面中,沿盾构掘进机的掘进路线开挖多条横向通道与锚索相通,多条横向通道设置为沿盾构掘进机的盾构区间两翼分布。On the tunneling route of the shield tunneling machine, the metal detector is used to determine the anchor cable. In the section of the shield section of the shield tunneling machine, multiple transverse passages are excavated along the tunneling route of the shield tunneling machine to communicate with the anchor cable. The transverse passages are arranged to be distributed along the two wings of the shield section of the shield tunneling machine.

由于设计了对盾构区间内的锚索进行移除的方法,在有限的空间内,满足了锚索的分段的移除,实现了锚索的回收,满足盾构掘进机的作业需要。Due to the design of the method for removing the anchor cables in the shield section, within a limited space, the segmental removal of the anchor cables is satisfied, the recovery of the anchor cables is realized, and the operation needs of the shield tunneling machine are met.

本发明的优选方案九:Preferred scheme nine of the present invention:

对盾构区间内的围护桩和钢腰梁进行移除的方法,其步骤是:The method for removing the protective piles and steel waist beams in the shield section is as follows:

一、移除围护桩和钢腰梁的通道的开挖1. Excavation of passageway for removal of retaining piles and steel waist beams

a、在盾构区间内中,沿盾构掘进机的掘进路线上通过围护桩和钢腰梁坐标确定围护桩和钢腰梁,在盾构掘进机的盾构区间的断面中,沿盾构掘进机的掘进路线改变用于移除锚索的横向通道方向;a. In the shield interval, determine the enclosure piles and steel waist beams through the coordinates of the enclosure piles and steel waist beams along the tunneling route of the shield tunneling machine. In the section of the shield section of the shield tunneling machine, along the The tunneling route of the shield boring machine changes the direction of the transverse channel for the removal of anchor cables;

b、在横向通道中,沿盾构掘进机的盾构区间的断面的径线方向开挖与地面相通的竖向通道;b. In the horizontal channel, excavate a vertical channel connected with the ground along the radial direction of the section of the shield section of the shield tunneling machine;

c、在横向通道中,沿围护桩的轴线方向开挖与围护桩和钢腰梁相通的竖向工作井;c. In the transverse channel, excavate the vertical working well connected with the surrounding protection pile and the steel waist beam along the axial direction of the surrounding protection pile;

二、防护的安装Second, the installation of protection

a、横向通道的防护:在横向通道开挖部位使用超前无障碍性防护装置,对已经形成的横向通道使用可无障碍性防护装置;a. Protection of transverse passages: use advanced barrier-free protective devices at the excavation site of the transverse passages, and use barrier-free protective devices for the formed transverse passages;

b、竖向通道:在竖向通道的内壁上使用无障碍性防护装置。b. Vertical passage: use barrier-free protective devices on the inner wall of the vertical passage.

三、围护桩和钢腰梁的移除3. Removal of retaining piles and steel waist beams

通过风镐将桩身钢筋混凝土保护层剥离和采用气割将钢筋割断对围护桩进行移除,切除在横向通道、竖向通道和竖向工作井中的围护桩和钢腰梁部分,对于存在岩土体中的围护桩和钢腰梁,并沿围护桩轴线方向向前开挖并且进行无障碍性防护装置,使围护桩的桩身裸露,对横向通道顶部及底部钢筋割断后,沿通道顶部及底部用风镐将桩截断,最后破碎成块运出洞外,围护桩清除后,钢腰梁自然暴露出来,采用气割逐段割除。The protective layer of reinforced concrete on the pile body is peeled off by wind pick and the steel bars are cut off by gas cutting to remove the surrounding protection piles, and the surrounding protection piles and steel waist beams in the horizontal passage, vertical passage and vertical working shaft are cut off. The surrounding protection piles and steel waist beams in the rock and soil are excavated forward along the axial direction of the surrounding protection piles and equipped with barrier-free protection devices, so that the pile body of the surrounding protection piles is exposed. After cutting the top and bottom reinforcement bars of the transverse channel , along the top and bottom of the channel, the piles are cut off with picks, and finally broken into pieces and transported out of the hole. After the protective piles are removed, the steel waist beams are naturally exposed, and are cut off section by section by gas cutting.

在处于围护桩和钢腰梁的横向通道部位的左右侧壁上设置有扩展空间。Expansion spaces are arranged on the left and right side walls of the lateral passages between the protective piles and the steel waist beams.

由于设计了对盾构区间内的围护桩和钢腰梁进行移除的方法,在有限的空间内,满足了围护桩和钢腰梁的分段的粉碎移除,满足盾构掘进机的作业需要。Due to the design of the method of removing the surrounding protection piles and steel waist beams in the shield section, in a limited space, the segmental crushing and removal of the surrounding protection piles and steel waist beams is satisfied, and the shield tunneling machine is satisfied. job needs.

本发明的优选方案十:Preferred scheme ten of the present invention:

一种基于横向通道对盾构区间内障碍性异物进行移除的装置,包含有设置在盾构掘进机的盾构区间中并且与盾构区间内障碍性异物连通的横向通道,横向通道设置为沿盾构掘进机的掘进路线分布。A device for removing obstructive foreign matter in a shield section based on a transverse channel, comprising a transverse channel arranged in the shield section of a shield tunneling machine and communicating with the obstructive foreign matter in the shield section, the transverse channel is set as Distributed along the excavation route of the shield boring machine.

由于设计了横向通道,通过横向通道,满足对盾构区间内障碍性异物移除的空间,提高了对盾构区间内障碍性异物移除的效率。Due to the design of the horizontal passage, the space for removing the obstructive foreign matter in the shield section is satisfied through the transverse passage, and the efficiency of removing the obstructive foreign matter in the shield interval is improved.

本发明的优选方案十一:Preferred scheme eleven of the present invention:

按照在盾构掘进机的盾构区间的断面中形成与异物连通的方式设计横向通道的断面和分布路线。The section and distribution route of the transverse channel are designed in such a way that the section of the shield section of the shield tunneling machine is connected with foreign objects.

由于设计了横向通道,通过横向通道,满足了盾构区间内障碍性异物的分布状况,提高了对盾构区间内障碍性异物移除的准确性。Due to the design of the transverse passage, the distribution of obstructive foreign matter in the shield tunneling section is satisfied through the transverse passage, and the accuracy of removing the obstructive foreign matter in the shield tunneling section is improved.

本发明的优选方案十二:Preferred scheme 12 of the present invention:

还包含有竖向通道、竖向工作井和无障碍性防护装置,在盾构区间的断面1中设置有沿盾构掘进机的掘进路线分布的横向通道并且在横向通道与地面之间设置有竖向通道,在横向通道中设置有与异物相通的竖向工作井并且在横向通道和竖向通道中设置有无障碍性防护装置,It also includes vertical passages, vertical working shafts and barrier-free protection devices. In the section 1 of the shield section, there are transverse passages distributed along the excavation route of the shield tunneling machine and between the transverse passages and the ground. The vertical channel is provided with a vertical working shaft communicating with foreign objects in the horizontal channel and barrier-free protection devices are provided in the horizontal channel and the vertical channel,

横向通道的轮廓线设置为拱形门状体,The outline of the transverse passage is set as an arched portal,

或沿盾构掘进机的掘进路线的段状横向通道的横向截面设置为呈变面积分布,Or the transverse section of the segmented transverse channel along the excavation route of the shield tunneling machine is set to be distributed in variable area,

或横向通道的中心设置为与盾构掘进机的盾构区间的中心重合分布,Or the center of the transverse channel is set to coincide with the center of the shield section of the shield tunneling machine,

或横向通道的中心设置为与盾构掘进机的盾构区间的中心错位分布,Or the center of the transverse channel is set to be misaligned with the center of the shield section of the shield tunneling machine,

或横向通道的断面面积与盾构区间的断面面积的比例设置为0.28-0.38:1,Or the ratio of the cross-sectional area of the transverse channel to the cross-sectional area of the shield section is set to 0.28-0.38:1,

或横向通道的直径与盾构掘进机的盾构区间的直径的比例设置为0.3-0.5,Or the ratio of the diameter of the transverse channel to the diameter of the shield section of the shield boring machine is set to 0.3-0.5,

或横向通道的直径设置为2.5-4.0m,Or the diameter of the transverse channel is set to 2.5-4.0m,

或竖向通道设置为井状体,Or the vertical channel is set as a well-shaped body,

或竖向工作井设置为U字形槽体,竖向工作井的敞口部设置在横向通道的侧壁上,Or the vertical working well is set as a U-shaped trough, and the opening of the vertical working well is set on the side wall of the transverse passage,

或沿盾构掘进机的掘进路线上在地面和横向通道之间设置有竖向通道并且在横向通道中设置有垂直向下的竖向工作井,Or along the excavation route of the shield boring machine, a vertical passage is provided between the ground and the transverse passage and a vertical working shaft vertically downward is arranged in the transverse passage,

或多条横向通道设置为沿盾构掘进机的盾构区间两翼分布,or a plurality of transverse passages are arranged to be distributed along the two wings of the shield section of the shield tunneling machine,

或无障碍性防护装置包含有基体加固装置和外支撑装置,基体加固装置设置为混凝土层体、格栅和锚杆并且在需要支护的壁上喷射有混凝土层体,在混凝土层体上覆盖格栅,格栅通过锚杆固定在需要支护的壁上,外支撑装置设置为包含有拱梁、支撑横梁、侧梁和支撑块并且拱梁的两端端面部分别设置有侧梁,在两个侧梁之间设置有支撑横梁并且在侧梁的内侧面部设置有支撑块。Or the barrier-free protective device includes a base reinforcement device and an external support device. The base reinforcement device is set as a concrete layer, a grid and an anchor rod, and the concrete layer is sprayed on the wall to be supported, and the concrete layer is covered Grille, the grid is fixed on the wall to be supported by anchor rods, the external support device is set to include arch beams, support beams, side beams and support blocks, and the two ends of the arch beams are respectively provided with side beams. A supporting beam is arranged between the two side beams and a supporting block is arranged on the inner side of the side beams.

或设置在横向通道的无障碍性防护装置设置为包含有超前无障碍性防护装置和无障碍性防护装置,超前无障碍性防护装置设置为由塑料格栅和可回收锚杆或非金属锚杆组成的防护体并且无障碍性防护装置设置为由格栅和混凝土层体组成的防护层及由撑钢拱架、液压支柱和方撑木组成的可拆卸支撑体,Or the barrier-free protection device arranged in the transverse passage is set to include the advanced barrier-free protection device and the barrier-free protection device, and the advanced barrier-free protection device is set to consist of a plastic grille and a recyclable anchor rod or a non-metallic anchor rod The barrier-free protective device is set as a protective layer composed of grids and concrete layers and a detachable support composed of steel arches, hydraulic props and square braces.

或混凝土层体设置为厚度为80-400mm、强度小于C20的混凝土层体并且在厚度为80-400mm、强度小于C20的混凝土层体中设置有速凝剂,Or the concrete layer is set as a concrete layer with a thickness of 80-400mm and a strength less than C20, and an accelerator is arranged in the concrete layer with a thickness of 80-400mm and a strength less than C20,

或设置在竖向工作井的无障碍性防护装置设置为无障碍性防护装置并且无障碍性防护装置设置为由塑钢格栅和混凝土层体组成的防护层。Or the barrier-free protection device arranged in the vertical working shaft is set as the barrier-free protection device and the barrier-free protection device is set as a protective layer composed of plastic-steel grid and concrete layer.

由于设计了竖向通道、竖向工作井和无障碍性防护装置,通过竖向通道和竖向工作井,提高了移除效率,通过无障碍性防护装置保证了施工的安全,通过横向通道、竖向通道和竖向工作井的变形和相互的布置,满足了对锚索、围护桩和钢腰梁等异物的要求。Due to the design of the vertical passage, vertical working shaft and barrier-free protection device, the removal efficiency is improved through the vertical passage and vertical working shaft, and the safety of construction is ensured through the barrier-free protection device. The deformation and mutual arrangement of the vertical channel and the vertical working shaft meet the requirements for foreign objects such as anchor cables, retaining piles and steel waist beams.

在本技术方案中:In this technical solution:

障碍性异物是指沿盾构掘进机的作业路线分布并且影响盾构掘进机作业的主要为锚索、围护桩和钢腰梁的金属部件,Obstructive foreign objects refer to metal parts distributed along the operation route of the shield tunneling machine and affecting the operation of the shield tunneling machine, mainly anchor cables, protective piles and steel waist beams.

锚索是指用于建筑基坑防护的索、杆和外水泥体的整体,Anchor cable refers to the whole of cable, rod and outer cement body used for building foundation pit protection.

横向通道是指与盾构掘进机的作业路线平行的洞道,The transverse channel refers to the tunnel parallel to the working route of the shield tunneling machine.

竖向通道和竖向工作井是指覆盖了为了满足移除障碍性异物并且具有其它功能的横向通道延伸部分,Vertical passages and vertical working wells refer to the extended parts of the horizontal passages that cover the removal of obstructive foreign objects and have other functions.

无障碍性防护装置是指保证横向通道处于正常状态并且对盾构掘进机的作业不形成障碍的支护体。The barrier-free protection device refers to the support body that ensures that the transverse passage is in a normal state and does not form obstacles to the operation of the shield boring machine.

当本技术方案使用直径表示尺寸的大小时,其对应的截面也是用直径标识的截面,如圆周截面、椭圆截面。When the technical solution uses the diameter to indicate the size of the size, the corresponding cross-section is also a cross-section identified by the diameter, such as a circular cross-section and an elliptical cross-section.

在本技术方案中,在盾构掘进机的盾构区间的断面中形成与锚索连通的横向通道为重要技术特征,在基于横向通道对盾构区间内障碍性异物进行移除的方法及装置的技术领域中,具有新颖性、创造性和实用性,在本技术方案中的术语都是可以用本技术领域中的专利文献进行解释和理解。In this technical solution, it is an important technical feature to form a transverse channel connected with the anchor cable in the section of the shield section of the shield tunneling machine. The method and device for removing obstructive foreign objects in the shield section based on the transverse channel In the technical field, there is novelty, creativity and practicability, and the terms in this technical solution can be explained and understood with the patent documents in this technical field.

四、附图说明4. Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1为本发明的基于横向通道对盾构区间内障碍性异物进行移除的装置的移除锚索的示意图:Fig. 1 is a schematic diagram of removing the anchor cable of the device for removing obstructive foreign matter in the shield section based on the transverse channel of the present invention:

1-盾构区间的断面、2-横向通道、3-竖向通道、4-竖向工作井、5-锚索、6-无障碍性防护装置,1-section of the shield section, 2-horizontal passage, 3-vertical passage, 4-vertical working well, 5-anchor cable, 6-obstacle-free protection device,

图2为本发明的基于横向通道对盾构区间内障碍性异物进行移除的装置的移除围护桩和钢腰梁的示意图:Fig. 2 is a schematic diagram of removing enclosure piles and steel waist beams of the device for removing obstructive foreign matter in the shield section based on the transverse channel of the present invention:

1-盾构区间的断面、2-横向通道、3-竖向通道、4-竖向工作井、6-无障碍性防护装置、9-围护桩和钢腰梁。1- Section of the shield section, 2- Horizontal passage, 3- Vertical passage, 4- Vertical working shaft, 6- Barrier-free protection device, 9- Surrounding pile and steel waist beam.

五、具体实施方式5. Specific implementation

根据审查指南,对本发明所使用的诸如“具有”、“包含”以及“包括”术语应当理解为不配出一个或多个其它元件或其组合的存在或添加。According to the review guidelines, terms such as "having", "comprising" and "including" used in the present invention should be understood as not deriving the presence or addition of one or more other elements or combinations thereof.

在本发明的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" etc. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, or in a specific orientation. construction and operation, therefore, should not be construed as limiting the invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and should not be construed as indicating or implying relative importance.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connected, or integrally connected; it can be mechanically connected or electrically connected; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.

此外,下面所描述的本发明不同实施方式中所涉及的技术特征只要彼此之间未构成冲突就可以相互结合。In addition, the technical features involved in the different embodiments of the present invention described below may be combined with each other as long as there is no conflict with each other.

一种基于横向通道对盾构区间内障碍性异物进行移除的方法,下面结合实施例,对本发明进一步描述,以下实施例旨在说明本发明而不是对本发明的进一步限定。A method for removing obstructive foreign matter in the shield section based on a transverse channel. The present invention will be further described below in conjunction with the examples. The following examples are intended to illustrate the present invention rather than further limit the present invention.

第一个实施例,first embodiment,

对盾构区间内的锚索进行移除的方法,其步骤是:The method for removing the anchor cable in the shield interval, the steps are:

一、移除锚索的通道的开挖1. Excavation of the channel to remove the anchor cable

a、在盾构区间内中,沿盾构掘进机的掘进路线上通过金属探测器确定锚索,在盾构掘进机的盾构区间的断面中,沿盾构掘进机的掘进路线开挖横向通道2;a. In the shield section, along the tunneling route of the shield tunneling machine, determine the anchor cable through a metal detector, and in the section of the shield section of the shield tunneling machine, excavate horizontally along the tunneling route of the shield tunneling machine channel 2;

b、在横向通道2中,沿盾构掘进机的盾构区间的断面的径线方向开挖与地面相通的竖向通道3;b. In the transverse channel 2, excavate a vertical channel 3 communicating with the ground along the radial direction of the section of the shield section of the shield tunneling machine;

c、在横向通道2中,通过金属探测器确定锚索,沿盾构掘进机的盾构区间的断面的径线方向开挖与锚索相通的竖向工作井4;c. In the transverse channel 2, the anchor cable is determined by a metal detector, and the vertical working shaft 4 communicated with the anchor cable is excavated along the radial direction of the section of the shield section of the shield tunneling machine;

二、防护的安装Second, the installation of protection

a、横向通道2的防护:在横向通道2开挖部位使用超前无障碍性防护装置6,对已经形成的横向通道2使用可无障碍性防护装置6;a. Protection of the transverse channel 2: use an advanced barrier-free protective device 6 at the excavation site of the transverse channel 2, and use an accessible barrier-free protective device 6 for the formed transverse channel 2;

b、竖向通道3:在竖向通道3的内壁上使用无障碍性防护装置6。b. Vertical channel 3: use barrier-free protection device 6 on the inner wall of vertical channel 3.

三、锚索的移除3. Removal of anchor cables

切除在横向通道2、竖向通道3和竖向工作井4中的锚索部分,对于存在岩土体中的锚索,通过对锚索全套管套取、减摩拔除和人工挖除的方式把岩土体中的锚索进行移除。Cut off the part of the anchor cable in the transverse channel 2, vertical channel 3 and vertical working shaft 4, and for the anchor cable existing in the rock and soil mass, the full casing of the anchor cable, anti-friction removal and manual excavation Remove the anchor cable in the rock and soil mass.

在本实施例中,横向通道2的轮廓线设置为拱形门状体并且沿盾构掘进机的掘进路线的段状横向通道2的横向截面设置为呈变面积分布,横向通道2的直径与盾构掘进机的盾构区间的直径的比例设置为0.3-0.5。In this embodiment, the outline of the transverse channel 2 is set as an arched door-shaped body and the transverse section of the segmental transverse channel 2 along the excavation route of the shield tunneling machine is arranged to be distributed in a variable area, and the diameter of the transverse channel 2 is the same as The ratio of the diameter of the shield section of the shield boring machine is set to 0.3-0.5.

在本实施例中,竖向通道3设置为圆形或矩形井状体并且竖向工作井4设置为U字形槽体,竖向工作井4的敞口部设置在横向通道2的侧壁上。In this embodiment, the vertical channel 3 is set as a circular or rectangular well-shaped body and the vertical working well 4 is set as a U-shaped trough, and the opening of the vertical working well 4 is arranged on the side wall of the transverse channel 2 .

在本实施例中,横向通道2的断面面积与盾构区间的断面面积的比例设置为0.28-0.38:1。In this embodiment, the ratio of the cross-sectional area of the transverse channel 2 to the cross-sectional area of the shield section is set at 0.28-0.38:1.

在本实施例中,横向通道2的中心设置为与盾构掘进机的盾构区间的中心重合分布,沿盾构掘进机的掘进路线上在地面和横向通道2之间设置有竖向通道3并且在横向通道2中设置有垂直向下的竖向工作井4。In this embodiment, the center of the transverse channel 2 is arranged to coincide with the center of the shield section of the shield tunneling machine, and a vertical channel 3 is arranged between the ground and the transverse channel 2 along the excavation route of the shield tunneling machine And a vertical working shaft 4 vertically downward is arranged in the transverse channel 2 .

在本实施例中,在盾构掘进机的掘进路线上通过金属探测器确定锚索,在盾构掘进机的盾构区间的断面中,沿盾构掘进机的掘进路线开挖多条横向通道2与锚索相通,多条横向通道2设置为沿盾构掘进机的盾构区间两翼分布。In this embodiment, metal detectors are used to determine the anchor cable on the tunneling route of the shield tunneling machine, and multiple transverse passages are excavated along the tunneling route of the shield tunneling machine in the section of the shield section of the shield tunneling machine 2 communicates with the anchor cable, and a plurality of transverse passages 2 are arranged to be distributed along the two wings of the shield section of the shield tunneling machine.

在本实施例中,沿盾构掘进机的掘进路线开挖两条横向通道2与锚索相通,横向通道2的直径设置为2.5-4.0m。In this embodiment, two transverse passages 2 are excavated along the excavation route of the shield tunneling machine to communicate with the anchor cables, and the diameter of the transverse passages 2 is set to 2.5-4.0m.

在本实施例中,超前无障碍性防护装置6设置为由塑料格栅和可回收锚杆或非金属锚杆组成的防护体,在横向通道2开挖部位的顶壁上覆盖塑料格栅,通过可回收锚杆或非金属锚杆把塑料格栅固定在横向通道2开挖部位中。In this embodiment, the advanced barrier-free protection device 6 is set as a protective body composed of a plastic grid and a recyclable anchor rod or a non-metallic anchor rod, and the plastic grid is covered on the top wall of the excavation site of the transverse passage 2, The plastic grid is fixed in the excavation site of the transverse channel 2 by retrievable anchor rods or non-metallic anchor rods.

在本实施例中,横向通道2的无障碍性防护装置6设置为由格栅和混凝土层体组成的防护层及由撑钢拱架、液压支柱和方撑木组成的可拆卸支撑体,把混凝土层体喷射到横向通道2的顶壁上再覆盖格栅,形成防护层,在横向通道2的底端壁上放上方撑木并且通过液压支柱把撑钢拱架作用在格栅上,形成支撑体。In this embodiment, the barrier-free protection device 6 of the transverse channel 2 is set as a protective layer composed of grids and concrete layers and a detachable support body composed of steel arches, hydraulic props and square braces. The concrete layer is sprayed onto the top wall of the transverse channel 2 and then covered with the grille to form a protective layer, and upper braces are placed on the bottom end wall of the transverse channel 2 and the steel arch frame is applied to the grille through hydraulic props to form a protective layer. support body.

在本实施例中,混凝土层体设置为厚度为80-400mm、强度小于C20的混凝土层体,在厚度为80-400mm、强度小于C20的混凝土层体中设置有速凝剂。In this embodiment, the concrete layer is set as a concrete layer with a thickness of 80-400 mm and a strength lower than C20, and an accelerator is arranged in the concrete layer with a thickness of 80-400 mm and a strength lower than C20.

在本实施例中,竖向通道3的无障碍性防护装置6设置为由塑钢格栅和混凝土层体组成的防护层。In this embodiment, the barrier-free protection device 6 of the vertical channel 3 is set as a protective layer composed of plastic-steel grids and concrete layers.

在本实施例中,全套管套取的步骤:使用分体式液压钻机和套筒钻杆在锚索的周边进行环绕在锚索的孔体,把锚索与周围土体剥离,通过外力把锚索和套筒钻杆一起拔出,回填锚孔。In this embodiment, the step of taking the full casing: use a split hydraulic drilling rig and a sleeve drill pipe to surround the hole around the anchor cable, peel the anchor cable from the surrounding soil, and use external force to remove the anchor cable. The cable and casing drill pipe are pulled out together, and the anchor hole is backfilled.

在本实施例中,减摩拔除的步骤:采用高压水对锚索周围土体进行切割剥离,利用外力将锚索拔出,回填锚孔。In this embodiment, the friction-reducing removal step: use high-pressure water to cut and strip the soil around the anchor cable, use external force to pull out the anchor cable, and backfill the anchor hole.

在本实施例中,人工挖除的步骤:采用洛阳铲,沿锚索方向将周围土体挖除,利用钻机将钢绞线与锚固体剥离,再采用切断器将钢绞线切断。In this embodiment, manual excavation steps: use Luoyang shovel to excavate the surrounding soil along the direction of the anchor cable, use a drilling rig to separate the steel strand from the anchor, and then use a cutter to cut the steel strand.

在本实施例中,也可以使用改性的水玻璃的喷射层体替代混凝土层体,改性的水玻璃是指水玻璃和磷酸的混合物。In this embodiment, the sprayed layer of modified water glass can also be used instead of the concrete layer, and the modified water glass refers to a mixture of water glass and phosphoric acid.

对盾构区间内的围护桩和钢腰梁进行移除的方法,其步骤是:The method for removing the protective piles and steel waist beams in the shield section is as follows:

一、移除围护桩和钢腰梁的通道的开挖1. Excavation of passageway for removal of retaining piles and steel waist beams

a、在盾构区间内中,沿盾构掘进机的掘进路线上通过围护桩和钢腰梁坐标确定围护桩和钢腰梁,在盾构掘进机的盾构区间的断面中,沿盾构掘进机的掘进路线改变用于移除锚索的横向通道2方向;a. In the shield interval, determine the enclosure piles and steel waist beams through the coordinates of the enclosure piles and steel waist beams along the tunneling route of the shield tunneling machine. In the section of the shield section of the shield tunneling machine, along the The tunneling route of the shield boring machine changes the direction of the transverse channel 2 for removing anchor cables;

b、在横向通道2中,沿盾构掘进机的盾构区间的断面的径线方向开挖与地面相通的竖向通道3;b. In the transverse channel 2, excavate a vertical channel 3 communicating with the ground along the radial direction of the section of the shield section of the shield tunneling machine;

c、在横向通道2中,沿围护桩的轴线方向开挖与围护桩和钢腰梁相通的竖向工作井4;c. In the transverse channel 2, excavate the vertical working well 4 connected with the surrounding protection piles and the steel waist beam along the axial direction of the surrounding protection piles;

二、防护的安装Second, the installation of protection

a、横向通道2的防护:在横向通道2开挖部位使用超前无障碍性防护装置6,对已经形成的横向通道2使用可无障碍性防护装置6;a. Protection of the transverse channel 2: use an advanced barrier-free protective device 6 at the excavation site of the transverse channel 2, and use an accessible barrier-free protective device 6 for the formed transverse channel 2;

b、竖向通道3:在竖向通道3的内壁上使用无障碍性防护装置6。b. Vertical channel 3: use barrier-free protection device 6 on the inner wall of vertical channel 3.

三、围护桩和钢腰梁的移除3. Removal of retaining piles and steel waist beams

通过风镐将桩身钢筋混凝土保护层剥离和采用气割将钢筋割断对围护桩进行移除,切除在横向通道2、竖向通道3和竖向工作井4中的围护桩和钢腰梁部分,对于存在岩土体中的围护桩和钢腰梁,并沿围护桩轴线方向向前开挖并且进行无障碍性防护装置6,使围护桩的桩身裸露,对横向通道2顶部及底部钢筋割断后,沿通道顶部及底部用风镐将桩截断,最后破碎成块运出洞外,围护桩清除后,钢腰梁自然暴露出来,采用气割或液压钳逐段割除。The protective layer of reinforced concrete on the pile body is stripped off with a pick and the steel bars are cut off by gas cutting to remove the surrounding protection piles, and the surrounding protection piles and steel waist beams in the horizontal channel 2, vertical channel 3 and vertical working shaft 4 are removed Part, for the retaining piles and steel waist beams existing in the rock and soil, excavate forward along the axial direction of the retaining piles and carry out barrier-free protection device 6, so that the pile body of the retaining piles is exposed, and the horizontal passage 2 After the top and bottom steel bars are cut off, the piles are cut off with pneumatic picks along the top and bottom of the passage, and finally broken into pieces and transported out of the hole. After the protective piles are removed, the steel waist beams are naturally exposed, and cut off section by section with gas cutting or hydraulic pliers.

在本实施例中,在处于围护桩和钢腰梁的横向通道2部位的左右侧壁上设置有扩展空间。In this embodiment, expansion spaces are provided on the left and right side walls of the lateral channel 2 located at the enclosure pile and the steel waist beam.

在本实施例中,横向通道2的中心设置为与盾构掘进机的盾构区间的中心错位分布。In this embodiment, the center of the transverse channel 2 is set to be dislocated from the center of the shield section of the shield boring machine.

一种基于横向通道对盾构区间内障碍性异物进行移除的方法,第二个实施例,A method for removing obstructive foreign matter in the shield interval based on the transverse channel, the second embodiment,

对盾构区间内的锚索、围护桩或钢腰梁进行移除的方法,其步骤是:The method for removing the anchor cables, retaining piles or steel waist beams in the shield section is as follows:

在对盾构区间内障碍性异物进行移除时,移除障碍性异物的通道是指横向通道2,当为了实现连续性地移除障碍性异物,横向通道2延伸为与地面连通的竖向通道3也是移除障碍性异物的通道,当处于盾构区间内的障碍性异物没有裸露在横向通道2中时,横向通道2延伸为与障碍性异物连通的竖向工作井4也是移除障碍性异物的通道,When removing obstructive foreign objects in the shield section, the channel for removing obstructive foreign objects refers to the horizontal channel 2. In order to achieve continuous removal of obstructive foreign objects, the horizontal channel 2 extends to a vertical channel connected to the ground. Channel 3 is also a channel for removing obstructive foreign matter. When the obstructive foreign matter in the shield section is not exposed in the transverse channel 2, the vertical working shaft 4 extending from the transverse channel 2 to communicate with the obstructive foreign matter is also the removal of obstacles. channel for sexual aliens,

无障碍性防护装置6包含有基体加固装置和外支撑装置,基体加固装置设置为混凝土层体、格栅和锚杆并且在需要支护的壁上喷射有混凝土层体,在混凝土层体上覆盖格栅,格栅通过锚杆固定在需要支护的壁上,外支撑装置设置为包含有拱梁61、支撑横梁62、侧梁63和支撑块64并且拱梁61的两端端面部分别设置有侧梁63,在两个侧梁63之间设置有支撑横梁62并且在侧梁63的内侧面部设置有支撑块64,拱梁61和侧梁63支护在需要支护的壁上,通过伸缩缸作用在支撑块64上,对拱梁61和侧梁63进行安装和移除。The barrier-free protection device 6 includes a matrix reinforcement device and an external support device, the matrix reinforcement device is set as a concrete layer, a grid and an anchor rod, and the concrete layer is sprayed on the wall to be supported, and the concrete layer is covered Grille, the grid is fixed on the wall to be supported by anchor rods, the external support device is set to include arch beams 61, support beams 62, side beams 63 and support blocks 64 and the end faces of the two ends of the arch beams 61 are respectively set There are side beams 63, a support beam 62 is arranged between the two side beams 63 and a support block 64 is arranged on the inner side of the side beams 63, the arch beam 61 and the side beam 63 are supported on the wall to be supported, and the The telescoping cylinders act on the support blocks 64 to install and remove the arch beams 61 and side beams 63 .

在本实施例中,锚杆设置为可回收锚杆或玻璃钢锚杆,当使用玻璃钢锚杆时,就可以不再进行回收,格栅设置为塑料格栅,当使用塑料格栅时,就可以不再进行回收,当使用木材或竹材的板体替代格栅时,就可以不再进行回收,当使用钢丝网或钢板网替代格栅时,就要进行回收移除,当在需要支护的侧壁上安装了锚杆,就不需要在两个侧梁63之间设置有支撑横梁62。In this embodiment, the anchor rod is set as a recyclable anchor rod or a fiberglass anchor rod. When the fiberglass anchor rod is used, it can no longer be recycled. The grid is set as a plastic grid. When the plastic grid is used, it can Recycling is no longer required. When wood or bamboo boards are used instead of grilles, recycling is no longer required. When steel mesh or steel mesh is used instead of grilles, recycling and removal are required. With anchor rods installed on the side walls, there is no need to provide a supporting beam 62 between the two side beams 63 .

在一种基于横向通道对盾构区间内障碍性异物进行移除的方法的第一个实施例和第二个实施例的基础上,根据锚索、围护桩或钢腰梁的分布状况、盾构掘进机的掘进路线和施工情况的地质条件,为了满足专利文件的清楚和支持的条款,其它形式的第一个实施例,On the basis of the first embodiment and the second embodiment of the method for removing obstructive foreign matter in the shield section based on the transverse channel, according to the distribution of anchor cables, protective piles or steel waist beams, The tunneling route of the shield boring machine and the geological conditions of the construction situation, in order to meet the clear and supportive clauses of the patent document, the first embodiment of other forms,

横向通道2的轮廓线设置为拱形门状体并且沿盾构掘进机的掘进路线的段状横向通道2的横向截面设置为呈变面积分布,横向通道2的直径与盾构掘进机的盾构区间的直径的比例设置为0.3,The outline of the transverse channel 2 is set as an arched door-shaped body and the transverse section of the segmental transverse channel 2 along the tunneling route of the shield tunneling machine is set to be distributed in a variable area. The diameter of the transverse channel 2 is the same as the shield tunneling machine. The ratio of the diameters of the compartments is set to 0.3,

横向通道2的断面面积与盾构区间的断面面积的比例设置为0.28:1,The ratio of the cross-sectional area of the transverse channel 2 to the cross-sectional area of the shield section is set to 0.28:1,

在盾构掘进机的掘进路线上通过金属探测器确定锚索,在盾构掘进机的盾构区间的断面中,沿盾构掘进机的掘进路线开挖两条横向通道2与锚索相通,两条横向通道2设置为沿盾构掘进机的盾构区间两翼分布,On the tunneling route of the shield tunneling machine, the anchor cable is determined by a metal detector. In the section of the shield section of the shield tunneling machine, two transverse passages 2 are excavated along the tunneling route of the shield tunneling machine to communicate with the anchor cable. The two transverse passages 2 are arranged to be distributed along the two wings of the shield section of the shield tunneling machine,

沿盾构掘进机的掘进路线开挖两条横向通道2与锚索相通,横向通道2的直径设置为2.5m,Two transverse passages 2 are excavated along the excavation route of the shield tunneling machine to communicate with the anchor cables. The diameter of the transverse passage 2 is set to 2.5m.

混凝土层体设置为厚度为80mm、强度为C20的混凝土层体,在厚度为80mm、强度为C20的混凝土层体中设置有速凝剂。The concrete layer is set as a concrete layer with a thickness of 80 mm and a strength of C20, and an accelerator is arranged in the concrete layer with a thickness of 80 mm and a strength of C20.

其它形式的第二个实施例,Other forms of the second embodiment,

横向通道2的轮廓线设置为拱形门状体并且沿盾构掘进机的掘进路线的段状横向通道2的横向截面设置为呈变面积分布,横向通道2的直径与盾构掘进机的盾构区间的直径的比例设置为0.5,The outline of the transverse channel 2 is set as an arched door-shaped body and the transverse section of the segmental transverse channel 2 along the tunneling route of the shield tunneling machine is set to be distributed in a variable area. The diameter of the transverse channel 2 is the same as the shield tunneling machine. The ratio of the diameters of the compartments is set to 0.5,

横向通道2的断面面积与盾构区间的断面面积的比例设置为0.38:1,The ratio of the cross-sectional area of the transverse channel 2 to the cross-sectional area of the shield section is set to 0.38:1,

在盾构掘进机的掘进路线上通过金属探测器确定锚索,在盾构掘进机的盾构区间的断面中,沿盾构掘进机的掘进路线开挖三条横向通道2与锚索相通,三条横向通道2设置为沿盾构掘进机的盾构区间两翼分布,On the tunneling route of the shield tunneling machine, the anchor cable is determined by a metal detector. In the section of the shield section of the shield tunneling machine, three transverse passages 2 are excavated along the tunneling route of the shield tunneling machine to communicate with the anchor cable, and three The transverse channel 2 is set to be distributed along the two wings of the shield section of the shield tunneling machine,

沿盾构掘进机的掘进路线开挖两条横向通道2与锚索相通,横向通道2的直径设置为4.0m,Two transverse passages 2 are excavated along the excavation route of the shield tunneling machine to communicate with the anchor cables. The diameter of the transverse passage 2 is set to 4.0m.

混凝土层体设置为厚度为400mm、强度小于C20的混凝土层体,在厚度为400mm、强度小于C20的混凝土层体中设置有速凝剂。The concrete layer is set as a concrete layer with a thickness of 400mm and a strength lower than C20, and an accelerator is arranged in the concrete layer with a thickness of 400mm and a strength lower than C20.

其它形式的第三个实施例,Other forms of the third embodiment,

横向通道2的轮廓线设置为拱形门状体并且沿盾构掘进机的掘进路线的段状横向通道2的横向截面设置为呈变面积分布,横向通道2的直径与盾构掘进机的盾构区间的直径的比例设置为0.4,The outline of the transverse channel 2 is set as an arched door-shaped body and the transverse section of the segmental transverse channel 2 along the tunneling route of the shield tunneling machine is set to be distributed in a variable area. The diameter of the transverse channel 2 is the same as the shield tunneling machine. The ratio of the diameters of the compartments is set to 0.4,

横向通道2的断面面积与盾构区间的断面面积的比例设置为0.33:1,The ratio of the cross-sectional area of the transverse channel 2 to the cross-sectional area of the shield section is set to 0.33:1,

在盾构掘进机的掘进路线上通过金属探测器确定锚索,在盾构掘进机的盾构区间的断面中,沿盾构掘进机的掘进路线开挖三条横向通道2与锚索相通,三条横向通道2设置为沿盾构掘进机的盾构区间两翼分布,On the tunneling route of the shield tunneling machine, the anchor cable is determined by a metal detector. In the section of the shield section of the shield tunneling machine, three transverse passages 2 are excavated along the tunneling route of the shield tunneling machine to communicate with the anchor cable, and three The transverse channel 2 is set to be distributed along the two wings of the shield section of the shield tunneling machine,

沿盾构掘进机的掘进路线开挖两条横向通道2与锚索相通,横向通道2的直径设置为3.25m,Two transverse passages 2 are excavated along the excavation route of the shield tunneling machine to communicate with the anchor cables. The diameter of the transverse passage 2 is set to 3.25m.

混凝土层体设置为厚度为240mm、强度为C20的混凝土层体,在厚度为240mm、强度为C20的混凝土层体中设置有速凝剂。The concrete layer is set as a concrete layer with a thickness of 240mm and a strength of C20, and an accelerator is arranged in the concrete layer with a thickness of 240mm and a strength of C20.

其它形式的第四个实施例,Other forms of the fourth embodiment,

横向通道2的轮廓线设置为拱形门状体并且沿盾构掘进机的掘进路线的段状横向通道2的横向截面设置为呈变面积分布,横向通道2的直径与盾构掘进机的盾构区间的直径的比例设置为0.33,The outline of the transverse channel 2 is set as an arched door-shaped body and the transverse section of the segmental transverse channel 2 along the tunneling route of the shield tunneling machine is set to be distributed in a variable area. The diameter of the transverse channel 2 is the same as the shield tunneling machine. The ratio of the diameters of the compartments is set to 0.33,

横向通道2的断面面积与盾构区间的断面面积的比例设置为0.36:1,The ratio of the cross-sectional area of the transverse channel 2 to the cross-sectional area of the shield section is set to 0.36:1,

在盾构掘进机的掘进路线上通过金属探测器确定锚索,在盾构掘进机的盾构区间的断面中,沿盾构掘进机的掘进路线开挖四条横向通道2与锚索相通,四条横向通道2设置为沿盾构掘进机的盾构区间两翼分布,On the tunneling route of the shield tunneling machine, the anchor cable is determined by a metal detector. In the section of the shield section of the shield tunneling machine, four transverse passages 2 are excavated along the tunneling route of the shield tunneling machine to communicate with the anchor cable, and four The transverse channel 2 is set to be distributed along the two wings of the shield section of the shield tunneling machine,

沿盾构掘进机的掘进路线开挖两条横向通道2与锚索相通,横向通道2的直径设置为2.52m,Two transverse passages 2 are excavated along the excavation route of the shield tunneling machine to communicate with the anchor cables. The diameter of the transverse passage 2 is set to 2.52m.

混凝土层体设置为厚度为320mm、强度小于C20的混凝土层体,在厚度为320mm、强度小于C20的混凝土层体中设置有速凝剂。The concrete layer is set as a concrete layer with a thickness of 320mm and a strength lower than C20, and an accelerator is arranged in the concrete layer with a thickness of 320mm and a strength lower than C20.

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

一种基于横向通道对盾构区间内障碍性异物进行移除的装置,附图为本发明的第一个实施例,结合附图具体说明本实施例,包含有横向通道2、竖向通道3、竖向工作井4和无障碍性防护装置6,在盾构区间的断面1中设置有沿盾构掘进机的掘进路线分布的横向通道2并且在横向通道2与地面之间设置有竖向通道3,在横向通道2中设置有与异物相通的竖向工作井4并且在横向通道2和竖向通道3中设置有无障碍性防护装置6。A device for removing obstructive foreign matter in the shield tunneling section based on a horizontal channel. The attached drawing shows the first embodiment of the present invention. This embodiment will be described in detail in conjunction with the attached drawing, including a horizontal channel 2 and a vertical channel 3 , the vertical working shaft 4 and the barrier-free protection device 6, in the section 1 of the shield section, there are transverse passages 2 distributed along the excavation route of the shield boring machine, and between the transverse passage 2 and the ground, there are vertical The channel 3 is provided with a vertical working shaft 4 communicating with foreign objects in the transverse channel 2 and an obstacle-free protection device 6 is provided in the transverse channel 2 and the vertical channel 3 .

在本实施例中,横向通道2的轮廓线设置为拱形门状体并且沿盾构掘进机的掘进路线的段状横向通道2的横向截面设置为呈变面积分布,横向通道2的断面面积与盾构区间的断面面积的比例设置为0.28-0.38:1。In this embodiment, the outline of the transverse channel 2 is set as an arched door-shaped body and the transverse section of the segmental transverse channel 2 along the excavation route of the shield tunneling machine is set to be distributed in a variable area. The cross-sectional area of the transverse channel 2 The ratio to the cross-sectional area of the shield section is set at 0.28-0.38:1.

在本实施例中,竖向通道3设置为井状体并且竖向工作井4设置为U字形槽体,竖向工作井4的敞口部设置在横向通道2的侧壁上。In this embodiment, the vertical channel 3 is set as a well-shaped body and the vertical working well 4 is set as a U-shaped trough, and the opening of the vertical working well 4 is set on the side wall of the transverse channel 2 .

在本实施例中,设置在横向通道2的无障碍性防护装置6设置为包含有超前无障碍性防护装置6和无障碍性防护装置6,超前无障碍性防护装置6设置为由塑料格栅和可回收锚杆或非金属锚杆组成的防护体并且无障碍性防护装置6设置为由格栅和混凝土层体组成的防护层及由撑钢拱架、液压支柱和方撑木组成的可拆卸支撑体。In this embodiment, the barrier-free protection device 6 arranged on the transverse channel 2 is configured to include a forward barrier-free protection device 6 and a barrier-free protection device 6, and the forward barrier-free protection device 6 is set to be made of a plastic grid and a protective body composed of recyclable anchor rods or non-metallic anchor rods, and the barrier-free protective device 6 is set as a protective layer composed of grids and concrete layers, and a protective layer composed of steel arches, hydraulic props and square braces. Remove the support body.

在本实施例中,混凝土层体设置为厚度为80-400mm、强度小于C20的混凝土层体并且在厚度为80-400mm、强度小于C20的混凝土层体中设置有速凝剂。In this embodiment, the concrete layer is set as a concrete layer with a thickness of 80-400 mm and a strength less than C20, and an accelerator is arranged in the concrete layer with a thickness of 80-400 mm and a strength less than C20.

在本实施例中,无障碍性防护装置6包含有基体加固装置和外支撑装置,基体加固装置设置为混凝土层体、格栅和锚杆并且在需要支护的壁上喷射有混凝土层体,在混凝土层体上覆盖格栅,格栅通过锚杆固定在需要支护的壁上,外支撑装置设置为包含有拱梁61、支撑横梁62、侧梁63和支撑块64并且拱梁61的两端端面部分别设置有侧梁63,在两个侧梁63之间设置有支撑横梁62并且在侧梁63的内侧面部设置有支撑块64。In this embodiment, the barrier-free protection device 6 includes a matrix reinforcement device and an external support device, and the matrix reinforcement device is configured as a concrete layer, a grid and an anchor rod, and a concrete layer is sprayed on the wall to be supported, Cover the grid on the concrete layer, the grid is fixed on the wall to be supported by anchor rods, and the external support device is set to include arch beams 61, support beams 62, side beams 63 and support blocks 64 and the arch beam 61 Side beams 63 are respectively provided on the end surfaces of both ends, a support beam 62 is provided between the two side beams 63 and a support block 64 is provided on the inner surface of the side beams 63 .

拱梁61和侧梁63支护在需要支护的壁上,通过伸缩缸作用在支撑块64上,对拱梁61和侧梁63进行安装和移除。The arch beam 61 and the side beam 63 are supported on the wall to be supported, and the telescopic cylinder acts on the support block 64 to install and remove the arch beam 61 and the side beam 63 .

在本实施例中,设置在竖向工作井4的无障碍性防护装置6设置为无障碍性防护装置6并且无障碍性防护装置6设置为由塑钢格栅和混凝土层体组成的防护层。In this embodiment, the barrier-free protection device 6 arranged on the vertical working shaft 4 is set as the barrier-free protection device 6 and the barrier-free protection device 6 is set as a protective layer composed of plastic-steel grids and concrete layers.

在本实施例中,横向通道2的中心设置为与盾构掘进机的盾构区间的中心重合分布,沿盾构掘进机的掘进路线上在地面和横向通道2之间设置有竖向通道3并且在横向通道2中设置有垂直向下的竖向工作井4。In this embodiment, the center of the transverse channel 2 is arranged to coincide with the center of the shield section of the shield tunneling machine, and a vertical channel 3 is arranged between the ground and the transverse channel 2 along the excavation route of the shield tunneling machine And a vertical working shaft 4 vertically downward is arranged in the transverse channel 2 .

一种基于横向通道对盾构区间内障碍性异物进行移除的装置,附图为本发明的第二个实施例,A device for removing obstructive foreign matter in the shield section based on a transverse channel, the accompanying drawing is the second embodiment of the present invention,

多条横向通道2设置为沿盾构掘进机的盾构区间两翼分布。A plurality of transverse passages 2 are arranged to be distributed along the two wings of the shield section of the shield boring machine.

横向通道2的直径与盾构掘进机的盾构区间的直径的比例设置为0.3-0.5并且沿盾构掘进机的掘进路线开挖两条横向通道2与异物相通,横向通道2的直径设置为2.5-4.0m。The ratio of the diameter of the transverse channel 2 to the diameter of the shield section of the shield tunneling machine is set to 0.3-0.5 and two transverse channels 2 are excavated along the tunneling route of the shield tunneling machine to communicate with foreign objects, and the diameter of the transverse channel 2 is set to 2.5-4.0m.

在横向通道2、竖向通道3和竖向工作井4中,对裸露的异物部分进行切除处理,对存在岩土体中的异物,通过拔取和粉碎的方式移除异物。In the horizontal channel 2, the vertical channel 3 and the vertical working shaft 4, the exposed foreign body part is cut off, and the foreign body existing in the rock and soil mass is removed by pulling out and crushing.

在一种基于横向通道对盾构区间内障碍性异物进行移除的装置的第一个实施例和第二个实施例的基础上,根据锚索、围护桩或钢腰梁的分布状况、盾构掘进机的掘进路线和施工情况的地质条件,为了满足专利文件的清楚和支持的条款,其它形式的第一个实施例,On the basis of the first embodiment and the second embodiment of a device for removing obstructive foreign matter in the shield section based on the transverse channel, according to the distribution of anchor cables, protective piles or steel waist beams, The tunneling route of the shield boring machine and the geological conditions of the construction situation, in order to meet the clear and supportive clauses of the patent document, the first embodiment of other forms,

横向通道2的轮廓线设置为拱形门状体并且沿盾构掘进机的掘进路线的段状横向通道2的横向截面设置为呈变面积分布,横向通道2的断面面积与盾构区间的断面面积的比例设置为0.28:1,The outline of the transverse channel 2 is set as an arched door-shaped body and the transverse section of the segmental transverse channel 2 along the excavation route of the shield tunneling machine is set to have a variable area distribution. The area ratio is set to 0.28:1,

混凝土层体设置为厚度为80mm、强度为C20的混凝土层体并且在厚度为80mm、强度为C20的混凝土层体中设置有速凝剂,The concrete layer is set as a concrete layer with a thickness of 80mm and a strength of C20, and an accelerator is arranged in the concrete layer with a thickness of 80mm and a strength of C20,

四条横向通道2设置为沿盾构掘进机的盾构区间两翼分布,The four transverse passages 2 are arranged to be distributed along the two wings of the shield section of the shield tunneling machine,

横向通道2的直径与盾构掘进机的盾构区间的直径的比例设置为0.3并且沿盾构掘进机的掘进路线开挖四条横向通道2与异物相通,横向通道2的直径设置为2.5m。The ratio of the diameter of the transverse channel 2 to the diameter of the shield section of the shield tunneling machine is set to 0.3 and four transverse channels 2 are excavated along the tunneling route of the shield tunneling machine to communicate with foreign objects, and the diameter of the transverse channel 2 is set to 2.5m.

其它形式的第二个实施例,Other forms of the second embodiment,

横向通道2的轮廓线设置为拱形门状体并且沿盾构掘进机的掘进路线的段状横向通道2的横向截面设置为呈变面积分布,横向通道2的断面面积与盾构区间的断面面积的比例设置为0.38:1,The outline of the transverse channel 2 is set as an arched door-shaped body and the transverse section of the segmental transverse channel 2 along the excavation route of the shield tunneling machine is set to have a variable area distribution. The area ratio is set to 0.38:1,

混凝土层体设置为厚度为400mm、强度小于C20的混凝土层体并且在厚度为400mm、强度小于C20的混凝土层体中设置有速凝剂,The concrete layer is set as a concrete layer with a thickness of 400mm and a strength less than C20, and an accelerator is arranged in the concrete layer with a thickness of 400mm and a strength less than C20,

两条横向通道2设置为沿盾构掘进机的盾构区间两翼分布,The two transverse passages 2 are arranged to be distributed along the two wings of the shield section of the shield tunneling machine,

横向通道2的直径与盾构掘进机的盾构区间的直径的比例设置为0.5并且沿盾构掘进机的掘进路线开挖两条横向通道2与异物相通,横向通道2的直径设置为4.0m。The ratio of the diameter of the transverse passage 2 to the diameter of the shield section of the shield tunneling machine is set to 0.5 and two transverse passages 2 are excavated along the tunneling route of the shield tunneling machine to communicate with foreign objects, and the diameter of the transverse passage 2 is set to 4.0m .

其它形式的第三个实施例,Other forms of the third embodiment,

横向通道2的轮廓线设置为拱形门状体并且沿盾构掘进机的掘进路线的段状横向通道2的横向截面设置为呈变面积分布,横向通道2的断面面积与盾构区间的断面面积的比例设置为0.33:1,The outline of the transverse channel 2 is set as an arched door-shaped body and the transverse section of the segmental transverse channel 2 along the excavation route of the shield tunneling machine is set to have a variable area distribution. The area ratio is set to 0.33:1,

混凝土层体设置为厚度为240mm、强度小于C20的混凝土层体并且在厚度为240mm、强度小于C20的混凝土层体中设置有速凝剂,The concrete layer is set as a concrete layer with a thickness of 240mm and a strength less than C20, and an accelerator is arranged in the concrete layer with a thickness of 240mm and a strength less than C20,

三条横向通道2设置为沿盾构掘进机的盾构区间两翼分布,Three transverse passages 2 are arranged to be distributed along the two wings of the shield section of the shield tunneling machine,

横向通道2的直径与盾构掘进机的盾构区间的直径的比例设置为0.4并且沿盾构掘进机的掘进路线开挖三条横向通道2与异物相通,横向通道2的直径设置为3.25m。The ratio of the diameter of the transverse channel 2 to the diameter of the shield section of the shield tunneling machine is set to 0.4, and three transverse channels 2 are excavated along the tunneling route of the shield tunneling machine to communicate with foreign objects, and the diameter of the transverse channel 2 is set to 3.25m.

其它形式的第四个实施例,Other forms of the fourth embodiment,

横向通道2的轮廓线设置为拱形门状体并且沿盾构掘进机的掘进路线的段状横向通道2的横向截面设置为呈变面积分布,横向通道2的断面面积与盾构区间的断面面积的比例设置为0.30:1,The outline of the transverse channel 2 is set as an arched door-shaped body and the transverse section of the segmental transverse channel 2 along the excavation route of the shield tunneling machine is set to have a variable area distribution. The area ratio is set to 0.30:1,

混凝土层体设置为厚度为330mm、强度小于C20的混凝土层体并且在厚度为330mm、强度小于C20的混凝土层体中设置有速凝剂,The concrete layer is set as a concrete layer with a thickness of 330mm and a strength less than C20, and an accelerator is arranged in the concrete layer with a thickness of 330mm and a strength less than C20,

两条横向通道2设置为沿盾构掘进机的盾构区间两翼分布,The two transverse passages 2 are arranged to be distributed along the two wings of the shield section of the shield tunneling machine,

横向通道2的直径与盾构掘进机的盾构区间的直径的比例设置为0.33并且沿盾构掘进机的掘进路线开挖两条横向通道2与异物相通,横向通道2的直径设置为3.6m。The ratio of the diameter of the transverse channel 2 to the diameter of the shield section of the shield tunneling machine is set to 0.33, and two transverse channels 2 are excavated along the tunneling route of the shield tunneling machine to communicate with foreign objects, and the diameter of the transverse channel 2 is set to 3.6m .

本发明具有下特点:The present invention has following characteristics:

1、由于设计了横向通道2,通过横向通道2与盾构掘进机的盾构区间内的障碍性异物相连通,在横向通道2中对障碍性异物移除,不再需要操作人员进入到盾构掘进机的前端高压仓中进行锚索或锚杆的移除,因此提高了盾构掘进机的工作效率,保障了操作人员的人身安全。1. Due to the design of the transverse passage 2, the transverse passage 2 is connected with the obstructive foreign matter in the shield section of the shield tunneling machine, and the obstacle foreign matter is removed in the transverse passage 2, so that the operator no longer needs to enter the shield The anchor cables or bolts are removed from the high-pressure chamber at the front end of the shield tunneling machine, thus improving the working efficiency of the shield tunneling machine and ensuring the personal safety of the operators.

2、由于设计了移除通道,在移除通道中对残留在岩土体中的锚索进行作业,使对锚索进行移除,不再需要操作人员进入到盾构掘进机的前端高压仓中进行锚索或锚杆的移除,因此提高了盾构掘进机的工作效率,保障了操作人员的人身安全。2. Due to the design of the removal channel, the anchor cable remaining in the rock and soil mass is operated in the removal channel, so that the removal of the anchor cable does not require the operator to enter the front high-pressure chamber of the shield tunneling machine The anchor cable or anchor rod is removed in the middle, thus improving the working efficiency of the shield boring machine and ensuring the personal safety of the operator.

3、由于设计了移除通道,方便了移除作业。3. Due to the design of the removal channel, the removal operation is facilitated.

4、由于设计了移除通道,回收了无障碍性防护装置6,降低了施工成本。4. Due to the design of the removal channel, the barrier-free protection device 6 is recovered, which reduces the construction cost.

5、由于设计了对结构形状进行了数值范围的限定,使数值范围为本发明的技术方案中的技术特征,不是通过公式计算或通过有限次试验得出的技术特征,试验表明该数值范围的技术特征取得了很好的技术效果。5. Due to the limitation of the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the present invention, not the technical feature obtained through formula calculation or limited number of tests. The test shows that the numerical range is Technical Features A very good technical effect has been achieved.

6、由于设计了本发明的技术特征,在技术特征的单独和相互之间的集合的作用,通过试验表明,本发明的各项性能指标为现有的各项性能指标的至少为1.7倍,通过评估具有很好的市场价值。6. Due to the design of the technical features of the present invention, the tests show that the various performance indicators of the present invention are at least 1.7 times that of the existing various performance indicators. Very good market value with appraisal.

还有其它的与在盾构掘进机的盾构区间的断面中形成与锚索连通的横向通道2相关联的其它技术特征都是本发明的实施例之一,并且以上所述实施例的各技术特征可以进行任意的组合,为满足专利法、专利实施细则和审查指南的要求,不再对上述实施例中的各个技术特征所有可能的组合的实施例都进行描述。There are other technical features associated with forming the transverse channel 2 connected with the anchor cable in the section of the shield section of the shield boring machine, which are all one of the embodiments of the present invention, and each of the above-mentioned embodiments The technical features can be combined arbitrarily. In order to meet the requirements of the Patent Law, Patent Implementation Rules and Examination Guidelines, all possible combinations of the technical features in the above embodiments are not described again.

上述实施例只是本发明所提供的基于横向通道对盾构区间内障碍性异物进行移除的方法及装置的一种实现形式,根据本发明所提供的方案的其他变形,增加或者减少其中的成份或步骤,或者将本发明用于其他的与本发明接近的技术领域,均属于本发明的保护范围。The above-mentioned embodiment is only an implementation form of the method and device for removing obstructive foreign matter in the shield section based on the transverse channel provided by the present invention. According to other variations of the solution provided by the present invention, the components thereof are increased or decreased or steps, or using the present invention in other technical fields close to the present invention, all belong to the protection scope of the present invention.

Claims (10)

1. method foreign body dyskinetic in shield interval removed based on interconnection, it is characterized in that: the steps include: in the section that the shield of shield excavation machine is interval, it is provided with the interconnection (2) of the driving route distribution along shield excavation machine, in interconnection (2), foreign body is removed.
The method removed foreign body dyskinetic in shield interval based on interconnection the most according to claim 1, is characterized in that:
The contour line of interconnection (2) is set to arch gate-shaped body,
Or be set to be distributed in variable area along the lateral cross section of section shape interconnection (2) of the driving route of shield excavation machine,
Or interconnection (2) centrally disposed is the center superposition distribution that the shield with shield excavation machine is interval,
Or interconnection (2) centrally disposed is the off(-)center distribution that the shield with shield excavation machine is interval,
Or the ratio setting of the cross-sectional area in the cross-sectional area of interconnection (2) and shield interval is 0.28-0.38:1,
Or the ratio setting of the diameter in the shield interval of the diameter of interconnection (2) and shield excavation machine is 0.3-0.5,
Or the diameter of interconnection (2) is set to 2.5-4.0m.
The method removed foreign body dyskinetic in shield interval based on interconnection the most according to claim 1, is characterized in that:
When in shield interval, dyskinetic foreign body removes, the passage removing dyskinetic foreign body refers to interconnection (2), when in order to remove dyskinetic foreign body with realizing seriality, the vertical passageway (3) that interconnection (2) extends to connect with ground is also the passage removing dyskinetic foreign body, when the dyskinetic foreign body being in shield interval do not have exposed in interconnection (2) time, the vertical active well (4) that interconnection (2) extends to connect with dyskinetic foreign body is also the passage removing dyskinetic foreign body, remove passage and be set to include the interconnection (2) of at least one excavation.
The method removed foreign body dyskinetic in shield interval based on interconnection the most according to claim 3, is characterized in that:
Vertical passageway (3) is set to well shape body,
Or the uncovered portion that vertical active well (4) is set to U-shaped cell body and vertical active well (4) is arranged on the sidewall of interconnection (2).
The method removed foreign body dyskinetic in shield interval based on interconnection the most according to claim 1, is characterized in that:
In interconnection (2) and vertical passageway (3), it is provided with Barrien-free preventer (6).
The method removed foreign body dyskinetic in shield interval based on interconnection the most according to claim 5, is characterized in that:
nullBarrien-free preventer (6) includes matrix bracing means and outer support device,Matrix bracing means is set to concrete layer body、Grid and anchor pole and on the wall need supporting, be injected with concrete layer body,Grating on concrete layer body,Grid is fixed on the wall needing supporting by anchor pole,Outer support device is set to include arched girder (61)、Support crossbeam (62)、The two ends end face portion of curb girder (63) and a bracer (64) and arched girder (61) is respectively arranged with curb girder (63),It is provided with between two curb girders (63) and supports crossbeam (62) and the inner side face of curb girder (63) is provided with a bracer (64),Arched girder (61) and curb girder (63) supporting are on the wall needing supporting,Acted on a bracer (64) by telescoping cylinder,Arched girder (61) and curb girder (63) are installed and removed,
Or when being mounted with anchor pole on the sidewall need supporting, avoid the need between two curb girders (63), be provided with support crossbeam (62).
The method removed foreign body dyskinetic in shield interval based on interconnection the most according to claim 5, is characterized in that:
The Barrien-free preventer (6) being arranged on interconnection (2) is set to include advanced Barrien-free preventer (6) and Barrien-free preventer (6),
Or Barrien-free preventer (6) is set to the protection body being made up of plastic grill and recoverable anchor rod or non-metallic rock in advance, the roof at interconnection (2) excavation position covers plastic grill, by recoverable anchor rod or non-metallic rock, plastic grill is fixed in interconnection (2) excavation position
Or the Barrien-free preventer (6) of interconnection (2) is set to the overcoat being made up of grid and concrete layer body and the detachable supporter being made up of support steel arch-shelf, hydraulic prop and side's gallows timber, concrete layer body is ejected on the roof of interconnection (2) grating again, form overcoat, in the base end wall of interconnection (2) side's of putting gallows timber and by hydraulic prop support steel arch-shelf act on grid, form supporter
Or concrete layer body be set to thickness be 80-400mm, intensity less than the concrete layer body of C20, be 80-400mm at thickness, the intensity concrete layer body less than C20 be provided with accelerator,
Or the Barrien-free preventer (6) of vertical passageway (3) is set to the overcoat that is made up of composite plastic steel grating and concrete layer body.
The method removed foreign body dyskinetic in shield interval based on interconnection the most according to claim 1, is characterized in that:
The method removing dyskinetic foreign body is set to include full-sleeve set access method, antifriction removal method and excavated by manual work and removes method,
Or full-sleeve set access method: use Split type hydraulic rig and set cylinder drill pipe to carry out being looped around the hole body of anchor cable at the periphery of anchor cable, anchor cable peeled off with surrounding soil, by external force, anchor cable is extracted together with set cylinder drill pipe, backfill anchor hole,
Or the method that antifriction is pulled out: use water under high pressure that anchor cable surrounding soil carries out cutting and peel off, utilize external force to be extracted by anchor cable, backfill anchor hole,
Or the method that excavated by manual work removes: use Luoyang Spade, along anchor cable direction, surrounding soil is excavated, utilize rig to be peeled off with anchoring body by steel strand wires, then use cutter to be cut off by steel strand wires.
The method removed foreign body dyskinetic in shield interval based on interconnection the most according to claim 1, is characterized in that:
The method removing the anchor cable in shield interval, the steps include:
One, the excavation of the passage of anchor cable is removed
A, in shield interval in, along the driving route of shield excavation machine, determine anchor cable by metal detector, in the section that the shield of shield excavation machine is interval, the driving route along shield excavation machine excavates interconnection (2);
B, in interconnection (2), the vertical passageway (3) communicated with ground is excavated in the radial line direction of the section that shield along shield excavation machine is interval;
C, in interconnection (2), determine anchor cable by metal detector, the vertical active well (4) communicated with anchor cable is excavated in the radial line direction of the section that shield along shield excavation machine is interval;
Two, the installation of protection
A, the protection of interconnection (2): using advanced Barrien-free preventer (6) at interconnection (2) excavation position, using the interconnection (2) formed can Barrien-free preventer (6);
B, vertical passageway (3): on the inwall of vertical passageway (3), use Barrien-free preventer (6),
Three, the removing of anchor cable
Excision anchor cable part in interconnection (2), vertical passageway (3) and vertical active well (4), for there is the anchor cable in Rock And Soil, by anchor cable full-sleeve is extracted, antifriction pull out and excavated by manual work remove by the way of the anchor cable in Rock And Soil is removed,
Along the driving route of shield excavation machine, between ground and interconnection (2), it is provided with vertical passageway (3) and in interconnection (2), is provided with vertical active well (4) vertically downward,
The driving route of shield excavation machine determines anchor cable by metal detector, in the section that the shield of shield excavation machine is interval, driving route along shield excavation machine excavates a plurality of interconnection (2) and communicates with anchor cable, a plurality of interconnection (2) is set to the shield interval both wings distribution along shield excavation machine
Or the method that the fender post in shield interval and steel waist rail removed, the steps include:
One, the excavation of the passage of fender post and steel waist rail is removed
A, in shield interval in, fender post and steel waist rail is determined by fender post and steel waist rail coordinate along the driving route of shield excavation machine, in the section that the shield of shield excavation machine is interval, the driving route along shield excavation machine changes interconnection (2) direction for removing anchor cable;
B, in interconnection (2), the vertical passageway (3) communicated with ground is excavated in the radial line direction of the section that shield along shield excavation machine is interval;
C, in interconnection (2), the axis direction along fender post excavates the vertical active well (4) that communicates with fender post and steel waist rail;
Two, the installation of protection
A, the protection of interconnection (2): using advanced Barrien-free preventer (6) at interconnection (2) excavation position, using the interconnection (2) formed can Barrien-free preventer (6);
B, vertical passageway (3): on the inwall of vertical passageway (3), use Barrien-free preventer (6),
Three, the removing of fender post and steel waist rail
By pneumatic pick pile body reinforced concrete protective layer peeled off and use gas cutting to be cut off by reinforcing bar and fender post is removed, excision is in interconnection (2), fender post in vertical passageway (3) and vertical active well (4) and steel waist rail part, for there is the fender post in Rock And Soil and steel waist rail, and excavate forward along fender post axis direction and carry out Barrien-free preventer (6), the pile body making fender post is exposed, after interconnection (2) top and bottom reinforcement bars are cut off, along channel roof and bottom pneumatic pick, stake is blocked, finally crush in bulk and transport outside hole, after fender post is removed, steel waist rail natural exposing is out, gas cutting is used to cut off piecemeal,
The left and right sidewall at interconnection (2) position being in fender post and steel waist rail is provided with extending space.
10. device foreign body dyskinetic in shield interval removed based on interconnection, include the interconnection (2) being arranged in the shield interval of shield excavation machine and connecting with dyskinetic foreign body in shield interval, interconnection (2) is set to be distributed along the driving route of shield excavation machine
Or design section and the distribution link of interconnection (2) according to the section in the shield interval of shield excavation machine forms the mode connected with foreign body,
Or also include vertical passageway (3), vertical active well (4) and Barrien-free preventer (6), in the section 1 that shield is interval, it is provided with the interconnection (2) of the driving route distribution along shield excavation machine and between interconnection (2) and ground, is provided with vertical passageway (3), in interconnection (2), it is provided with the vertical active well (4) communicated with foreign body and is provided with Barrien-free preventer (6) in interconnection (2) and vertical passageway (3)
Or the contour line of interconnection (2) is set to arch gate-shaped body,
Or be set to be distributed in variable area along the lateral cross section of section shape interconnection (2) of the driving route of shield excavation machine,
Or interconnection (2) centrally disposed is the center superposition distribution that the shield with shield excavation machine is interval,
Or interconnection (2) centrally disposed is the off(-)center distribution that the shield with shield excavation machine is interval,
Or the ratio setting of the cross-sectional area in the cross-sectional area of interconnection (2) and shield interval is 0.28-0.38:1,
Or the ratio setting of the diameter in the shield interval of the diameter of interconnection (2) and shield excavation machine is 0.3-0.5,
Or the diameter of interconnection (2) is set to 2.5-4.0m,
Or vertical passageway (3) are set to well shape body,
Or vertically active well (4) is set to U-shaped cell body, the uncovered portion of vertical active well (4) is arranged on the sidewall of interconnection (2),
Or along the driving route of shield excavation machine, between ground and interconnection (2), be provided with vertical passageway (3) and in interconnection (2), be provided with vertical active well (4) vertically downward,
Or a plurality of interconnection (2) is set to the shield interval both wings distribution along shield excavation machine,
Or Barrien-free preventer (6) includes matrix bracing means and outer support device, matrix bracing means is set to concrete layer body, grid and anchor pole and on the wall need supporting, be injected with concrete layer body, grating on concrete layer body, grid is fixed on the wall needing supporting by anchor pole, outer support device is set to include arched girder (61), support crossbeam (62), the two ends end face portion of curb girder (63) and a bracer (64) and arched girder (61) is respectively arranged with curb girder (63), it is provided with between two curb girders (63) and supports crossbeam (62) and the inner side face of curb girder (63) is provided with a bracer (64),
Or the Barrien-free preventer (6) being arranged on interconnection (2) is set to include advanced Barrien-free preventer (6) and Barrien-free preventer (6), advanced Barrien-free preventer (6) is set to the protection body that is made up of plastic grill and recoverable anchor rod or non-metallic rock and Barrien-free preventer (6) is set to the overcoat being made up of grid and concrete layer body and the detachable supporter being made up of support steel arch-shelf, hydraulic prop and side's gallows timber
Or concrete layer body be set to thickness be 80-400mm, intensity less than C20 concrete layer body and thickness be 80-400mm, intensity less than C20 concrete layer body in be provided with accelerator,
Or the Barrien-free preventer (6) being arranged on vertical active well (4) is set to Barrien-free preventer (6) and Barrien-free preventer (6) is set to the overcoat that is made up of composite plastic steel grating and concrete layer body.
CN201610332247.2A 2015-09-09 2016-05-19 The method and device that dyskinetic foreign matter in shield section is removed based on interconnection Expired - Fee Related CN105822313B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510566963.2A CN105201515A (en) 2015-09-09 2015-09-09 Anchor cable dismantling method based on shield operation area
CN2015105669632 2015-09-09

Publications (2)

Publication Number Publication Date
CN105822313A true CN105822313A (en) 2016-08-03
CN105822313B CN105822313B (en) 2018-09-14

Family

ID=54949428

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201510566963.2A Pending CN105201515A (en) 2015-09-09 2015-09-09 Anchor cable dismantling method based on shield operation area
CN201620456432.8U Expired - Fee Related CN205654349U (en) 2015-09-09 2016-05-19 Device based on interconnection removes shield zone cataract or glaucoma impenetrability foreign matter
CN201610332247.2A Expired - Fee Related CN105822313B (en) 2015-09-09 2016-05-19 The method and device that dyskinetic foreign matter in shield section is removed based on interconnection

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201510566963.2A Pending CN105201515A (en) 2015-09-09 2015-09-09 Anchor cable dismantling method based on shield operation area
CN201620456432.8U Expired - Fee Related CN205654349U (en) 2015-09-09 2016-05-19 Device based on interconnection removes shield zone cataract or glaucoma impenetrability foreign matter

Country Status (1)

Country Link
CN (3) CN105201515A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168134A (en) * 2016-08-16 2016-11-30 泰安市岱宗机电科技开发有限公司 Based on side to passage to the method for removing of foreign body in shield interval and device
CN106437798A (en) * 2016-09-23 2017-02-22 广东省基础工程集团有限公司 Pretreatment method for anchor cable group penetrating through shield driving fracture surface
CN107461200A (en) * 2017-09-18 2017-12-12 中铁四局集团第五工程有限公司 A kind of construction technology for handling shield machine and passing through anchor cable barrier zone anchor cable
CN107740596A (en) * 2017-11-30 2018-02-27 中建三局第建设工程有限责任公司 A kind of non-open cut Demolition Construction method of underground structure being drilled into
CN108222012A (en) * 2017-12-18 2018-06-29 中冶天工集团有限公司 A kind of foundation pit anchor cable excision and the construction method that supporting pile is carried out using anchor cable excision system
CN108612100A (en) * 2018-04-12 2018-10-02 佛山轨道交通设计研究院有限公司 A method of anchor cable is handled using churning driven
CN113266362A (en) * 2021-05-25 2021-08-17 中铁四局集团第三建设有限公司 Top pipe cover excavation construction method for penetrating through existing dense anchor cable area
CN113266392A (en) * 2021-05-25 2021-08-17 中铁四局集团第三建设有限公司 Pipe jacking construction method for penetrating through existing anchor cable group

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201515A (en) * 2015-09-09 2015-12-30 泰安市岱宗机电科技开发有限公司 Anchor cable dismantling method based on shield operation area
CN108643948B (en) * 2018-04-27 2020-03-17 中建八局轨道交通建设有限公司 Construction method for shield to penetrate anchor cable area
CN108643193B (en) * 2018-05-16 2020-06-23 深圳市工勘岩土集团有限公司 Drilling and pulling method for prestressed anchor cable of foundation pit support
CN112228130B (en) * 2020-09-01 2022-10-14 中铁十局集团城市轨道交通工程有限公司 Construction method for pulling out anchor cable intruding into shield zone of urban subway
CN114592892A (en) * 2022-04-02 2022-06-07 中铁第六勘察设计院集团有限公司 Implementation method for pulling out anchor cable of shield tunnel in steel sleeve in soft soil area
CN117307036A (en) * 2023-08-11 2023-12-29 中煤科工西安研究院(集团)有限公司 Underground large-diameter drilling equipment and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075161A (en) * 2013-01-16 2013-05-01 中铁隧道集团有限公司 Quick underground obstacle clearing method for slurry shield construction
CN203066074U (en) * 2012-12-28 2013-07-17 宏润建设集团股份有限公司 Anchor rod pull-out system
CN104564091A (en) * 2013-10-24 2015-04-29 宏润建设集团股份有限公司 Method and device for removing anchor rods from shield crossing area
CN205654349U (en) * 2015-09-09 2016-10-19 泰安市岱宗机电科技开发有限公司 Device based on interconnection removes shield zone cataract or glaucoma impenetrability foreign matter

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203066074U (en) * 2012-12-28 2013-07-17 宏润建设集团股份有限公司 Anchor rod pull-out system
CN103075161A (en) * 2013-01-16 2013-05-01 中铁隧道集团有限公司 Quick underground obstacle clearing method for slurry shield construction
CN104564091A (en) * 2013-10-24 2015-04-29 宏润建设集团股份有限公司 Method and device for removing anchor rods from shield crossing area
CN205654349U (en) * 2015-09-09 2016-10-19 泰安市岱宗机电科技开发有限公司 Device based on interconnection removes shield zone cataract or glaucoma impenetrability foreign matter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李广良: "郑州地铁1号线会-民盾构区间锚索拔除施工技术", 《隧道建设》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168134A (en) * 2016-08-16 2016-11-30 泰安市岱宗机电科技开发有限公司 Based on side to passage to the method for removing of foreign body in shield interval and device
CN106168134B (en) * 2016-08-16 2019-04-05 泰安市岱宗机电科技开发有限公司 Based on side to channel to the method for removing and device of foreign matter in shield section
CN106437798A (en) * 2016-09-23 2017-02-22 广东省基础工程集团有限公司 Pretreatment method for anchor cable group penetrating through shield driving fracture surface
CN107461200A (en) * 2017-09-18 2017-12-12 中铁四局集团第五工程有限公司 A kind of construction technology for handling shield machine and passing through anchor cable barrier zone anchor cable
CN107461200B (en) * 2017-09-18 2020-02-21 中铁四局集团第五工程有限公司 A construction technology for dealing with anchor cables of shield machines crossing through anchor cable obstacle areas
CN107740596A (en) * 2017-11-30 2018-02-27 中建三局第建设工程有限责任公司 A kind of non-open cut Demolition Construction method of underground structure being drilled into
CN108222012A (en) * 2017-12-18 2018-06-29 中冶天工集团有限公司 A kind of foundation pit anchor cable excision and the construction method that supporting pile is carried out using anchor cable excision system
CN108612100A (en) * 2018-04-12 2018-10-02 佛山轨道交通设计研究院有限公司 A method of anchor cable is handled using churning driven
CN113266362A (en) * 2021-05-25 2021-08-17 中铁四局集团第三建设有限公司 Top pipe cover excavation construction method for penetrating through existing dense anchor cable area
CN113266392A (en) * 2021-05-25 2021-08-17 中铁四局集团第三建设有限公司 Pipe jacking construction method for penetrating through existing anchor cable group
CN113266362B (en) * 2021-05-25 2022-04-12 中铁四局集团第三建设有限公司 A construction method of pipe jacking and cover excavation crossing existing dense anchor cable area

Also Published As

Publication number Publication date
CN105822313B (en) 2018-09-14
CN105201515A (en) 2015-12-30
CN205654349U (en) 2016-10-19

Similar Documents

Publication Publication Date Title
CN105822313B (en) The method and device that dyskinetic foreign matter in shield section is removed based on interconnection
CN109736827B (en) Excavation method of high-pressure gas expansion-induced cracking in the connection channel of urban subway hard rock strata
CN103469817B (en) Existing subway station main structure broadening construction method
CN111878080A (en) Method for equipment withdrawal and self-lane-forming of withdrawal channel of fully mechanized coal mining face of coal mine
CN109707399B (en) Tunnel exit supporting structure and construction method thereof
CN102587922A (en) Oblique-crossing inclined shaft upper arc guide top brushing construction method for soft crushed rock layer
CN105003272A (en) Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways
CN109611103A (en) A method for strengthening the group of suspended boulders in the shield interval
CN107514262A (en) The construction method of shield piping lane
CN103867209A (en) Method of layered and segmental construction, excavation and holing of transverse passages of vertical shaft of metro
CN117365501A (en) Reinforcing construction method for large-diameter shield tunnel by enlarging and excavating large-size vehicle transverse passage
CN211006756U (en) Interface structure of open cut station and large-span duplex arch buried tunnel
CN112031814A (en) Cave-entering construction method for crossing shallow-layer high-load highway
CN115726791A (en) Hard rock rope saw construction method for shield interval contact channel
CN112096425B (en) Transverse passage supporting system for position of ingate and construction method thereof
CN110067581B (en) Arrangement and construction method of pre-buried holes in reinforced concrete supporting layers at tunnel or roadway forks or openings
CN115875058A (en) A construction method for extending a wall-column subway station on a parallel shield tunnel
CN113309525B (en) Construction method for releasing core rock and soil in advance for ultra-large section underground excavation station
CN111472389B (en) Open excavation construction method for rebuilding existing tunnel into double-layer tunnel
CN110735641B (en) The construction method of the transfer channel under the pipeline
CN210829267U (en) Shield constructs interval back construction air shaft structure
CN119435012A (en) A method for concealed excavation of a three-layer six-hole subway station
KR101184255B1 (en) A construction method for a non-portal tunnel structure and a steel plate structure used in the method
CN111502708A (en) Reinforcing construction method for existing tunnel transverse passage by shield underpass
CN117967323A (en) Strengthening ring structure and top-lifting construction method at the interface of branch tunnel and branch tunnel of hydraulic tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 271000 Xinghuo science and Technology Park, 1366 Zhongtianmen street, development zone, Tai'an City, Shandong Province

Patentee after: TAIAN DAIZONG ELECTROMECHANICAL TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 271000 in the courtyard of Municipal Agricultural Machinery Bureau, No. 404, Daizong street, Tai'an City, Shandong Province

Patentee before: TAIAN DAIZONG ELECTROMECHANICAL TECHNOLOGY DEVELOPMENT Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180914