CN101949132A - Construction Method of Formwork Bracket for Cap Beam of Independent Bridge Pier - Google Patents
Construction Method of Formwork Bracket for Cap Beam of Independent Bridge Pier Download PDFInfo
- Publication number
- CN101949132A CN101949132A CN 201010508686 CN201010508686A CN101949132A CN 101949132 A CN101949132 A CN 101949132A CN 201010508686 CN201010508686 CN 201010508686 CN 201010508686 A CN201010508686 A CN 201010508686A CN 101949132 A CN101949132 A CN 101949132A
- Authority
- CN
- China
- Prior art keywords
- main beam
- mount pad
- hinge mount
- anchor ear
- semi
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域:Technical field:
本发明涉及一种土建施工方法,特别涉及一种浇铸桥墩盖梁的盖梁模板托架的搭建方法。The invention relates to a civil construction method, in particular to a method for building a cover beam formwork bracket of a cast bridge pier cover beam.
背景技术Background technique
建造桥梁的过程中,在浇铸桥墩盖梁时一般采用搭设支架的施工方案,这种施工方案存在搭建工期长,资金投入大,搭建使用过的材料重复利用率低的缺点,同时由于施工工地的地质情况不同,常常遇到地面沉降,造成搭设的支架沉降和变形严重影响到了桥墩盖梁的浇铸质量,给建造的桥梁带来了安全隐患。In the process of building bridges, the construction scheme of erecting brackets is generally adopted when casting bridge piers and cap beams. This construction scheme has the disadvantages of long construction period, large capital investment, and low reuse rate of used materials. At the same time, due to the construction site The geological conditions are different, and ground subsidence is often encountered, which causes the settlement and deformation of the erected supports to seriously affect the casting quality of the bridge pier cap beam, and brings safety hazards to the constructed bridge.
发明内容Contents of the invention
本发明提供的独立桥墩盖梁模板托架的搭建方法解决了现有技术存在的工期长,搭建使用过的材料重复利用率低,资金投入大和搭设的支架沉降变形严重影响到了桥墩盖梁的浇铸质量的技术问题。The method for building formwork brackets for independent bridge pier cover beams provided by the present invention solves the problems of long construction period in the prior art, low reuse rate of used materials, large capital investment and settling deformation of the erected supports, which seriously affects the casting of bridge pier cover beams quality technical issues.
本发明是通过以下技术方案解决以上技术问题的:The present invention solves the above technical problems through the following technical solutions:
独立桥墩盖梁模板托架的搭建方法,包括以下步骤:The construction method of the independent bridge pier cap beam formwork bracket includes the following steps:
第一步在两个半环形下抱箍的外侧中部分别焊接第一铰链安装座和第二铰链安装座,在两个半环形上抱箍的外侧中部分别焊接前主横梁支撑座和后主横梁支撑座,在前主横梁的左右两端下面分别焊接第三铰链安装座和第四铰链安装座,在后主横梁的左右两端下面分别焊接第五铰链安装座和第六铰链安装座;The first step is to weld the first hinge mounting seat and the second hinge mounting seat on the outer middle of the two semi-circular lower hoops respectively, and weld the front main beam support seat and rear main beam on the outer middle of the two semi-circular upper hoops respectively For the supporting seat, the third hinge mounting seat and the fourth hinge mounting seat are respectively welded under the left and right ends of the front main beam, and the fifth hinge mounting seat and the sixth hinge mounting seat are respectively welded under the left and right ends of the rear main beam;
第二步将两个半环形下抱箍用螺栓卡箍在桥墩侧面中间组成圆环形下抱箍,将两个半环形上抱箍用螺栓卡箍在桥墩侧面上端组成圆环形上抱箍;The second step is to use bolt clamps on the two semi-circular lower hoops to form a circular lower hoop in the middle of the side of the pier, and use bolts to clamp the two semi-annular upper hoops to form a circular upper hoop. ;
第三步将前主横梁的中部下面通过螺栓与前主横梁支撑座固定连接在一起,将左前斜支撑梁的一端通过销子与前主横梁的左端下面焊接的第三铰链安装座铰接在一起,将左前斜支撑梁的另一端通过销子与下抱箍的前半环的外侧设置的第一铰链安装座铰接在一起,将右前斜支撑梁的一端与前主横梁的右端下面焊接的第四铰链安装座铰接在一起,将右前斜支撑梁的另一端与下抱箍的前半环的外侧设置的第一铰链安装座铰接在一起;The third step is to fix the lower part of the front main beam with the front main beam support seat through bolts, and hinge one end of the left front inclined support beam to the third hinge installation seat welded under the left end of the front main beam through pins. , the other end of the left front oblique support beam is hinged to the first hinge mounting seat provided outside the front half ring of the lower hoop through a pin, and one end of the right front oblique support beam is welded to the fourth joint under the right end of the front main beam. The hinge mounts are hinged together, and the other end of the right front oblique support beam is hinged with the first hinge mount set outside the front half ring of the lower hoop;
第四步将后主横梁的中部下面通过螺栓与固定设置在上抱箍的后半环的外侧的后主横梁支撑座固定连接在一起,将左后斜支撑梁的一端通过销子与后主横梁的左端下面焊接的第五铰链安装座铰接在一起,将左后斜支撑梁的另一端通过销子与下抱箍的后半环的外侧设置的第二铰链安装座铰接在一起,将右后斜支撑梁的一端与后主横梁的右端下面焊接的第六铰链安装座铰接在一起,将右后斜支撑梁的另一端与下抱箍的后半环的外侧设置的第二铰链安装座铰接在一起;The fourth step is to connect the bottom of the middle part of the rear main beam with the rear main beam support seat fixed on the outside of the rear half ring of the upper hoop through bolts, and connect one end of the left rear inclined support beam to the rear main beam through pins. The fifth hinge mounting seat welded under the left end of the crossbeam is hinged together, and the other end of the left rear inclined support beam is hinged together with the second hinge mounting seat provided outside the rear half ring of the lower hoop through a pin, and the right One end of the rear oblique support beam is hinged to the sixth hinge mounting seat welded under the right end of the rear main beam, and the other end of the right rear oblique support beam is connected to the second hinge mounting seat on the outside of the rear half ring of the lower hoop hinged together;
第五步在前主横梁与后主横梁之间放置盖梁底模托架,在盖梁底模托架上浇铸桥墩盖梁。The fifth step is to place the bottom form bracket of the cover beam between the front main beam and the rear main beam, and cast the pier cover beam on the bottom form bracket of the cover beam.
本发明大大缩短了施工工期,节约了成本,提高了桥墩盖梁的浇铸质量,拆卸方便,材料重复使用率高。The invention greatly shortens the construction period, saves the cost, improves the casting quality of the pier cover beam, is convenient to disassemble, and has a high material reuse rate.
附图说明Description of drawings
图1是本发明搭建的盖梁模板托架的主视方向的结构示意图Fig. 1 is the structural representation of the front view direction of the cover beam formwork bracket built by the present invention
图2是本发明搭建的盖梁模板托架的侧视方向的结构示意图Fig. 2 is the structural representation of the side view direction of the cover beam formwork bracket built by the present invention
具体实施方式Detailed ways
本发明的具体实施方式如下:The specific embodiment of the present invention is as follows:
独立桥墩盖梁模板托架的搭建方法,包括以下步骤:The construction method of the independent bridge pier cap beam formwork bracket includes the following steps:
第一步在两个半环形下抱箍3的外侧中部分别焊接第一铰链安装座7和第二铰链安装座8,在两个半环形上抱箍2的外侧中部分别焊接前主横梁1支撑座12和后主横梁支撑座,在前主横梁1的左右两端下面分别焊接第三铰链安装座9和第四铰链安装座10,在后主横梁的左右两端下面分别焊接第五铰链安装座11和第六铰链安装座;The first step is to weld the first
第二步将两个半环形下抱箍3用螺栓卡箍在桥墩15侧面中间组成圆环形下抱箍,将两个半环形上抱箍2用螺栓卡箍在桥墩15侧面上端组成圆环形上抱箍;In the second step, the two semi-annular
第三步将前主横梁1的中部下面通过螺栓与前主横梁1支撑座12固定连接在一起,将左前斜支撑梁4的一端通过销子与前主横梁1的左端下面焊接的第三铰链安装座9铰接在一起,将左前斜支撑梁4的另一端通过销子与下抱箍3的前半环的外侧设置的第一铰链安装座7铰接在一起,将右前斜支撑梁6的一端与前主横梁1的右端下面焊接的第四铰链安装座10铰接在一起,将右前斜支撑梁6的另一端与下抱箍3的前半环的外侧设置的第一铰链安装座7铰接在一起;The third step is to connect the lower part of the middle part of the front
第四步将后主横梁的中部下面通过螺栓与固定设置在上抱箍2的后半环的外侧的后主横梁支撑座固定连接在一起,将左后斜支撑梁5的一端通过销子与后主横梁的左端下面焊接的第五铰链安装座11铰接在一起,将左后斜支撑梁5的另一端通过销子与下抱箍3的后半环的外侧设置的第二铰链安装座8铰接在一起,将右后斜支撑梁的一端与后主横梁的右端下面焊接的第六铰链安装座铰接在一起,将右后斜支撑梁的另一端与下抱箍3的后半环的外侧设置的第二铰链安装座8铰接在一起;In the fourth step, the lower part of the rear main beam is fixedly connected with the rear main beam support seat fixed on the outside of the rear half ring of the
第五步在前主横梁1与后主横梁之间放置盖梁底模托架13,在盖梁底模托架13上浇铸桥墩盖梁14。The fifth step is to place the cover beam
本发明的盖梁模板采用厂制定型钢模板,模板拼装采取侧模及端模座落于底模上的形式,螺栓连接。底模下部的三角架与面板及背筋加工成整体。The cover beam formwork of the present invention adopts a factory-made steel formwork, and the formwork assembly adopts the form that the side formwork and the end formwork are seated on the bottom formwork, and are connected by bolts. The tripod at the lower part of the bottom mold is processed into a whole with the panel and the back reinforcement.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010508686 CN101949132A (en) | 2010-10-18 | 2010-10-18 | Construction Method of Formwork Bracket for Cap Beam of Independent Bridge Pier |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010508686 CN101949132A (en) | 2010-10-18 | 2010-10-18 | Construction Method of Formwork Bracket for Cap Beam of Independent Bridge Pier |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN101949132A true CN101949132A (en) | 2011-01-19 |
Family
ID=43452749
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201010508686 Pending CN101949132A (en) | 2010-10-18 | 2010-10-18 | Construction Method of Formwork Bracket for Cap Beam of Independent Bridge Pier |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101949132A (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102261042A (en) * | 2011-06-09 | 2011-11-30 | 四川川交路桥有限责任公司 | Cantilever diagonal bracing bracket for casting bridge pier cover beam |
| CN102277835A (en) * | 2011-05-10 | 2011-12-14 | 中铁九局集团有限公司 | Method for constructing single-column bent cap by adopting hoop and A-frame composite system |
| CN105484161A (en) * | 2015-12-14 | 2016-04-13 | 中铁十九局集团第二工程有限公司 | Method for constructing cast-in-place panel of T-shaped beam by using steel template |
| CN105803946A (en) * | 2016-05-12 | 2016-07-27 | 中铁十局集团第二工程有限公司 | Quickly adjustable bracket for cap beam and construction method of quickly adjustable bracket for cap beam |
| CN107100076A (en) * | 2017-02-27 | 2017-08-29 | 中铁十九局集团有限公司 | Cast-in-place bent cap construction method |
| CN111441258A (en) * | 2020-05-21 | 2020-07-24 | 中交二公局第三工程有限公司 | Connection-free self-stability large cantilever bent cap support system |
-
2010
- 2010-10-18 CN CN 201010508686 patent/CN101949132A/en active Pending
Non-Patent Citations (1)
| Title |
|---|
| 《研究与设计》 20070330 杜和军 独柱墩盖梁托架体系设计与计算 40-42 1 , 2 * |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102277835A (en) * | 2011-05-10 | 2011-12-14 | 中铁九局集团有限公司 | Method for constructing single-column bent cap by adopting hoop and A-frame composite system |
| CN102261042A (en) * | 2011-06-09 | 2011-11-30 | 四川川交路桥有限责任公司 | Cantilever diagonal bracing bracket for casting bridge pier cover beam |
| CN105484161A (en) * | 2015-12-14 | 2016-04-13 | 中铁十九局集团第二工程有限公司 | Method for constructing cast-in-place panel of T-shaped beam by using steel template |
| CN105803946A (en) * | 2016-05-12 | 2016-07-27 | 中铁十局集团第二工程有限公司 | Quickly adjustable bracket for cap beam and construction method of quickly adjustable bracket for cap beam |
| CN105803946B (en) * | 2016-05-12 | 2017-08-04 | 中铁十局集团第二工程有限公司 | Quickly adjustable support for a cover beam and its construction method |
| CN107100076A (en) * | 2017-02-27 | 2017-08-29 | 中铁十九局集团有限公司 | Cast-in-place bent cap construction method |
| CN111441258A (en) * | 2020-05-21 | 2020-07-24 | 中交二公局第三工程有限公司 | Connection-free self-stability large cantilever bent cap support system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101942810A (en) | Independent pier cap beam formwork bracket | |
| CN101949132A (en) | Construction Method of Formwork Bracket for Cap Beam of Independent Bridge Pier | |
| CN103243651B (en) | Method for fixedly installing and leveling base of metal upright column of bridge guardrail | |
| CN106758787B (en) | A kind of Precast Pier Columns mounting and positioning device | |
| CN210134353U (en) | Bracket type hoop bracket for bent cap construction | |
| CN209923771U (en) | A dumbbell-shaped steel pipe arch installation structure | |
| CN102277835A (en) | Method for constructing single-column bent cap by adopting hoop and A-frame composite system | |
| CN201762662U (en) | Independent bridge pier capping beam formwork support | |
| CN103243649B (en) | The system and method for a kind of cable saddle Fast Installation, location | |
| CN106759457A (en) | The installation method of cantilever design high-accuracy built-in fitting | |
| CN208884362U (en) | A kind of Construction of continuous beam bracket | |
| CN103233426A (en) | Bailey beam support free of buttress in soft foundation and supporting method thereof | |
| JP5260709B2 (en) | Bridge girder delivery method | |
| CN214005438U (en) | Long cantilever bent cap assembled bracket | |
| CN101935982B (en) | Method for setting up bent cap form bracket of isolated pier | |
| CN105040591A (en) | Positioning device for waveform steel web and positioning method thereof | |
| CN101476330B (en) | Thick and large-volume concrete elastic base and construction method thereof | |
| CN106939557A (en) | A kind of pin-connected panel bracket casting platform of brace support | |
| CN113216015B (en) | Construction method of viaduct jacking bearing platform pier column upgrading structure | |
| CN215104736U (en) | Cast-in-place pier reinforcement bed-jig and operation platform | |
| CN106758839A (en) | A kind of strutting system and its installation method of the cast-in-place segmental construction of pier top | |
| CN210236933U (en) | High pier stud tower crane attaches wall device | |
| CN201962605U (en) | Independent pier cap beam formwork bracket | |
| CN213896816U (en) | Y-shaped support frame | |
| CN207551775U (en) | A kind of derrick crane attached wall attachment device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110119 |