CN106499411A - A kind of single-track tunnel macroportion inverted arch self-propelled hangs template and construction method - Google Patents

A kind of single-track tunnel macroportion inverted arch self-propelled hangs template and construction method Download PDF

Info

Publication number
CN106499411A
CN106499411A CN201611068669.XA CN201611068669A CN106499411A CN 106499411 A CN106499411 A CN 106499411A CN 201611068669 A CN201611068669 A CN 201611068669A CN 106499411 A CN106499411 A CN 106499411A
Authority
CN
China
Prior art keywords
template
support
self
inverted arch
propelled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611068669.XA
Other languages
Chinese (zh)
Other versions
CN106499411B (en
Inventor
尚军
赵伟
韩建坤
王彦伟
马占群
何阳春
宫学君
王光伟
宋康年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201611068669.XA priority Critical patent/CN106499411B/en
Publication of CN106499411A publication Critical patent/CN106499411A/en
Application granted granted Critical
Publication of CN106499411B publication Critical patent/CN106499411B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of single-track tunnel macroportion inverted arch self-propelled hangs template, hang template to be hung on below self-propelled trestle by chain block, point template that template includes arranging is hung along tunnel macroportion inverted arch both sides, point template is formed by some little template splicings axial arranged along tunnel, little template includes the arc ring template and L-type vertical formwork that one end is hinged, support is fixed with the inside of L-type vertical formwork, it is located between point template of tunnel macroportion inverted arch both sides and is connected with to supportting truss by the support, the upper end connection limited location column of support, spacing column is hung support by side and is connected with self-propelled trestle.Inverted arch self-propelled in single-track tunnel proposed by the present invention hangs template and construction method, solves the lining template of monoblock type inverted arch two and applies limitation problem in single-track tunnel, installs, removes simple and convenient, simplifies workload, improve work efficiency.

Description

A kind of single-track tunnel macroportion inverted arch self-propelled hangs template and construction method
Technical field
The present invention relates to tunnel construction technical field, it particularly relates to a kind of single-track tunnel macroportion inverted arch is certainly Line hangs template and construction method.
Background technology
Tunnel inverted arch and filling construction, must separate pouring construction according to design specification inverted arch and filling, and inverted arch construction will Inverted arch arc formwork and end head formwork are first installed, then pour inverted arch concrete.Start form removal installation to fill out after inverted arch concrete final set Mold filling plate, finally pours filling layer concrete.In construction, arc formwork installation difficulty is larger, time length, demoulding rear pattern plate fall Fortune workload is larger, and template size deviation is extremely difficult to design requirement.Single-track tunnel is limited by space, traditional inverted arch trestle Monoblock type template cannot be used in single-track tunnel.
Content of the invention
It is an object of the invention to proposing a kind of single-track tunnel macroportion inverted arch self-propelled hangs template and construction method, energy Enough solve the problems, such as that monoblock type template is applied in single-track tunnel limited.
For realizing above-mentioned technical purpose, the technical scheme is that and be achieved in that:
A kind of single-track tunnel macroportion inverted arch self-propelled hangs template, and the suspension template is hung on certainly by chain block Below line trestle, and can include facing upward along tunnel macroportion with the self-propelled trestle advanced in unison, the suspension template Point template that arch both sides are arranged, described point of template are formed by some little template splicings axial arranged along tunnel, the little template It is hinged including one end
Arc ring template and L-type vertical formwork, be fixed with support on the inside of the L-type vertical formwork, positioned at tunnel It is connected with to supportting truss, the upper end connection of the support by the support between described point of template of road macroportion inverted arch both sides Limited location column, the spacing column are hung support by side and are connected with self-propelled trestle.
Further, fix also by the first support leading screw between the top of the L-type vertical formwork and self-propelled trestle It is connected.
Further, the arc ring template is connected also by the 3rd support leading screw with the inside of tunnel.
Further, the regulation for regulation point template horizontal level is provided between the support and described pair of support truss Plate, and the support is connected with the adjustable plate, the adjustable plate is connected with described pair of support truss.
Further, fix also by the second support leading screw between the arc ring template and the L-type vertical formwork It is connected.
Further, support of putting more energy into is additionally provided with the inside of described point of template.
A kind of single-track tunnel macroportion inverted arch self-propelled as above hangs the construction method of template, including following step Suddenly:
1) movement of template is hung, including:
1.1) center line is marked on inverted arch basal plane;
1.2) it is with reference to moving up self-propelled trestle with the center line of labelling on inverted arch basal plane, it is ensured that self-propelled trestle is not inclined From center line;
1.3) suspension template is moved to behind assigned position with self-propelled trestle and purges totally loose for substrate slag and debris;
2) Template Location is hung, including:
2.1) horizontal elevation positioning:According to measurement control point, form height is hung using chain block adjustment, before adjustment first Die head elevation is hung at measurement suspension centre, rough adjustment is first carried out and is accurately adjusted again;
2.2) center line positioning:According to measurement control point, the position to supportting adjustable plate at truss, adjustment is transferred using jack When first adjust tip position and adjust other again to supportting truss position, bolt on adjustable plate is locked after being adjusted in place;
2.3) fixing rivet is set on the abutment wall of both sides after the completion of positioning, support leading screw to fix by the 3rd and hang mould Plate;
3) casting concrete, including:
3.1) inverted arch casting concrete is given according to the order of first intermediate and then both sides;
3.2) after above-mentioned pour operation terminate 8 hours after, opening quotation pour inverted arch fill concrete to designed elevation;
4) demoulding:Step 3.2) operation starts the demoulding after terminating 4 hours, and the demoulding comprises the steps:
4.1) remove the 3rd and support leading screw;
4.2) the second support leading screw that removes between arc ring template and L-type vertical formwork withdraws arc ring template;
4.3) adjustable plate is unclamped;
4.4) suspension template is lifted by chain block and completes the demoulding.
Further, step 1.2) in by first support leading screw by hang template be fixed on below self-propelled trestle, and By the spacing column that is sequentially connected with support and side hang support carry out spacing.
Beneficial effects of the present invention:Inverted arch self-propelled in single-track tunnel proposed by the present invention hangs template and construction party Method, solves the lining template of monoblock type inverted arch two and applies limitation problem in single-track tunnel, install, remove simple and convenient, simplify Workload, improves work efficiency.
Description of the drawings
Fig. 1 is the use structure that single-track tunnel macroportion inverted arch self-propelled described according to embodiments of the present invention hangs template Schematic diagram;
Fig. 2 is the structural representation of ring template described according to embodiments of the present invention;
Fig. 3 is the structural representation of vertical formwork described according to embodiments of the present invention;
Fig. 4 is the structural representation of support of putting more energy into described according to embodiments of the present invention;
Fig. 5 is the structural representation of support described according to embodiments of the present invention;
Fig. 6 is the structural representation to supportting truss described according to embodiments of the present invention;
Fig. 7 is that the front view connected between support is hung in spacing column described according to embodiments of the present invention and side;
Fig. 8 is that the side view connected between support is hung in spacing column described according to embodiments of the present invention and side;
Fig. 9 is the structural representation of adjustable plate described according to embodiments of the present invention;
Figure 10 is the structural representation of the first described according to embodiments of the present invention support leading screw;
Figure 11 is the structural representation of the 3rd described according to embodiments of the present invention support leading screw;
Figure 12 is the side structure schematic diagram of suspension template described according to embodiments of the present invention.
Shown in figure:
1- arc ring templates;2-L type vertical formworks;3- puts more energy into support;4- supports;5- is to supportting truss;The spacing columns of 6-; 7- hangs support in side;8- templates lean on band;9- second supports leading screw;10- adjustable plates;11- chain blocks;12- first supports leading screw; 13- the 3rd supports leading screw;The vertical connecting plates of 14-;15- horizontal connecting plates;16-L shape supports;The first bolts hole of 17-;18- second Bolt hole;The 3rd bolts hole of 19-;The 4th bolts hole of 20-;21- chutes.
Specific embodiment
Accompanying drawing in reference to the embodiment of the present invention, to the embodiment of the present invention in technical scheme carry out clear, complete Ground description.
As shown in figs. 1-12, a kind of single-track tunnel macroportion inverted arch self-propelled described in embodiments in accordance with the present invention hangs Template, the suspension template are hung on below self-propelled trestle by 5 tons of chain block 11, and can be with the self-propelled Trestle advanced in unison, the suspension template include point template arranged along tunnel macroportion inverted arch both sides, point template construct per block 24 meters long, and described point of template is formed by 16 pieces of little template splicings axial arranged along tunnel, i.e., per block, the length of little template is 1.5 Rice, the little template include that the arc ring template 1 and L-type vertical formwork 2 that one end is mutually connected by hinges 26, the L-type are erected Support 4 is fixed with to the inner side of template 2, as shown in figure 5, the support 4 includes vertically connecting along what L-type vertical formwork 2 was arranged Fishplate bar 14 and the horizontal connecting plate 15 being fixedly linked with 14 upper end of vertical connecting plate, vertical connecting plate 14 and horizontal connecting plate 15 it Between be further fixed on a L bracket 16, the top of vertical connecting plate 14 is provided with three the first bolts hole 17, sets on horizontal connecting plate 15 There are two the second bolts hole 18, be connected with by the support 4 between point template positioned at described in tunnel macroportion inverted arch both sides To supportting truss 5, the effect for supportting truss 5 is to connect as one a point template for both sides, so pass through chain block 11 can be by Hang template system to hang over below self-propelled trestle, as shown in fig. 6, the two ends of described pair of support truss 5 are provided with the 3rd bolt hole 19, The upper end of the support 4 connects limited location column 6, and the spacing column 6 is hung support 7 by side and is connected with self-propelled trestle, institute State spacing column 6 and side is hung the effect of support 7 and is to prevent to hang template and the larger swing in left and right occur.
In the above-described embodiments, be additionally provided with template by band 8, the template by band 8 be used for guaranteeing the rigidity of little template with Linearity.
In the above-described embodiments, also by the first supporting wire between the top of the L-type vertical formwork 2 and self-propelled trestle Thick stick 12 is fixedly linked, it is therefore intended that prevent swing excessive when self-propelled trestle is moved.
In the above-described embodiments, the arc ring template 1 is connected also by the 3rd reinforcing leading screw 13 with the inside of tunnel, mesh Be prevent hang Template Location after occur float situation.
In the above-described embodiments, it is provided between the support 4 and described pair of support truss 5 for regulation point template horizontal level Adjustable plate 10, and the support 4 is connected with the adjustable plate 10, and the adjustable plate 10 is connected with described pair of support truss 5.As schemed Shown in 8, in a specific embodiment, it is provided with and 17 phase of the first bolt hole near the part to supportting truss 5 in adjustable plate 10 Corresponding three the 4th bolts hole 20, are provided with chute 21 with respect to the position of the 4th bolt hole 20 on adjustable plate 10.Concrete operations When, suspension template is adjusted by jack and moved along chute 21, so that it is guaranteed that hanging template without departing from inverted arch trestle center line.
In the above-described embodiments, support also by second between the arc ring template 1 and the L-type vertical formwork 2 Leading screw 9 is fixedly linked.Second supports leading screw 9 to be used for the folding and unfolding of arc ring template 1, and during the demoulding, arc ring template 1 is by the Two support leading screws 9 withdraw, and ejected by the second support leading screw 9, can achieve arc ring template 1 and move with trestle, soon during formwork Fast formwork positioning.
In the above-described embodiments, in order to improve the stability for hanging template, as shown in figure 4, the inner side of described point of template is also It is provided with support 3 of putting more energy into.
The invention also discloses a kind of single-track tunnel macroportion inverted arch self-propelled hangs the construction method of template, including following Step:
1) movement of template is hung, including:
1.1) center line is marked on inverted arch basal plane;
1.2) it is with reference to moving up self-propelled trestle with the center line of labelling on inverted arch basal plane, it is ensured that self-propelled trestle is not inclined From center line;
1.3) suspension template is moved to behind assigned position with self-propelled trestle and purges totally loose for substrate slag and debris;
2) Template Location is hung, including:
2.1) horizontal elevation positioning:According to measurement control point, form height is hung using the adjustment of chain block 11, before adjustment First die head elevation is hung at measurement suspension centre, first carry out rough adjustment and accurately adjusted again;
2.2) center line positioning:According to measurement control point, the position to supportting adjustable plate 10 at truss 5 is transferred using jack, Tip position is first adjusted during adjustment and adjusts other again to supportting 5 position of truss, bolt on adjustable plate 10 is locked after being adjusted in place Tightly;
2.3) fixing rivet is set on the abutment wall of both sides after the completion of positioning, support leading screw 13 to fix by the 3rd and hang mould Plate;
3) casting concrete, including:
3.1) inverted arch casting concrete is given according to the order of first intermediate and then both sides;
3.2) after above-mentioned pour operation terminate 8 hours after, opening quotation pour inverted arch fill concrete to designed elevation;
4) demoulding:Step 3.2) operation starts the demoulding after terminating 4 hours, and the demoulding comprises the steps:
4.1) remove the 3rd and support leading screw 13;
4.2) the second support leading screw 9 that removes between arc ring template 1 and L-type vertical formwork 2 withdraws arc ring mould Plate (1);
4.3) adjustable plate 10 is unclamped;
4.4) suspension template is lifted by chain block 11 and completes the demoulding.
Preferably, step 1.2) in by first support leading screw 12 by hang template be fixed on below self-propelled trestle, and By the spacing column 6 that is sequentially connected with support 4 and side hang support 7 carry out spacing.
In sum, by means of the above-mentioned technical proposal of the present invention, the inverted arch in single-track tunnel proposed by the present invention is voluntarily Formula hangs template and construction method, solves the lining template of monoblock type inverted arch two and applies limitation problem in single-track tunnel, installs, tears open Except simple and convenient, workload is simplified, work efficiency is improve.
Presently preferred embodiments of the present invention is the foregoing is only, not in order to limit the present invention, all in essence of the invention Within god and principle, any modification, equivalent substitution and improvements that is made etc. should be included within the scope of the present invention.

Claims (8)

1. a kind of single-track tunnel macroportion inverted arch self-propelled hangs template, it is characterised in that the suspension template is by pulling calabash Reed (11) is hung on below self-propelled trestle, and can be included with the self-propelled trestle advanced in unison, the suspension template Along point template that tunnel macroportion inverted arch both sides are arranged, described point of template is by some little template splicings axial arranged along tunnel Include arc ring template (1) and L-type vertical formwork (2) that one end is hinged into, the little template, the vertical mould of the L-type Support (4) is fixed with the inside of plate (2), passes through the support between described in tunnel macroportion inverted arch both sides points of templates (4) it is connected with to supportting truss (5), the upper end of support (4) connects limited location column (6), and described spacing column (6) pass through side Hang support (7) to be connected with self-propelled trestle.
2. single-track tunnel macroportion inverted arch self-propelled according to claim 1 hangs template, it is characterised in that the L-type It is fixedly linked also by the first support leading screw (12) between the top of vertical formwork (2) and self-propelled trestle.
3. single-track tunnel macroportion inverted arch self-propelled according to claim 1 hangs template, it is characterised in that the arc Ring template (1) is connected also by the 3rd support leading screw (13) with the inside of tunnel.
4. single-track tunnel macroportion inverted arch self-propelled according to claim 1 hangs template, it is characterised in that the support (4) adjustable plate (10) for regulation point template horizontal level, and the support (4) are provided between described pair of support truss (5) It is connected with the adjustable plate (10), adjustable plate (10) are connected with described pair of support truss (5).
5. single-track tunnel macroportion inverted arch self-propelled according to claim 1 hangs template, it is characterised in that the arc It is fixedly linked also by the second support leading screw (9) between ring template (1) and the L-type vertical formwork (2).
6. single-track tunnel macroportion inverted arch self-propelled according to claim 1 hangs template, it is characterised in that described point of mould Support of putting more energy into (3) is additionally provided with the inside of plate.
7. a kind of single-track tunnel macroportion inverted arch self-propelled as claimed in claim 1 hangs the construction method of template, its feature It is, comprises the following steps:
1) movement of template is hung, including:
1.1) center line is marked on inverted arch basal plane;
1.2) it is with reference to moving up self-propelled trestle with the center line of labelling on inverted arch basal plane, it is ensured that self-propelled trestle is without departing from Line;
1.3) suspension template is moved to behind assigned position with self-propelled trestle and purges totally loose for substrate slag and debris;
2) Template Location is hung, including:
2.1) horizontal elevation positioning:According to measurement control point, form height is hung using chain block (11) adjustment, before adjustment first Die head elevation is hung at measurement suspension centre, rough adjustment is first carried out and is accurately adjusted again;
2.2) center line positioning:According to measurement control point, the position to supportting truss (5) place adjustable plate (10) is transferred using jack, Tip position is first adjusted during adjustment and adjusts other again to supportting truss (5) position, the upper bolt of adjustable plate (10) is entered after being adjusted in place Row locking;
2.3) fixing rivet is set on the abutment wall of both sides after the completion of positioning, support the fixed suspension mould of leading screw (13) by the 3rd Plate;
3) casting concrete, including:
3.1) inverted arch casting concrete is given according to the order of first intermediate and then both sides;
3.2) after above-mentioned pour operation terminate 8 hours after, opening quotation pour inverted arch fill concrete to designed elevation;
4) demoulding:Step 3.2) operation starts the demoulding after terminating 4 hours, and the demoulding comprises the steps:
4.1) remove the 3rd and support leading screw (13);
4.2) arc ring is withdrawn in the second support leading screw (9) that removes between arc ring template (1) and L-type vertical formwork (2) Template (1);
4.3) adjustable plate (10) is unclamped;
4.4) suspension template is lifted by chain block (11) and completes the demoulding.
8. construction method according to claim 7, it is characterised in that step 1.2) in support the leading screw (12) will by first Hang template to be fixed on below self-propelled trestle, and support is hung by the spacing column (6) and side that are sequentially connected with support (4) (7) carry out spacing.
CN201611068669.XA 2016-11-29 2016-11-29 A kind of single-track tunnel macroportion inverted arch self-propelled suspension template and construction method Active CN106499411B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611068669.XA CN106499411B (en) 2016-11-29 2016-11-29 A kind of single-track tunnel macroportion inverted arch self-propelled suspension template and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611068669.XA CN106499411B (en) 2016-11-29 2016-11-29 A kind of single-track tunnel macroportion inverted arch self-propelled suspension template and construction method

Publications (2)

Publication Number Publication Date
CN106499411A true CN106499411A (en) 2017-03-15
CN106499411B CN106499411B (en) 2019-02-12

Family

ID=58328713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611068669.XA Active CN106499411B (en) 2016-11-29 2016-11-29 A kind of single-track tunnel macroportion inverted arch self-propelled suspension template and construction method

Country Status (1)

Country Link
CN (1) CN106499411B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107090767A (en) * 2017-06-19 2017-08-25 中铁隧道集团二处有限公司 A kind of Full-hydraulic crawler-type self trestle
CN108150197A (en) * 2018-02-05 2018-06-12 中铁隧道集团处有限公司 Radially overturning inverted arch trestle and its installation position method for demoulding to arc formwork
CN111691902A (en) * 2020-06-04 2020-09-22 中交一公局集团有限公司 Tunnel inverted arch construction process
CN112160771A (en) * 2020-11-06 2021-01-01 湖南五新模板有限公司 Upward-floating-prevention overhead arch formwork system
CN112281774A (en) * 2020-10-23 2021-01-29 四川港航建设工程有限公司 Inverted arch finalized formwork system and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4449876B2 (en) * 2005-09-28 2010-04-14 羽田コンクリート工業株式会社 Large-section tunnel structure and its construction method
CN101967985A (en) * 2010-09-08 2011-02-09 中铁隧道集团三处有限公司 Self-propelled inverted arch template construction method
CN102787850A (en) * 2012-08-29 2012-11-21 中铁二十三局集团第一工程有限公司 Inverted arch formwork for tunnel inverted arch construction
CN203081466U (en) * 2013-03-01 2013-07-24 中铁十七局集团第四工程有限公司 Integrated moving framework for inverted arch of tunnel
CN103899335A (en) * 2014-04-15 2014-07-02 中铁隧道集团有限公司 Inverted arch lining trolley, synchronous tunnel operating system and inverted arch synchronous lining method
CN104533450A (en) * 2014-11-25 2015-04-22 中铁十八局集团有限公司 One-time-concreting construction method of inverted arch low wall of single-track tunnel
CN204386608U (en) * 2014-12-24 2015-06-10 中铁四局集团第五工程有限公司 A kind of tunnel invert construction tool
CN204552774U (en) * 2015-01-08 2015-08-12 中交第二航务工程局有限公司 A kind of monolithic inverted arch mould bases of locating longitudinal waterstop

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4449876B2 (en) * 2005-09-28 2010-04-14 羽田コンクリート工業株式会社 Large-section tunnel structure and its construction method
CN101967985A (en) * 2010-09-08 2011-02-09 中铁隧道集团三处有限公司 Self-propelled inverted arch template construction method
CN102787850A (en) * 2012-08-29 2012-11-21 中铁二十三局集团第一工程有限公司 Inverted arch formwork for tunnel inverted arch construction
CN203081466U (en) * 2013-03-01 2013-07-24 中铁十七局集团第四工程有限公司 Integrated moving framework for inverted arch of tunnel
CN103899335A (en) * 2014-04-15 2014-07-02 中铁隧道集团有限公司 Inverted arch lining trolley, synchronous tunnel operating system and inverted arch synchronous lining method
CN104533450A (en) * 2014-11-25 2015-04-22 中铁十八局集团有限公司 One-time-concreting construction method of inverted arch low wall of single-track tunnel
CN204386608U (en) * 2014-12-24 2015-06-10 中铁四局集团第五工程有限公司 A kind of tunnel invert construction tool
CN204552774U (en) * 2015-01-08 2015-08-12 中交第二航务工程局有限公司 A kind of monolithic inverted arch mould bases of locating longitudinal waterstop

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
柳其圣: "《液压仰拱台车在铁路隧道施工中的应用分析》", 《设备/仪器》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107090767A (en) * 2017-06-19 2017-08-25 中铁隧道集团二处有限公司 A kind of Full-hydraulic crawler-type self trestle
CN108150197A (en) * 2018-02-05 2018-06-12 中铁隧道集团处有限公司 Radially overturning inverted arch trestle and its installation position method for demoulding to arc formwork
CN108150197B (en) * 2018-02-05 2024-04-05 中铁隧道集团一处有限公司 Radial overturning inverted arch trestle of arc-shaped template and mounting, positioning and demolding method thereof
CN111691902A (en) * 2020-06-04 2020-09-22 中交一公局集团有限公司 Tunnel inverted arch construction process
CN112281774A (en) * 2020-10-23 2021-01-29 四川港航建设工程有限公司 Inverted arch finalized formwork system and construction method
CN112160771A (en) * 2020-11-06 2021-01-01 湖南五新模板有限公司 Upward-floating-prevention overhead arch formwork system

Also Published As

Publication number Publication date
CN106499411B (en) 2019-02-12

Similar Documents

Publication Publication Date Title
CN106499411A (en) A kind of single-track tunnel macroportion inverted arch self-propelled hangs template and construction method
CN207143755U (en) A kind of adjustable bracket for No. 0 block of bridge pier
CN105297637B (en) Downward mobile formwork bridge fabrication machine integral demounting method
CN103352710B (en) The convertible tunnel overhead arch mould plate trolley of a kind of suspension and construction method thereof
CN101391438A (en) Whole dismounting and whole mounting integral slippage large formwork for thin wall U-shaped beam
CN207419520U (en) Piping lane construction template component
CN104120877B (en) A kind of hydraulic climbing die block system and climbing form method
CN105401679A (en) Large-gradient cast-in-place concrete inclined roof construction method
CN106042173A (en) Bridge production system
CN209243715U (en) Circular hole pile wall formwork bracing system
KR20070106386A (en) Non-cementation concrete forming structure of capsule type or cave type underground structure
CN102561193A (en) Construction technology of closure section for rotary continuous beam for overpass electrified railway and hanging basket thereof
CN108589772A (en) Method is torn open for the platform modular system of piping lane top plate and the morning of early stripping formwork system
CN109176840A (en) The mold and its casting method of tunnel square shape prefabricated components
CN106401606B (en) Template trestle trolley
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN108005114A (en) A kind of piping lane pours mould
CN104912322B (en) Early dismantling supporting system for plastic template and construction method thereof
CN104500106B (en) A kind of tunnel inverted arch construction mould bases and tunnel inverted arch construction technology
CN208305334U (en) A kind of box beam precast pedestal with concrete wedge block
CN207775925U (en) A kind of piping lane pours mold
CN203200719U (en) Hanging type slope pouring template device
CN107191205B (en) Self-moving full-arc template for loop casting of tunnel side wall inverted arch concrete
CN108729456A (en) It is a kind of one concrete revetment pour mold and its pouring construction method
CN108150197A (en) Radially overturning inverted arch trestle and its installation position method for demoulding to arc formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant