CN105735630A - 一种钢梁固定方法 - Google Patents

一种钢梁固定方法 Download PDF

Info

Publication number
CN105735630A
CN105735630A CN201610093464.0A CN201610093464A CN105735630A CN 105735630 A CN105735630 A CN 105735630A CN 201610093464 A CN201610093464 A CN 201610093464A CN 105735630 A CN105735630 A CN 105735630A
Authority
CN
China
Prior art keywords
bolt
floor
floor slab
sleeve pipe
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610093464.0A
Other languages
English (en)
Inventor
姜志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huahai Steel Structure Co Ltd
Original Assignee
Jiangsu Huahai Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huahai Steel Structure Co Ltd filed Critical Jiangsu Huahai Steel Structure Co Ltd
Priority to CN201610093464.0A priority Critical patent/CN105735630A/zh
Publication of CN105735630A publication Critical patent/CN105735630A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种钢梁固定方法,混凝土楼板底模安装后、混凝土浇筑前,将套管固定在套管底座上,组成预埋成孔装置,固定在悬挑脚手架钢梁的锚固位置处;混凝土凝固后,形成垂直于楼板的两个成孔;从楼板上表面插入U形锚栓,并从楼板下表面穿出;调正U形锚栓的位置后,从楼板的下表面向螺纹部旋入螺母,旋紧后即可将钢梁固定在楼板上;施工完毕需要拆除时,拧松U形锚栓上的螺母,即可很快将U形锚栓卸下,预埋成孔装置在楼板中不取出。本发明的套管底座保证了套管始终垂直于楼板,预埋时不会歪倒倾斜;安装和拆卸方便,连接稳定,能够保证施工安全;可以多次重复使用,节省了材料,且大幅节约了劳力,提高了工作效率。

Description

一种钢梁固定方法
技术领域
本发明涉及一种钢梁固定方法,属于建筑结构技术领域。
背景技术
近二十年来,随着我国建筑行业的飞速发展,建筑结构向着更高、更复杂的形式推进,高层、异形建筑结构日益增多,而悬挑式脚手架往往是保障其顺利施工的必备条件,使用量巨大。其中,悬挑脚手架中钢梁的锚固又是保障悬挑脚手架安全的关键。目前,绝大多数传统的悬挑脚手架钢梁的锚固方法多为采用锚栓现浇于混凝土楼板之中。锚栓只能一次性使用,而且在使用完毕之后还要费工将超出楼板的部分切除。此方法不仅浪费大量钢材,而且多余锚栓的切除也要浪费大量人力、物力。
发明内容
针对上述现有技术存在的问题,本发明的目的是提供一种连接稳定,可以多次重复使用、锚栓安装简单,拆除方便的钢梁固定方法。
为实现上述目的,本发明采用的技术方案是:一种钢梁固定方法,包括如下步骤:
步骤1:根据实际工程需要,计算悬挑脚手架钢梁的锚固长度与锚固螺栓的规格、位置和数量,使之符合受力与构造要求,进而确定预埋成孔装置的尺寸、位置和数量。
步骤2:混凝土楼板底模安装后、混凝土浇筑前,将套管固定在套管底座上,组成预埋成孔装置,固定在悬挑脚手架钢梁的锚固位置处;浇筑混凝土楼板时,保持预埋的套管位置稳定,混凝土凝固后,形成垂直于楼板的两个成孔;
步骤3:待混凝土强度满足安装脚手架强度后,按设计位置放置悬挑钢梁,从楼板上表面插入U形锚栓,所述U形锚栓的螺纹部分别依次从预留两个通孔的角钢压板、套管和套管底座穿过,并从楼板下表面穿出;
步骤4:调正U形锚栓的位置后,从楼板的下表面向螺纹部旋入螺母,旋紧后即可将钢梁固定在楼板上;
步骤5:施工完毕需要拆除时,拧松U形锚栓上的螺母,即可很快将U形锚栓卸下,移除悬挑钢梁;
步骤6:采用细石混凝土将楼板混凝土中的锚固螺栓预留孔道灌注密实。
进一步的,浇筑混凝土楼板前,在所述套管表面涂刷隔离剂。
优选的,所述套管内外表面粗糙。
本发明的套管底座保证了套管始终垂直于楼板,预埋时不会歪倒倾斜;安装和拆卸方便,连接稳定,能够保证施工安全;可以多次重复使用,节省了材料,且大幅节约了劳力,提高了工作效率。
附图说明
图1是本发明的结构示意图;
图中,1.套管,2.套管底座,3.楼板,4.U形锚栓,5.角钢压板,6.钢梁,7.螺母。
具体实施方式
下面结合附图对本发明作进一步详细说明。
如图1所示,钢梁固定方法包括如下步骤:
步骤1:根据实际工程需要,计算脚手架钢梁的锚固长度与锚固螺栓的规格、位置和数量,使之符合受力与构造要求,进而确定预埋成孔装置的尺寸、位置和数量。
步骤2:混凝土楼板底模安装后、混凝土浇筑前,将套管1固定在套管底座2上,组成预埋成孔装置,固定在脚手架钢梁的锚固位置处;浇筑混凝土楼板时,保持预埋的套管1位置稳定,混凝土凝固后,形成垂直于楼板3的两个成孔;
步骤3:待混凝土强度满足安装脚手架强度后,按设计位置放置钢梁6,从楼板3上表面插入U形锚栓4,所述U形锚栓4的螺纹部分别依次从预留两个通孔的角钢压板5、套管1和套管底座2穿过,并从楼板3下表面穿出;
步骤4:调正U形锚栓4的位置后,从楼板3的下表面向螺纹部旋入螺母7,旋紧后即可将钢梁6固定在楼板3上;
步骤5:施工完毕需要拆除时,拧松U形锚栓4上的螺母7,即可很快将U形锚栓4卸下,移除钢梁6;
步骤6:采用细石混凝土将楼板3混凝土中的锚固螺栓预留孔道灌注密实。
优选的,浇筑混凝土楼板3前,在所述套管1表面涂刷隔离剂。
优选的,为了保证套管1能与周围混凝土之间紧密结合,所述套管1内外表面粗糙。由于套管1内表面粗糙,能够与灌入的细石混凝土紧密结合,从而对混凝土楼板造成的损伤达到最小。本方法拆卸方便,可以多次重复使用,节省了材料;不需要切除多余的部分,节约了人力物力。

Claims (3)

1.一种钢梁固定方法,其特征在于,包括如下步骤:
步骤1:根据实际工程需要,计算悬挑脚手架钢梁的锚固长度与锚固螺栓的规格、位置和数量,使之符合受力与构造要求,进而确定预埋成孔装置的尺寸、位置和数量。
步骤2:混凝土楼板底模安装后、混凝土浇筑前,将套管固定在套管底座上,组成预埋成孔装置,固定在悬挑脚手架钢梁的锚固位置处;浇筑混凝土楼板时,保持预埋的套管位置稳定,混凝土凝固后,形成垂直于楼板的两个成孔;
步骤3:待混凝土强度满足安装脚手架强度后,按设计位置放置悬挑钢梁,从楼板上表面插入U形锚栓,所述U形锚栓的螺纹部分别依次从预留两个通孔的角钢压板、套管和套管底座穿过,并从楼板下表面穿出;
步骤4:调正U形锚栓的位置后,从楼板的下表面向螺纹部旋入螺母,旋紧后即可将钢梁固定在楼板上;
步骤5:施工完毕需要拆除时,拧松U形锚栓上的螺母,即可很快将U形锚栓卸下,移除悬挑钢梁;
步骤6:采用细石混凝土将楼板混凝土中的锚固螺栓预留孔道灌注密实。
2.根据权利要求1所述的钢梁固定方法,其特征在于,浇筑混凝土楼板前,在所述套管表面涂刷隔离剂。
3.根据权利要求1所述的钢梁固定方法,其特征在于,所述套管内外表面粗糙。
CN201610093464.0A 2016-02-19 2016-02-19 一种钢梁固定方法 Pending CN105735630A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610093464.0A CN105735630A (zh) 2016-02-19 2016-02-19 一种钢梁固定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610093464.0A CN105735630A (zh) 2016-02-19 2016-02-19 一种钢梁固定方法

Publications (1)

Publication Number Publication Date
CN105735630A true CN105735630A (zh) 2016-07-06

Family

ID=56241972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610093464.0A Pending CN105735630A (zh) 2016-02-19 2016-02-19 一种钢梁固定方法

Country Status (1)

Country Link
CN (1) CN105735630A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023154A (zh) * 2017-05-05 2017-08-08 绍兴明煌建材科技有限公司 一种新型悬挑脚手架构件及其施工方法
CN109441094A (zh) * 2018-12-20 2019-03-08 上海建工七建集团有限公司 悬挑脚手架工字钢固定预埋装置及其安装方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201902010U (zh) * 2010-12-23 2011-07-20 中建三局建设工程股份有限公司 工具型悬挑脚手架抱箍
CN203441075U (zh) * 2013-07-01 2014-02-19 中建五局工业设备安装有限公司 一种悬挑脚手架地锚
CN204081445U (zh) * 2014-07-28 2015-01-07 天津二十冶建设有限公司 悬挑工字钢锚固装置
CN204299162U (zh) * 2014-09-26 2015-04-29 中国建筑第八工程局有限公司 悬挑工字钢梁锚固结构
CN204386140U (zh) * 2014-12-24 2015-06-10 江苏南通二建集团有限公司 一种可回收式悬挑架型钢锚固装置
CN204531355U (zh) * 2015-01-07 2015-08-05 中国建筑第八工程局有限公司 悬挑梁锚固装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201902010U (zh) * 2010-12-23 2011-07-20 中建三局建设工程股份有限公司 工具型悬挑脚手架抱箍
CN203441075U (zh) * 2013-07-01 2014-02-19 中建五局工业设备安装有限公司 一种悬挑脚手架地锚
CN204081445U (zh) * 2014-07-28 2015-01-07 天津二十冶建设有限公司 悬挑工字钢锚固装置
CN204299162U (zh) * 2014-09-26 2015-04-29 中国建筑第八工程局有限公司 悬挑工字钢梁锚固结构
CN204386140U (zh) * 2014-12-24 2015-06-10 江苏南通二建集团有限公司 一种可回收式悬挑架型钢锚固装置
CN204531355U (zh) * 2015-01-07 2015-08-05 中国建筑第八工程局有限公司 悬挑梁锚固装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023154A (zh) * 2017-05-05 2017-08-08 绍兴明煌建材科技有限公司 一种新型悬挑脚手架构件及其施工方法
CN109441094A (zh) * 2018-12-20 2019-03-08 上海建工七建集团有限公司 悬挑脚手架工字钢固定预埋装置及其安装方法

Similar Documents

Publication Publication Date Title
CN105696796A (zh) 一种悬挑脚手架钢梁锚固方法
CN103556819B (zh) 一种在梁板上预留构造柱孔洞的施工方法
CN204060020U (zh) 一种钢筋混凝土柱加固结构
CN207863507U (zh) 一种用于高层建筑楼层的竖向构件置换装置
CN200985564Y (zh) T型预埋自脱式锚具
CN210396134U (zh) 一种控制剪力墙水平接茬质量的加固工具
CN105735630A (zh) 一种钢梁固定方法
CN102912977A (zh) 一种用于浇筑定型楼梯的模具
CN203452273U (zh) 一种移动式现浇板厚度控制马凳
CN105220882A (zh) 一种水泥浇捣厚度控制装置及其使用方法
CN202596148U (zh) 可重复利用的悬挑脚手架锚固压环
CN204299162U (zh) 悬挑工字钢梁锚固结构
CN203499017U (zh) 墙体拉结筋预埋定位装置
CN203097290U (zh) 装配式对拉螺栓
CN102296746B (zh) 含有预埋件的混凝土现浇板
CN214575760U (zh) 一种楼面吊模通用底座
CN205529917U (zh) 一种用于高墩、u型桥台模板安装的支撑固定装置
CN105735631A (zh) 一种悬挑脚手架钢梁锚固装置
CN211973855U (zh) 管廊预埋件
CN204386139U (zh) 可拆卸式型钢锚固装置
CN208777700U (zh) 现浇楼板孔洞预留模具
CN108442698B (zh) 一种变形缝对拉螺栓pvc套管填堵方法及封堵固定套件
CN207960164U (zh) 预制装配式围墙
CN208618833U (zh) 成组立管安装预埋套管定位装置
CN103104099A (zh) 一种框架柱内拉墙筋的施工方法及构造

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160706