CN103243955A - Method for rush-repairing electric power circuit pole in paddy field and specialized pole foundation base - Google Patents
Method for rush-repairing electric power circuit pole in paddy field and specialized pole foundation base Download PDFInfo
- Publication number
- CN103243955A CN103243955A CN2013101972735A CN201310197273A CN103243955A CN 103243955 A CN103243955 A CN 103243955A CN 2013101972735 A CN2013101972735 A CN 2013101972735A CN 201310197273 A CN201310197273 A CN 201310197273A CN 103243955 A CN103243955 A CN 103243955A
- Authority
- CN
- China
- Prior art keywords
- angle steel
- pole
- hole
- long
- long angle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The invention relates to a method for rush-repairing an electric power circuit pole in a paddy field and a specialized pole foundation base, belonging to the technical field of power rush-repair. The technical scheme is that the specialized pole foundation base comprises four long angle steel (1) severing as vertical posts and two short angle steel (2) serving as ground supports, wherein the four long angle steel are vertical to the ground and are arranged symmetrically and in parallel with each other; the opening of each angle steel points outwards; a space encircled by the four long angle steel matches the outer edge of a section of a vertical pole; two adjacent long angel steel are connected through cotter pins (5) and nuts; the two short angle steel are arranged to be vertical to the long angle steel at the position having a distance of 1.3 m to the bottom of each long angle steel; each short angle steel is fixed on two long angle steel through bolts (6) and nuts; and the two short angle steel are parallel with each other and are vertical to the long angle steel. The method for rush-repairing the electric power circuit pole in the paddy field can finish the rush-repair of the electric power circuit pole in the paddy field conveniently and rapidly, is convenient to assemble, firm in foundation and high in efficiency, ensures an erected wood pole to not swing leftwards and rightwards and the erected pole to be straight without any inclination, and can rush-repair the paddy field pole rapidly, safely and reliably.
Description
Technical field
The present invention relates to a kind of paddy field power circuit electric pole emergency repair method and special-purpose pole-foundation base, belong to the electric power first-aid technical field.
Background technology
At present, because factors such as harsh weather or outside destroy, cause fall, disconnected bar accident happens occasionally, especially in the paddy field, interim repairing is very difficult, require to restore electricity as early as possible, main cause: ⑴ is because there is the cause of water, and during excavation pit, the earth drift sand that digs out falls after rise rapidly in the hole fills and leads up foundation ditch, cause the rod buried depth of repairing usefulness not enough, cause secondary to fall bar easily; ⑵ windproof backguy is also pulled out because the backguy hole degree of depth very easily causes in the backguy inadequately, loses the backguy effect, causes that the height of falling the bar falls accident in the repairing process.
Summary of the invention
The object of the invention provides a kind of paddy field power circuit electric pole emergency repair method and special-purpose pole-foundation base, the convenient and swift paddy field power circuit electric pole of finishing is rushed to repair, be convenient to assembling, be built on the rock, the efficient height, guarantee not double swerve of the rod that erects, institute's pole erecting does not vertically tilt, and solves the problems referred to above that background technology exists.
Technical scheme of the present invention is:
A kind of paddy field power circuit electric pole is rushed to repair special-purpose pole-foundation base, comprise as four long angle steel of column with as two angle cleats of ground supports, four long angle steel vertical grounds, symmetric arrangement is parallel to each other, the opening of angle steel is outside, and the space that four long angle steel surround and the outer, electric pole cross section of setting are complementary; Connect by drift bolt, nut between two adjacent long angle steel; The position that distance angle steel bottom is 1.3 meters vertically with long angle steel arranges two angle cleats, and every angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, and are all vertical with long angle steel.
Described four long angle steel are provided with fixed platform with the position that two angle cleats are connected, and four fixed platforms are welded on respectively on four long angle steel, and four fixed platforms are provided with installing hole, and every angle cleat is fixed on two fixed platforms by bolt and nut.
Described long angle steel, the top is provided with punch panel, is convenient to long angle steel is impacted into ground.
Described drift bolt amounts to 12, and the length of drift bolt is greater than the pole diameter of erectting; Three holes are set: A hole, B hole and C hole on the every long angle steel, the A hole is positioned at the angle cleat below, and the B hole is positioned at the angle cleat top, and the C hole is positioned at long angle steel top, A hole, B hole and C hole corresponding drift bolt are respectively passed, and two adjacent long angle steel link together by three drift bolts.
A kind of paddy field power circuit electric pole emergency repair method adopts above-mentioned special-purpose pole-foundation base to carry out, and step is as follows:
When 1. needing to rush to repair the paddy field electric pole, on the ground, the opening of four long angle steel outwards is erected in the four sides of rod respectively, long angle steel as far as possible with rod near; One group each other in per two long angle steel connect by drift bolt, nut between two adjacent long angle steel; The position that distance angle steel bottom is 1.3 meters, vertical with long angle steel two angle cleats are set, every angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel, just make two angle steel of ground supports become an angle of 90 degrees with rod;
2. pole-foundation base and rod are placed into the position that rush to repair in the paddy field, with the top that iron hammer hits four long angle steel simultaneously, whole pole-foundation base are gone into underground 1.3 meters with the rod pricker, stop to impact; This moment, two angle cleats and the ground of ground supports connect reality, and two angle cleats play a supportive role;
3. fastening drift bolt, nut then, the fastening bolt nut makes the pole-foundation base become firm one with rod, fastens with two angle cleats of sandbag with the rod both sides of speedily carrying out rescue work at last, finishes paddy field power circuit electric pole repairing.
Go into not sideslip of underground direction for control pole-foundation base pricker, after rod was erect, the pole-foundation base installed drift bolt by the rod diameter, do not want fastening too tight, go into underground 1.3 meters along the rod pricker, fastening drift bolt firmly is integral pole-foundation base and rod then.
Characteristics of the present invention: convenient on-the-spot assembling, carrying; Rod and pole-foundation base are connected firmly, and can select drift bolt with bar footpath flexible in size; The angle cleat of ground supports is not limited by landform, can be with sandbag or the compacting of plank place mat to lax soil property; Institute's pole erecting does not vertically tilt, and pole-foundation base pricker is gone into the firm degree of under ground portion and directly imbedded far above electric pole; The angle cleat of ground supports is guaranteed not double swerve of the rod that erects, plays the effect of strengthening windproof backguy.
Good effect of the present invention: convenient and swiftly finish the repairing of paddy field power circuit electric pole, be convenient to assembling, be built on the rock, the efficient height is guaranteed not double swerve of the rod that erects, and institute's pole erecting does not vertically tilt, repairing paddy field electric pole fast, safety, reliable.
Description of drawings
Fig. 1 is embodiment of the invention schematic diagram;
Fig. 2 uses schematic diagram for the embodiment of the invention;
Among the figure: long angle steel 1, angle cleat 2, punch panel 3, fixed platform 4, drift bolt 5, bolt 6, rod 7, above-ground route 8, A hole 9, B hole 10, C hole 11.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention will be further described by embodiment.
A kind of paddy field power circuit electric pole is rushed to repair special-purpose pole-foundation base, comprise as four long angle steel 1 of column with as two angle cleats 2 of ground supports, four long angle steel vertical grounds, symmetric arrangement is parallel to each other, the opening of angle steel is outside, and the space that four long angle steel surround and the outer, electric pole cross section of setting are complementary; Connect by drift bolt 5, nut between two adjacent long angle steel; The position that distance angle steel bottom is 1.3 meters vertically with long angle steel arranges two angle cleats, and every angle cleat is fixed on two long angle steel by bolt 6 nuts, and two angle cleats are parallel to each other, and are all vertical with long angle steel.
The position that described four long angle steel are connected with two angle cleats is provided with 4, four fixed platforms of fixed platform and is welded on respectively on four long angle steel, and four fixed platforms are provided with installing hole, and every angle cleat is fixed on two fixed platforms by bolt and nut.
Described long angle steel, the top is provided with punch panel 3, is convenient to long angle steel is impacted into ground.
Described drift bolt amounts to 12, and the length of drift bolt is greater than the pole diameter of erectting; Three holes are set: A hole, B hole and C hole on the every long angle steel, A hole 9 is positioned at the angle cleat below, and B hole 10 is positioned at the angle cleat top, and C hole 11 is positioned at long angle steel top, A hole, B hole and C hole corresponding drift bolt are respectively passed, and two adjacent long angle steel link together by three drift bolts.
A kind of paddy field power circuit electric pole emergency repair method adopts above-mentioned special-purpose pole-foundation base to carry out, and step is as follows:
When 1. needing to rush to repair the paddy field electric pole, on the ground, the opening of four long angle steel outwards is erected in the four sides of rod respectively, long angle steel as far as possible with rod near; One group each other in per two long angle steel connect by drift bolt, nut between two adjacent long angle steel; The position that distance angle steel bottom is 1.3 meters, vertical with long angle steel two angle cleats are set, every angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel, just make two angle steel of ground supports become an angle of 90 degrees with rod;
2. pole-foundation base and rod are placed into the position that rush to repair in the paddy field, with the top that iron hammer hits four long angle steel simultaneously, whole pole-foundation base are gone into underground 1.3 meters with the rod pricker, stop to impact; This moment, two angle cleats and the ground of ground supports connect reality, and two angle cleats play a supportive role;
3. fastening drift bolt, nut then, the fastening bolt nut makes the pole-foundation base become firm one with rod, fastens with two angle cleats of sandbag with the rod both sides of speedily carrying out rescue work at last, finishes paddy field power circuit electric pole repairing.
In an embodiment, the specification of four long angle steel is ∠ 63 * 6 * 2300, and the specification of two angle cleats is ∠ 63 * 6 * 1500, and the ground supports angle cleat can lengthen according to topographic features.
Embodiment more specifically:
1. the interior angle of four long angle steel outwards is erected in respectively rod around, long angle steel as far as possible with rod near, per two one group each other, make two fixed platforms on same plane simultaneously, the angle cleat of guaranteeing the ground supports of next step installation becomes an angle of 90 degrees with rod, and is inaccurate in order to prevent pole-foundation base direction when pricker is gone into ground, in the A hole of four long angle steel drift bolt is installed and fixed, but can not be too tight, otherwise difficulty when causing pricker to go into ground;
2. drift bolt is installed in the B hole of four long angle steel is fixed, attention can not be fixed too tight, otherwise difficulty when causing pricker to go into ground;
3. drift bolt is installed in the C hole of four long angle steel is fixed, attention can not be fixed too tight, otherwise difficulty when causing the iron hammer pricker to go into ground;
4. the angle cleat as ground supports becomes 90 degree with rod, with four bolts the ground supports angle cleat is fixed on the fixed platform, guarantees that two angle cleats are at same horizontal plane;
5. hit the punch panel at 4 long angle steel tops with iron hammer simultaneously, whole pole-foundation base pricker is gone into underground 1.3 meters, make the angle cleat of ground supports and ground connect reality; The drift bolt in fastening A hole, B hole and C hole makes pole-foundation base and rod become firm one then, two angle cleats of ground supports is fastened in the rod both sides with the sandbag of speedily carrying out rescue work at last, finishes repairing.
Claims (7)
1. a paddy field power circuit electric pole is rushed to repair special-purpose pole-foundation base, it is characterized in that: comprise as four long angle steel (1) of column with as two angle cleats (2) of ground supports, four long angle steel vertical grounds, symmetric arrangement is parallel to each other, the opening of angle steel is outside, and the space that four long angle steel surround and the outer, electric pole cross section of setting are complementary; Connect by drift bolt (5), nut between two adjacent long angle steel; The position that distance angle steel bottom is 1.3 meters vertically with long angle steel arranges two angle cleats, and every angle cleat is fixed on two long angle steel by bolt (6) nut, and two angle cleats are parallel to each other, and are all vertical with long angle steel.
2. a kind of paddy field according to claim 1 power circuit electric pole is rushed to repair special-purpose pole-foundation base, it is characterized in that: the position that described four long angle steel are connected with two angle cleats is provided with fixed platform (4), four fixed platforms are welded on respectively on four long angle steel, four fixed platforms are provided with installing hole, and every angle cleat is fixed on two fixed platforms by bolt and nut.
3. a kind of paddy field according to claim 1 and 2 power circuit electric pole is rushed to repair special-purpose pole-foundation base, and it is characterized in that: described long angle steel, top are provided with punch panel (3).
4. a kind of paddy field according to claim 1 and 2 power circuit electric pole is rushed to repair special-purpose pole-foundation base, it is characterized in that: described drift bolt amounts to 12, and the length of drift bolt is greater than the pole diameter of erectting; Three holes are set: A hole, B hole and C hole on the every long angle steel, A hole (9) is positioned at the angle cleat below, and B hole (10) are positioned at the angle cleat top, and C hole (11) are positioned at long angle steel top, A hole, B hole and C hole corresponding drift bolt are respectively passed, and two adjacent long angle steel link together by three drift bolts.
5. paddy field power circuit electric pole emergency repair method, right to use require the 1 special-purpose pole-foundation base that limits to carry out, and it is characterized in that step is as follows:
When 1. needing to rush to repair the paddy field electric pole, on the ground, the opening of four long angle steel outwards is erected in the four sides of rod respectively, long angle steel as far as possible with rod near; One group each other in per two long angle steel connect by drift bolt, nut between two adjacent long angle steel; The position that distance angle steel bottom is 1.3 meters, vertical with long angle steel two angle cleats are set, every angle cleat is fixed on two long angle steel by bolt and nut, and two angle cleats are parallel to each other, all vertical with long angle steel, just make two angle steel of ground supports become an angle of 90 degrees with rod;
2. pole-foundation base and rod are placed into the position that rush to repair in the paddy field, with the top that iron hammer hits four long angle steel simultaneously, whole pole-foundation base are gone into underground 1.3 meters with the rod pricker, stop to impact; This moment, two angle cleats and the ground of ground supports connect reality, and two angle cleats play a supportive role;
3. fastening drift bolt, nut then, the fastening bolt nut makes the pole-foundation base become firm one with rod, fastens with two angle cleats of sandbag with the rod both sides of speedily carrying out rescue work at last, finishes paddy field power circuit electric pole repairing.
6. a kind of paddy field according to claim 5 power circuit electric pole emergency repair method, it is characterized in that: the position that described four long angle steel are connected with two angle cleats is provided with fixed platform (4), four fixed platforms are welded on respectively on four long angle steel, four fixed platforms are provided with installing hole, and every angle cleat is fixed on two fixed platforms by bolt and nut; Described long angle steel, top are provided with punch panel (3); Described drift bolt amounts to 12, and the length of drift bolt is greater than the pole diameter of erectting; Three holes are set: A hole, B hole and C hole on the every long angle steel, A hole (9) is positioned at the angle cleat below, and B hole (10) are positioned at the angle cleat top, and C hole (11) are positioned at long angle steel top, A hole, B hole and C hole corresponding drift bolt are respectively passed, and two adjacent long angle steel link together by three drift bolts.
7. a kind of paddy field according to claim 6 power circuit electric pole emergency repair method is characterized in that step more specifically:
1. the interior angle of four long angle steel outwards is erected in respectively rod around, long angle steel as far as possible with rod near, per two one group each other, make two fixed platforms on same plane simultaneously, the angle cleat of guaranteeing the ground supports of next step installation becomes an angle of 90 degrees with rod, inaccurate in order to prevent pole-foundation base direction when pricker is gone into ground, in the A hole of four long angle steel drift bolt is installed and is fixed, can not be too tight;
2. in the B hole of four long angle steel drift bolt is installed and is fixed, can not fix too tight;
3. in the C hole of four long angle steel drift bolt is installed and is fixed, can not fix too tight;
4. the angle cleat as ground supports becomes 90 degree with rod, with four bolts the ground supports angle cleat is fixed on the fixed platform, guarantees that two angle cleats are at same horizontal plane;
5. hit the punch panel at 4 long angle steel tops with iron hammer simultaneously, whole pole-foundation base pricker is gone into underground 1.3 meters, make the angle cleat of ground supports and ground connect reality; The drift bolt in fastening A hole, B hole and C hole makes pole-foundation base and rod become firm one then, two angle cleats of ground supports is fastened in the rod both sides with the sandbag of speedily carrying out rescue work at last, finishes repairing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310197273.5A CN103243955B (en) | 2013-05-24 | 2013-05-24 | Method for rush-repairing electric power circuit pole in paddy field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310197273.5A CN103243955B (en) | 2013-05-24 | 2013-05-24 | Method for rush-repairing electric power circuit pole in paddy field |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103243955A true CN103243955A (en) | 2013-08-14 |
CN103243955B CN103243955B (en) | 2015-02-04 |
Family
ID=48923802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310197273.5A Active CN103243955B (en) | 2013-05-24 | 2013-05-24 | Method for rush-repairing electric power circuit pole in paddy field |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103243955B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760897A (en) * | 2016-11-28 | 2017-05-31 | 国网河南偃师市供电公司 | A kind of cement or steel pipe electric pole means for correcting |
CN107327201A (en) * | 2016-04-29 | 2017-11-07 | 罗得之 | The fixing device of column piece |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2178955Y (en) * | 1993-10-13 | 1994-10-05 | 成都市玻璃钢制品厂 | Multipurpose rush-repair bar |
JP2002266521A (en) * | 2001-03-05 | 2002-09-18 | Setsu Igawa | Ground foundation for carp streamer pole |
JP2007270547A (en) * | 2006-03-31 | 2007-10-18 | Nippon Steel Corp | Structure and method for installing steel pipe pole |
CN201372599Y (en) * | 2008-12-25 | 2009-12-30 | 广东和发输变电安装有限公司 | Fast first-aid repair system for transmission line |
CN201531140U (en) * | 2009-11-11 | 2010-07-21 | 西北电网有限公司 | 750KVFRP composite material emergency repair pole tower |
CN101824932A (en) * | 2010-03-23 | 2010-09-08 | 宁波天弘电力器具有限公司 | Tower section of rush repair tower |
CN203230219U (en) * | 2013-05-24 | 2013-10-09 | 国家电网公司 | Electrical pole foundation specialized for rush-repair of electrical power line of paddy field |
-
2013
- 2013-05-24 CN CN201310197273.5A patent/CN103243955B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2178955Y (en) * | 1993-10-13 | 1994-10-05 | 成都市玻璃钢制品厂 | Multipurpose rush-repair bar |
JP2002266521A (en) * | 2001-03-05 | 2002-09-18 | Setsu Igawa | Ground foundation for carp streamer pole |
JP2007270547A (en) * | 2006-03-31 | 2007-10-18 | Nippon Steel Corp | Structure and method for installing steel pipe pole |
CN201372599Y (en) * | 2008-12-25 | 2009-12-30 | 广东和发输变电安装有限公司 | Fast first-aid repair system for transmission line |
CN201531140U (en) * | 2009-11-11 | 2010-07-21 | 西北电网有限公司 | 750KVFRP composite material emergency repair pole tower |
CN101824932A (en) * | 2010-03-23 | 2010-09-08 | 宁波天弘电力器具有限公司 | Tower section of rush repair tower |
CN203230219U (en) * | 2013-05-24 | 2013-10-09 | 国家电网公司 | Electrical pole foundation specialized for rush-repair of electrical power line of paddy field |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107327201A (en) * | 2016-04-29 | 2017-11-07 | 罗得之 | The fixing device of column piece |
CN106760897A (en) * | 2016-11-28 | 2017-05-31 | 国网河南偃师市供电公司 | A kind of cement or steel pipe electric pole means for correcting |
CN106760897B (en) * | 2016-11-28 | 2019-01-25 | 国网河南偃师市供电公司 | A kind of cement or steel pipe electric pole means for correcting |
Also Published As
Publication number | Publication date |
---|---|
CN103243955B (en) | 2015-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105155569A (en) | Construction device and method for offshore wind turbine foundation with piling performed later | |
CN106013241B (en) | Guan Liang foundation trench uprightly performs and cap excavation method station integrated structure system and construction method | |
CN104404861A (en) | Steel trestle provided with steel anchor pile and construction method of steel trestle | |
CN203654294U (en) | Foundation pit supporting structure used in reverse building method | |
CN105155549A (en) | Partition support system for large-area deep foundation pit under forward and backward working condition, and construction method thereof | |
CN106759448A (en) | A kind of sunk type agricultural greenhouse photovoltaic bracket foundation structure and its construction method | |
CN108999099B (en) | Method for transversely limiting and reinforcing middle part of steel trestle and reinforcing device thereof | |
CN103498475A (en) | Foundation pit supporting structure for controlling existing building deformation and construction method for excavating foundation pit | |
CN206768570U (en) | A kind of foundation ditch assembled steel trestle | |
KR102084829B1 (en) | Top-down method using precast-concrete colum | |
CN104532856A (en) | Fabricated lattice unit for foundation pit supporting and installation method | |
CN105586985A (en) | Construction method of subway envelop enclosure structure and subway envelop enclosure structure | |
CN103243955B (en) | Method for rush-repairing electric power circuit pole in paddy field | |
CN104195956A (en) | Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof | |
CN104711931A (en) | Novel temporary underwater pier manufacturing, assembling and disassembling method suitable for bridge erection | |
CN203834487U (en) | Section steel inner brace and Lassen pile support for excavation of dumbbell-shaped deep and large foundation pit | |
CN203230219U (en) | Electrical pole foundation specialized for rush-repair of electrical power line of paddy field | |
CN205529843U (en) | Landing stage anchor structure | |
CN104452775A (en) | Prestress support used for foundation pit and construction method | |
CN204825955U (en) | After drive piles construction equipment on marine fan basis | |
JP2015161064A (en) | Method of installing a cast-in percussion type support post for solar panel mounting frame | |
KR20150004038U (en) | Basic prop for the solar-power system | |
CN204435389U (en) | A kind of assembled lattice unit for pattern foundation pit supporting structure | |
CN210686000U (en) | Tunnel construction operation trolley | |
CN203429557U (en) | Anchor pole back beam applied to underpass bridge jacking construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |