CN104330107A - 一种固体充填采煤工作面充填质量评价方法 - Google Patents

一种固体充填采煤工作面充填质量评价方法 Download PDF

Info

Publication number
CN104330107A
CN104330107A CN201410482884.9A CN201410482884A CN104330107A CN 104330107 A CN104330107 A CN 104330107A CN 201410482884 A CN201410482884 A CN 201410482884A CN 104330107 A CN104330107 A CN 104330107A
Authority
CN
China
Prior art keywords
filling
solid
coal mining
coal
solid filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410482884.9A
Other languages
English (en)
Inventor
张吉雄
李猛
张强
姜海强
薛松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201410482884.9A priority Critical patent/CN104330107A/zh
Publication of CN104330107A publication Critical patent/CN104330107A/zh
Priority to PCT/CN2015/081019 priority patent/WO2016041389A1/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明公开的一种固体充填采煤工作面充填质量评价方法,首先由固体充填采煤应用目的确定固体充填采煤控制对象;其次根据控制对象选取不同充填开采目的下相应的评价指标;然后由工作面工程地质参数及控制对象,确定各项评价指标理论要求范围;最后将评价指标理论值与实际值进行对比分析,得出充填工作面质量评价结果。此方法为固体充填采煤工作面充填质量有效地评价提供参考,对确保固体充填采煤的成功实施具有重要意义。特别适用于矸石、粉煤灰等固体充填采煤工作面充填质量评价其评价,其方法简单易行,省时省力,效果好。

Description

一种固体充填采煤工作面充填质量评价方法
技术领域
本发明涉及一种充填采煤工作面质量评价方法,特别是一种适用于矸石、粉煤灰等固体充填采煤工作面充填质量评价方法。
背景技术
固体充填采煤技术作为一种我国自主研发的、能够与环境协调发展的绿色开采技术,将地面矸石、粉煤灰、风积沙等固体废弃物直接充填至井下采空区,在控制采场覆岩移动及地表沉陷的基础上,达到置换建(构)筑物下、水体下、铁路下(三下)压煤、保护地表建筑物及矿区生态环境的目的,有效兼顾了煤矿开采的经济效益与环境效益,获得了广泛的关注及较大规模的推广应用。固体充填采煤工作面充填质量是关系充填成败的关键,目前关于固体充填采煤工作面充填质量还没有一种有效的评价方法,因此,亟需提出一种对固体充填采煤工作面充填质量有效评价的方法,从而实时监测固体充填采煤工作面质量状况,为确保固体充填采煤成功实施具有重要意义。
发明内容
技术问题:本发明的目的是针对现有技术中存在的问题,提供一种评价方法简单、准确的固体充填采煤工作面充填质量评价方法。
技术方案:本发明的固体充填采煤工作面充填质量评价方法,通过对比分析不同固体充填开采目的下的评价指标理论值与实际值来评价充填采煤工作面的充填质量,其具体步骤如下:
(1)由固体充填采煤的应用目的确定固体充填采煤所控制的对象;
(2)根据确定的控制对象选取不同充填开采目的下对应的评价指标;
(3)由工作面工程地质参数及控制对象,确定各项评价指标的理论要求范围;
(4)将评价指标理论值与实际值进行对比分析,得出充填工作面充填质量评价结果。
所述的固体充填采煤应用目的包括建构筑物下采煤、水体下采煤、条带变密实充填、固体废弃物处理、房式煤柱回收;所述的控制对象包括建筑物变形级别、覆岩裂隙发育范围、采煤量、固体废弃物处理能力、顶板稳定性,不同的应用目的对应不同的控制对象;所述的评价指标包括地表变形值、导水裂隙带高度、回采率、充填量、充实率,不同的控制对象对应不同的评价指标;所述充填工作面充填质量评价结果是将工作面充填质量分为达标、不达标两个等级;若所有评价指标均满足各自达标要求,则工作面充填质量达标,否则,不达标。
有益效果:由于采用了上述技术方案,本发明在实际运用时只需根据不同充填目的下的控制对象确定其评价指标,通过实时监测充填采煤工作面评价指标实际值,即可评价充填工作面质量。本发明能为固体充填采煤工作面充填质量有效地评价提供参考,对确保固体充填采煤的成功实施具有重要意义。特别适用于矸石、粉煤灰等固体充填采煤工作面充填质量评价其评价,其方法简单易行,省时省力,效果好,在本技术领域内具有广泛的实用性。
附图说明
图1为本发明固体充填采煤工作面充填质量评价方法流程图。
具体实施方式
下面结合附图对本发明的实施例作进一步的描述:
如图1所示,本发明的固体充填采煤工作面充填质量评价方法,通过对比分析不同固体充填开采应用目的下的评价指标理论值与实际值来评价充填采煤工作面的充填质量,其具体步骤如下:
(1)由固体充填采煤应用目的,如建构筑物下采煤、水体下采煤、条带变密实充填、固体废弃物处理、或房式煤柱回收,确定固体充填采煤控制对象,如建筑物变形级别、覆岩裂隙发育范围、采煤量、固体废弃物处理能力、或顶板稳定性;
(2)根据控制对象选取不同充填开采目的下相应的评价指标,如地表变形值、导水裂隙带高度、回采率、充填量、或充实率;
(3)由工作面工程地质参数及控制对象,确定各项评价指标理论要求范围;
(4)将评价指标理论值与实际值进行对比分析,得出充填工作面充填质量评价结果。若所有评价指标均满足各自达标要求,则工作面充填质量达标,否则,不达标。
实施例1、以某煤矿CT101充填采煤工作面为例,具体实施步骤如下:
(1)该煤矿CT101工作面位于第四含水层下,应用目的为水体下采煤,煤层开采受“四含”影响严重,为保证工作面的安全开采,选取覆岩裂隙发育范围为控制对象,因此,需严格控制采场覆岩裂隙发育范围;
(2)为防止工作面开采后覆岩裂隙波及第四含水层,选取导水裂隙带高度作为该工作面充填质量的评价指标;
(3)由于第四含水层直接覆盖于基岩地层之上,下方无隔水层,CT101工作面煤层距第四含水层最近为25.6m,因此,需保证充填采煤工作面导水裂隙带高度小于煤层距第四含水层最小距离,确定评价指标理论值为25.6m;
(4)CT101工作面开采后,采用钻孔冲洗液法对覆岩导水裂隙带高度进行监测,实测得到导水裂隙带最大高度为10.5m,小于充填采煤评价指标理论值,保证水体下煤层的安全开采,所以该固体充填采煤工作面充填质量达标。
实施例2、以某煤矿1312充填采煤工作面为例,具体实施步骤如下:
(1)该煤矿1312工作面位于建筑物下,主要为砖混结构的建筑物,应用目的为建筑物下采煤,为保证工作面的安全开采,选取建筑物变形级别为控制对象,因此,需严格控制地表建筑物的变形;
(2)为防止工作面开采后地表下沉值过大,选取地表变形值作为该工作面充填质量的评价指标;
(3)根据充填区域地面村庄建筑物情况,地面建(构)筑物的设防标准的设防标准是:地面村庄等建(构)筑物区域的采动影响控制在I级采动影响范围内,建筑物区域地表最大下沉量控制在250mm以内,地表最大水平变形控制在1.0mm/m以内。因此,需保证充填采煤工作面开采后地表变形值在I级采动影响范围内,确定评价指标理论值:最大下沉量250mm、最大水平变形1.0mm/m;
(4)1312工作面开采后,采上方地表的最大下沉值为163mm,地表拉伸变形最大值为0.4mm/m,地表压缩变形最大值为0.7mm/m,地表倾斜最大值为0.7mm/m。所有村庄建筑群的地表下沉值均小于250mm设防标准;各村庄地表最大变形值均远小于一般砖混结构平房的临界变形值,对各类建筑物的采动损害影响均在I级范围内,不会影响地面各类建(构)筑物的正常使用。因此,评价指标实际值小于充填采煤评价指标理论值,保证建筑物下煤层的安全开采,所以该固体充填采煤工作面充填质量达标。

Claims (5)

1.一种固体充填采煤工作面充填质量评价方法,其特征在于:通过对比分析不同固体充填开采目的下的评价指标理论值与实际值来评价充填采煤工作面的充填质量,其具体步骤如下:
(1)由固体充填采煤的应用目的确定固体充填采煤所控制的对象;
(2)根据确定的控制对象选取不同充填开采目的下对应的评价指标;
(3)由工作面工程地质参数及控制对象,确定各项评价指标的理论要求范围;
(4)将评价指标理论值与实际值进行对比分析,得出充填工作面充填质量评价结果。
2.根据权利要求1所述的一种固体充填采煤工作面充填质量评价方法,其特征在于:所述的固体充填采煤的应用目的包括建构筑物下采煤、水体下采煤、条带变密实充填、固体废弃物处理、或房式煤柱回收。
3.根据权利要求1所述的一种固体充填采煤工作面充填质量评价方法,其特征在于:所述的控制对象包括建筑物变形级别、覆岩裂隙发育范围、采煤量、固体废弃物处理能力、顶板稳定性,不同的应用目的对应不同的控制对象。
4.根据权利要求1所述的一种固体充填采煤工作面充填质量评价方法,其特征在于:所述的评价指标包括地表变形值、导水裂隙带高度、回采率、充填量、充实率,不同的控制对象对应不同的评价指标。
5.根据权利要求1所述的一种固体充填采煤工作面充填质量评价方法,其特征在于:所述充填工作面充填质量评价结果是将充填工作面充填质量分为达标、不达标两个等级;若所有评价指标均满足各自达标要求,则充填工作面充填质量达标,否则,不达标。
CN201410482884.9A 2014-09-19 2014-09-19 一种固体充填采煤工作面充填质量评价方法 Pending CN104330107A (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410482884.9A CN104330107A (zh) 2014-09-19 2014-09-19 一种固体充填采煤工作面充填质量评价方法
PCT/CN2015/081019 WO2016041389A1 (zh) 2014-09-19 2015-06-09 一种固体充填采煤工作面充填质量评价方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410482884.9A CN104330107A (zh) 2014-09-19 2014-09-19 一种固体充填采煤工作面充填质量评价方法

Publications (1)

Publication Number Publication Date
CN104330107A true CN104330107A (zh) 2015-02-04

Family

ID=52404878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410482884.9A Pending CN104330107A (zh) 2014-09-19 2014-09-19 一种固体充填采煤工作面充填质量评价方法

Country Status (2)

Country Link
CN (1) CN104330107A (zh)
WO (1) WO2016041389A1 (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105240014A (zh) * 2015-11-12 2016-01-13 中国矿业大学 一种充填再造护巷煤柱条带回收房式遗留煤柱的方法
CN107038529A (zh) * 2017-04-07 2017-08-11 天地科技股份有限公司 条带充填体稳定性的评价方法
WO2017215192A1 (zh) * 2016-06-14 2017-12-21 中国矿业大学 一种充填采煤液压支架充填特性评价方法
CN109117585A (zh) * 2018-09-06 2019-01-01 中国矿业大学 一种固体充填材料内部应力确定方法
CN113341048A (zh) * 2021-07-02 2021-09-03 锡林郭勒职业学院 一种黑种草方剂的质量评价方法
CN115341903A (zh) * 2022-08-19 2022-11-15 中国矿业大学 面向煤炭开采和耕地保护协同发展的地下采煤设计方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111428357B (zh) * 2020-03-20 2023-03-28 山西工程技术学院 基于覆岩剩余自由空间高度的地表最大下沉值确定方法
CN112360548B (zh) * 2020-11-24 2022-08-26 西安科技大学 巷旁混凝土充填体全服务周期稳定性监测预警系统及方法
CN116757557B (zh) * 2023-08-15 2023-11-07 山东新巨龙能源有限责任公司 一种基于数据分析的原矸充填开采质量评估方法
CN117217626B (zh) * 2023-11-09 2024-07-19 清远市泓远矿业有限公司 一种基于绿色环保的智能开采方法
CN118008453B (zh) * 2024-01-29 2024-07-26 冀中能源股份有限公司邢东矿 一种充填开采边界受护对象的低扰动处理方法
CN118710136A (zh) * 2024-08-27 2024-09-27 天地科技股份有限公司 液压支架支护质量动态评估方法、装置、电子设备及介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586460A (zh) * 2009-06-02 2009-11-25 中国矿业大学 一种采煤固体物充填方法
CN103510984A (zh) * 2013-10-23 2014-01-15 中国矿业大学 固体充填采煤充采质量比设计方法
CN103527195A (zh) * 2013-10-23 2014-01-22 中国矿业大学 一种厚夹矸煤层分采分运矸石回填采空区方法
CN103899352A (zh) * 2014-04-08 2014-07-02 中国矿业大学 煤炭开采中固体充填充实率设计及控制方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3932046C3 (de) * 1989-09-26 1994-04-07 Bergwerksverband Gmbh Bruchfeldversatzverfahren
CN103147792B (zh) * 2012-02-22 2014-09-17 贾巍 进路式采煤充填法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586460A (zh) * 2009-06-02 2009-11-25 中国矿业大学 一种采煤固体物充填方法
CN103510984A (zh) * 2013-10-23 2014-01-15 中国矿业大学 固体充填采煤充采质量比设计方法
CN103527195A (zh) * 2013-10-23 2014-01-22 中国矿业大学 一种厚夹矸煤层分采分运矸石回填采空区方法
CN103899352A (zh) * 2014-04-08 2014-07-02 中国矿业大学 煤炭开采中固体充填充实率设计及控制方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105240014A (zh) * 2015-11-12 2016-01-13 中国矿业大学 一种充填再造护巷煤柱条带回收房式遗留煤柱的方法
CN105240014B (zh) * 2015-11-12 2017-09-15 中国矿业大学 一种充填再造护巷煤柱条带回收房式遗留煤柱的方法
WO2017215192A1 (zh) * 2016-06-14 2017-12-21 中国矿业大学 一种充填采煤液压支架充填特性评价方法
CN107038529A (zh) * 2017-04-07 2017-08-11 天地科技股份有限公司 条带充填体稳定性的评价方法
CN107038529B (zh) * 2017-04-07 2023-09-12 天地科技股份有限公司 条带充填体稳定性的评价方法
CN109117585A (zh) * 2018-09-06 2019-01-01 中国矿业大学 一种固体充填材料内部应力确定方法
CN109117585B (zh) * 2018-09-06 2022-10-28 中国矿业大学 一种固体充填材料内部应力确定方法
CN113341048A (zh) * 2021-07-02 2021-09-03 锡林郭勒职业学院 一种黑种草方剂的质量评价方法
CN115341903A (zh) * 2022-08-19 2022-11-15 中国矿业大学 面向煤炭开采和耕地保护协同发展的地下采煤设计方法

Also Published As

Publication number Publication date
WO2016041389A1 (zh) 2016-03-24

Similar Documents

Publication Publication Date Title
CN104330107A (zh) 一种固体充填采煤工作面充填质量评价方法
CN104763432B (zh) 一种高应力巷道围岩卸压控制大变形的方法
CN103902780B (zh) 固体充填采煤地表变形预计方法
CN110242301A (zh) 一种顶板含水层两步骤注浆改性保水采煤方法
AU2015345830B2 (en) Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence
CN103899352B (zh) 煤炭开采中固体充填充实率设计及控制方法
CN108798769B (zh) 条采采空区一体化综合治理施工方法
CN100560937C (zh) 一种薄基岩浅埋煤层长壁工作面保水开采方法
CN112392431A (zh) 通过采动裂隙带内水平长钻孔动态保压注浆封堵裂隙防治煤层顶板水害技术
CN104863629A (zh) 一种利用复合钻孔抽覆岩下离层瓦斯及排水注浆的方法
CN106150546B (zh) 一种根据地表沉陷特征进行采空区部分充填的方法
CN115030722B (zh) 一种采空区滞后充填高效保水采煤方法
CN108663724B (zh) 一种基于水资源转移路径的煤矿地下水库位置选择方法
Liu et al. Undersea safety mining of the large gold deposit in Xinli District of Sanshandao Gold Mine
CN112879011B (zh) 一种含水层下坚硬覆岩预裂弱化控制导水裂缝带高度方法
CN103498696A (zh) 一种从顶板巷道注浆充填压实采空区充填体的方法
CN104775816A (zh) 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法
CN111075478A (zh) 采掘工作面构造破碎带地面施工预注浆加固工艺
CN103953386A (zh) 一种上堵下渗抽采采动区瓦斯的方法
CN102777185A (zh) 一种斜井井筒施工工艺
CN107313743B (zh) 一种利用煤层气井对煤层底板隔水层薄弱区带修补方法
CN110778317A (zh) 一种采动过程中垮落带内地面注浆充填钻孔结构施工方法
ZHA et al. Mining subsidence control by solid backfilling under buildings
CN105804752A (zh) 一种煤矿条带开采中覆岩离层注浆减沉工艺
CN104763423A (zh) 利用反井方式凿岩采出粉矿的开采工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150204