CN105804752A - 一种煤矿条带开采中覆岩离层注浆减沉工艺 - Google Patents
一种煤矿条带开采中覆岩离层注浆减沉工艺 Download PDFInfo
- Publication number
- CN105804752A CN105804752A CN201610150918.3A CN201610150918A CN105804752A CN 105804752 A CN105804752 A CN 105804752A CN 201610150918 A CN201610150918 A CN 201610150918A CN 105804752 A CN105804752 A CN 105804752A
- Authority
- CN
- China
- Prior art keywords
- colliery
- grouting
- coal mine
- separation
- absciss layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/08—Filling-up hydraulically or pneumatically
Abstract
一种煤矿条带开采中覆岩离层注浆减沉工艺,工艺步骤如下:a.划分煤矿条带;b.得到各煤矿条带的煤柱数量以及间隔距离,各个煤矿条带煤柱位置保持一致,用于煤矿开采过程中离层产生位置保持一致;c.检测煤矿条带条带在开采过程中,在煤矿上方产生的离层位置,避免离层闭合;d.在离层上方钻孔,进行注浆操作,直至注浆完全填充离层;e.持续钻孔,直至孔洞与下一煤矿条带离层连通,在地面上经由孔洞向离层进行注浆操作,直至注浆完全填充离层;f.重复步骤e,直至煤矿完成开采。本发明通过条带开采法与离层注浆减沉技术结合,可减少单一条带开采造成的资源浪费,提高出采率,同时提高单一覆岩离层注浆的减沉效果。
Description
技术领域
本发明涉及涉及矿区减沉领域,尤其是一种煤矿条带开采中覆岩离层注浆减沉工艺。
背景技术
建筑物下压煤是困扰我国煤矿的重大技术难题之一,在东部矿区尤为突出,以地处华东矿区的淮北矿业集团为例,现有压煤村庄300余处,村庄压煤量占总储量的47%,部分矿井高达80%,每年征迁费用高达8-10亿元。近些年来,充填采煤技术的发展一定程度上对这一问题起到了缓解作用,形成了如固体、膏体、高水材料等多种采空区充填开采技术。
但是单纯的离层注浆减沉技术的减沉效果有限,减沉效果不足以控制煤层开采对地表的影响和破坏。
发明内容
本发明主要解决的技术问题在于提供一种煤矿条带开采中覆岩离层注浆减沉工艺。
本发明为解决上述技术问题采用的技术方案为:
一种煤矿条带开采中覆岩离层注浆减沉工艺,所述工艺步骤如下:
a.划分煤矿条带:通过当前煤矿的采矿设备、煤层地质条件以及通风能力得到当前煤矿在采用条带开采技术条件下的最大条带数量以及各煤矿条带的位置划分;
b.通过步骤a中划分后的煤矿条带,得到各煤矿条带的煤柱数量以及间隔距离,各个煤矿条带煤柱位置保持一致,用于煤矿开采过程中离层产生位置保持一致;
c.检测煤矿条带条带在开采过程中,在煤矿上方产生的离层位置,通过步骤b中设置的煤柱,避免离层闭合;
d.通过步骤c中得到的离层位置,在离层上方钻孔,直至地面与离层通过孔洞连通,在地面上经由孔洞向离层进行注浆操作,直至注浆完全填充离层;
e.在步骤d中的钻孔位置持续钻孔,直至孔洞与下一煤矿条带离层连通,在地面上经由孔洞向离层进行注浆操作,直至注浆完全填充离层;
f.重复步骤e,直至煤矿完成开采。
进一步地,所述步骤d中使用工程钻机进行钻孔操作。
进一步地,所述步骤d中注浆操作中的浆液为单液水泥浆、粘土水泥浆或水泥-水玻璃浆中的一种。
本发明的有益效果为:
1.本发明通过条带开采法与离层注浆减沉技术结合,可减少单一条带开采造成的资源浪费,提高出采率,同时提高单一覆岩离层注浆的减沉效果。
2.本发明通过煤柱的设置,可以大大缩小离层出现的位置范围,使每一条带离层的出现位置一致,可通过一个孔洞实现各个煤矿条带离层的填充,同时有利于将注浆材料在合适的时间注入合适的离层带。
3.通过条带开采与离层注浆两者的结合,减少单一条带开采条件下的条带煤柱数量,降低工作面搬家次数,推动工作面推进的连续性。
4.注浆设备置于地面,设备操作仅在地面进行,不影响井下开拓布局与回采工艺,同时地下采煤与地面注浆同时进行,井下生产与地面施工互不干扰。吨煤成本增加有限,经济上推行合理。
具体实施方式
一种煤矿条带开采中覆岩离层注浆减沉工艺,所述工艺步骤如下:
a.划分煤矿条带:通过当前煤矿的采矿设备、煤层地质条件以及通风能力得到当前煤矿在采用条带开采技术条件下的最大条带数量以及各煤矿条带的位置划分;
b.通过步骤a中划分后的煤矿条带,得到各煤矿条带的煤柱数量以及间隔距离,各个煤矿条带煤柱位置保持一致,用于煤矿开采过程中离层产生位置保持一致;
c.检测煤矿条带条带在开采过程中,在煤矿上方产生的离层位置,通过步骤b中设置的煤柱,避免离层闭合;
d.通过步骤c中得到的离层位置,在离层上方钻孔,直至地面与离层通过孔洞连通,在地面上经由孔洞向离层进行注浆操作,直至注浆完全填充离层;步骤d中使用工程钻机进行钻孔操作;注浆操作中使用的浆为单液水泥浆、粘土水泥浆或水泥-水玻璃浆中的一种。
e.在步骤d中的钻孔位置持续钻孔,直至孔洞与下一煤矿条带离层连通,在地面上经由孔洞向离层进行注浆操作,直至注浆完全填充离层;
f.重复步骤e,直至煤矿完成开采。
本发明通过条带开采法与离层注浆减沉技术结合,可减少单一条带开采造成的资源浪费,提高出采率,同时提高单一覆岩离层注浆的减沉效果。
本发明通过煤柱的设置,可以大大缩小离层出现的位置范围,使每一条带离层的出现位置一致,可通过一个孔洞实现各个煤矿条带离层的填充,同时有利于将注浆材料在合适的时间注入合适的离层带。
通过条带开采与离层注浆两者的结合,减少单一条带开采条件下的条带煤柱数量,降低工作面搬家次数,推动工作面推进的连续性。注浆设备置于地面,设备操作仅在地面进行,不影响井下开拓布局与回采工艺,同时地下采煤与地面注浆同时进行,井下生产与地面施工互不干扰。吨煤成本增加有限,经济上推行合理。
Claims (3)
1.一种煤矿条带开采中覆岩离层注浆减沉工艺,其特征在于:所述工艺步骤如下:
a.划分煤矿条带:通过当前煤矿的采矿设备、煤层地质条件以及通风能力得到当前煤矿在采用条带开采技术条件下的最大条带数量以及各煤矿条带的位置划分;
b.通过步骤a中划分后的煤矿条带,得到各煤矿条带的煤柱数量以及间隔距离,各个煤矿条带煤柱位置保持一致,用于煤矿开采过程中离层产生位置保持一致;
c.检测煤矿条带条带在开采过程中,在煤矿上方产生的离层位置,通过步骤b中设置的煤柱,避免离层闭合;
d.通过步骤c中得到的离层位置,在离层上方钻孔,直至地面与离层通过孔洞连通,在地面上经由孔洞向离层进行注浆操作,直至注浆完全填充离层;
e.在步骤d中的钻孔位置持续钻孔,直至孔洞与下一煤矿条带离层连通,在地面上经由孔洞向离层进行注浆操作,直至注浆完全填充离层;
f.重复步骤e,直至煤矿完成开采。
2.根据权利要求1中的煤矿条带开采中覆岩离层注浆减沉工艺,其特征在于:所述步骤d中使用工程钻机进行钻孔操作。
3.根据权利要求1中的煤矿条带开采中覆岩离层注浆减沉工艺,其特征在于:所述步骤d中注浆操作中的浆液为单液水泥浆、粘土水泥浆或水泥-水玻璃浆中的一种。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610150918.3A CN105804752A (zh) | 2016-03-15 | 2016-03-15 | 一种煤矿条带开采中覆岩离层注浆减沉工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610150918.3A CN105804752A (zh) | 2016-03-15 | 2016-03-15 | 一种煤矿条带开采中覆岩离层注浆减沉工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105804752A true CN105804752A (zh) | 2016-07-27 |
Family
ID=56453166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610150918.3A Pending CN105804752A (zh) | 2016-03-15 | 2016-03-15 | 一种煤矿条带开采中覆岩离层注浆减沉工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105804752A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106593444A (zh) * | 2016-12-02 | 2017-04-26 | 淮北矿业(集团)有限责任公司 | 一种坚硬岩层下降低采动震动能量的方法 |
CN106869966A (zh) * | 2017-03-02 | 2017-06-20 | 宿州学院 | 一种离层水补给源的封堵方法 |
CN110080714A (zh) * | 2019-04-04 | 2019-08-02 | 中勘资源勘探科技股份有限公司 | 一种覆岩隔离注浆工程中地面冒浆堵漏的施工工艺 |
CN114183195A (zh) * | 2022-02-15 | 2022-03-15 | 山东山矿机械有限公司 | 一种基于离层分布规律的地表沉陷控制注浆填充系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2176734C2 (ru) * | 1999-06-21 | 2001-12-10 | ОАО "Кузнецкий научно-исследовательский угольный институт" | Способ разработки пологих и наклонных угольных пластов средней мощности |
CN102704933A (zh) * | 2012-05-25 | 2012-10-03 | 中国矿业大学 | 采动覆岩分区隔离注浆充填采煤方法 |
CN103147758A (zh) * | 2012-05-25 | 2013-06-12 | 中国矿业大学 | 与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法 |
CN103291303A (zh) * | 2013-06-27 | 2013-09-11 | 山东科技大学 | 一种留设条带煤柱的开采方法 |
-
2016
- 2016-03-15 CN CN201610150918.3A patent/CN105804752A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2176734C2 (ru) * | 1999-06-21 | 2001-12-10 | ОАО "Кузнецкий научно-исследовательский угольный институт" | Способ разработки пологих и наклонных угольных пластов средней мощности |
CN102704933A (zh) * | 2012-05-25 | 2012-10-03 | 中国矿业大学 | 采动覆岩分区隔离注浆充填采煤方法 |
CN103147758A (zh) * | 2012-05-25 | 2013-06-12 | 中国矿业大学 | 与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法 |
CN103291303A (zh) * | 2013-06-27 | 2013-09-11 | 山东科技大学 | 一种留设条带煤柱的开采方法 |
Non-Patent Citations (1)
Title |
---|
刘金海: "条带开采条件下的覆岩离层注浆减沉技术体系研究", 《中国优秀硕士学位论文全文数据库》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106593444A (zh) * | 2016-12-02 | 2017-04-26 | 淮北矿业(集团)有限责任公司 | 一种坚硬岩层下降低采动震动能量的方法 |
CN106869966A (zh) * | 2017-03-02 | 2017-06-20 | 宿州学院 | 一种离层水补给源的封堵方法 |
CN106869966B (zh) * | 2017-03-02 | 2018-10-23 | 宿州学院 | 一种离层水补给源的封堵方法 |
CN110080714A (zh) * | 2019-04-04 | 2019-08-02 | 中勘资源勘探科技股份有限公司 | 一种覆岩隔离注浆工程中地面冒浆堵漏的施工工艺 |
CN110080714B (zh) * | 2019-04-04 | 2021-07-20 | 中勘资源勘探科技股份有限公司 | 一种覆岩隔离注浆工程中地面冒浆堵漏的施工工艺 |
CN114183195A (zh) * | 2022-02-15 | 2022-03-15 | 山东山矿机械有限公司 | 一种基于离层分布规律的地表沉陷控制注浆填充系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103016053B (zh) | 一种采空区局部充填控制地表沉陷的方法 | |
CN108661705B (zh) | 条采采空区四位一体综合治理施工方法 | |
CN103306720B (zh) | 一种特厚煤层倾斜分层固体充填采煤方法 | |
WO2023029617A1 (zh) | 煤矸石井下减排的覆岩隔离注浆充填方法 | |
CN106593445A (zh) | 一种老采空区下伏近距离煤层覆岩隔离注浆充填开采方法 | |
CN103967493B (zh) | 一种缓倾斜薄矿体矿柱采矿法 | |
CN104775816B (zh) | 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法 | |
CN104481540A (zh) | 一种利用高位钻孔注浆控制多种煤矿开采灾害的方法 | |
CN108798769B (zh) | 条采采空区一体化综合治理施工方法 | |
CN104863629A (zh) | 一种利用复合钻孔抽覆岩下离层瓦斯及排水注浆的方法 | |
CN110671145A (zh) | 一种大采宽厚煤层开采复合注浆方法 | |
CN103821558A (zh) | 煤矿采空区充填采矿系统及沿空留巷充填工艺 | |
WO2016074456A1 (zh) | 控制覆岩裂隙与地表沉陷的掘采充平行作业的采煤方法 | |
CN108087021A (zh) | 一种充填采煤回收遗留煤柱并控制隔水关键层稳定的方法 | |
CN107339105B (zh) | 一种分层膏体充填复采特厚煤层残采区停采线煤柱的方法 | |
CN112879011B (zh) | 一种含水层下坚硬覆岩预裂弱化控制导水裂缝带高度方法 | |
CN101608552A (zh) | 煤层底板含水层加固并在加固过程中保护隔水层的方法 | |
CN110295905B (zh) | 一种倾斜煤层的高压水精准碎煤充填开采方法 | |
AU2021106168A4 (en) | High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face | |
CN105804752A (zh) | 一种煤矿条带开采中覆岩离层注浆减沉工艺 | |
CN105464700A (zh) | 综采-充填混合开采工作面充填段长度确定方法 | |
CN104330107A (zh) | 一种固体充填采煤工作面充填质量评价方法 | |
CN109611146B (zh) | 一种离层水疏放注浆方法 | |
CN103993882A (zh) | 一种冒落区注浆充填置换条带煤柱的方法 | |
CN107816366A (zh) | 一种多层采空区充填井成井工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 235047 No. 18, Wu Tong Road, Longhu Industrial Park, Huaibei Economic Development Zone, Anhui Applicant after: Exploration and exploration of the Polytron Technologies Inc Address before: 235047 No. 18, Wu Tong Road, Longhu Industrial Park, Huaibei Economic Development Zone, Anhui Applicant before: Huaibei mining (Group) Exploration Engineering Co., Ltd. |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160727 |