CN103243955B - Method for rush-repairing electric power circuit pole in paddy field - Google Patents

Method for rush-repairing electric power circuit pole in paddy field Download PDF

Info

Publication number
CN103243955B
CN103243955B CN201310197273.5A CN201310197273A CN103243955B CN 103243955 B CN103243955 B CN 103243955B CN 201310197273 A CN201310197273 A CN 201310197273A CN 103243955 B CN103243955 B CN 103243955B
Authority
CN
China
Prior art keywords
angle steel
pole
long
long angle
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310197273.5A
Other languages
Chinese (zh)
Other versions
CN103243955A (en
Inventor
于成功
王静波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TANGSHAN POWER SUPPLY COMPANY JIBEI POWER CO LTD
State Grid Corp of China SGCC
Original Assignee
TANGSHAN POWER SUPPLY COMPANY JIBEI POWER CO LTD
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TANGSHAN POWER SUPPLY COMPANY JIBEI POWER CO LTD, State Grid Corp of China SGCC filed Critical TANGSHAN POWER SUPPLY COMPANY JIBEI POWER CO LTD
Priority to CN201310197273.5A priority Critical patent/CN103243955B/en
Publication of CN103243955A publication Critical patent/CN103243955A/en
Application granted granted Critical
Publication of CN103243955B publication Critical patent/CN103243955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The invention relates to a method for rush-repairing an electric power circuit pole in a paddy field and a specialized pole foundation base, belonging to the technical field of power rush-repair. The technical scheme is that the specialized pole foundation base comprises four long angle steel (1) severing as vertical posts and two short angle steel (2) serving as ground supports, wherein the four long angle steel are vertical to the ground and are arranged symmetrically and in parallel with each other; the opening of each angle steel points outwards; a space encircled by the four long angle steel matches the outer edge of a section of a vertical pole; two adjacent long angel steel are connected through cotter pins (5) and nuts; the two short angle steel are arranged to be vertical to the long angle steel at the position having a distance of 1.3 m to the bottom of each long angle steel; each short angle steel is fixed on two long angle steel through bolts (6) and nuts; and the two short angle steel are parallel with each other and are vertical to the long angle steel. The method for rush-repairing the electric power circuit pole in the paddy field can finish the rush-repair of the electric power circuit pole in the paddy field conveniently and rapidly, is convenient to assemble, firm in foundation and high in efficiency, ensures an erected wood pole to not swing leftwards and rightwards and the erected pole to be straight without any inclination, and can rush-repair the paddy field pole rapidly, safely and reliably.

Description

A kind of paddy field electric pole of electric power circuit emergency repair method
Technical field
The present invention relates to a kind of paddy field electric pole of electric power circuit emergency repair method, belong to technical field of power rush-repair.
Background technology
At present, due to the factor such as harsh weather or outside destroy, cause fall, disconnected bar accident happens occasionally, especially in paddy field, interim repairing is very difficult, require to restore electricity as early as possible, main cause: (1) because there is the cause of water, during excavation pit, the earth drift sand dug out falls after rise rapidly in hole fills and leads up foundation ditch, cause the rod buried depth of repairing inadequate, easily cause secondary to fall bar; (2) windproof bracing wire is also because the bracing wire hole degree of depth not very easily causes in bracing wire and pulls out, and loses bracing wire effect, causes in repairing process to fall that bar is high falls accident.
Summary of the invention
The object of the invention is to provide a kind of paddy field electric pole of electric power circuit emergency repair method, and the convenient and swift paddy field electric pole of electric power circuit that completes is rushed to repair, and is convenient to assembling, be built on the rock, efficiency is high, guarantees the rod not double swerve erected, institute's pole erecting does not vertically tilt, and solves the problems referred to above that background technology exists.
Technical scheme of the present invention is:
A kind of paddy field electric pole of electric power circuit repairing special-purpose electrical pole sole plate, comprise four long angle steel as column and two angle cleats as ground supports, four long angle steel vertical grounds, be parallel to each other and be arranged symmetrically with, the outward opening of angle steel, the outer, electric pole cross section of the space that four long angle steel surround and setting matches; Connected by drift bolt, nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arranges two angle cleats, and every root angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel.
The position that four described long angle steel are connected with two angle cleats is provided with fixed platform, and four fixed platforms are welded on four long angle steel respectively, and four fixed platforms are provided with installing hole, and every root angle cleat is fixed in two fixed platforms by bolt and nut.
Described long angle steel, top is provided with punch panel, is convenient to be impacted by long angle steel into ground.
Described drift bolt amounts to 12, and the length of drift bolt is greater than the pole diameter of setting; The long angle steel of every root is arranged three holes: A hole, B hole and C hole, A hole is positioned at below angle cleat, and B hole is positioned at above angle cleat, and C hole is positioned at long angle steel top, A hole, B hole and C hole respectively corresponding drift bolt are passed, and two adjacent long angle steel are linked together by three drift bolts.
A kind of paddy field electric pole of electric power circuit emergency repair method, adopt above-mentioned special-purpose electrical pole sole plate to carry out, step is as follows:
When 1. needing repairing paddy field electric pole, on the ground, the outward opening of four long angle steel is erected in respectively the four sides of rod, long angle steel as far as possible with rod near; One group each other, every two long angle steel, are connected by drift bolt, nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arrange two angle cleats, every root angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel, namely make two of ground supports angle steel become an angle of 90 degrees with rod;
2. pole-foundation base and rod are placed into the position of paddy field repairing, hit the top of four long angle steel with iron hammer simultaneously, whole pole-foundation base pricker together with rod is entered 1.3 meters, underground, stop impact; Now two angle cleats of ground supports and ground connect reality, and two angle cleats play a supportive role;
3. then fastening drift bolt, nut, fastening bolt nut, makes pole-foundation base become firmly one with rod, is finally fastened by two of rod both sides angle cleats with sandbag of speedily carrying out rescue work, and completes paddy field electric pole of electric power circuit repairing.
Enter direction, underground not sideslip for controlling pole-foundation base pricker, after rod is erect, pole-foundation base installs drift bolt by rod diameter, fastening too not tight, enter 1.3 meters, underground, then fastening drift bolt along rod pricker, make pole-foundation base and rod firmly integral.
Feature of the present invention: facilitate Assembling, carrying; Rod and pole-foundation base are connected firmly, and can select drift bolt with bar footpath flexible in size; The angle cleat of ground supports does not limit by landform, can with sandbag or the compacting of plank place mat to lax soil property; Institute's pole erecting does not vertically tilt, and the firmness that pole-foundation base pricker enters under ground portion is directly imbedded far above electric pole; The angle cleat of ground supports, guarantees the rod not double swerve erected, plays the effect strengthening windproof bracing wire.
Good effect of the present invention: the convenient and swift paddy field electric pole of electric power circuit that completes is rushed to repair, and be convenient to assembling, be built on the rock, efficiency is high, and guarantee the rod not double swerve erected, institute's pole erecting does not vertically tilt, repairing paddy field electric pole fast, safely, reliably.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention schematic diagram;
Fig. 2 is that the embodiment of the present invention uses schematic diagram;
In figure: long angle steel 1, angle cleat 2, punch panel 3, fixed platform 4, drift bolt 5, bolt 6, rod 7, above-ground route 8, A hole 9, B hole 10, C hole 11.
Detailed description of the invention
Below in conjunction with accompanying drawing, by embodiment, the present invention will be further described.
A kind of paddy field electric pole of electric power circuit repairing special-purpose electrical pole sole plate, comprise as four long angle steel 1 of column and two angle cleats 2 as ground supports, four long angle steel vertical grounds, be parallel to each other and be arranged symmetrically with, the outward opening of angle steel, the outer, electric pole cross section of the space that four long angle steel surround and setting matches; Connected by drift bolt 5, nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arranges two angle cleats, and every root angle cleat is fixed on two long angle steel by bolt 6 nut, and two angle cleats are parallel to each other, all vertical with long angle steel.
The position that four described long angle steel are connected with two angle cleats is provided with fixed platform 4, and four fixed platforms are welded on four long angle steel respectively, and four fixed platforms are provided with installing hole, and every root angle cleat is fixed in two fixed platforms by bolt and nut.
Described long angle steel, top is provided with punch panel 3, is convenient to be impacted by long angle steel into ground.
Described drift bolt amounts to 12, and the length of drift bolt is greater than the pole diameter of setting; The long angle steel of every root is arranged three holes: A hole, B hole and C hole, A hole 9 is positioned at below angle cleat, and B hole 10 is positioned at above angle cleat, and C hole 11 is positioned at long angle steel top, A hole, B hole and C hole respectively corresponding drift bolt are passed, and two adjacent long angle steel are linked together by three drift bolts.
A kind of paddy field electric pole of electric power circuit emergency repair method, adopt above-mentioned special-purpose electrical pole sole plate to carry out, step is as follows:
When 1. needing repairing paddy field electric pole, on the ground, the outward opening of four long angle steel is erected in respectively the four sides of rod, long angle steel as far as possible with rod near; One group each other, every two long angle steel, are connected by drift bolt, nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arrange two angle cleats, every root angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel, namely make two of ground supports angle steel become an angle of 90 degrees with rod;
2. pole-foundation base and rod are placed into the position of paddy field repairing, hit the top of four long angle steel with iron hammer simultaneously, whole pole-foundation base pricker together with rod is entered 1.3 meters, underground, stop impact; Now two angle cleats of ground supports and ground connect reality, and two angle cleats play a supportive role;
3. then fastening drift bolt, nut, fastening bolt nut, makes pole-foundation base become firmly one with rod, is finally fastened by two of rod both sides angle cleats with sandbag of speedily carrying out rescue work, and completes paddy field electric pole of electric power circuit repairing.
In an embodiment, the specification of four long angle steel is ∠ 63 × 6 × 2300, and the specification of two angle cleats is ∠ 63 × 6 × 1500, and ground supports angle cleat can lengthen according to topographic features.
Embodiment more specifically:
1. the interior angle of four long angle steel is outwards erected in respectively the surrounding of rod, long angle steel as far as possible with rod near, every two one group each other, make two fixed platforms at same plane simultaneously, guarantee that the angle cleat of next step ground supports of installing becomes an angle of 90 degrees with rod, in order to prevent pole-foundation base from being forbidden in direction when pricker enters ground, drift bolt being installed in the A hole of four long angle steel and fixing, but can not be too tight, otherwise difficulty when causing pricker to enter ground;
2. install drift bolt to fix in the B hole of four long angle steel, attention can not be fixed too tight, otherwise difficulty when causing pricker to enter ground;
3. install drift bolt to fix in the C hole of four long angle steel, attention can not be fixed too tight, otherwise difficulty when causing iron hammer pricker to enter ground;
4. the angle cleat as ground supports becomes 90 degree with rod, is fixed in fixed platform with four bolts by ground supports angle cleat, guarantees that two angle cleats are in same level;
5. hit the punch panel at 4 long angle steel tops with iron hammer simultaneously, whole pole-foundation base pricker is entered 1.3 meters, underground, makes the angle cleat of ground supports and ground connect reality; Then the drift bolt in fastening A hole, B hole and C hole, makes pole-foundation base and rod become firm one, is finally fastened by two of ground supports angle cleats in rod both sides with sandbag of speedily carrying out rescue work, complete repairing.

Claims (2)

1. a paddy field electric pole of electric power circuit emergency repair method, is characterized in that step is as follows:
1. special-purpose electrical pole sole plate is used to carry out, this pole-foundation base comprises four long angle steel (1) as column and two angle cleats (2) as ground supports, four long angle steel vertical grounds, be parallel to each other and be arranged symmetrically with, the outward opening of long angle steel, the outer, electric pole cross section of the space that four long angle steel surround and setting matches; Connected by drift bolt (5), nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arranges two angle cleats, and every root angle cleat is fixed on two long angle steel by bolt (6) nut, and two angle cleats are parallel to each other, all vertical with long angle steel;
The position that four described long angle steel are connected with two angle cleats is provided with fixed platform (4), four fixed platforms are welded on four long angle steel respectively, four fixed platforms are provided with installing hole, and every root angle cleat is fixed in two fixed platforms by bolt and nut;
When 2. needing repairing paddy field electric pole, on the ground, the outward opening of four long angle steel is erected in respectively the four sides of rod, long angle steel as far as possible with rod near; One group each other, every two long angle steel, are connected by drift bolt, nut between two adjacent long angle steel; The position of 1.3 meters bottom distance angle steel, vertically with long angle steel arrange two angle cleats, every root angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel, namely make two of ground supports angle cleats become an angle of 90 degrees with rod;
3. pole-foundation base and rod are placed into the position of paddy field repairing, hit the top of four long angle steel with iron hammer simultaneously, whole pole-foundation base pricker together with rod is entered 1.3 meters, underground, stop impact; Now two angle cleats of ground supports and ground connect reality, and two angle cleats play a supportive role;
4. then fastening drift bolt, nut, fastening bolt nut, makes pole-foundation base become firmly one with rod, is finally fastened by two of rod both sides angle cleats with sandbag of speedily carrying out rescue work, and completes paddy field electric pole of electric power circuit repairing.
2. a kind of paddy field according to claim 1 electric pole of electric power circuit emergency repair method, it is characterized in that: the position that four described long angle steel are connected with two angle cleats is provided with fixed platform (4), four fixed platforms are welded on four long angle steel respectively, four fixed platforms are provided with installing hole, and every root angle cleat is fixed in two fixed platforms by bolt and nut; Described long angle steel, top is provided with punch panel (3); Described drift bolt amounts to 12, and the length of drift bolt is greater than the pole diameter of setting; The long angle steel of every root is arranged three holes: A hole, B hole and C hole, A hole (9) is positioned at below angle cleat, and B hole (10) are positioned at above angle cleat, and C hole (11) are positioned at long angle steel top, A hole, B hole and C hole respectively corresponding drift bolt are passed, and two adjacent long angle steel are linked together by three drift bolts.
CN201310197273.5A 2013-05-24 2013-05-24 Method for rush-repairing electric power circuit pole in paddy field Active CN103243955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310197273.5A CN103243955B (en) 2013-05-24 2013-05-24 Method for rush-repairing electric power circuit pole in paddy field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310197273.5A CN103243955B (en) 2013-05-24 2013-05-24 Method for rush-repairing electric power circuit pole in paddy field

Publications (2)

Publication Number Publication Date
CN103243955A CN103243955A (en) 2013-08-14
CN103243955B true CN103243955B (en) 2015-02-04

Family

ID=48923802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310197273.5A Active CN103243955B (en) 2013-05-24 2013-05-24 Method for rush-repairing electric power circuit pole in paddy field

Country Status (1)

Country Link
CN (1) CN103243955B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327201A (en) * 2016-04-29 2017-11-07 罗得之 The fixing device of column piece
CN106760897B (en) * 2016-11-28 2019-01-25 国网河南偃师市供电公司 A kind of cement or steel pipe electric pole means for correcting

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2178955Y (en) * 1993-10-13 1994-10-05 成都市玻璃钢制品厂 Multipurpose rush-repair bar
JP2002266521A (en) * 2001-03-05 2002-09-18 Setsu Igawa Ground foundation for carp streamer pole
JP2007270547A (en) * 2006-03-31 2007-10-18 Nippon Steel Corp Structure and method for installing steel pipe pole
CN201372599Y (en) * 2008-12-25 2009-12-30 广东和发输变电安装有限公司 Fast first-aid repair system for transmission line
CN201531140U (en) * 2009-11-11 2010-07-21 西北电网有限公司 750KVFRP composite material emergency repair pole tower
CN101824932A (en) * 2010-03-23 2010-09-08 宁波天弘电力器具有限公司 Tower section of rush repair tower
CN203230219U (en) * 2013-05-24 2013-10-09 国家电网公司 Electrical pole foundation specialized for rush-repair of electrical power line of paddy field

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2178955Y (en) * 1993-10-13 1994-10-05 成都市玻璃钢制品厂 Multipurpose rush-repair bar
JP2002266521A (en) * 2001-03-05 2002-09-18 Setsu Igawa Ground foundation for carp streamer pole
JP2007270547A (en) * 2006-03-31 2007-10-18 Nippon Steel Corp Structure and method for installing steel pipe pole
CN201372599Y (en) * 2008-12-25 2009-12-30 广东和发输变电安装有限公司 Fast first-aid repair system for transmission line
CN201531140U (en) * 2009-11-11 2010-07-21 西北电网有限公司 750KVFRP composite material emergency repair pole tower
CN101824932A (en) * 2010-03-23 2010-09-08 宁波天弘电力器具有限公司 Tower section of rush repair tower
CN203230219U (en) * 2013-05-24 2013-10-09 国家电网公司 Electrical pole foundation specialized for rush-repair of electrical power line of paddy field

Also Published As

Publication number Publication date
CN103243955A (en) 2013-08-14

Similar Documents

Publication Publication Date Title
CN100564700C (en) The job practices of lattice type steel column tower crane pedestal
CN105155569A (en) Construction device and method for offshore wind turbine foundation with piling performed later
CN105155549A (en) Partition support system for large-area deep foundation pit under forward and backward working condition, and construction method thereof
KR101879141B1 (en) Foundation reinforcement structure for solar photovoltaic apparatus
CN203654294U (en) Foundation pit supporting structure used in reverse building method
CN103498475B (en) Foundation pit supporting structure for controlling existing building deformation and construction method for excavating foundation pit
CN201053123Y (en) Deep foundation ditch tower crane platform base frame
CN106759448A (en) A kind of sunk type agricultural greenhouse photovoltaic bracket foundation structure and its construction method
CN102561384A (en) Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN205975658U (en) Steel platform tower crane foundation
CN109505298A (en) A kind of self-balancing foundation pit enclosure method
KR102084829B1 (en) Top-down method using precast-concrete colum
CN105586985A (en) Construction method of subway envelop enclosure structure and subway envelop enclosure structure
CN104532856A (en) Fabricated lattice unit for foundation pit supporting and installation method
CN206768570U (en) A kind of foundation ditch assembled steel trestle
CN103243955B (en) Method for rush-repairing electric power circuit pole in paddy field
CN104711931A (en) Novel temporary underwater pier manufacturing, assembling and disassembling method suitable for bridge erection
CN104195956A (en) Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof
US9238921B2 (en) Method and arrangements relating to foundation for antenna mast of wireless communication system
CN203498839U (en) Foundation pit retaining structure for controlling deformation of existing building
CN104452775A (en) Prestress support used for foundation pit and construction method
CN205529843U (en) Landing stage anchor structure
CN204825955U (en) After drive piles construction equipment on marine fan basis
CN104863406A (en) Arranging method of support used for solar panel bracket based on pouring impact mode
CN203230219U (en) Electrical pole foundation specialized for rush-repair of electrical power line of paddy field

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant