CN105803946B - Quickly adjustable support for a cover beam and its construction method - Google Patents

Quickly adjustable support for a cover beam and its construction method Download PDF

Info

Publication number
CN105803946B
CN105803946B CN201610310112.6A CN201610310112A CN105803946B CN 105803946 B CN105803946 B CN 105803946B CN 201610310112 A CN201610310112 A CN 201610310112A CN 105803946 B CN105803946 B CN 105803946B
Authority
CN
China
Prior art keywords
installation
hoop
formwork
cover
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610310112.6A
Other languages
Chinese (zh)
Other versions
CN105803946A (en
Inventor
张耀辉
赵华伟
曾云旭
宋俊领
刘明明
赵明宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN201610310112.6A priority Critical patent/CN105803946B/en
Publication of CN105803946A publication Critical patent/CN105803946A/en
Application granted granted Critical
Publication of CN105803946B publication Critical patent/CN105803946B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种盖梁可快速调节支架及其施工方法,该施工方法括以下步骤:(1)抱箍安装;(2)机械千斤顶安装;(3)横梁安装;(4)纵梁安装;(5)底模安装;(6)钢筋绑扎;(7)侧模安装;(8)混凝土浇筑;(9)模板支架拆除。本发明的优点在于机械千斤顶对支架底模板高程可自由上下调节至设计位置,且机械千斤顶不会回缩下滑,相比传统的楔形块拆除支架更便利快捷,缩短了工序持续时间,提高了盖梁支架的稳定性及安全性。

The invention discloses a quickly adjustable support for a cover beam and a construction method thereof. The construction method includes the following steps: (1) installation of a hoop; (2) installation of a mechanical jack; (3) installation of a beam; (4) installation of a longitudinal beam (5) Bottom formwork installation; (6) Steel bar binding; (7) Side formwork installation; (8) Concrete pouring; (9) Formwork support removal. The invention has the advantage that the mechanical jack can freely adjust the height of the bottom formwork of the support to the design position, and the mechanical jack will not retract and slide down. Compared with the traditional wedge-shaped block, it is more convenient and quick to remove the support, shortening the duration of the process and improving the cover. The stability and safety of the beam support.

Description

一种盖梁可快速调节支架及其施工方法Quickly adjustable support for a cover beam and its construction method

技术领域technical field

本发明属于桥梁下部结构圆柱形墩柱盖梁施工技术领域,具体涉及一种盖梁可快速调节支架及其施工方法。The invention belongs to the technical field of construction of a cylindrical pier column cover beam of a bridge substructure, and in particular relates to a quickly adjustable support for a cover beam and a construction method thereof.

背景技术Background technique

随着建设工程的发展,圆柱形墩柱盖梁结构形式,在我国桥梁施工中得到广泛应用。根据目前盖梁的支架形式有穿杠法、钢管支柱法、碗扣支架法等方法,这类施工方法具有一定的局限性,且工序持续时间长,产生成本大。With the development of construction projects, the cylindrical pier-column-cap-beam structure has been widely used in bridge construction in our country. According to the current support forms of cover beams, there are methods such as piercing rod method, steel pipe support method, and bowl buckle support method.

发明内容Contents of the invention

本发明为了解决现有技术中的不足之处,提供一种盖梁可快速调节支架及其施工方法,可在一定范围内可对支架底模标高进行调节至设计位置,具有灵活性强、速度快捷方便的优点,更易保证盖梁结构的标高准确性,同时降低了人力劳动强度,简化了施工工序,提高了工作效率高,加快了施工进度,确保结构物的实体质量,而且能够比传统施工更加安全的进行支架拆除。In order to solve the deficiencies in the prior art, the present invention provides a rapidly adjustable support for the cover beam and its construction method, which can adjust the elevation of the bottom mold of the support to the design position within a certain range, and has strong flexibility, high speed The advantages of quick and convenient, it is easier to ensure the accuracy of the elevation of the cover beam structure, while reducing the labor intensity, simplifying the construction process, improving work efficiency, speeding up the construction progress, ensuring the physical quality of the structure, and can be compared with traditional construction Safer bracket removal.

为解决上述技术问题,本发明采用如下技术方案:一种盖梁可快速调节支架的施工方法,该施工方法依次按以下步骤进行:In order to solve the above-mentioned technical problems, the present invention adopts the following technical scheme: a construction method for the quickly adjustable support of the cover beam, which is carried out in turn according to the following steps:

(1)抱箍安装:圆形墩柱按盖梁高程计算出抱箍安装高程,经水准仪测量后在指定高程上安装经过受力计算设计的抱箍;(1) Hoop installation: Calculate the hoop installation height of the circular pier column according to the height of the cover beam, and install the hoop designed by force calculation on the specified elevation after measuring with the level gauge;

(2)机械千斤顶安装:将机械千斤顶安装在抱箍牛腿上;(2) Mechanical jack installation: install the mechanical jack on the hoop corbel;

(3)横梁安装:在机械千斤顶顶部安装横梁;(3) Beam installation: install the beam on the top of the mechanical jack;

(4)纵梁安装:在横梁上安装纵梁;(4) Longitudinal beam installation: install the longitudinal beam on the beam;

(5)底模安装:在纵梁安装盖梁的底模板,在纵梁两端的底模板设置三角支架,底模板安装完成后,对底模板高程进行复测,通过上下调节机械千斤顶使底模板高程准确安装至设计高程;(5) Bottom form installation: install the bottom formwork of the cover beam on the longitudinal beam, and set up triangular brackets on the bottom formwork at both ends of the longitudinal beam. The elevation is accurately installed to the design elevation;

(6)钢筋绑扎及安装:预绑扎完成的盖梁钢筋笼运输至施工现场,将盖梁钢筋笼起吊安装至底模板上的设计位置;(6) Reinforcement binding and installation: The pre-bound cover beam reinforcement cage is transported to the construction site, and the cover beam reinforcement cage is hoisted and installed to the designed position on the bottom formwork;

(7)侧模安装:侧模、端模按照设计尺寸安装到位,并安装拉筋;(7) Side form installation: side form and end form are installed in place according to the design size, and tie bars are installed;

(8)混凝土浇筑:按规范及设计要求进行混凝土浇筑;(8) Concrete pouring: Concrete pouring shall be carried out according to the specifications and design requirements;

(9)模板支架拆除:混凝土强度达到2.5MPa拆除侧模、端模,强度达到设计强度的85%开始拆除三角支架,调节机械千斤顶,拆除纵梁和横梁,去掉机械千斤顶,拆除抱箍。(9) Formwork support removal: When the concrete strength reaches 2.5MPa, remove the side formwork and end formwork. When the strength reaches 85% of the design strength, start to remove the triangular support, adjust the mechanical jack, remove the longitudinal beam and beam, remove the mechanical jack, and remove the hoop.

所述步骤(1)中抱箍与墩柱之间安设白色土工布。In the step (1), a white geotextile is installed between the hoop and the pier.

所述步骤(2)中抱箍牛腿上焊接加工三个限位钢筋,使机械千斤顶底部正好安装在内。In the step (2), three limit steel bars are welded and processed on the hoop bracket, so that the bottom of the mechanical jack is just installed inside.

所述步骤(3)中的横梁间设置多道拉杆。Multiple tie rods are arranged between the beams in the step (3).

所述步骤(5)中底模安装完成后采用钢筋对三角支架进行预压,实地验证受力计算,查看三角支架是否变形。In the step (5), after the bottom mold is installed, the triangle bracket is preloaded with steel bars, and the force calculation is verified on the spot to check whether the triangle bracket is deformed.

所述步骤(8)中混凝土浇筑后对盖梁进行洒水养护,洒水养护的时间不低于7天。In the step (8), after the concrete is poured, the cover beam is watered and cured, and the time of watering and curing is not less than 7 days.

所述步骤(9)中机械千斤顶的工序包括以下流程:同步对同一个抱箍上的两个机械千斤顶向下调节,首次调节2cm,然后调节另一端两个机械千斤顶向下4cm,两端逐步下调7cm左右。The process of the mechanical jacks in the step (9) includes the following process: Synchronously adjust the two mechanical jacks on the same hoop downwards, adjust 2cm for the first time, then adjust the two mechanical jacks at the other end down 4cm, and gradually Adjust down about 7cm.

本发明的一种盖梁可快速调节支架,它包括设置在圆形墩柱上的抱箍,抱箍两侧的抱箍牛腿分别设置有竖向的机械千斤顶,每个机械千斤顶的顶部均设置有横梁,横梁上安装有多个纵梁,多个纵梁沿横梁的长度方向间隔布置,且每个纵梁均横向架设在两个横梁之间,纵梁上安装有底模板,底模板上浇筑设置有盖梁。A quick-adjustable bracket for a cover beam of the present invention comprises a hoop arranged on a circular pier column, the hoop brackets on both sides of the hoop are respectively provided with vertical mechanical jacks, and the top of each mechanical jack is A crossbeam is provided, and a plurality of longitudinal beams are installed on the crossbeam, and the plurality of longitudinal beams are arranged at intervals along the length direction of the crossbeam, and each longitudinal beam is horizontally erected between two crossbeams, and a bottom formwork is installed on the longitudinal beam, and the bottom formwork The top pouring is provided with a cover beam.

位于所述纵梁两端的底模板与纵梁之间设置三角支架。A triangular bracket is arranged between the bottom formwork at both ends of the longitudinal beam and the longitudinal beam.

所述两个横梁之间设置有多道拉杆。There are multiple pull rods arranged between the two beams.

本发明的有益效果是:The beneficial effects of the present invention are:

本发明适用于各种圆柱形墩柱盖梁结构形式,以工字钢、抱箍为支撑力,机械千斤顶为底支架的卸落调节装置,在一定范围内可对支架底模标高进行调节至设计位置,具有灵活性强、速度快捷方便,更易保证盖梁结构的标高准确性,同时可降低人力劳动强度,简化了施工工序,提高了工作效率高,加快施工进度,确保结构物的实体质量。支架拆除时,机械千斤顶卸落便捷,能够比传统施工更加安全的进行支架拆除。本发明的机械千斤顶对支架底模板高程可自由上下调节至设计位置,且机械千斤顶不会回缩下滑,相比传统的楔形块拆除支架更便利快捷,缩短了工序持续时间,提高了盖梁支架的稳定性及安全性。The invention is applicable to various cylindrical pier-column-cover-beam structures, with I-beams and hoops as the supporting force, and a mechanical jack as the unloading adjustment device for the bottom bracket, which can adjust the elevation of the bottom mold of the bracket to within a certain range The design position is flexible, fast and convenient, and it is easier to ensure the accuracy of the elevation of the cover beam structure. At the same time, it can reduce the labor intensity, simplify the construction process, improve work efficiency, speed up the construction progress, and ensure the physical quality of the structure. . When the bracket is removed, the mechanical jack is easy to remove, and the bracket can be removed more safely than traditional construction. The mechanical jack of the present invention can freely adjust the height of the bottom formwork of the bracket to the design position, and the mechanical jack will not retract and slide down. Compared with the traditional wedge-shaped block, it is more convenient and quick to remove the bracket, shortening the duration of the process and improving the cover beam bracket. stability and security.

附图说明Description of drawings

图1是本发明盖梁可快速调节支架的断面图;Fig. 1 is the sectional view of the quickly adjustable support of the cover beam of the present invention;

图2是本发明盖梁可快速调节支架的剖面图。Fig. 2 is a cross-sectional view of the quickly adjustable support for the cover beam of the present invention.

具体实施方式detailed description

如图1至图2所示,本发明的一种盖梁可快速调节支架的施工方法,该施工方法依次按以下步骤进行:As shown in Fig. 1 to Fig. 2, a kind of cover beam of the present invention can quickly adjust the construction method of support, and this construction method is carried out according to the following steps successively:

(1)抱箍安装:抱箍安装是在圆形墩柱6按盖梁高程计算出抱箍安装高程,经水准仪测量后在指定高程上安装经过受力计算设计的抱箍5。抱箍5与墩柱6之间安设白色土工布,以增强抱箍5与墩柱6摩擦力及保护墩柱外观。抱箍连接螺栓采用高强螺栓,螺栓上紧后采用扭力扳手验证,螺栓使用一段时间后及时检查螺栓丝的情况,发现脱丝、损伤等情况及时更换螺栓。(1) Hoop installation: The hoop installation is to calculate the hoop installation elevation on the circular pier 6 according to the height of the cover beam, and install the hoop 5 designed by force calculation on the specified elevation after measuring with the level instrument. A white geotextile is installed between the hoop 5 and the pier column 6 to enhance the friction between the hoop 5 and the pier column 6 and to protect the appearance of the pier column. The hoop connection bolts are high-strength bolts, and the torque wrench is used to verify the tightening of the bolts. After the bolts have been used for a period of time, check the condition of the bolt wires in time, and replace the bolts in time if they are found to be detached or damaged.

(2)机械千斤顶安装:机械千斤顶4安装在抱箍牛腿上,共计四个,抱箍牛腿上焊接加工三个1cm高限位钢筋,使机械千斤顶4底部正好安装在内,起到防止机械千斤顶4移动的作用。(2) Mechanical jack installation: The mechanical jack 4 is installed on the hoop corbel, a total of four, and three 1cm high limit steel bars are welded and processed on the hoop corbel, so that the bottom of the mechanical jack 4 is just installed inside to prevent Mechanical jack 4 moves the action.

(3)横梁安装:在机械千斤顶4顶部安装I45c工字钢横梁3,为防横梁3侧倾,横梁3间设置5道钢筋拉杆。同一墩柱两侧机械千斤顶4顶面高程调节一致。(3) Installation of beams: install I45c I-beam beams 3 on the top of mechanical jack 4, in order to prevent beams 3 from tilting, and set 5 steel tie rods between beams 3. The elevation adjustment of the top surface of the mechanical jack 4 on both sides of the same pier column is consistent.

(4)纵梁安装:在I45c工字钢横梁6上安装I16工字钢纵梁2,纵梁2间距50cm。(4) Longitudinal beam installation: install I16 I-shaped steel longitudinal beam 2 on I45c I-shaped steel beam 6, and the distance between longitudinal beams 2 is 50cm.

(5)底模安装:在I16工字钢纵梁2上安装盖梁的底模板1(两端底模板1自带三角支架7),底模板1安装完成后,进行打磨涂刷模板漆,且对底模板高程进行复测,此时底模板若有误差一般在3cm以内,可以通过上下调节机械千斤顶4使底模板高程准确安装至设计高程。首次支架使用时,底模安装完成后采用砂袋对支架进行预压,实地验证受力计算,查看支架是否变形。(5) Bottom form installation: Install the bottom formwork 1 of the cover beam on the I16 I-beam longitudinal beam 2 (bottom formwork 1 at both ends has a triangular bracket 7). After the bottom formwork 1 is installed, polish and paint the formwork paint. And the bottom template elevation is remeasured, if the bottom template has an error generally within 3cm, the bottom template elevation can be accurately installed to the design elevation by adjusting the mechanical jack 4 up and down. When the bracket is used for the first time, after the bottom mold is installed, sand bags are used to pre-press the bracket, and the force calculation is verified on the spot to check whether the bracket is deformed.

(6)钢筋绑扎及安装:钢筋在加工棚内加工,在台座上绑扎。钢筋的交叉点用铁丝绑扎牢固,主筋接头采用双面搭接焊。在钢筋加工厂内部加工绑扎完成的盖梁钢筋笼,通过炮车运输至施工现场,25T吊机起吊安装至底模板上的设计位置,并在底层钢筋下侧支垫绑扎与盖梁砼标号相同的砼垫块,砼垫块呈梅花形交错布置,并在绑扎前用水浸湿,以保证钢筋保护层符合设计要求。(6) Binding and installation of steel bars: The steel bars are processed in the processing shed and bound on the pedestal. The intersections of the steel bars are bound firmly with iron wires, and the joints of the main bars are double-sided lap welded. The cover beam reinforcement cages processed and bundled in the steel bar processing plant are transported to the construction site by gun trucks, hoisted by a 25T crane and installed to the design position on the bottom formwork, and bound on the lower side support pads of the bottom steel bars with the same label as the cover beam concrete The concrete pads are arranged in a quincunx-shaped staggered pattern and soaked with water before binding to ensure that the protective layer of steel bars meets the design requirements.

(7)侧模安装:侧模安装,是在盖梁钢筋绑扎完成经检查合格后,进行侧模施工。侧模采用定型钢模由专业模板厂设计制作,安装前必须打磨除锈,打磨干净后均匀涂刷脱模剂。钢模板现场拼接,人工配合吊车吊上盖梁进行安装,根据盖梁的纵、横轴线及设计几何尺寸进行立模。侧模与侧模、侧模与底模之间的接缝要紧密,模板间连接螺栓设计M22,双螺帽固定,加垫双面胶条防止漏浆。侧模拉筋采用18mm螺纹钢,长2.8m。拉杆布置双排,底排拉杆位置为底模板下方穿过,上层拉杆布置在模板顶面,拉杆横向间距80cm,拉杆端头垫片双螺帽拧紧,内设10*10cm方木支撑。错台在2mm以内,保证浇筑混凝土平整度。侧模安装前在盖梁两侧钢筋层的外侧绑扎砼垫块,砼垫块呈梅花形交错布置,布置间距为50cm~70cm。保证浇保护层厚度。侧模与端模的安装为本领域技术人员的常规技术能力。(7) Side formwork installation: side formwork installation is to carry out side formwork construction after the steel bars of the cover beam have been bound and passed the inspection. The side mold is made of shaped steel mold designed and manufactured by a professional formwork factory. It must be polished and derusted before installation, and the mold release agent should be evenly applied after polishing. The steel formwork is spliced on site, and the cover beam is lifted manually by a crane for installation, and the formwork is established according to the longitudinal and transverse axes of the cover beam and the design geometric dimensions. The joints between side molds and side molds, and between side molds and bottom molds should be tight. The connecting bolts between the templates are designed to be M22, fixed with double nuts, and double-sided adhesive strips are padded to prevent grout leakage. The side form reinforcement is made of 18mm rebar with a length of 2.8m. The tie rods are arranged in double rows, the position of the bottom row of tie rods passes under the bottom formwork, and the upper layer of tie rods is arranged on the top surface of the formwork. The horizontal distance between the tie rods is 80cm. The misalignment is within 2mm to ensure the smoothness of the poured concrete. Before the installation of the side formwork, bind the concrete pads on the outer sides of the reinforcement layer on both sides of the cover beam, and the concrete pads are arranged in a quincunx-shaped staggered manner with a spacing of 50cm to 70cm. Ensure the thickness of the pouring protective layer. The installation of the side form and the end form is the conventional technical ability of those skilled in the art.

(8)混凝土浇筑:混凝土浇筑前对模板的加固尺寸及牢固等情况进行仔细检查,合格后方可进行混凝土浇筑。混凝土采用罐车运输,吊机配合1方大料斗浇筑,使混凝土直接灌注入模。浇筑的自由倾落高度不得超过2m,浇筑前混凝土运输车强制搅拌2分钟,对模板及柱头洒水湿润。浇筑时,混凝土应水平分层、斜向分段浇筑,混凝土布料由盖梁一端向另一端推进浇筑,当浇筑离盖梁模板另一端1m时反向由端部向已浇筑部分方向浇筑,向并应边浇筑边振捣,浇筑混凝土分层厚度为30 cm左右,防止出现较大斜的搭接面。混凝土的振捣使用直径为50mm的插入式振捣器,移动间距不得超过振捣器作用半径的1.5倍;与侧模应保持5-10cm的距离;插入下层混凝土5-10cm;振捣密实后徐徐提出振捣棒;应避免振捣棒碰撞模板、钢筋及其他预埋件,造成模板变形,预埋件移位等。当混凝土面停止下沉,不再冒出气泡,表面呈平坦、泛浆现象时表明混凝土已振捣密实。混凝土浇筑为本领域技术人员的常规技术能力。(8) Concrete pouring: Before concrete pouring, carefully check the reinforcement size and firmness of the formwork, and concrete pouring can only be carried out after passing the test. Concrete is transported by tank truck, and poured with a crane and a large hopper so that the concrete can be directly poured into the mold. The free fall height of pouring shall not exceed 2m. Before pouring, the concrete transport vehicle shall be forced to stir for 2 minutes, and the formwork and column head shall be sprinkled with water to moisten them. When pouring, the concrete should be poured horizontally in layers and obliquely in sections. The concrete cloth should be poured from one end of the cover beam to the other end. It should be vibrated while pouring, and the layered thickness of the poured concrete should be about 30 cm, so as to prevent large oblique overlapping surfaces. The concrete is vibrated using a plug-in vibrator with a diameter of 50mm, and the moving distance shall not exceed 1.5 times the radius of action of the vibrator; a distance of 5-10cm should be kept from the side form; 5-10cm should be inserted into the lower concrete; Xu Xu raised the vibrating rod; it should be avoided that the vibrating rod collides with the formwork, steel bars and other embedded parts, causing the deformation of the formwork and the displacement of the embedded parts. When the concrete surface stops sinking, bubbles no longer appear, and the surface is flat and muddy, it indicates that the concrete has been vibrated and compacted. Concrete pouring is a routine technical ability of those skilled in the art.

浇筑混凝土期间,设专人检查支撑、模板、钢筋和预埋件的稳固情况,当发现有松动、变形、移位时,应及时进行处理。During the pouring of concrete, a special person shall be appointed to check the stability of supports, formwork, steel bars and embedded parts. When any looseness, deformation or displacement is found, it shall be dealt with in time.

混凝土浇筑完毕后,对混凝土面应及时进行修整、收浆抹平,0.5小时后进行二次抹面。混凝土强度达到2.5mPa时,采用专用锥子对支座垫石范围内进行凿毛,露出混凝土中的大颗粒石子,保证支座垫石与盖梁混凝土连接良好。After the concrete pouring is completed, the concrete surface should be trimmed and smoothed in time, and the surface should be plastered a second time after 0.5 hours. When the concrete strength reaches 2.5mPa, use a special awl to chisel the range of the support pad stone to expose the large grain stones in the concrete, so as to ensure that the support pad stone and the cover beam concrete are well connected.

混凝土养护采用采用土工布覆盖养生,混凝土浇筑完成并初凝后,即开始覆盖土工布保湿养生,养护时间不低于7天。盖梁上方放置4个底部有孔的塑料桶,由水泵抽水上去,并安排专人负责抽水,进行保湿养护,保证混凝土不致失水干燥。当气温低于5℃时,禁止对混凝土进行洒水养护。Concrete maintenance adopts geotextile covering and curing. After the concrete pouring is completed and the initial setting is completed, the geotextile is covered to moisturize and maintain. The curing time is not less than 7 days. Four plastic buckets with holes in the bottom are placed above the cover beam, and the water is pumped up by a water pump, and a special person is arranged to pump water for moisturizing and curing to ensure that the concrete will not lose water and dry out. When the temperature is lower than 5°C, it is forbidden to water the concrete for curing.

(9)模板支架拆除:混凝土强度达到2.5MPa拆除侧模、端模,混凝土养护7天后,对混凝土试块进行强度检测,当强度达到设计强度的85%后开始拆除支架,同步对同一个抱箍上的两个机械千斤顶4向下调节,首次调节2cm,然后调节另一端两个机械千斤顶向下4cm,两端逐步下调7cm左右,开始拆除纵梁2和横梁3,去掉机械千斤顶4,拆除抱箍5。(9) Removal of formwork support: Remove the side formwork and end formwork when the concrete strength reaches 2.5MPa. After 7 days of concrete curing, perform strength testing on the concrete test block. When the strength reaches 85% of the design strength, start to remove the support formwork. Adjust the two mechanical jacks 4 on the hoop downwards, adjust 2cm for the first time, then adjust the two mechanical jacks at the other end down 4cm, gradually lower the two ends by about 7cm, start to remove the longitudinal beam 2 and crossbeam 3, remove the mechanical jack 4, remove Hoop 5.

如图1至图2所示,本发明的一种盖梁可快速调节支架,它包括设置在圆形墩柱6上的抱箍5,抱箍5两侧的抱箍牛腿分别设置有竖向的机械千斤顶4,每个机械千斤顶4的顶部均设置有工字钢横梁3,两个工字钢横梁3之间设置有多道钢筋拉杆(拉杆在附图中未标示),工字钢横梁3上安装有多个工字钢纵梁2,多个工字钢纵梁2沿工字钢横梁3的长度方向间隔布置,且每个工字钢纵梁2均横向架设在两个工字钢横梁3之间,工字钢纵梁2上安装有底模板1,位于工字钢纵梁2两端的底模板1与工字钢纵梁2之间设置三角支架7,架底模板1上浇筑设置有盖梁8。As shown in Figures 1 to 2, a quick-adjustable bracket for a cover beam of the present invention includes a hoop 5 arranged on a circular pier column 6, and the hoop brackets on both sides of the hoop 5 are respectively provided with vertical The mechanical jack 4 is oriented, and the top of each mechanical jack 4 is provided with an I-beam beam 3, and there are multiple reinforcement rods between the two I-beam beams 3 (the rods are not marked in the accompanying drawings), and the I-beam A plurality of I-steel longitudinal beams 2 are installed on the beam 3, and the plurality of I-steel longitudinal beams 2 are arranged at intervals along the length direction of the I-steel beam 3, and each I-steel longitudinal beam 2 is horizontally erected on two Between the beams 3 of the I-beam, a bottom template 1 is installed on the longitudinal beam 2 of the I-beam, and a triangular bracket 7 is set between the bottom template 1 at both ends of the I-beam 2 and the longitudinal beam 2 of the I-beam, and the bottom template 1 The top pouring is provided with a cover beam 8 .

本发明适用于各种圆柱形墩柱盖梁结构形式,以工字钢、抱箍为支撑力,机械千斤顶为底支架的卸落调节装置,在一定范围内可对支架底模标高进行调节至设计位置,具有灵活性强、速度快捷方便,更易保证盖梁结构的标高准确性,同时可降低人力劳动强度,简化了施工工序,提高了工作效率高,加快施工进度,确保结构物的实体质量。支架拆除时,机械千斤顶卸落便捷,能够比传统施工更加安全的进行支架拆除。本发明的机械千斤顶对支架底模板高程可自由上下调节至设计位置,且机械千斤顶不会回缩下滑,相比传统的楔形块拆除支架更便利快捷,缩短了工序持续时间,提高了盖梁支架的稳定性及安全性。The invention is applicable to various cylindrical pier-column-cover-beam structures, with I-beams and hoops as the supporting force, and a mechanical jack as the unloading adjustment device for the bottom bracket, which can adjust the elevation of the bottom mold of the bracket to within a certain range The design position is flexible, fast and convenient, and it is easier to ensure the accuracy of the elevation of the cover beam structure. At the same time, it can reduce the labor intensity, simplify the construction process, improve work efficiency, speed up the construction progress, and ensure the physical quality of the structure. . When the bracket is removed, the mechanical jack is easy to remove, and the bracket can be removed more safely than traditional construction. The mechanical jack of the present invention can freely adjust the height of the bottom formwork of the bracket to the design position, and the mechanical jack will not retract and slide down. Compared with the traditional wedge-shaped block, it is more convenient and quick to remove the bracket, shortening the duration of the process and improving the cover beam bracket. stability and security.

以上实施例仅用以说明而非限制本发明的技术方案,尽管参照上述实施例对本发明进行了详细说明,本领域的普通技术人员应当理解:依然可以对本发明进行修改或者等同替换,而不脱离本发明的精神和范围的任何修改或局部替换,其均应涵盖在本发明的权利要求范围当中。The above embodiments are only used to illustrate and not limit the technical solutions of the present invention. Although the present invention has been described in detail with reference to the above embodiments, those of ordinary skill in the art should understand that the present invention can still be modified or equivalently replaced without departing from it. Any modifications or partial replacements within the spirit and scope of the present invention shall fall within the scope of the claims of the present invention.

Claims (8)

1.一种盖梁可快速调节支架的施工方法,其特征在于该施工方法依次按以下步骤进行:1. A construction method for fast adjustable support of a cap beam, characterized in that the construction method is carried out in the following steps: (1)抱箍安装:圆形墩柱按盖梁高程计算出抱箍安装高程,经水准仪测量后在指定高程上安装经过受力计算设计的抱箍;(1) Hoop installation: Calculate the hoop installation height of the circular pier column according to the height of the cover beam, and install the hoop designed by force calculation on the specified elevation after measuring with the level gauge; (2)机械千斤顶安装:将机械千斤顶安装在抱箍牛腿上;(2) Mechanical jack installation: install the mechanical jack on the hoop corbel; (3)横梁安装:在机械千斤顶顶部安装横梁;(3) Beam installation: install the beam on the top of the mechanical jack; (4)纵梁安装:在横梁上安装纵梁;(4) Longitudinal beam installation: install the longitudinal beam on the beam; (5)底模安装:在纵梁安装盖梁的底模板,在纵梁两端的底模板与纵梁之间设置支架,底模板安装完成后,对底模板高程进行复测,通过上下调节机械千斤顶使底模板高程准确安装至设计高程;(5) Bottom form installation: install the bottom formwork of the cover beam on the longitudinal beam, and set up brackets between the bottom formwork and the longitudinal beam at both ends of the longitudinal beam. The jack makes the height of the bottom formwork accurately installed to the design height; (6)钢筋绑扎及安装:预绑扎完成的盖梁钢筋笼运输至施工现场,将盖梁钢筋笼起吊安装至底模板上的设计位置;(6) Reinforcement binding and installation: The pre-bound cover beam reinforcement cage is transported to the construction site, and the cover beam reinforcement cage is hoisted and installed to the designed position on the bottom formwork; (7)侧模安装:侧模、端模按照设计尺寸安装到位,并安装拉筋;(7) Side form installation: side form and end form are installed in place according to the design size, and tie bars are installed; (8)混凝土浇筑:按规范及设计要求进行混凝土浇筑;(8) Concrete pouring: Concrete pouring shall be carried out according to the specifications and design requirements; (9)模板支架拆除:混凝土强度达到2.5MPa拆除侧模、端模,强度达到设计强度的85%开始拆除三角支架,调节机械千斤顶,拆除纵梁和横梁,去掉机械千斤顶,拆除抱箍;(9) Formwork support removal: When the concrete strength reaches 2.5MPa, the side formwork and end formwork are removed. When the strength reaches 85% of the design strength, the triangular support is removed, the mechanical jack is adjusted, the longitudinal beams and beams are removed, the mechanical jack is removed, and the hoop is removed; 所述步骤(2)中抱箍牛腿上焊接加工三个限位钢筋,使机械千斤顶底部正好安装在内;In the step (2), three limit steel bars are welded and processed on the hoop bracket, so that the bottom of the mechanical jack is just installed inside; 所述步骤(9)中机械千斤顶的工序包括以下流程:同步对同一个抱箍上的两个机械千斤顶向下调节,首次调节2cm,然后调节另一端两个机械千斤顶向下4cm,两端逐步下调7cm左右。The process of the mechanical jacks in the step (9) includes the following process: Synchronously adjust the two mechanical jacks on the same hoop downwards, adjust 2cm for the first time, then adjust the two mechanical jacks at the other end down 4cm, and gradually Adjust down about 7cm. 2.根据权利要求1所述的盖梁可快速调节支架的施工方法,其特征在于:所述步骤(1)中抱箍与墩柱之间安设白色土工布。2. The construction method of the rapidly adjustable support of the cover beam according to claim 1, characterized in that: in the step (1), a white geotextile is installed between the hoop and the pier column. 3.根据权利要求1所述的盖梁可快速调节支架的施工方法,其特征在于:所述步骤(3)中的横梁间设置多道拉杆。3. The construction method of the quickly adjustable bracket of the cover beam according to claim 1, characterized in that: multiple tie rods are arranged between the beams in the step (3). 4.根据权利要求1所述的盖梁可快速调节支架的施工方法,其特征在于:所述步骤(5)中底模安装完成后采用钢筋对支架进行预压,实地验证受力计算,查看支架是否变形。4. The construction method of quickly adjustable brackets for cover beams according to claim 1, characterized in that: after the installation of the bottom mold in the step (5), steel bars are used to preload the brackets, and the force calculation is verified on the spot. Whether the bracket is deformed. 5.根据权利要求1所述的盖梁可快速调节支架的施工方法,其特征在于:所述步骤(8)中混凝土浇筑后对盖梁进行洒水养护,洒水养护的时间不低于7天。5. The construction method of the quickly adjustable support of the cover beam according to claim 1, characterized in that: in the step (8), after the concrete is poured, the cover beam is watered and cured, and the time for watering and curing is not less than 7 days. 6.实现权利要求1所述施工方法的一种盖梁可快速调节支架,其特征在于:它包括设置在圆形墩柱上的抱箍,抱箍两侧的抱箍牛腿分别设置有竖向的机械千斤顶,每个机械千斤顶的顶部均设置有横梁,横梁上安装有多个纵梁,多个纵梁沿横梁的长度方向间隔布置,且每个纵梁均横向架设在两个横梁之间,纵梁上安装有底模板,底模板上浇筑设置有盖梁。6. A quickly adjustable support for a cover beam that realizes the construction method described in claim 1, characterized in that it includes hoops arranged on circular pier columns, and the hoop brackets on both sides of the hoop are respectively provided with vertical The top of each mechanical jack is equipped with a crossbeam, and multiple longitudinal beams are installed on the crossbeam. The multiple longitudinal beams are arranged at intervals along the length of the crossbeam, and each longitudinal beam is horizontally erected between two crossbeams. In the room, a bottom formwork is installed on the longitudinal beam, and a cover beam is poured on the bottom formwork. 7.根据权利要求6所述的盖梁可快速调节支架,其特征在于:位于所述纵梁两端的底模板与纵梁之间设置三角支架。7. The quickly adjustable support for the cover beam according to claim 6, characterized in that: a triangular bracket is arranged between the bottom formwork and the longitudinal beam at both ends of the longitudinal beam. 8.根据权利要求6或7所述的盖梁可快速调节支架,其特征在于:所述两个横梁之间设置有多道拉杆。8. The quickly adjustable support for the cover beam according to claim 6 or 7, characterized in that: multiple pull rods are arranged between the two cross beams.
CN201610310112.6A 2016-05-12 2016-05-12 Quickly adjustable support for a cover beam and its construction method Expired - Fee Related CN105803946B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610310112.6A CN105803946B (en) 2016-05-12 2016-05-12 Quickly adjustable support for a cover beam and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610310112.6A CN105803946B (en) 2016-05-12 2016-05-12 Quickly adjustable support for a cover beam and its construction method

Publications (2)

Publication Number Publication Date
CN105803946A CN105803946A (en) 2016-07-27
CN105803946B true CN105803946B (en) 2017-08-04

Family

ID=56456954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610310112.6A Expired - Fee Related CN105803946B (en) 2016-05-12 2016-05-12 Quickly adjustable support for a cover beam and its construction method

Country Status (1)

Country Link
CN (1) CN105803946B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642046B (en) * 2017-10-31 2023-09-05 中铁十六局集团第三工程有限公司 Steel-pipe pile support device of unloading
CN107916623A (en) * 2017-12-22 2018-04-17 宁波二十冶建设有限公司 A kind of bent cap elevation adjusting device and adjusting method
CN108930224A (en) * 2018-08-08 2018-12-04 云南公投建设集团第九工程有限公司 Punching stick method bent cap supports regulating system construction method
CN109594477A (en) * 2018-12-06 2019-04-09 中国建筑第四工程局有限公司 A kind of big bent cap strutting system construction technology of only pier
CN110644371A (en) * 2019-09-30 2020-01-03 中铁大桥局集团第五工程有限公司 Prefabricated cover beam installation method and system
CN110983971B (en) * 2019-11-13 2025-07-04 中冶天工集团有限公司 Box beam formwork support and installation method thereof
CN110939052B (en) * 2019-12-11 2021-08-31 成都轨道建设管理有限公司 A kind of subway cover beam construction method
CN111608083A (en) * 2020-05-21 2020-09-01 中国建筑土木建设有限公司 T-beam continuous end post-cast strip template installation system and construction method thereof
CN114875800A (en) * 2022-06-09 2022-08-09 福建第一公路工程集团有限公司 Capping beam construction device and method
CN115233550A (en) * 2022-07-01 2022-10-25 湖北工建基础设施建设有限公司 Construction process of rectangular pier capping beam
CN115821770A (en) * 2022-11-29 2023-03-21 中国水利水电第五工程局有限公司 A Construction Method for Covering Girder of a Sea-Crossing Bridge
CN115897413A (en) * 2023-01-10 2023-04-04 中铁八局集团第三工程有限公司 Composite bracket system of middle cross beam of special-shaped cable-stayed bridge cable tower and construction method thereof
CN117071441A (en) * 2023-08-27 2023-11-17 安徽省公路桥梁工程有限公司 A cast-in-place cover beam adjustable formwork support structure and construction method
CN117513163A (en) * 2023-11-10 2024-02-06 湖南路桥建设集团有限责任公司 Support platform and construction method for cylindrical pier cap beam and middle tie beam construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100825089B1 (en) * 2006-12-22 2008-04-25 주식회사 스틸코리아 Temporary vent structure with transverse cap beam and double hinge support
CN101586328A (en) * 2009-06-12 2009-11-25 中国第一冶金建设有限责任公司 Anchor ear angle-table bracket building method for bridge sidespan closure segment construction
CN101949132A (en) * 2010-10-18 2011-01-19 中铁十九局集团有限公司 Construction Method of Formwork Bracket for Cap Beam of Independent Bridge Pier
CN102296542A (en) * 2011-06-14 2011-12-28 汇通路桥建设集团有限公司 Method for constructing high pier capping beams
CN205604088U (en) * 2016-05-12 2016-09-28 中铁十局集团第二工程有限公司 But bent cap quick adjustment support

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100825089B1 (en) * 2006-12-22 2008-04-25 주식회사 스틸코리아 Temporary vent structure with transverse cap beam and double hinge support
CN101586328A (en) * 2009-06-12 2009-11-25 中国第一冶金建设有限责任公司 Anchor ear angle-table bracket building method for bridge sidespan closure segment construction
CN101949132A (en) * 2010-10-18 2011-01-19 中铁十九局集团有限公司 Construction Method of Formwork Bracket for Cap Beam of Independent Bridge Pier
CN102296542A (en) * 2011-06-14 2011-12-28 汇通路桥建设集团有限公司 Method for constructing high pier capping beams
CN205604088U (en) * 2016-05-12 2016-09-28 中铁十局集团第二工程有限公司 But bent cap quick adjustment support

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"悬臂抱箍法在圆形墩盖梁施工中的应用研究",顾金荣,广东科技,第8期,第118页-第120页;顾金荣;《广东科技》;20140425(第8期);第118页-第120页 *
"青衣江大桥盖梁抱箍法施工技术",马力,科技风,第6期,第50页-第51页;马力;《科技风》;20090325;第50页-第51页 *

Also Published As

Publication number Publication date
CN105803946A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN105803946B (en) Quickly adjustable support for a cover beam and its construction method
CN205604088U (en) But bent cap quick adjustment support
CN100587165C (en) Construction method of in-situ cast-in-place beams for fabricated supports
CN102587689B (en) Repairing and strengthening method for existing reinforced concrete beam-column joints
CN105544396B (en) Steel arc distributive girder structure of rod type bracket for cast-in-place arch bridge and construction method
CN205778910U (en) A kind of outer mould trolley of cut-and-cover tunnel lining cutting
CN105401958A (en) Prefabricating construction method with movable prefabricating trolley for tunnel cable trench cover plate
CN108330902A (en) The cast-in-place bottom end rail construction method of long piled wharf
CN103882813A (en) Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN108914780A (en) A kind of bridge tall pier and thin wall hydraulic sliding mould construction method
CN104894954A (en) Overall mounting and constructing method of pier stud reinforcing steel bars of urban bridge
CN104532754B (en) A kind of prestressed concrete box girder end-blocking template construction method
CN101492907B (en) A construction method of cast-in-place construction method for flange plate of T-shaped bridge
CN108457243A (en) A kind of construction method of assembly concrete wave wall
CN115256615A (en) Intelligent shower maintenance standard construction system for prefabricated box girder of expressway
CN103422443B (en) The multidirectional coupling precasting process of frame culvert segment long line method and frame culvert segment template system
CN114277672B (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN102936958A (en) Construction method for positioning upper reinforcements of concrete floor slab by using tool type supports
CN112030750A (en) Construction process for tie beam in water
CN212176547U (en) Building floor bathroom falls board construction template device in building
CN101967884B (en) Concrete Flatness Control Method for Large Area Reinforced Truss Formwork
CN113266397A (en) Hydraulic formwork trolley for small-section chamber lining and construction method
CN118581812A (en) A method for constructing a tower column under the main pier of a cable-stayed bridge
CN105804448A (en) Vertical prefabricating construction method of cooling tower herringbone column
CN111851569A (en) Gantry crane track foundation beam and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170804