CN105758185B - A kind of formwork bracing system of heating furnace furnace wall castable refractory construction - Google Patents
A kind of formwork bracing system of heating furnace furnace wall castable refractory construction Download PDFInfo
- Publication number
- CN105758185B CN105758185B CN201610280973.4A CN201610280973A CN105758185B CN 105758185 B CN105758185 B CN 105758185B CN 201610280973 A CN201610280973 A CN 201610280973A CN 105758185 B CN105758185 B CN 105758185B
- Authority
- CN
- China
- Prior art keywords
- support
- steel
- heating
- heating furnace
- present
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D1/00—Casings; Linings; Walls; Roofs
- F27D1/16—Making or repairing linings increasing the durability of linings or breaking away linings
- F27D1/1626—Making linings by compacting a refractory mass in the space defined by a backing mould or pattern and the furnace wall
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The problem of the invention discloses a kind of formwork bracing systems of heating furnace furnace wall castable refractory construction, improve the device of existing support shuttering, complicated, installation trouble.The present invention includes being vertically arranged and the support I-steel for being connected with heating drop-bottom, it is set to support I-steel bottom side and is used for the triangle gusset being connected with heating drop-bottom and is set to support I-steel top and the connecting plate for being connected with heating furnace top crossbeam;Supporting rod is also tiltedly installed in the middle part of the support I-steel.The present invention can be repeated as many times and use, and reduce construction cost;The present invention is easy to use, quick, firm simultaneously, can ensure that pouring construction safety and quality.
Description
Technical field
The present invention relates to a kind of formwork bracing systems of heating furnace furnace wall castable refractory construction.
Background technology
In industrial heating furnace engineering construction, furnace wall castable refractory pour must use template, template then need into
Row support, however the device of support shuttering is currently used for, complicated, installation trouble.
Invention content
In order to improve the above problem, the purpose of the present invention is to provide a kind of moulds of heating furnace furnace wall castable refractory construction
Plate support system.
To achieve these goals, the technical solution adopted by the present invention is as follows:
The formwork bracing system of a kind of heating furnace furnace wall castable refractory construction, including being vertically arranged and being used for and heating furnace
The support I-steel that bottom plate is connected is set to support I-steel bottom side and the triangle muscle for being connected with heating drop-bottom
Plate and be set at the top of support I-steel and for the connecting plate that is connected of crossbeam at the top of heating furnace;The support I-steel
Middle part is also tiltedly installed with supporting rod.
Further, the connecting plate is rectangle structure, and is mutually welded with support I-steel.
Still further, described support I-steel as several, and arranged in parallel successively, phase between adjacent supports I-steel
Away from 1.4~1.6 meters.
Further, it is also horizontally disposed between adjacent supports I-steel to have connecting rod.
In addition, the side that the support I-steel is equipped with supporting rod is set there are one notch, and be equipped with and branch in bottom of the gap
Support I-steel both sides are connected and are used to support the support plate of connecting rod;The thickness of the connecting rod is less than the height of notch.
Compared with prior art, the present invention haing the following advantages and advantageous effect:
The present invention can be repeated as many times and use, and reduce construction cost;The present invention is easy to use, quick, firm simultaneously, can be really
Protect pouring construction safety and quality.
Present invention installation, convenient disassembly, greatly reduce construction personnel's labor intensity.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Wherein, the corresponding parts title is marked to be in attached drawing:1- support I-steel, 2- triangle gussets, 3- connecting plates,
4- supporting rods, 5- connecting rods, 6- notches, 7- support plates, 8- chassis.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples, and embodiments of the present invention include but not limited to
The following example.
Embodiment
As shown in Figure 1, a kind of formwork bracing system of heating furnace furnace wall castable refractory construction, is used in combination including being vertically arranged
In the support I-steel 1 being connected with heating drop-bottom, it is set to support I-steel bottom side and for heating drop-bottom phase
Triangle gusset 2 even and be set at the top of support I-steel and for the connecting plate 3 that is connected of crossbeam at the top of heating furnace;
Supporting rod 4 is also tiltedly installed in the middle part of the support I-steel.
In actual use, support I-steel bottom site welding is on heating drop-bottom, while triangle muscle by the present invention
Plate is also welding on heating drop-bottom, for reinforcement support I-steel and heating the fastness between drop-bottom, it is ensured that pour
Build the stabilization of process.Connecting plate at the top of support I-steel is mutually welded with crossbeam at the top of heating furnace, and this makes it possible to will prop up
Support I-steel is fixed, so as to which it be made to play the role of support shuttering.Above-mentioned supporting rod is to support the support I-shaped
Steel, it is specifically the side for being located remotely from template, because when being poured, has certain impact force, so with support
Bar is supported, it can be ensured that support I-steel not run-off the straight etc. can remain fixed template, so as to preferably be poured
It builds.
In order to which supporting rod is more stablized, set in the supporting rod bottom there are one chassis 8, so as to make its bottom more steady
It is fixed.
Specifically, the connecting plate is rectangle structure, and is mutually welded with support I-steel.By the way that connecting plate is set as
Rectangle makes its connection more convenient, and welding is more stablized.
Specifically, the support I-steel is several, and arranged in parallel successively, between adjacent supports I-steel apart
1.4~1.6 meters.
In order to ensure the stability between adjacent supports I-steel, while the support support I-steel side is played,
It is avoided to be tilted to side, it is also horizontally disposed between adjacent supports I-steel to have connecting rod 5.
In order to facilitate the installation of with dismantling connection bar, the side that the support I-steel is equipped with supporting rod is set there are one notch 6,
And it is equipped in bottom of the gap and is connected and is used to support the support plate 7 of connecting rod with support I-steel both sides;The thickness of the connecting rod
Degree is less than the height of notch.By setting notch, the both ends of the connecting rod can be moved to by notch in I-steel, Ran Houfang
It is placed in support plate, can thus keep relative stability with support I-steel, it is ensured that the distance between adjacent supports I-steel,
It can prevent run-off the straight phenomenon.
What deserves to be explained is the present invention is reusable, and after the completion of pouring, as form removal together removes the present invention,
Next construction point can be then transported to be installed, be used to support template.
What deserves to be explained is when being actually supported, template is located in the side for being not provided with supporting rod, and with support
I-steel is in close contact.
According to above-described embodiment, the present invention can be realized well.What deserves to be explained is before based on said structure design
It puts, to solve the technical issues of similary, even if some made in the present invention are used without substantive change or polishing
Technical solution essence still as the present invention, therefore it should also be as within the scope of the present invention.
Claims (1)
1. a kind of formwork bracing system of heating furnace furnace wall castable refractory construction, which is characterized in that be used in combination including being vertically arranged
In the support I-steel (1) being connected with heating drop-bottom, it is set to support I-steel bottom side and for heating drop-bottom
It connected triangle gusset (2) and is set at the top of support I-steel and the connection for being connected with crossbeam at the top of heating furnace
Plate (3);Supporting rod (4) is also tiltedly installed in the middle part of the support I-steel;
It is also horizontally disposed between adjacent supports I-steel to have connecting rod (5);
The side that the support I-steel is equipped with supporting rod is set there are one notch (6), and be equipped in bottom of the gap with supporting I-shaped
Steel both sides are connected and are used to support the support plate (7) of connecting rod;The thickness of the connecting rod is less than the height of notch;
The support I-steel is several, and arranged in parallel successively, at a distance of 1.4~1.6 meters between adjacent supports I-steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610280973.4A CN105758185B (en) | 2016-04-28 | 2016-04-28 | A kind of formwork bracing system of heating furnace furnace wall castable refractory construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610280973.4A CN105758185B (en) | 2016-04-28 | 2016-04-28 | A kind of formwork bracing system of heating furnace furnace wall castable refractory construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105758185A CN105758185A (en) | 2016-07-13 |
CN105758185B true CN105758185B (en) | 2018-06-15 |
Family
ID=56325209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610280973.4A Active CN105758185B (en) | 2016-04-28 | 2016-04-28 | A kind of formwork bracing system of heating furnace furnace wall castable refractory construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105758185B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106979689B (en) * | 2017-05-26 | 2023-07-07 | 中冶华天工程技术有限公司 | Emergency repair device and method for side wall of heating furnace |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008156133A (en) * | 2006-12-21 | 2008-07-10 | Jfe Steel Kk | Injection refractory under blast furnace body bottom plate, and construction method of blast furnace bottom |
CN101581540A (en) * | 2009-06-19 | 2009-11-18 | 中国第一冶金建设有限责任公司 | Flange beam formwork method when pouring material for heating furnace wall |
CN201785410U (en) * | 2010-07-29 | 2011-04-06 | 中国一冶集团有限公司 | Furnace shell and cooling wall suspension type retaining device for blast furnace overhaul |
CN104806011A (en) * | 2015-05-25 | 2015-07-29 | 中国五冶集团有限公司 | Raft plate post-cast strip pouring template and construction method thereof |
CN205561553U (en) * | 2016-04-28 | 2016-09-07 | 中国五冶集团有限公司 | Formwork support system of heating furnace brickwork refractory castable construction |
-
2016
- 2016-04-28 CN CN201610280973.4A patent/CN105758185B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008156133A (en) * | 2006-12-21 | 2008-07-10 | Jfe Steel Kk | Injection refractory under blast furnace body bottom plate, and construction method of blast furnace bottom |
CN101581540A (en) * | 2009-06-19 | 2009-11-18 | 中国第一冶金建设有限责任公司 | Flange beam formwork method when pouring material for heating furnace wall |
CN201785410U (en) * | 2010-07-29 | 2011-04-06 | 中国一冶集团有限公司 | Furnace shell and cooling wall suspension type retaining device for blast furnace overhaul |
CN104806011A (en) * | 2015-05-25 | 2015-07-29 | 中国五冶集团有限公司 | Raft plate post-cast strip pouring template and construction method thereof |
CN205561553U (en) * | 2016-04-28 | 2016-09-07 | 中国五冶集团有限公司 | Formwork support system of heating furnace brickwork refractory castable construction |
Also Published As
Publication number | Publication date |
---|---|
CN105758185A (en) | 2016-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103556578A (en) | Casting mold system for straight line section and side span closure section of continuous beam and building method thereof | |
CN103882813A (en) | Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform | |
CN106499411A (en) | A kind of single-track tunnel macroportion inverted arch self-propelled hangs template and construction method | |
CN207714310U (en) | A kind of lowering device for reinforcing cage | |
CN109049323A (en) | Plate bar frame production method | |
CN105758185B (en) | A kind of formwork bracing system of heating furnace furnace wall castable refractory construction | |
CN103362069A (en) | Steel and concrete combined box girder concrete wing plate formwork and construction method | |
CN104514570B (en) | Tunnel ditch cable trough form trolley | |
CN105014055A (en) | Casting pouring truck | |
CN208578064U (en) | Combination die for piping lane box type telescopic bottom plate and parapet | |
CN103147569A (en) | Operation platform system for cross-pulling slip form with both full-diameter silo and spoke-type center plate | |
CN205561553U (en) | Formwork support system of heating furnace brickwork refractory castable construction | |
CN103334584B (en) | Template regulating system for sliding form system | |
CN110722344B (en) | Oil cylinder replacing device and oil cylinder replacing method | |
CN106989600A (en) | The template construction method of heating furnace furnace wall | |
CN110295539A (en) | A kind of high thin-wall reinforced concrete structure and construction method of overturn-preventing | |
CN205998874U (en) | A kind of Slag treatment baffle-box quick-replaceable special purpose device | |
CN205934962U (en) | A system of sliding for underground pipe gallery cast -in -situ construction | |
CN109653770A (en) | A kind of middle board construction method carried out using original temporary support | |
CN105887922B (en) | A kind of method that inwall construction is carried out using truss support device | |
CN203530862U (en) | Casting mold system for straight section and side span closure section of continuous beam | |
CN205893923U (en) | A fast dismantle device that steel construction was demolishd in was used for narrow space | |
CN210884981U (en) | Carbide emergency device that comes out of stove | |
CN105822063A (en) | L-shaped special-shaped post formwork and formwork supporting method | |
CN206722370U (en) | A kind of operating platform in concrete box room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |