CN204435389U - A kind of assembled lattice unit for pattern foundation pit supporting structure - Google Patents

A kind of assembled lattice unit for pattern foundation pit supporting structure Download PDF

Info

Publication number
CN204435389U
CN204435389U CN201520003595.6U CN201520003595U CN204435389U CN 204435389 U CN204435389 U CN 204435389U CN 201520003595 U CN201520003595 U CN 201520003595U CN 204435389 U CN204435389 U CN 204435389U
Authority
CN
China
Prior art keywords
lattice unit
anchor cable
foundation pit
supporting structure
pit supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520003595.6U
Other languages
Chinese (zh)
Inventor
欧孝夺
李结全
蒋华
侯福昌
张油军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI RUIYU BUILDING TECHNOLOGY Co Ltd
Original Assignee
GUANGXI RUIYU BUILDING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI RUIYU BUILDING TECHNOLOGY Co Ltd filed Critical GUANGXI RUIYU BUILDING TECHNOLOGY Co Ltd
Priority to CN201520003595.6U priority Critical patent/CN204435389U/en
Application granted granted Critical
Publication of CN204435389U publication Critical patent/CN204435389U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a kind of assembled lattice unit for pattern foundation pit supporting structure, it is characterized in that: comprise the lattice unit that several are connected by syndeton, described lattice unit comprises intermediolateral column and is located at the beam on intermediolateral column surrounding side, described beam is evenly distributed, intermediolateral column is provided with anchor cable hole, and connect the Anchor Cable Anchorage on foundation ditch by anchor cable hole, connected by the syndeton in beam end between two described lattice unit.Described syndeton is made up of the set bolt and junction plate being located at beam end, junction plate has the through hole matched with set bolt.The described assembled lattice unit for pattern foundation pit supporting structure can adapt to the stratum such as stiff clay, mud stone preferably, and its supporting effect is reliable; Construction safety is quick, need not big machinery, has the dismountable advantage with recycling and reusing; Production have industrialization, standardized feature.The utility model can reduce energy consumption, improves labor productivity, promotes environmental protection.

Description

A kind of assembled lattice unit for pattern foundation pit supporting structure
Technical field
The utility model relates to geotechnical engineering Base hole supporting technology field.
Background technology
Along with the develop rapidly of urban economy, the high level in city, super highrise building are as emerged rapidly in large numbersBamboo shoots after a spring rain, more and more, urban space has become more and more crowded, and such as basement in high rise building, subway and track traffic, underground store and the underground building such as shopping street, civil air defense works are built in a large number, and towards the large degree of depth, large area future development, surrounding enviroment are more complicated, have high input, speed of application is slow, and the difficulty of foundation pit excavation and bracing is increasing.
The maximum pattern foundation pit supporting structure form of current application has: put slope excavation, steel sheet pile supporting, soil-nail wall support, the supporting of colonnade formula castinplace pile campshed, diaphragm wall supporting, inner support or draw anchor supporting, freezing process, contrary sequence method, combined supporting etc.These support forms are cast-in-place concrete, and because construction plant is narrow, cast-in-place concrete forms intensity needs the regular hour, and wayward quality, simultaneously as temporary support device, its cost is higher.
Utility model content
The purpose of this utility model is assembled lattice to be applied on foundation pit supporting project, provides a kind of safe and reliable to pattern foundation pit supporting structure, constructs simple and quick, the dismountable assembled lattice unit for pattern foundation pit supporting structure with repeating to recycle.
The technical solution of the utility model is:
A kind of assembled lattice unit for pattern foundation pit supporting structure, comprise the lattice unit that several are connected by syndeton, described lattice unit comprises intermediolateral column and is located at four beams on intermediolateral column surrounding side, described beam is evenly distributed, intermediolateral column is provided with anchor cable hole, and connecting the Anchor Cable Anchorage on foundation ditch by anchor cable hole, described syndeton is located at the end of beam.Connected by the syndeton in beam end between two described lattice unit.Described assembling refers to that this lattice unit makes at precasting yard in advance, installs through being transported to job site.
Preferentially, described syndeton is made up of the set bolt and junction plate being located at beam end, junction plate has the through hole matched with set bolt, and described connector is the steel connector with band hole, by the high-strength bolt compound action of steel connector and beam end, formed and connect.
Preferentially, the upper end face of described beam is ramp structure, and ramp structure extends to the end of beam from intermediolateral column.Adopt ramp structure can reduce being suitable for of material, reduce construction costs.
Preferentially, the beam of described lattice unit is provided with several Heave Heres.Heave Here is set and can carries out lifting work to lattice unit quickly and easily, increase work efficiency.
Preferentially, described anchor cable hole is provided with the backing plate matched.The lifting surface area that backing plate can increase anchor cable and contact surface is set, avoids stress to concentrate and stress surface is damaged.
Further, the step of the preparation method of described lattice unit is as follows:
(1) the good reinforcing cage with described lattice units match of colligation;
(2) described reinforcing cage is hung in the template of building lattice unit;
(3) template of building lattice unit is corrected;
(4) concreting;
(5) form removal.
Further, according to technique scheme, provide a kind of mounting method of described a kind of assembled lattice unit for pattern foundation pit supporting structure, its step is as follows:
Step one: cutting depth to the foundation ditch of length of described lattice unit, as first floor;
Step 2: install first floor first lattice unit, installs Anchor Cable Anchorage by after the anchor cable hole of described lattice unit and the hole bit alignment bored on foundation ditch, and carries out pre-stretch-draw;
Step 3: install first floor second lattice unit, by the anchor cable hole of described lattice unit and the hole bit alignment bored on foundation ditch, by syndeton, adjacent beam between first good to itself and step 2 anchoring lattice unit is connected, then its Anchor Cable Anchorage is installed and carries out pre-stretch-draw;
Step 4: first floor second the lattice cellular installation method repeating step 3 installs the 3rd the lattice unit be adjacent, repeat the mounting method of above lattice unit, after installing described lattice unit in a row around foundation ditch, carry out two times tensioning to design load to whole anchor cables, first floor lattice unit so far installs end;
Step 5: continue the length of the excavation soil body degree of depth to described lattice unit, as the second layer;
Step 6: install the second layer first lattice unit, by the anchor cable hole of described lattice unit and the hole bit alignment bored on foundation ditch, by syndeton, beam adjacent between lattice unit and the lattice unit of the first floor installed in step 2 ~ step 4 is connected, then its Anchor Cable Anchorage is installed and carries out pre-stretch-draw;
Step 7: install the second layer second lattice unit, by the anchor cable hole of described lattice unit and the hole bit alignment bored on foundation ditch, by syndeton, beam adjacent between the second layer first the lattice unit installed in the lattice unit of lattice unit and the first floor installed in step 2 ~ step 4 and step 6 is connected, then its Anchor Cable Anchorage is installed and carries out pre-stretch-draw
Step 8: the second layer second the lattice cellular installation method repeating step 7 installs the 3rd the lattice unit be adjacent, repeat the mounting method of above lattice unit, after installing described lattice unit in a row around foundation ditch, carry out two times tensioning to design load to whole anchor cables, second layer lattice unit so far installs end;
Step 9: continue to install, until be mounted to bottom foundation ditch according to the order of above-mentioned excavation and lattice cellular installation method.
Compared to prior art, the beneficial effects of the utility model are as follows:
Because ubiquity construction plant in the Base hole supporting technology applied at present is narrow, cast-in-place concrete forms intensity needs the regular hour, and wayward quality, simultaneously as temporary support device, the problems such as its cost is higher, take assembled lattice unit, deficiency of the prior art can be overcome.
Take assembled lattice under the safety ensured in excavation of foundation pit and Underground Construction process and stable prerequisite, technical scaleization can produce in precasting yard, again because the construction speed that makes easy for installation is accelerated, considerably improve engineering construction efficiency.Assembled lattice has detachable and can repeat the feature recycled, under the safety ensured in excavation of foundation pit and Underground Construction process and stable prerequisite, both effectively reduces engineering construction cost, simultaneously also can protection of the environment well.
Research and probe is constructed simple and quick a kind of assembled lattice unit for pattern foundation pit supporting structure, can adapt to site condition preferably, safe and reliable to pattern foundation pit supporting structure, and easy construction is quick, has the dismountable characteristic with repeating to recycle; Production have industrialization, standardized feature.The utility model can reduce the consumption of energy resources, improves labor productivity, promotes environmental protection, has significant social benefit and wide application prospect.
Accompanying drawing explanation
Fig. 1 is a kind of assembled lattice cell schematics for pattern foundation pit supporting structure described in the utility model.
Fig. 2 is lattice cell schematics described in the utility model.
Fig. 3 is the A-A generalized section in Fig. 2.
Fig. 4 is the B-B generalized section in Fig. 2.
Fig. 5 is junction plate schematic diagram described in the utility model.
Fig. 6 is backing plate schematic diagram described in the utility model.
Fig. 7 is the first floor scheme of installation that lattice unit described in the utility model is connected to form assembled lattice foundation pit support device.
Fig. 8 is the second layer scheme of installation that lattice unit described in the utility model is connected to form assembled lattice foundation pit support device.
Fig. 9 is the second layer scheme of installation that lattice unit described in the utility model is connected to form assembled lattice foundation pit support device.
Figure 10 is the schematic diagram of a kind of assembled lattice unit anchoring foundation ditch for pattern foundation pit supporting structure described in the utility model.
Wherein: 1-lattice unit, 2-intermediolateral column, 3-beam, 4-anchor cable hole, 5-backing plate, 6-set bolt, 7-junction plate, 8-through hole, 9-Heave Here, 10-free section of anchor cable, 11-anchorage cable anchoring section, 12-Anchor Cable Anchorage
Detailed description of the invention
Below in conjunction with accompanying drawing, the technical solution of the utility model is described further.
Fig. 1-Fig. 7 shows a kind of assembled lattice unit for pattern foundation pit supporting structure of an embodiment, comprise the lattice unit 1 that several are connected by syndeton, described lattice unit 1 comprises the intermediolateral column 2 of reinforced concrete structure and is located at the beam 3 of intermediolateral column side, described beam is evenly distributed, intermediolateral column is provided with anchor cable hole 4, and connects the Anchor Cable Anchorage on foundation ditch by anchor cable hole 4; Described syndeton is located at the end of beam, syndeton between each structure unit is made up of the set bolt 6 and junction plate 7 being located at beam end, junction plate there is the through hole 8 matched with set bolt, connector is the steel connector with band hole, the set bolt of steel connector and beam end is connected, forms the connection of lattice unit.Set bolt 6 is vertical relation with the bottom surface of lattice unit 1, and beam 3, lattice unit 1 makes at precasting yard in advance, installs through being transported to job site.The upper end face of described beam 3 is ramp structure, and inclined-plane connects the upper surface of intermediolateral column and the front end face of beam.The beam of described lattice unit is provided with several Heave Heres 9, described anchor cable hole 4 is provided with the backing plate 5 matched.
During the construction of Fig. 7-Fig. 8 displaying scene, lattice unit is connected to form the mounting method of assembled lattice foundation pit support device.
According to designing requirement, first prefabricated cross lattice unit 1 in precasting yard.Excavation pit at the construction field (site), adopt layer and section excavation, the length of cutting depth to lattice unit 1, this layer is first floor.Lattice shipped prefabricated in precasting yard is on-the-spot to foundation ditch, and lattice unit is installed at the scene, and mounting method is that layering is installed.The step of installing is as follows: bored the porose position of anchoring at first floor according to designing requirement, then utilize crane lifting lattice unit to work plane, first by the anchor cable hole 4 of one of them lattice unit and hole bit alignment, place lattice unit, install Anchor Cable Anchorage 12 again, and pre-stretch-draw is carried out to it.And then the lattice unit on its side is installed, by anchor cable hole 4 and the hole bit alignment of lattice unit, place lattice unit, as shown in Figure 7 tie-beam 3, then install Anchor Cable Anchorage 12, and pre-stretch-draw is carried out to it.Then install lattice unit around foundation pit walls after the same method successively, after install row's lattice unit around foundation ditch, then carry out two times tensioning to whole anchor cables, and be stretched to design load, free section of anchor cable 10 temporarily can not be cut.The assembled lattice unit that first floor is used for pattern foundation pit supporting structure so far installs end.
Next, continue the excavation soil body, the length of cutting depth to lattice unit 1, this layer is called the second layer.After having excavated the second layer, again carry out the installation of lattice unit.The step of installing is as follows: utilize crane lifting lattice unit to work plane, first by the anchor cable hole 4 of a lattice unit and hole bit alignment, place lattice unit, first connect with the beam of lattice unit corresponding above as shown in Figure 8, install Anchor Cable Anchorage 12 again, and pre-stretch-draw is carried out to it.Next lattice unit is installed again, by the anchor cable hole 4 of this lattice unit and hole bit alignment, place lattice unit, the beam 3 of this element lattice unit adjacent with side with the beam 3 of lattice unit corresponding above is respectively connected as shown in Figure 9, install Anchor Cable Anchorage 12 again, and pre-stretch-draw is carried out to it.Then install lattice unit around foundation pit walls after the same method successively, after install row's lattice unit around foundation ditch, then carry out two times tensioning to whole anchor cables, and be stretched to design load, free section of anchor cable 10 temporarily can not be cut.The assembled lattice unit that the second layer is used for pattern foundation pit supporting structure so far installs end.
Then, continue to carry out engineering construction, until be mounted to bottom foundation ditch according to the order of above-mentioned excavation and the mounting method of second layer lattice unit.
The description of above-described embodiment is convenient for people to understand and application the utility model.Protection domain of the present utility model does not describe by embodiment and limited.Anyone improvement made the utility model and amendment all should be considered as within the utility model protection domain.

Claims (5)

1. the assembled lattice unit for pattern foundation pit supporting structure, it is characterized in that: comprise the lattice unit (1) that several are connected by syndeton, described lattice unit (1) comprises intermediolateral column (2) and is located at four beams (3) on intermediolateral column surrounding side, described beam (3) is evenly distributed, intermediolateral column (2) is provided with anchor cable hole (4), and connect the Anchor Cable Anchorage (12) on foundation ditch by anchor cable hole (4), connected by the syndeton on beam (3) end between two described lattice unit (1).
2. a kind of assembled lattice unit for pattern foundation pit supporting structure according to claim 1, it is characterized in that: described syndeton is made up of the set bolt (6) and junction plate (7) being located at beam end, junction plate (7) has the through hole (8) matched with set bolt (6).
3. a kind of assembled lattice unit for pattern foundation pit supporting structure according to claim 1, is characterized in that: the upper end face of described beam (3) is ramp structure, and ramp structure extends to the end of beam from intermediolateral column.
4. a kind of assembled lattice unit for pattern foundation pit supporting structure according to claim 1, is characterized in that: the beam (3) of described lattice unit is provided with several Heave Heres (9).
5. a kind of assembled lattice unit for pattern foundation pit supporting structure according to claim 1, is characterized in that: described anchor cable hole (4) is provided with the backing plate (5) matched.
CN201520003595.6U 2015-01-05 2015-01-05 A kind of assembled lattice unit for pattern foundation pit supporting structure Expired - Fee Related CN204435389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520003595.6U CN204435389U (en) 2015-01-05 2015-01-05 A kind of assembled lattice unit for pattern foundation pit supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520003595.6U CN204435389U (en) 2015-01-05 2015-01-05 A kind of assembled lattice unit for pattern foundation pit supporting structure

Publications (1)

Publication Number Publication Date
CN204435389U true CN204435389U (en) 2015-07-01

Family

ID=53603276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520003595.6U Expired - Fee Related CN204435389U (en) 2015-01-05 2015-01-05 A kind of assembled lattice unit for pattern foundation pit supporting structure

Country Status (1)

Country Link
CN (1) CN204435389U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532856A (en) * 2015-01-05 2015-04-22 广西瑞宇建筑科技有限公司 Fabricated lattice unit for foundation pit supporting and installation method
CN111236243A (en) * 2020-01-08 2020-06-05 中国十七冶集团有限公司 Prefabricated assembly type foundation pit slope protection structure and implementation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532856A (en) * 2015-01-05 2015-04-22 广西瑞宇建筑科技有限公司 Fabricated lattice unit for foundation pit supporting and installation method
CN111236243A (en) * 2020-01-08 2020-06-05 中国十七冶集团有限公司 Prefabricated assembly type foundation pit slope protection structure and implementation method
CN111236243B (en) * 2020-01-08 2021-11-05 中国十七冶集团有限公司 Prefabricated assembly type foundation pit slope protection structure and implementation method

Similar Documents

Publication Publication Date Title
CN107664035B (en) Shield-well-after-shield construction method for shield pipe gallery
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN107842035B (en) Ultra-high performance concrete prefabricated assembled comprehensive pipe gallery system and construction method
CN104532856A (en) Fabricated lattice unit for foundation pit supporting and installation method
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN104652443B (en) Construction method of the interim horizontal support of deep basal pit as permanent structure beam
CN108343071A (en) A kind of foundation pit supporting construction and construction method of steel sheet pile combined deposited pile
CN105862910A (en) Top-down type construction method of assembling type three-dimensional underground garage
CN210031842U (en) Combined supporting system for adjacent deep foundation pit based on row piles, connecting beams and counter-pulling anchor cables
CN103397660A (en) Underground construction constructed in assembled mode and construction method of underground construction
CN107806101B (en) Construction method for strip foundation pit cast-in-place concrete diagonal bracing prefabricated connecting beam
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN103410152A (en) Construction method for long, narrow and deep foundation pit soil excavation
CN112575789A (en) Diagonal space truss foundation pit inner support system
CN104863183B (en) Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction
CN109681233B (en) Inverted T-shaped excavation construction method and temporary support structure for urban shallow-buried large-section tunnel by adopting prefabricated support duct pieces
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN103397634A (en) Anchoring construction method for fastener steel tube pile cofferdam
CN105064711A (en) Method for constructing underground garage between residential buildings
CN204435389U (en) A kind of assembled lattice unit for pattern foundation pit supporting structure
CN104264684A (en) Pre-fabricated specially-shaped hollow pile for deep foundation pit supporting structure and construction method of pre-fabricated specially-shaped hollow pile
CN102116036B (en) Method for constructing underground large building by combining top-down construction method technology with sequence construction method technology
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method
CN209779640U (en) foundation pit supporting pile top crown beam construction structure
CN105863649A (en) Underground space construction technique adopting underground excavation and causing little ruin to land surface

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Fabricated lattice unit for foundation pit supporting and installation method

Effective date of registration: 20160927

Granted publication date: 20150701

Pledgee: China Co. truction Bank Corp Nanning hi tech sub branch

Pledgor: GUANGXI RUIYU BUILDING TECHNOLOGY Co.,Ltd.

Registration number: 2016990000832

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20180523

Granted publication date: 20150701

Pledgee: China Co. truction Bank Corp Nanning hi tech sub branch

Pledgor: GUANGXI RUIYU BUILDING TECHNOLOGY Co.,Ltd.

Registration number: 2016990000832

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Fabricated lattice unit for foundation pit supporting and installation method

Effective date of registration: 20180806

Granted publication date: 20150701

Pledgee: GF bank Limited by Share Ltd. Nanning branch

Pledgor: GUANGXI RUIYU BUILDING TECHNOLOGY Co.,Ltd.

Registration number: 2018450000021

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20190906

Granted publication date: 20150701

Pledgee: GF bank Limited by Share Ltd. Nanning branch

Pledgor: GUANGXI RUIYU BUILDING TECHNOLOGY Co.,Ltd.

Registration number: 2018450000021

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Fabricated lattice unit for foundation pit supporting and installation method

Effective date of registration: 20190912

Granted publication date: 20150701

Pledgee: GF bank Limited by Share Ltd. Nanning branch

Pledgor: GUANGXI RUIYU BUILDING TECHNOLOGY Co.,Ltd.

Registration number: Y2019450000012

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20220105