CN108612100A - A method of anchor cable is handled using churning driven - Google Patents
A method of anchor cable is handled using churning driven Download PDFInfo
- Publication number
- CN108612100A CN108612100A CN201810328302.XA CN201810328302A CN108612100A CN 108612100 A CN108612100 A CN 108612100A CN 201810328302 A CN201810328302 A CN 201810328302A CN 108612100 A CN108612100 A CN 108612100A
- Authority
- CN
- China
- Prior art keywords
- anchor cable
- shield
- churning driven
- construction
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
Abstract
The invention discloses a kind of methods handling anchor cable using churning driven, include the following steps:A, during subway shield tunnel construction, when encountering existing anchor cable (2), the anchor cable (2) is cut off with churning driven (1), discharges the tension stress of the anchor cable (2);Part in the anchor cable (2) is taken out of by churning driven (1), and other two sections of anchor cables after cutting off form free end and remain in the earth formation;B, after churning driven (1) construction, rock stratum (3) is backfilled using C20 concrete, soil layer (4) is backfilled using M5 cement mortar;C, carry out shield-tunneling construction again, shield driving by when, select suitable boring parameter, will be squeezed to the soil at both sides of shield as the anchor cable of free end, realize tunneling construction of the shield by anchor cable section.The method for handling anchor cable using churning driven of the present invention, will not have an impact surrounding building, and the duration is shorter, engineering cost is relatively low.
Description
Technical field
The present invention relates to technical field of tunnel construction, and in particular to a method of anchor cable is handled using churning driven.
Background technology
With the rapid development of cities in China rail traffic, in urban rail transit shield work progress often
Encounter various underground obstacles.Currently, most cities skyscraper is equipped with basement, urban construction basement encloses
Protection structure largely uses the form of cable bolting, this constructs to urban rail transit shield and generates large effect.
And for underground anchor rope processing it is current domestic occur similar in the case of be also it is more, processing method difference it is larger but
Substantially be to clear up in advance anchor cable, take method it is common there is pipe-following drilling set to follow the example of, artificial digging pile segmentation pull out
Method, chute forming machine crawl method, full-sleeve slewing drilling machine patterning method etc., and the interaction between shield driving and anchor cable is ground
Study carefully less;The good and bad index of evaluation anchor cable processing construction is construction period, the influence to surrounding enviroment and engineering cost;It is common
Pipe-following drilling set follow the example of the basement side wall that need to abolish existing building, be affected to existing building;Artificial digging pile point
Method that section is pulled out, chute forming machine crawl method, full-sleeve slewing drilling machine patterning method construction area area are big and long in time limit, engineering cost
It is high.
Since churning driven is directly constructed in subway shield tunnel construction range, and rotary drilling rig footprint is smaller, uses
Churning driven processing anchor cable will not have an impact surrounding building, and the duration is shorter, and engineering cost is relatively low, and applicability is wide, because
This, there is an urgent need for designing a kind of completely new processing scheme coordinated using churning driven and shield machine, to handle anchor cable.
Invention content
The object of the present invention is to provide a kind of methods handling anchor cable using churning driven, will not be generated to surrounding building
It influences, and the duration is shorter, engineering cost is relatively low.
To achieve the above object, a kind of method that anchor cable is handled using churning driven provided by the present invention, including walk as follows
Suddenly:
A, during subway shield tunnel construction, when encountering existing anchor cable (2), the anchor cable is cut off with churning driven (1)
(2), the tension stress of the anchor cable (2) is discharged;Part in the anchor cable (2) is taken out of by churning driven (1), and after cutting off other two
Section anchor cable forms free end and remains in the earth formation;
B, after churning driven (1) construction, rock stratum (3) are backfilled using C20 concrete, M5 is used to soil layer (4)
Cement mortar is backfilled;
C, carry out shield-tunneling construction again, shield driving by when, select suitable boring parameter, will be as the anchor of free end
Rope is squeezed to the soil at both sides of shield, realizes tunneling construction of the shield by anchor cable section.
In the above-mentioned method for handling anchor cable using churning driven, in the step (a), churning driven (1) is in ground construction.
The present invention has the advantages that compared with prior art:
Since churning driven is directly constructed in subway shield tunnel construction range, and rotary drilling rig footprint is smaller, uses
Churning driven processing anchor cable will not have an impact surrounding building, and the duration is shorter, and engineering cost is relatively low, and applicability is wide;This
Although part construction risk, by whole anchor cables in range, is transferred to shield machine pick by inventive method without fully erased shield
Into in the process, but it is flexible with rotary digging pile layout, and quantities is few, and cost is controllable, rotary drilling rig machine source is sufficient, speed of application
Soon, stake position positioning accuracy is high, anchor cable cut off situation it is controllable, using mud off, the advantages that construction safety risk is controllable, be suitble to anchor
The processing of rope is constructed.
Description of the drawings
Fig. 1 is a kind of construction schematic diagram of method handling anchor cable using churning driven of the embodiment of the present invention.
Wherein, 1, churning driven;2, anchor cable;3, rock stratum;4, soil layer.
Specific implementation mode
With reference to the accompanying drawings and examples, the specific implementation mode of the present invention is described in further detail.Implement below
Example is not limited to the scope of the present invention for illustrating the present invention.
As shown in Figure 1, a kind of method handling anchor cable using churning driven provided by the present invention, includes the following steps:
A, during subway shield tunnel construction, when encountering existing anchor cable 2, the anchor cable 2 is cut off with churning driven 1, is discharged
The tension stress of the anchor cable 2;Part in the anchor cable 2 is taken out of by churning driven 1, and other two sections of anchor cables after cutting off form freedom
It holds and remains in the earth formation;
B, after churning driven 1 is constructed, rock stratum 3 is backfilled using C20 concrete, M5 cement bonded sands are used to soil layer 4
Slurry is backfilled;
C, carry out shield-tunneling construction again, shield driving by when, select suitable boring parameter, will be as the anchor of free end
Rope is squeezed to the soil at both sides of shield, realizes tunneling construction of the shield by anchor cable section.
Preferably, in the step (a), churning driven 1 is in ground construction.
To sum up, the present invention has the advantages that compared with prior art:
Since churning driven is directly constructed in subway shield tunnel construction range, and rotary drilling rig footprint is smaller, uses
Churning driven processing anchor cable will not have an impact surrounding building, and the duration is shorter, and engineering cost is relatively low, and applicability is wide;This
Although part construction risk, by whole anchor cables in range, is transferred to shield machine pick by inventive method without fully erased shield
Into in the process, but it is flexible with rotary digging pile layout, and quantities is few, and cost is controllable, rotary drilling rig machine source is sufficient, speed of application
Soon, stake position positioning accuracy is high, anchor cable cut off situation it is controllable, using mud off, the advantages that construction safety risk is controllable, be suitble to anchor
The processing of rope is constructed.
It the above is only the preferred embodiment of the present invention, it is noted that those skilled in the art are come
It says, without departing from the technical principles of the invention, several improvement and replacement can also be made, these improve and replace and also answer
It is considered as protection scope of the present invention.
Claims (2)
1. a kind of method handling anchor cable using churning driven, which is characterized in that include the following steps:
A, during subway shield tunnel construction, when encountering existing anchor cable (2), the anchor cable (2) is cut off with churning driven (1), is released
Put the tension stress of the anchor cable (2);Part in the anchor cable (2) is taken out of by churning driven (1), and other two sections of anchor cables after cutting off
It forms free end and remains in the earth formation;
B, after churning driven (1) construction, rock stratum (3) are backfilled using C20 concrete, M5 cement is used to soil layer (4)
Mortar is backfilled;
C, carry out shield-tunneling construction again, shield driving by when, select suitable boring parameter, will be squeezed as the anchor cable of free end
It is depressed into the soil at both sides of shield, realizes tunneling construction of the shield by anchor cable section.
2. as described in claim 1 using the method for churning driven processing anchor cable, which is characterized in that in the step (a), rotary digging
(1) is bored in ground construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810328302.XA CN108612100A (en) | 2018-04-12 | 2018-04-12 | A method of anchor cable is handled using churning driven |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810328302.XA CN108612100A (en) | 2018-04-12 | 2018-04-12 | A method of anchor cable is handled using churning driven |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108612100A true CN108612100A (en) | 2018-10-02 |
Family
ID=63659799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810328302.XA Pending CN108612100A (en) | 2018-04-12 | 2018-04-12 | A method of anchor cable is handled using churning driven |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108612100A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630271A (en) * | 2019-09-09 | 2019-12-31 | 中国电建集团铁路建设有限公司 | Construction method for water-rich sand layer shield to penetrate through steel pipe soil nail area |
CN111851484A (en) * | 2020-07-30 | 2020-10-30 | 深圳市工勘岩土集团有限公司 | Method for cutting off semi-invasive prestressed anchor cable in supporting pile by rotary drilling rig |
CN111926821A (en) * | 2020-07-13 | 2020-11-13 | 北京城建勘测设计研究院有限责任公司 | Construction method of novel slope protection pile |
CN112145210A (en) * | 2020-08-25 | 2020-12-29 | 广州市市政工程设计研究总院有限公司 | Anchor cable group removing method for invading shield or pipe-jacking tunnel section |
CN113266362A (en) * | 2021-05-25 | 2021-08-17 | 中铁四局集团第三建设有限公司 | Top pipe cover excavation construction method for penetrating through existing dense anchor cable area |
CN113266392A (en) * | 2021-05-25 | 2021-08-17 | 中铁四局集团第三建设有限公司 | Pipe jacking construction method for penetrating through existing anchor cable group |
CN113513014A (en) * | 2021-04-26 | 2021-10-19 | 中铁四局集团有限公司 | Anchor cable treatment and stratum reinforcement integrated method adopting triaxial mixing pile machine |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101851922A (en) * | 2010-06-17 | 2010-10-06 | 昆明捷程桩工有限责任公司 | Method for eliminating underground anchor rope/rod by using all casing drill |
CN105201515A (en) * | 2015-09-09 | 2015-12-30 | 泰安市岱宗机电科技开发有限公司 | Anchor cable dismantling method based on shield operation area |
CN106437798A (en) * | 2016-09-23 | 2017-02-22 | 广东省基础工程集团有限公司 | Pretreatment method for anchor cable group penetrating through shield driving fracture surface |
CN206785388U (en) * | 2017-05-18 | 2017-12-22 | 中国建筑第八工程局有限公司 | Anchor cable removes system in a kind of tunnel |
CN107829753A (en) * | 2017-09-30 | 2018-03-23 | 中铁第四勘察设计院集团有限公司 | Underground anchor rope remove device and sweep-out method |
-
2018
- 2018-04-12 CN CN201810328302.XA patent/CN108612100A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101851922A (en) * | 2010-06-17 | 2010-10-06 | 昆明捷程桩工有限责任公司 | Method for eliminating underground anchor rope/rod by using all casing drill |
CN105201515A (en) * | 2015-09-09 | 2015-12-30 | 泰安市岱宗机电科技开发有限公司 | Anchor cable dismantling method based on shield operation area |
CN105822313A (en) * | 2015-09-09 | 2016-08-03 | 泰安市岱宗机电科技开发有限公司 | Method and device for removing obstacle foreign matter in shield section based on transverse channel |
CN106437798A (en) * | 2016-09-23 | 2017-02-22 | 广东省基础工程集团有限公司 | Pretreatment method for anchor cable group penetrating through shield driving fracture surface |
CN206785388U (en) * | 2017-05-18 | 2017-12-22 | 中国建筑第八工程局有限公司 | Anchor cable removes system in a kind of tunnel |
CN107829753A (en) * | 2017-09-30 | 2018-03-23 | 中铁第四勘察设计院集团有限公司 | Underground anchor rope remove device and sweep-out method |
Non-Patent Citations (1)
Title |
---|
张志冰: ""软弱地层盾构穿越锚索区域施工技术"", 《石家庄铁路职业技术学院学报》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110630271A (en) * | 2019-09-09 | 2019-12-31 | 中国电建集团铁路建设有限公司 | Construction method for water-rich sand layer shield to penetrate through steel pipe soil nail area |
CN110630271B (en) * | 2019-09-09 | 2020-11-20 | 中国电建集团铁路建设有限公司 | Construction method for water-rich sand layer shield to penetrate through steel pipe soil nail area |
CN111926821A (en) * | 2020-07-13 | 2020-11-13 | 北京城建勘测设计研究院有限责任公司 | Construction method of novel slope protection pile |
CN111851484A (en) * | 2020-07-30 | 2020-10-30 | 深圳市工勘岩土集团有限公司 | Method for cutting off semi-invasive prestressed anchor cable in supporting pile by rotary drilling rig |
CN112145210A (en) * | 2020-08-25 | 2020-12-29 | 广州市市政工程设计研究总院有限公司 | Anchor cable group removing method for invading shield or pipe-jacking tunnel section |
CN113513014A (en) * | 2021-04-26 | 2021-10-19 | 中铁四局集团有限公司 | Anchor cable treatment and stratum reinforcement integrated method adopting triaxial mixing pile machine |
CN113266362A (en) * | 2021-05-25 | 2021-08-17 | 中铁四局集团第三建设有限公司 | Top pipe cover excavation construction method for penetrating through existing dense anchor cable area |
CN113266392A (en) * | 2021-05-25 | 2021-08-17 | 中铁四局集团第三建设有限公司 | Pipe jacking construction method for penetrating through existing anchor cable group |
CN113266362B (en) * | 2021-05-25 | 2022-04-12 | 中铁四局集团第三建设有限公司 | Top pipe cover excavation construction method for penetrating through existing dense anchor cable area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108612100A (en) | A method of anchor cable is handled using churning driven | |
CN106049532B (en) | A kind of pipe gallery open-cut branch blocking means and its construction method | |
CN110344400A (en) | The hard rock pore-forming construction technology of churning driven opportunity | |
CN106978807A (en) | Existing bridge pile pulling device and construction method are passed through by a kind of weak soil shield driving area | |
CN105041322A (en) | Method and system for reinforcing hole for push bench to go in and out | |
CN103603342A (en) | Construction method of ultra-long bored concrete pile with large-diameter casing combination | |
KR102288770B1 (en) | Horizontal directional drilling method strengthening driving force | |
CN103046931A (en) | Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode | |
CN209958343U (en) | Connecting joint for connecting reinforced concrete cast-in-place piles | |
CN114320313B (en) | Air-pushing traction type push bench escaping construction method | |
CN109208594B (en) | Treatment method for steel casing sinking meeting boulder, steel casing structure and drilled pile | |
CN102733390A (en) | Method for removing underground waste anchor cable/anchor rod | |
JP6319935B2 (en) | Tubing pile driving method | |
KR101066296B1 (en) | Rock cutting method using boring lid | |
CN109944251A (en) | The drawing hole construction method that soft rock stratum steel sheet pile is squeezed into | |
CN106337418A (en) | Supporting structure and supporting method of deep foundation pit in narrow area | |
KR102267676B1 (en) | A method of construction for temporary retaining wall and sheating work cup using its method | |
CN109555127A (en) | A kind of construction for the flush type multimedium built pile that drills | |
CN103967000A (en) | Rotary excavating pile construction method in combined construction | |
CN208039236U (en) | It is a kind of belong to underground pile connect wall construction method at wall equipment | |
CN106677242A (en) | Engineering ship for underwater tunnel and construction method of engineering ship | |
KR101237749B1 (en) | Propulsion unit head that is used in shield method | |
CN106837343A (en) | Push pipe goes out the construction method of hole second consolidation | |
CN112324441A (en) | Construction method for removing underground shield segments by full-slewing drilling machine | |
JPS6332930B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181002 |