一种预制地铁拼装轨道板及其施工方法 Download PDFInfo
- Publication number
- CN105780612A CN105780612A CN201610340402.5A CN201610340402A CN105780612A CN 105780612 A CN105780612 A CN 105780612A CN 201610340402 A CN201610340402 A CN 201610340402A CN 105780612 A CN105780612 A CN 105780612A
- Authority
- CN
- China
- Prior art keywords
- concrete
- prefabricated
- track board
- prefabricated subway
- subway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及地铁建筑领域,具体为一种预制地铁拼装轨道板,包括预制地铁隧道管片,所述预制地铁隧道管片的内侧底部设有混凝土粘结面,所述混凝土粘结面的上侧设有预制混凝土轨道板;本发明还公开了一种预制地铁拼装轨道板的施工方法,包括以下步骤:S1:铺设混凝土,S2:安置预制混凝土轨道板,S3:调整预制混凝土轨道板。本发明结构简单,预制混凝土轨道板采用工厂化预制生产,生产效率高,节能环保,从而简化施工过程,提高施工进度,本发明施工方法加单,预制地铁隧道管片和预制混凝土轨道板之间留有间隙,用于浇注混凝土粘结面,便于安装和精度控制,提升整体性。
Description
技术领域
本发明涉及地铁建筑领域,具体为一种预制地铁拼装轨道板及其施工方法。
背景技术
现有地铁建设过程,在地铁轨道盾构成洞管片安装就为后,因为管片安装所组成的截面是圆形,还需要在隧道底面现浇一层混凝土层,这样可以在隧道底部形成一个水平面,可以架设轨道。
现有技术的缺陷和不足:
1.因为地铁隧道空间很狭小,浇筑混凝土的器械作业比较困难;
2.现浇混凝土工时长,同时消耗人力物力,会在一定程度上增加建设周期和成本。
发明内容
本发明的目的在于提供一种预制地铁拼装轨道板及其施工方法,以解决上述背景技术中提出的生产效率低,安装精度差等问题。
为实现上述目的,本发明提供如下技术方案:一种预制地铁拼装轨道板,包括预制地铁隧道管片,所述预制地铁隧道管片的内侧底部设有混凝土粘结面,所述混凝土粘结面的上侧设有预制混凝土轨道板;
所述混凝土轨道板包括混凝土基体,该混凝土基体的上表面内嵌有两组轨道安装座,两组所述轨道安装座的的上端面均固定连接有地铁轨道。
优选的,两组所述轨道安装座的内侧之间焊接有加固杆,两组所述轨道安装座的底部均与加固钢筋网固定连接,加固钢筋网设置在混凝土基体的内部。
优选的,所述混凝土基体的下侧为圆弧形,并且混凝土基体的下表面设有咬合槽,该咬合槽为齿条形状。
一种预制地铁拼装轨道板的施工方法,包括以下步骤:
S1:铺设混凝土,先在预制地铁隧道管片的内侧底部浇注一定量的混凝土;
S2:安置预制混凝土轨道板,将预先制造好的预制混凝土轨道板安放到上一步铺设的混凝土的上层;
S3:调整预制混凝土轨道板,测量预制混凝土轨道板的边缘高度和水平方向的角度,调整预制混凝土轨道板的位置和标高。
与现有技术相比,本发明的有益效果是:本发明结构简单,预制混凝土轨道板采用工厂化预制生产,生产效率高,节能环保,从而简化施工过程,提高施工进度,本发明施工方法加单,预制地铁隧道管片和预制混凝土轨道板之间留有间隙,用于浇注混凝土粘结面,便于安装和精度控制,提升整体性。
附图说明
图1为本发明结构示意图;
图2为本发明结构剖视图。
图中:1预制地铁隧道管片、2混凝土粘结面、3预制混凝土轨道板、31混凝土基体、32轨道安装座、33加固钢筋网、34加固杆、35咬合槽、4地铁轨道。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1-2,本发明提供一种技术方案:一种预制地铁拼装轨道板,包括预制地铁隧道管片1,预制地铁隧道管片1的内侧底部设有混凝土粘结面2,混凝土粘结面2的上侧设有预制混凝土轨道板3;
混凝土轨道板3包括混凝土基体31,该混凝土基体31的上表面内嵌有两组轨道安装座32,两组轨道安装座32的的上端面均固定连接有地铁轨道4。
两组轨道安装座32的内侧之间焊接有加固杆34,两组轨道安装座32的底部均与加固钢筋网33固定连接,加固钢筋网33设置在混凝土基体31的内部。
混凝土基体31的下侧为圆弧形,并且混凝土基体31的下表面设有咬合槽35,该咬合槽35为齿条形状。
一种预制地铁拼装轨道板的施工方法,包括以下步骤:
S1:铺设混凝土,先在预制地铁隧道管片的内侧底部浇注一定量的混凝土;
S2:安置预制混凝土轨道板,将预先制造好的预制混凝土轨道板安放到上一步铺设的混凝土的上层;
S3:调整预制混凝土轨道板,测量预制混凝土轨道板的边缘高度和水平方向的角度,调整预制混凝土轨道板的位置和标高。
在施工时,预制混凝土轨道板3采用工厂化预制生产,生产效率高,节能环保,从而简化施工过程,提高施工进度,预制地铁隧道管片1和预制混凝土轨道板3之间留有间隙,用于浇注混凝土粘结面2,便于安装和精度控制,提升整体性。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (4)
1.一种预制地铁拼装轨道板,包括预制地铁隧道管片(1),其特征在于:所述预制地铁隧道管片(1)的内侧底部设有混凝土粘结面(2),所述混凝土粘结面(2)的上侧设有预制混凝土轨道板(3);
所述混凝土轨道板(3)包括混凝土基体(31),该混凝土基体(31)的上表面内嵌有两组轨道安装座(32),两组所述轨道安装座(32)的上端面均固定连接有地铁轨道(4)。
2.根据权利要求1所述的一种预制地铁拼装轨道板,其特征在于:两组所述轨道安装座(32)的内侧之间焊接有加固杆(34),两组所述轨道安装座(32)的底部均与加固钢筋网(33)固定连接,加固钢筋网(33)设置在混凝土基体(31)的内部。
3.根据权利要求1所述的一种预制地铁拼装轨道板,其特征在于:所述混凝土基体(31)的下侧为圆弧形,并且混凝土基体(31)的下表面设有咬合槽(35),该咬合槽(35)为齿条形状。
4.如权利要求1所述的一种预制地铁拼装轨道板的施工方法,其特征在于,包括以下步骤:
S1:铺设混凝土,先在预制地铁隧道管片的内侧底部浇注一定量的混凝土;
S2:安置预制混凝土轨道板,将预先制造好的预制混凝土轨道板安放到上一步铺设的混凝土的上层;
S3:调整预制混凝土轨道板,测量预制混凝土轨道板的边缘高度和水平方向的角度,调整预制混凝土轨道板的位置和标高。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610340402.5A CN105780612B (zh) | 2016-05-20 | 2016-05-20 | 一种预制地铁拼装轨道板及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610340402.5A CN105780612B (zh) | 2016-05-20 | 2016-05-20 | 一种预制地铁拼装轨道板及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105780612A true CN105780612A (zh) | 2016-07-20 |
CN105780612B CN105780612B (zh) | 2017-11-03 |
Family
ID=56380118
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610340402.5A Active CN105780612B (zh) | 2016-05-20 | 2016-05-20 | 一种预制地铁拼装轨道板及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105780612B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106812031A (zh) * | 2017-03-17 | 2017-06-09 | 中南大学 | 一种考虑列车长期作用的重载铁路隧道底部结构设计方法 |
CN108716409A (zh) * | 2018-05-07 | 2018-10-30 | 中铁工程设计咨询集团有限公司 | 一种跨座式单轨隧道全预制轨道墙结构及其施工方法 |
CN111395074A (zh) * | 2020-03-25 | 2020-07-10 | 江苏锡沂钢模有限公司 | 一种盾构隧道施工用的电瓶车跑道轨枕 |
CN112647971A (zh) * | 2020-12-24 | 2021-04-13 | 陕西国防工业职业技术学院 | 一种便于拼接的bim地铁管片 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1181201A (ja) * | 1997-09-05 | 1999-03-26 | Kumagai Gumi Co Ltd | 地下鉄軌道スラブのパネル |
CN202809400U (zh) * | 2012-09-06 | 2013-03-20 | 隔而固(青岛)振动控制有限公司 | 一种道床基底预制板 |
US8544763B2 (en) * | 2010-03-15 | 2013-10-01 | Concrete Systems Inc. | Prefabricated plinth for supporting a railway track |
CN103603241A (zh) * | 2013-07-26 | 2014-02-26 | 厦门嘉达环保建造工程有限公司 | 轨道系统浮置隔振结构 |
CN105525541A (zh) * | 2016-01-11 | 2016-04-27 | 北京城建设计发展集团股份有限公司 | 轨道交通用新型预制板式减振轨道结构 |
CN205775637U (zh) * | 2016-05-20 | 2016-12-07 | 常州中铁城建构件有限公司 | 一种预制地铁拼装轨道板 |
-
2016
- 2016-05-20 CN CN201610340402.5A patent/CN105780612B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1181201A (ja) * | 1997-09-05 | 1999-03-26 | Kumagai Gumi Co Ltd | 地下鉄軌道スラブのパネル |
US8544763B2 (en) * | 2010-03-15 | 2013-10-01 | Concrete Systems Inc. | Prefabricated plinth for supporting a railway track |
CN202809400U (zh) * | 2012-09-06 | 2013-03-20 | 隔而固(青岛)振动控制有限公司 | 一种道床基底预制板 |
CN103603241A (zh) * | 2013-07-26 | 2014-02-26 | 厦门嘉达环保建造工程有限公司 | 轨道系统浮置隔振结构 |
CN105525541A (zh) * | 2016-01-11 | 2016-04-27 | 北京城建设计发展集团股份有限公司 | 轨道交通用新型预制板式减振轨道结构 |
CN205775637U (zh) * | 2016-05-20 | 2016-12-07 | 常州中铁城建构件有限公司 | 一种预制地铁拼装轨道板 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106812031A (zh) * | 2017-03-17 | 2017-06-09 | 中南大学 | 一种考虑列车长期作用的重载铁路隧道底部结构设计方法 |
CN106812031B (zh) * | 2017-03-17 | 2018-07-20 | 中南大学 | 一种考虑列车长期作用的重载铁路隧道底部结构设计方法 |
CN108716409A (zh) * | 2018-05-07 | 2018-10-30 | 中铁工程设计咨询集团有限公司 | 一种跨座式单轨隧道全预制轨道墙结构及其施工方法 |
CN108716409B (zh) * | 2018-05-07 | 2024-06-25 | 中铁工程设计咨询集团有限公司 | 一种跨座式单轨隧道全预制轨道墙结构及其施工方法 |
CN111395074A (zh) * | 2020-03-25 | 2020-07-10 | 江苏锡沂钢模有限公司 | 一种盾构隧道施工用的电瓶车跑道轨枕 |
CN112647971A (zh) * | 2020-12-24 | 2021-04-13 | 陕西国防工业职业技术学院 | 一种便于拼接的bim地铁管片 |
Also Published As
Publication number | Publication date |
---|---|
CN105780612B (zh) | 2017-11-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103669114B (zh) | 一种道床基底预制板及其应用 | |
CN104131498B (zh) | 一种用于曲线段沉降无砟轨道抬升修复方法 | |
CN105780612A (zh) | 一种预制地铁拼装轨道板及其施工方法 | |
CN203394170U (zh) | 装配式围墙 | |
CN102653931B (zh) | 弹性支撑隔振构件道床 | |
CN103132398B (zh) | 一种i型板式无砟轨道的维修方法 | |
CN205242181U (zh) | 一种新型板式无砟轨道结构 | |
CN103243621B (zh) | 有轨电车槽型钢轨调整用一体式钢轨支撑架的安装方法 | |
CN107268348A (zh) | 地铁柱式检查坑施工方法 | |
CN103243619A (zh) | 板式可更换组合道床系统及施工工艺 | |
CN109454746B (zh) | 一种建筑施工用混凝土浇注装置及其施工方法 | |
CN205775637U (zh) | 一种预制地铁拼装轨道板 | |
CN102926294B (zh) | 新型预制板拼装式浮置道床 | |
CN206289470U (zh) | 一种城市轨道交通预制板式轨道 | |
CN202809400U (zh) | 一种道床基底预制板 | |
CN208586468U (zh) | 二次浇筑式可升级通用道床 | |
CN208104910U (zh) | 一种中低速磁悬浮低置线路路基结构 | |
CN108560330B (zh) | 二次浇筑式可升级通用道床及其施工方法 | |
CN106283960A (zh) | 用于无砟轨道混凝土裂缝控制的轨枕及其施工方法 | |
CN202925483U (zh) | 一种预制装配式钢筋混凝土涵洞洞口 | |
CN105507110A (zh) | 受损混凝土路面面板的加固结构及加固方法 | |
CN204753382U (zh) | 城际铁路带声屏障预制人行道 | |
CN102587223A (zh) | 一种复合型预制混凝土轨道板 | |
CN209412844U (zh) | 一种装配式树脂混凝土排水沟 | |
CN203977237U (zh) | 城市轨道系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |