CN106013241B - Guan Liang foundation trench uprightly performs and cap excavation method station integrated structure system and construction method - Google Patents

Guan Liang foundation trench uprightly performs and cap excavation method station integrated structure system and construction method Download PDF

Info

Publication number
CN106013241B
CN106013241B CN201610544533.5A CN201610544533A CN106013241B CN 106013241 B CN106013241 B CN 106013241B CN 201610544533 A CN201610544533 A CN 201610544533A CN 106013241 B CN106013241 B CN 106013241B
Authority
CN
China
Prior art keywords
guan liang
top plate
lid
fender post
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610544533.5A
Other languages
Chinese (zh)
Other versions
CN106013241A (en
Inventor
王博
康华
王立新
高玄涛
杨自刚
杜宇
秦宇君
戴志仁
王磊
李若永
张雄雄
王鹏
毛念华
张毓斌
王洪波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201610544533.5A priority Critical patent/CN106013241B/en
Publication of CN106013241A publication Critical patent/CN106013241A/en
Application granted granted Critical
Publication of CN106013241B publication Critical patent/CN106013241B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • E02D29/055Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to Guan Liang foundation trenches uprightly to perform and cap excavation method station integrated structure system and construction method.There are many drawbacks, the present invention includes fender post, Guan Liang, semicircle stake, interim column and lid and digs station top plate traditional digging method construction method;Guan Liang is located at the top of fender post, the setting semicircle stake of Guan Liang back, and the Guan Liang back on the inside of semicircle stake sets up lid and digs station top plate;Lid is dug by vertical interim upright supports below the top plate of station, and fender post inside is by horizontal interim upright supports.The present invention makes full use of fender post to participate in stress, lid digging top plate, which transmits the highway loading to get off, has steel column and fender post to undertake, achieve the purpose that lid is constructed under the conditions of digging, it gathers materials on the spot, reduce investment outlay, easy construction, do not increase additional place to occupy, be effectively controlled the risk that surface displacement is brought for closing on construction of structures.

Description

Guan Liang foundation trench uprightly performs and cap excavation method station integrated structure system and construction method
Technical field
The invention belongs to subway engineering technical field of structures, and in particular to a kind of Guan Liang foundation trench uprightly performs and cap excavation method vehicle It stands integrated structure system and construction method.
Background technology
Digging method construction station is generally used for traffic more heavy duty zone, and the region constructing operation face is limited, pipeline and builds Structures are more and nearer apart from subway foundation pit, and Guan Liang foundation trench excavation will generally take slope digging mode and occupy certain field Ground certainly will influence already very nervous floor traffic space.For nearer apart from building, it is understood that there may be no slope is excavated Condition or slope excavation, which seriously affect, closes on building safety, on the other hand due to the needs of structural anti-buoyancy, the reinforcing bar of fender post It needs to anchor into station top plate, be controlled when being designed due to fender post with intensity, be splitting more than 0.2mm occur in the foundation pit stage It stitches, can be matched with main body on design life is still worth discussion.Digging method construction station combines semicircle stake and capping beam side Case can overcome Guan Liang foundation trench to excavate requirement of the stage to space to greatest extent, reduce the Guan Liang foundation trench foundation pit stage to building Risk existing for structures meets structural anti-buoyancy problem and so that subway internal force transmission path is clear and definite.Become lid and dig station Reduce a kind of effective construction method to traffic impact, source of controlling risk in work progress.
Guan Liang foundation trench foundation depth is generally 2.5m or so, for cap excavation method station, since station top plate need to be placed in Guan Liang top elevation location, causes Guan Liang to reduce absolute altitude, and Guan Liang foundation trench depth generally can reach 5m or so.It is opened in view of Guan Liang foundation trench Construction personnel human safety issues during digging, need carry out pattern foundation pit supporting structure, common support pattern for slope excavate or slope with Soil nail wall combination, the support pattern is there are occupied ground is big, control deforms unfavorable two big drawback, for being in city prosperity Location often without slope condition or reluctantly using slope but apart from construction build basis it is excessively near, lead to potential risks source problem.If Individually pattern foundation pit supporting structure is taken such as to perform piling bar, then project cost is brought to improve problem again, for pipeline more close quarters, construction Fender post place is very nervous, and there are no conditions to perform piling bar.On the other hand for water rich strata, anti-floating problem is that cap excavation method is applied Work station must take into consideration, and fender post reinforcing bar is used to anchor into station top plate mode and participates in anti-floating purpose, but relate to reach fender post And still have question at issue to internal force transmission, durability Design etc. are many.It can be seen that there are all for traditional design and construction method More drawbacks.
Invention content
The object of the present invention is to provide a kind of Guan Liang foundation trenches uprightly to perform and cap excavation method station integrated structure system and structure Method also serves as interim steel column using bracing members, the body with the complete set of the formation such as semicircle stake, capping beam, waterproof material System, makes full use of live material, realizes Guan Liang foundation trench safe construction on the basis of excavation space is not increased, reduces and periphery is built Structures influence.
The technical solution adopted in the present invention is:
Guan Liang foundation trench uprightly performs the structural system combined with cap excavation method station, it is characterised in that:
Station top plate is dug including fender post, Guan Liang, semicircle stake, interim column and lid;
Guan Liang is located at the top of fender post, the setting semicircle stake of Guan Liang back, and the Guan Liang back on the inside of semicircle stake sets up lid and digs vehicle It stands top plate;
Lid is dug by vertical interim upright supports below the top plate of station, and fender post inside is by horizontal interim upright supports.
Semicircle stake inside side walls setting capping beam covers lid and digs station top end.
Lid digs station top plate inside top and is provided with bracket, and bracket inside is by horizontal interim upright supports.
Interim post end is provided with interim column capital coupling beam.
The interim column bottom end that lid is dug below the top plate of station is provided with interim column pile foundation.
Fender post reinforcing bar is laid in fender post, reserves the semicircle stake reinforcing bar in semicircle stake when fender post reinforcing bar is bound upwards.
Guan Liang foundation trench uprightly performs the construction method with cap excavation method station integrated structure system, it is characterised in that:
Include the following steps:
Step 1:Fender post, interim column pile foundation construction are carried out, semicircle stake reinforcing bar is carried out when fender post reinforcing bar is bound It is reserved, it pours and goes along with sb. to guard him stake body part concrete, when concreting is high to Guan Liang top mark, semicircle is placed on the inside of semicircle stake Pile template continues to pour semicircle pile concrete, semicircle pile template is removed after concrete strength reaches design strength, simultaneously Carry out the construction of interim column and interim column pile foundation;
Step 2:It carries out foundation pit once to excavate, to Guan Liang longitudinally through bar planting at excavation of foundation pit to Guan Liang bottom elevation location Mode links together entire foundation pit Guan Liang, achievees the purpose that whole stress, and construction lid digs station top plate and thereon bracket, treats Lid digs station concrete roof when reaching design strength, performs lid and digs station waterproof roofing, in passing through bar planting mode in semicircle stake It performs capping beam and carries out concreting;
Step 3:With excavation of foundation pit and set up interim column, first interim column support is set on bracket, by bracket and Lid digs station top plate and side direction horizontal load is transferred on fender post, can be according to monitoring result in interim column in work progress Power is adjusted, and ensures deep pit monitor;
Step 4:After being excavated to substrate, construct successively according to construction way station bottom plate, middle plate, top plate finally restore road Entire subway station digging method construction process is completed in face.
The present invention has the following advantages:
1st, the present invention is using common 609 bracing members of φ in subway work, and fender post is made full use of to participate in stress, and lid is dug Top plate, which transmits the highway loading to get off, has steel column and fender post to undertake, and achievees the purpose that lid is constructed under the conditions of digging, takes on the spot Material is reduced investment outlay.
2nd, the present invention forms fender post reinforcing bar, binds, pouring and be improved, firm using the larger bending resistance of semicircle stake itself Degree undertakes foundation pit soil lateral pressure and overcharge on ground, does not need to additionally carry out excavation of foundation pit when performing Guan Liang foundation trench.Construction letter Just, do not increase additional place to occupy, be effectively controlled the risk that surface displacement is brought for closing on construction of structures.
3rd, the present invention performs capping beam by the later stage in semicircle stake bar planting mode, and capping beam is by water buoyancy during normal use Fender post is transferred to, by fender post and periphery soil body side friction come neutral buoyancy, reaches structural anti-buoyancy purpose.
Description of the drawings
Fig. 1 is the cross-sectional schematic diagram of structure of the present invention;
Fig. 2 is the semicircle stake of the present invention and the beam construction drawing that bears down on one;
Fig. 3 is the semicircle stake formation level drawing of the present invention.
In figure, 1- semicircle stakes, 2- capping beams, 3- Guan Liangs, 4- fender posts, 5- lid digging station top plates, 6- semicircle stake reinforcing bars, 7- Fender post reinforcing bar, 8- semicircle pile templates, 9- bear down on one beam steel, 10- brackets, the interim columns of 11-, and the interim column capitals of 12- connect Beam, the interim column pile foundations of 13-.
Specific embodiment
The present invention will be described in detail With reference to embodiment.
Guan Liang foundation trench of the present invention uprightly performs the structural system combined with cap excavation method station, including fender post 4, hat Beam 3, semicircle stake 1, interim column 11(Bracing members)And lid digs station top plate 5.Guan Liang 3 is located at 4 top of fender post, 3 back of Guan Liang Semicircle stake 1 is set, and 3 back of Guan Liang of 1 inside of semicircle stake sets up lid and digs station top plate 5.Lid digs 5 lower section of station top plate by vertical Interim column 11 supports, and 4 inside of fender post is supported by horizontal interim column 11.
1 inside side walls of semicircle stake setting capping beam 2 covers lid and digs 5 end of station top plate.Lid digs 5 inside top of station top plate Bracket 10 is provided with, 10 inside of bracket is supported by horizontal interim column 11.
Interim 11 end set of column has interim column capital coupling beam 12(Steel purlin).Lid digs facing for 5 lower section of station top plate 11 bottom ends of Shi Lizhu are provided with interim column pile foundation 13.
Fender post reinforcing bar 7 is laid in fender post 4, reserves the semicircle stake steel in semicircle stake 1 when fender post reinforcing bar 7 is bound upwards Muscle 6.
Fender post 4 passes through reserved steel bar so that 4 pile body of fender post reaches with 1 one-time-concreting of semicircle stake without 3 foundation trench of Guan Liang The purpose of excavation, lid dig station top plate 5 and are placed in 4 stake top Guan Liang 3 of fender post, dig after station top plate 5 pours and pass through in lid Bar planting mode performs capping beam 2 and reaches anti-floating purpose, avoid 4 reinforcing bar of fender post anchor into lid dig station top plate 5 cause structure by The problems such as power, durability Design.
Above-mentioned Guan Liang foundation trench uprightly performs the construction method with cap excavation method station integrated structure system, includes the following steps:
Step 1:Progress fender post 4, interim column pile foundation 13 are constructed, to semicircle stake reinforcing bar when fender post reinforcing bar 7 is bound 6 are reserved, and pour 4 pile body part concrete of fender post, when concreting is high to 3 top mark of Guan Liang, in 1 inside of semicircle stake It places semicircle pile template 8 to continue to pour 1 concrete of semicircle stake, semicircle pile is removed after concrete strength reaches design strength Template 8 is carried out at the same time the construction of interim column 11 and interim column pile foundation 13;
Step 2:It carries out foundation pit once to excavate, to Guan Liang 3 longitudinally through plant at excavation of foundation pit to 3 bottom elevation location of Guan Liang Muscle mode links together entire foundation pit Guan Liang 3, achievees the purpose that whole stress, and construction lid digs station top plate 5 and thereon ox Leg 10 when lid digs 5 concrete of station top plate and reaches design strength, performs lid and digs 5 waterproof of station top plate, in logical in semicircle stake 1 Bar planting mode is crossed to perform capping beam 2 and carry out concreting;
Step 3:With excavation of foundation pit and interim column 11 is set up, first of interim column 11 is set up on bracket 10, is passed through Bracket 10 and lid dig station top plate 5 and side direction horizontal load are transferred on fender post 4, can be according to monitoring result pair in work progress Interim 11 internal force of column is adjusted, and ensures deep pit monitor;
Step 4:After being excavated to substrate, construct successively according to construction way station bottom plate, middle plate, top plate finally restore road Entire subway station digging method construction process is completed in face.
The present invention reaches the mesh for carrying lid and digging top plate and its load using common 609 bracing members of φ in subway work scene , additional steel structure member is avoided to make;When fender post reinforcing bar is bound, more than stake top(I.e. more than Guan Liang top)Reinforcing bar is taken About 50% reinforcing bar mode is directly stretched out from pile body, the semicircle pilework that force modes are similar to barricade can be formed after pouring, for Inter-pile soil body supporting takes later stage bar planting mode to form complete retaining wall structure;Because individually performing capping beam, fender post reinforcing bar It does not need to anchor into station top plate, structural internal force pipeline is clear and definite, and design theory understands.Therefore it is not required to during Guan Liang construction of foundation ditch Foundation pit is individually performed, semicircle stake itself has stronger bending stiffness, has reached reduction and has performed space, controls earth's surface deformation Purpose.The specific concrete operations of this method are easy, relatively inexpensive in Metro Design to be applicable in.
Present disclosure is not limited to cited by embodiment, and those of ordinary skill in the art are by reading description of the invention And to any equivalent transformation that technical solution of the present invention is taken, it is that claim of the invention is covered.

Claims (1)

1. Guan Liang foundation trench uprightly performs the construction method with cap excavation method station integrated structure system, it is characterised in that:
The Guan Liang foundation trench is uprightly performed includes fender post with cap excavation method station integrated structure system(4), Guan Liang(3), semicircle stake (1), interim column(11)And lid digs station top plate(5);
Guan Liang(3)Positioned at fender post(4)Top, Guan Liang(3)Back sets semicircle stake(1), semicircle stake(1)The Guan Liang of inside(3) Back sets up lid and digs station top plate(5);
Lid digs station top plate(5)Lower section is by vertical interim column(11)Support, fender post(4)Inside is by horizontal interim column (11)Support;
Semicircle stake(1)Inside side walls set capping beam(2)It covers lid and digs station top plate(5)End;
Lid digs station top plate(5)Inside top is provided with bracket(10), bracket(10)Inside is by horizontal interim column(11)Branch Support;
Interim column(11)End set has interim column capital coupling beam(12);
Lid digs station top plate(5)The interim column of lower section(11)Bottom end is provided with interim column pile foundation(13);
Fender post(4)Interior laying fender post reinforcing bar(7), fender post reinforcing bar(7)Semicircle stake is reserved during binding upwards(1)Interior semicircle Stake reinforcing bar(6);
The construction method includes the following steps:
Step 1:Carry out fender post(4), interim column pile foundation(13)Construction, fender post reinforcing bar(7)To semicircle stake steel during binding Muscle(6)It is reserved, pours fender post(4)Pile body part concrete, treats concreting to Guan Liang(3)When top mark is high, in half Circle stake(1)Place semicircle pile template in inside(8)Continue to pour semicircle stake(1)It is strong to treat that concrete strength reaches design for concrete Semicircle pile template is removed after degree(8), it is carried out at the same time interim column(11)And interim column pile foundation(13)Construction;
Step 2:It carries out foundation pit once to excavate, excavation of foundation pit to Guan Liang(3)To Guan Liang at the elevation location of bottom(3)Longitudinally through plant Muscle mode is by entire foundation pit Guan Liang(3)It links together, achievees the purpose that whole stress, construction lid digs station top plate(5)And its Upper bracket(10), treat that lid digs station top plate(5)When concrete reaches design strength, perform lid and dig station top plate(5)Waterproof, in half Circle stake(1)On capping beam performed by bar planting mode(2)And carry out concreting;
Step 3:With excavation of foundation pit and set up interim column(11), first of interim column(11)It is set up in bracket(10)On, lead to Cross bracket(10)And lid digs station top plate(5)Side direction horizontal load is transferred to fender post(4)On, it can be according to prison in work progress Result is surveyed to interim column(11)Internal force is adjusted, and ensures deep pit monitor;
Step 4:After being excavated to substrate, construct successively according to construction way station bottom plate, middle plate, top plate finally restore road surface, Complete entire subway station digging method construction process.
CN201610544533.5A 2016-07-12 2016-07-12 Guan Liang foundation trench uprightly performs and cap excavation method station integrated structure system and construction method Active CN106013241B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610544533.5A CN106013241B (en) 2016-07-12 2016-07-12 Guan Liang foundation trench uprightly performs and cap excavation method station integrated structure system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610544533.5A CN106013241B (en) 2016-07-12 2016-07-12 Guan Liang foundation trench uprightly performs and cap excavation method station integrated structure system and construction method

Publications (2)

Publication Number Publication Date
CN106013241A CN106013241A (en) 2016-10-12
CN106013241B true CN106013241B (en) 2018-06-08

Family

ID=57109389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610544533.5A Active CN106013241B (en) 2016-07-12 2016-07-12 Guan Liang foundation trench uprightly performs and cap excavation method station integrated structure system and construction method

Country Status (1)

Country Link
CN (1) CN106013241B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119711B (en) * 2017-07-06 2022-09-06 中国铁路设计集团有限公司 Connecting structure for large-range adjacent existing transfer station and construction method
CN107975038A (en) * 2017-10-18 2018-05-01 广州地铁设计研究院有限公司 A kind of cap excavation method temporary support makees the support of permanent structure concrete and its construction method
CN108277823A (en) * 2018-02-02 2018-07-13 北京市政建设集团有限责任公司 A kind of construction method of subway platform layer totality
CN108331021A (en) * 2018-03-22 2018-07-27 重庆建工第七建筑工程有限责任公司 Half cap excavation method large span bedding structure of one kind and its construction method
CN109356196B (en) * 2018-11-21 2020-07-31 中铁十一局集团城市轨道工程有限公司 Method and structure for erecting and supporting steel supports of foundation pit of half-cover subway digging station
CN109868838B (en) * 2019-03-12 2019-11-26 西南交通大学 A kind of rail traffic of underground utilities close quarters is without column station construction method
CN113215910A (en) * 2021-05-21 2021-08-06 中铁隧道局集团有限公司 Temporary pavement structure based on construction of limited-site subway station and application thereof
CN114703833A (en) * 2022-04-27 2022-07-05 中铁三局集团有限公司 Construction method for semi-circular piles for covering and digging station
CN114775690B (en) * 2022-06-17 2022-10-21 北京建工土木工程有限公司 Construction method of temporary bearing device for roof by cover-excavation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981898A (en) * 2014-05-12 2014-08-13 铁道第三勘察设计院集团有限公司 Integral open-excavation node top-down underground engineering construction method
CN204282399U (en) * 2014-11-14 2015-04-22 广州地铁设计研究院有限公司 A kind of subway space enclosing structure
CN105604091A (en) * 2016-02-04 2016-05-25 石家庄铁道大学 Construction method of cover-excavation-method covering system
CN205875210U (en) * 2016-07-12 2017-01-11 中铁第一勘察设计院集团有限公司 Hat liang ji upright executes in groove to do and digs method station integrated structure system with lid

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3327191B2 (en) * 1997-11-19 2002-09-24 鹿島建設株式会社 Underground structure and its construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981898A (en) * 2014-05-12 2014-08-13 铁道第三勘察设计院集团有限公司 Integral open-excavation node top-down underground engineering construction method
CN204282399U (en) * 2014-11-14 2015-04-22 广州地铁设计研究院有限公司 A kind of subway space enclosing structure
CN105604091A (en) * 2016-02-04 2016-05-25 石家庄铁道大学 Construction method of cover-excavation-method covering system
CN205875210U (en) * 2016-07-12 2017-01-11 中铁第一勘察设计院集团有限公司 Hat liang ji upright executes in groove to do and digs method station integrated structure system with lid

Also Published As

Publication number Publication date
CN106013241A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN106013241B (en) Guan Liang foundation trench uprightly performs and cap excavation method station integrated structure system and construction method
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN101338678B (en) Supporting arch hidden digging top-down construction method
CN101775807B (en) Structure for supporting deep foundation pit of soft soil foundation
CN205742213U (en) Foundation pit supporting construction
CN108487252A (en) A kind of deep foundation pit open cutting is suitable to make construction method
CN206721894U (en) Adjustable prestress device for foundation pit support
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN207063982U (en) Mechanical assistance sealing Station structure in a kind of pilot tunnel
CN108930275A (en) It is a kind of to face forever in conjunction with the ultra-deep shaft rapid constructing method along inverse combination
CN108589771A (en) One kind having runed underground station increasing layer transfer node construction method
CN205805574U (en) A kind of super-span pile foundation joist carrying arch tunnel recombination liner structure
JP2012107479A (en) Method for constructing underground and aboveground structure
CN107558477B (en) Supporting structure combining foundation pit and side slope and construction method
CN106050262A (en) Composite lining structure for super-large-span pile-foundation-joist-based bearing arched tunnel and construction method thereof
CN103452120B (en) A kind of stake apical cap girder construction of the high-strength Prestressed Pipe Pile for pattern foundation pit supporting structure and construction method thereof
CN103696429A (en) Concrete support and fish-belly sill combined supporting system of special-shaped foundation pit and construction method
CN103938634A (en) Deep foundation pit supporting structure and construction method
CN108385715A (en) A kind of assembled stake arch combination retaining wall and its construction method
CN106065628B (en) Based on the major diameter running water pipe security protection construction method faced forever with reference to theory
CN106193644B (en) Basement reconstruction structure with raft foundation building
CN106065668B (en) A kind of construction techniques
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN105421488A (en) Constriction method for changing support of foundation slab in underground composite enclosure system
CN108978673A (en) A kind of foundation pit supporting construction and construction method of viaduct pile foundation underpinning

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant