CN103243955B - Method for rush-repairing electric power circuit pole in paddy field - Google Patents
Method for rush-repairing electric power circuit pole in paddy field Download PDFInfo
- Publication number
- CN103243955B CN103243955B CN201310197273.5A CN201310197273A CN103243955B CN 103243955 B CN103243955 B CN 103243955B CN 201310197273 A CN201310197273 A CN 201310197273A CN 103243955 B CN103243955 B CN 103243955B
- Authority
- CN
- China
- Prior art keywords
- angle steel
- pole
- long
- long angle
- angle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 99
- 239000010959 steel Substances 0.000 claims abstract description 99
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 10
- 229910052742 iron Inorganic materials 0.000 claims description 5
- 230000003319 supportive effect Effects 0.000 claims description 3
- 239000002023 wood Substances 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The invention relates to a method for rush-repairing an electric power circuit pole in a paddy field and a specialized pole foundation base, belonging to the technical field of power rush-repair. The technical scheme is that the specialized pole foundation base comprises four long angle steel (1) severing as vertical posts and two short angle steel (2) serving as ground supports, wherein the four long angle steel are vertical to the ground and are arranged symmetrically and in parallel with each other; the opening of each angle steel points outwards; a space encircled by the four long angle steel matches the outer edge of a section of a vertical pole; two adjacent long angel steel are connected through cotter pins (5) and nuts; the two short angle steel are arranged to be vertical to the long angle steel at the position having a distance of 1.3 m to the bottom of each long angle steel; each short angle steel is fixed on two long angle steel through bolts (6) and nuts; and the two short angle steel are parallel with each other and are vertical to the long angle steel. The method for rush-repairing the electric power circuit pole in the paddy field can finish the rush-repair of the electric power circuit pole in the paddy field conveniently and rapidly, is convenient to assemble, firm in foundation and high in efficiency, ensures an erected wood pole to not swing leftwards and rightwards and the erected pole to be straight without any inclination, and can rush-repair the paddy field pole rapidly, safely and reliably.
Description
Technical field
The present invention relates to a kind of paddy field electric pole of electric power circuit emergency repair method, belong to technical field of power rush-repair.
Background technology
At present, due to the factor such as harsh weather or outside destroy, cause fall, disconnected bar accident happens occasionally, especially in paddy field, interim repairing is very difficult, require to restore electricity as early as possible, main cause: (1) because there is the cause of water, during excavation pit, the earth drift sand dug out falls after rise rapidly in hole fills and leads up foundation ditch, cause the rod buried depth of repairing inadequate, easily cause secondary to fall bar; (2) windproof bracing wire is also because the bracing wire hole degree of depth not very easily causes in bracing wire and pulls out, and loses bracing wire effect, causes in repairing process to fall that bar is high falls accident.
Summary of the invention
The object of the invention is to provide a kind of paddy field electric pole of electric power circuit emergency repair method, and the convenient and swift paddy field electric pole of electric power circuit that completes is rushed to repair, and is convenient to assembling, be built on the rock, efficiency is high, guarantees the rod not double swerve erected, institute's pole erecting does not vertically tilt, and solves the problems referred to above that background technology exists.
Technical scheme of the present invention is:
A kind of paddy field electric pole of electric power circuit repairing special-purpose electrical pole sole plate, comprise four long angle steel as column and two angle cleats as ground supports, four long angle steel vertical grounds, be parallel to each other and be arranged symmetrically with, the outward opening of angle steel, the outer, electric pole cross section of the space that four long angle steel surround and setting matches; Connected by drift bolt, nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arranges two angle cleats, and every root angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel.
The position that four described long angle steel are connected with two angle cleats is provided with fixed platform, and four fixed platforms are welded on four long angle steel respectively, and four fixed platforms are provided with installing hole, and every root angle cleat is fixed in two fixed platforms by bolt and nut.
Described long angle steel, top is provided with punch panel, is convenient to be impacted by long angle steel into ground.
Described drift bolt amounts to 12, and the length of drift bolt is greater than the pole diameter of setting; The long angle steel of every root is arranged three holes: A hole, B hole and C hole, A hole is positioned at below angle cleat, and B hole is positioned at above angle cleat, and C hole is positioned at long angle steel top, A hole, B hole and C hole respectively corresponding drift bolt are passed, and two adjacent long angle steel are linked together by three drift bolts.
A kind of paddy field electric pole of electric power circuit emergency repair method, adopt above-mentioned special-purpose electrical pole sole plate to carry out, step is as follows:
When 1. needing repairing paddy field electric pole, on the ground, the outward opening of four long angle steel is erected in respectively the four sides of rod, long angle steel as far as possible with rod near; One group each other, every two long angle steel, are connected by drift bolt, nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arrange two angle cleats, every root angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel, namely make two of ground supports angle steel become an angle of 90 degrees with rod;
2. pole-foundation base and rod are placed into the position of paddy field repairing, hit the top of four long angle steel with iron hammer simultaneously, whole pole-foundation base pricker together with rod is entered 1.3 meters, underground, stop impact; Now two angle cleats of ground supports and ground connect reality, and two angle cleats play a supportive role;
3. then fastening drift bolt, nut, fastening bolt nut, makes pole-foundation base become firmly one with rod, is finally fastened by two of rod both sides angle cleats with sandbag of speedily carrying out rescue work, and completes paddy field electric pole of electric power circuit repairing.
Enter direction, underground not sideslip for controlling pole-foundation base pricker, after rod is erect, pole-foundation base installs drift bolt by rod diameter, fastening too not tight, enter 1.3 meters, underground, then fastening drift bolt along rod pricker, make pole-foundation base and rod firmly integral.
Feature of the present invention: facilitate Assembling, carrying; Rod and pole-foundation base are connected firmly, and can select drift bolt with bar footpath flexible in size; The angle cleat of ground supports does not limit by landform, can with sandbag or the compacting of plank place mat to lax soil property; Institute's pole erecting does not vertically tilt, and the firmness that pole-foundation base pricker enters under ground portion is directly imbedded far above electric pole; The angle cleat of ground supports, guarantees the rod not double swerve erected, plays the effect strengthening windproof bracing wire.
Good effect of the present invention: the convenient and swift paddy field electric pole of electric power circuit that completes is rushed to repair, and be convenient to assembling, be built on the rock, efficiency is high, and guarantee the rod not double swerve erected, institute's pole erecting does not vertically tilt, repairing paddy field electric pole fast, safely, reliably.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention schematic diagram;
Fig. 2 is that the embodiment of the present invention uses schematic diagram;
In figure: long angle steel 1, angle cleat 2, punch panel 3, fixed platform 4, drift bolt 5, bolt 6, rod 7, above-ground route 8, A hole 9, B hole 10, C hole 11.
Detailed description of the invention
Below in conjunction with accompanying drawing, by embodiment, the present invention will be further described.
A kind of paddy field electric pole of electric power circuit repairing special-purpose electrical pole sole plate, comprise as four long angle steel 1 of column and two angle cleats 2 as ground supports, four long angle steel vertical grounds, be parallel to each other and be arranged symmetrically with, the outward opening of angle steel, the outer, electric pole cross section of the space that four long angle steel surround and setting matches; Connected by drift bolt 5, nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arranges two angle cleats, and every root angle cleat is fixed on two long angle steel by bolt 6 nut, and two angle cleats are parallel to each other, all vertical with long angle steel.
The position that four described long angle steel are connected with two angle cleats is provided with fixed platform 4, and four fixed platforms are welded on four long angle steel respectively, and four fixed platforms are provided with installing hole, and every root angle cleat is fixed in two fixed platforms by bolt and nut.
Described long angle steel, top is provided with punch panel 3, is convenient to be impacted by long angle steel into ground.
Described drift bolt amounts to 12, and the length of drift bolt is greater than the pole diameter of setting; The long angle steel of every root is arranged three holes: A hole, B hole and C hole, A hole 9 is positioned at below angle cleat, and B hole 10 is positioned at above angle cleat, and C hole 11 is positioned at long angle steel top, A hole, B hole and C hole respectively corresponding drift bolt are passed, and two adjacent long angle steel are linked together by three drift bolts.
A kind of paddy field electric pole of electric power circuit emergency repair method, adopt above-mentioned special-purpose electrical pole sole plate to carry out, step is as follows:
When 1. needing repairing paddy field electric pole, on the ground, the outward opening of four long angle steel is erected in respectively the four sides of rod, long angle steel as far as possible with rod near; One group each other, every two long angle steel, are connected by drift bolt, nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arrange two angle cleats, every root angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel, namely make two of ground supports angle steel become an angle of 90 degrees with rod;
2. pole-foundation base and rod are placed into the position of paddy field repairing, hit the top of four long angle steel with iron hammer simultaneously, whole pole-foundation base pricker together with rod is entered 1.3 meters, underground, stop impact; Now two angle cleats of ground supports and ground connect reality, and two angle cleats play a supportive role;
3. then fastening drift bolt, nut, fastening bolt nut, makes pole-foundation base become firmly one with rod, is finally fastened by two of rod both sides angle cleats with sandbag of speedily carrying out rescue work, and completes paddy field electric pole of electric power circuit repairing.
In an embodiment, the specification of four long angle steel is ∠ 63 × 6 × 2300, and the specification of two angle cleats is ∠ 63 × 6 × 1500, and ground supports angle cleat can lengthen according to topographic features.
Embodiment more specifically:
1. the interior angle of four long angle steel is outwards erected in respectively the surrounding of rod, long angle steel as far as possible with rod near, every two one group each other, make two fixed platforms at same plane simultaneously, guarantee that the angle cleat of next step ground supports of installing becomes an angle of 90 degrees with rod, in order to prevent pole-foundation base from being forbidden in direction when pricker enters ground, drift bolt being installed in the A hole of four long angle steel and fixing, but can not be too tight, otherwise difficulty when causing pricker to enter ground;
2. install drift bolt to fix in the B hole of four long angle steel, attention can not be fixed too tight, otherwise difficulty when causing pricker to enter ground;
3. install drift bolt to fix in the C hole of four long angle steel, attention can not be fixed too tight, otherwise difficulty when causing iron hammer pricker to enter ground;
4. the angle cleat as ground supports becomes 90 degree with rod, is fixed in fixed platform with four bolts by ground supports angle cleat, guarantees that two angle cleats are in same level;
5. hit the punch panel at 4 long angle steel tops with iron hammer simultaneously, whole pole-foundation base pricker is entered 1.3 meters, underground, makes the angle cleat of ground supports and ground connect reality; Then the drift bolt in fastening A hole, B hole and C hole, makes pole-foundation base and rod become firm one, is finally fastened by two of ground supports angle cleats in rod both sides with sandbag of speedily carrying out rescue work, complete repairing.
Claims (2)
1. a paddy field electric pole of electric power circuit emergency repair method, is characterized in that step is as follows:
1. special-purpose electrical pole sole plate is used to carry out, this pole-foundation base comprises four long angle steel (1) as column and two angle cleats (2) as ground supports, four long angle steel vertical grounds, be parallel to each other and be arranged symmetrically with, the outward opening of long angle steel, the outer, electric pole cross section of the space that four long angle steel surround and setting matches; Connected by drift bolt (5), nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arranges two angle cleats, and every root angle cleat is fixed on two long angle steel by bolt (6) nut, and two angle cleats are parallel to each other, all vertical with long angle steel;
The position that four described long angle steel are connected with two angle cleats is provided with fixed platform (4), four fixed platforms are welded on four long angle steel respectively, four fixed platforms are provided with installing hole, and every root angle cleat is fixed in two fixed platforms by bolt and nut;
When 2. needing repairing paddy field electric pole, on the ground, the outward opening of four long angle steel is erected in respectively the four sides of rod, long angle steel as far as possible with rod near; One group each other, every two long angle steel, are connected by drift bolt, nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arrange two angle cleats, every root angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel, namely make two of ground supports angle cleats become an angle of 90 degrees with rod;
3. pole-foundation base and rod are placed into the position of paddy field repairing, hit the top of four long angle steel with iron hammer simultaneously, whole pole-foundation base pricker together with rod is entered 1.3 meters, underground, stop impact; Now two angle cleats of ground supports and ground connect reality, and two angle cleats play a supportive role;
4. then fastening drift bolt, nut, fastening bolt nut, makes pole-foundation base become firmly one with rod, is finally fastened by two of rod both sides angle cleats with sandbag of speedily carrying out rescue work, and completes paddy field electric pole of electric power circuit repairing.
2. a kind of paddy field according to claim 1 electric pole of electric power circuit emergency repair method, it is characterized in that: the position that four described long angle steel are connected with two angle cleats is provided with fixed platform (4), four fixed platforms are welded on four long angle steel respectively, four fixed platforms are provided with installing hole, and every root angle cleat is fixed in two fixed platforms by bolt and nut; Described long angle steel, top is provided with punch panel (3); Described drift bolt amounts to 12, and the length of drift bolt is greater than the pole diameter of setting; The long angle steel of every root is arranged three holes: A hole, B hole and C hole, A hole (9) is positioned at below angle cleat, and B hole (10) are positioned at above angle cleat, and C hole (11) are positioned at long angle steel top, A hole, B hole and C hole respectively corresponding drift bolt are passed, and two adjacent long angle steel are linked together by three drift bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310197273.5A CN103243955B (en) | 2013-05-24 | 2013-05-24 | Method for rush-repairing electric power circuit pole in paddy field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310197273.5A CN103243955B (en) | 2013-05-24 | 2013-05-24 | Method for rush-repairing electric power circuit pole in paddy field |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103243955A CN103243955A (en) | 2013-08-14 |
CN103243955B true CN103243955B (en) | 2015-02-04 |
Family
ID=48923802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310197273.5A Active CN103243955B (en) | 2013-05-24 | 2013-05-24 | Method for rush-repairing electric power circuit pole in paddy field |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103243955B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107327201A (en) * | 2016-04-29 | 2017-11-07 | 罗得之 | The fixing device of column piece |
CN106760897B (en) * | 2016-11-28 | 2019-01-25 | 国网河南偃师市供电公司 | A kind of cement or steel pipe electric pole means for correcting |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2178955Y (en) * | 1993-10-13 | 1994-10-05 | 成都市玻璃钢制品厂 | Multipurpose rush-repair bar |
JP2002266521A (en) * | 2001-03-05 | 2002-09-18 | Setsu Igawa | Ground foundation for carp streamer pole |
JP2007270547A (en) * | 2006-03-31 | 2007-10-18 | Nippon Steel Corp | Structure and method for installing steel pipe pole |
CN201372599Y (en) * | 2008-12-25 | 2009-12-30 | 广东和发输变电安装有限公司 | Fast first-aid repair system for transmission line |
CN201531140U (en) * | 2009-11-11 | 2010-07-21 | 西北电网有限公司 | 750KVFRP composite material emergency repair pole tower |
CN101824932A (en) * | 2010-03-23 | 2010-09-08 | 宁波天弘电力器具有限公司 | Tower section of rush repair tower |
CN203230219U (en) * | 2013-05-24 | 2013-10-09 | 国家电网公司 | Electrical pole foundation specialized for rush-repair of electrical power line of paddy field |
-
2013
- 2013-05-24 CN CN201310197273.5A patent/CN103243955B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2178955Y (en) * | 1993-10-13 | 1994-10-05 | 成都市玻璃钢制品厂 | Multipurpose rush-repair bar |
JP2002266521A (en) * | 2001-03-05 | 2002-09-18 | Setsu Igawa | Ground foundation for carp streamer pole |
JP2007270547A (en) * | 2006-03-31 | 2007-10-18 | Nippon Steel Corp | Structure and method for installing steel pipe pole |
CN201372599Y (en) * | 2008-12-25 | 2009-12-30 | 广东和发输变电安装有限公司 | Fast first-aid repair system for transmission line |
CN201531140U (en) * | 2009-11-11 | 2010-07-21 | 西北电网有限公司 | 750KVFRP composite material emergency repair pole tower |
CN101824932A (en) * | 2010-03-23 | 2010-09-08 | 宁波天弘电力器具有限公司 | Tower section of rush repair tower |
CN203230219U (en) * | 2013-05-24 | 2013-10-09 | 国家电网公司 | Electrical pole foundation specialized for rush-repair of electrical power line of paddy field |
Also Published As
Publication number | Publication date |
---|---|
CN103243955A (en) | 2013-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100564700C (en) | The job practices of lattice type steel column tower crane pedestal | |
CN105155569A (en) | Construction device and method for offshore wind turbine foundation with piling performed later | |
CN105155549A (en) | Partition support system for large-area deep foundation pit under forward and backward working condition, and construction method thereof | |
KR101879141B1 (en) | Foundation reinforcement structure for solar photovoltaic apparatus | |
CN203654294U (en) | Foundation pit supporting structure used in reverse building method | |
CN103498475B (en) | Foundation pit supporting structure for controlling existing building deformation and construction method for excavating foundation pit | |
CN201053123Y (en) | Deep foundation ditch tower crane platform base frame | |
CN106759448A (en) | A kind of sunk type agricultural greenhouse photovoltaic bracket foundation structure and its construction method | |
CN102561384A (en) | Steel hoop truss type elevated pile cap tower crane foundation construction method and structure | |
CN205975658U (en) | Steel platform tower crane foundation | |
CN109505298A (en) | A kind of self-balancing foundation pit enclosure method | |
KR102084829B1 (en) | Top-down method using precast-concrete colum | |
CN105586985A (en) | Construction method of subway envelop enclosure structure and subway envelop enclosure structure | |
CN104532856A (en) | Fabricated lattice unit for foundation pit supporting and installation method | |
CN206768570U (en) | A kind of foundation ditch assembled steel trestle | |
CN103243955B (en) | Method for rush-repairing electric power circuit pole in paddy field | |
CN104711931A (en) | Novel temporary underwater pier manufacturing, assembling and disassembling method suitable for bridge erection | |
CN104195956A (en) | Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof | |
US9238921B2 (en) | Method and arrangements relating to foundation for antenna mast of wireless communication system | |
CN203498839U (en) | Foundation pit retaining structure for controlling deformation of existing building | |
CN104452775A (en) | Prestress support used for foundation pit and construction method | |
CN205529843U (en) | Landing stage anchor structure | |
CN204825955U (en) | After drive piles construction equipment on marine fan basis | |
CN104863406A (en) | Arranging method of support used for solar panel bracket based on pouring impact mode | |
CN203230219U (en) | Electrical pole foundation specialized for rush-repair of electrical power line of paddy field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |