CN105735466B - Prefabricated wall column one-part form steel bar connecting structure and method - Google Patents

Prefabricated wall column one-part form steel bar connecting structure and method Download PDF

Info

Publication number
CN105735466B
CN105735466B CN201610191697.4A CN201610191697A CN105735466B CN 105735466 B CN105735466 B CN 105735466B CN 201610191697 A CN201610191697 A CN 201610191697A CN 105735466 B CN105735466 B CN 105735466B
Authority
CN
China
Prior art keywords
wall column
prefabricated wall
sleeve
steel bar
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610191697.4A
Other languages
Chinese (zh)
Other versions
CN105735466A (en
Inventor
李凯阳
章谊
何永顺
王恒
龙莉波
李成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201610191697.4A priority Critical patent/CN105735466B/en
Publication of CN105735466A publication Critical patent/CN105735466A/en
Application granted granted Critical
Publication of CN105735466B publication Critical patent/CN105735466B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • E04B1/163Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, only the vertical slabs being partially cast in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • E04B1/165Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with elongated load-supporting parts, cast in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of prefabricated wall column one-part form steel bar connecting structure and methods, the connection structure includes upper, the prefabricated wall column in lower section, each prefabricated wall column it is upper, reserved steel bar is arranged in a staggered manner in lower end respectively, the top of the reserved steel bar of the upper end of prefabricated wall column is equipped with external screw thread and is threadedly coupled a sleeve, sleeve is up and down, the lower end of the sleeve opens up the internal screw thread for being threadedly coupled with the reserved steel bar, a grout hole is opened up on the upper end barrel of sleeve, the reserved steel bar of the lower end of the prefabricated wall column in top is inserted in the sleeve of the upper end of the prefabricated wall column in lower section, it is in the milk in the sleeve by grout hole, on, the butted part concreting of the prefabricated wall column in lower section.Which raises the strength and stiffness connected between reinforcing bar, and the connection of a dry wall intercolumniation is only needed between each layer, that is, adjacent level structure, compared to the way of dry wall intercolumniation connection twice in conventional each layer, the use dosage of the steel such as sleeve is effectively reduced, construction cost is reduced.

Description

Prefabricated wall column one-part form steel bar connecting structure and method
Technical field
The present invention relates to building engineering field more particularly to a kind of prefabricated wall column one-part form steel bar connecting structure and methods.
Background technique
Prefabricated construction system be using prefabricated components as main member, through assembly, connection, part it is cast-in-place made of mix Xtah Crude Clay structure.The concrete structure have build guality stabilization, high production efficiency, environmental pollution is small, the wasting of resources is few, is conducive to The advantages that social sustainable development.But the reinforcing bar connection between assembled wallboard is since cost is high or construction precision is demanding Factor is always the technical bottleneck for influencing the system and promoting on a large scale.
Existing conventional precast wall body connection method is that steel plate is reserved between floor, prefabricated panel, then uses bolt It carrying out being mechanically connected or using electric welding connection, the precast wall body between adjacent level structure at least needs connection construction twice, Not only time-consuming and laborious, the usage amount of corresponding steel plate is larger, causes cost excessively high.Pillar is not in existing fabricated construction technology Prefabricated, it is to pour in the later period, wet construction is more, needs using a large amount of template.
Therefore, the construction method for how simplifying prefabricated construction reduces the link cost of prefabricated wall column, improves building Prefabrication and assembly construction rate, be this field technical problem urgently to be resolved.
Summary of the invention
The purpose of the present invention is to provide a kind of prefabricated wall column one-part form steel bar connecting structure and method, improve reinforcing bar it Between the strength and stiffness that connect, ensure that the safety of structure, and avoid the toxic and harmful gas generated using electric welding connection, protect Hinder the working security of construction personnel.
In order to solve the above technical problems, the invention provides the following technical scheme:
A kind of prefabricated wall column one-part form steel bar connecting structure, including the prefabricated wall column of upper and lower, each prefabricated wall column it is upper, Reserved steel bar is arranged in a staggered manner in lower end respectively, and the top of the reserved steel bar of the upper end of the prefabricated wall column is equipped with external screw thread and screw thread connects A sleeve is connect, up and down, the lower end of the sleeve is opened up for the reserved steel bar screw thread with prefabricated wall column the sleeve The internal screw thread of connection opens up a grout hole on the upper end barrel of sleeve, and the reserved steel bar of the lower end of the prefabricated wall column in top is inserted in In the sleeve of the upper end of the prefabricated wall column in lower section, it is in the milk in the sleeve by the grout hole, pair of the prefabricated wall column of upper and lower Socket part point uses concreting.
It preferably, further include horizontal structure reinforcing bar, the water in above-mentioned prefabricated wall column one-part form steel bar connecting structure Flat structure reinforcing bar is before the butted part of the prefabricated wall column of upper and lower pours, reserved steel bar across the upper end of the prefabricated wall column in lower section, And reinforcing bar connection is carried out, the butted part formed by integrally casting of horizontal structure and upper and lower prefabricated wall column forms, the prefabricated wall column in lower section Top of concrete be close to the lower surface of the horizontal structure.
Preferably, in above-mentioned prefabricated wall column one-part form steel bar connecting structure, the grout hole is located at the sleeve The top of barrel.
Preferably, in above-mentioned prefabricated wall column one-part form steel bar connecting structure, the length in reserve of the reserved steel bar is 500mm-1000mm。
Preferably, in above-mentioned prefabricated wall column one-part form steel bar connecting structure, the prefabricated wall column is for dry wall or in advance Column processed.
The invention also discloses a kind of prefabricated wall column one-part form connecting method for reinforcing bars, using prefabricated wall column one as described above Segmentation steel bar connecting structure, includes the following steps:
The first step, the prefabricated wall column of first layer of constructing on the basis of wall column;
Second step lifts the prefabricated wall column of the second layer, and the lower end of the prefabricated wall column of the second layer as the prefabricated wall column in top is pre- It stays in sleeve of the reinforcing bar insertion as the reserved steel bar of the upper end of the prefabricated wall column of first layer when front lower place dry wall column, and uses Grouting material is by reserving grout hole grouting construction in the sleeve;
Horizontal structure reinforcing bar is passed through the upper end as the prefabricated wall column of first layer when front lower place dry wall column by third step Reserved steel bar, and carry out reinforcing bar connection;
4th step, Feng Mohou integrally pour the butted part of horizontal structure and current upper and lower two prefabricated wall column It builds.
5th step repeats second step to the 4th step, constructs upwards in turn, until completing the construction of all prefabricated wall columns of layer.
Preferably, in the first step, be staggered reserved reinforcement foundation on the basis of the wall column, the top spiral shell of reinforcement foundation Line connects a sleeve as described above, and the reserved steel bar of the lower end of the prefabricated wall column of first layer is inserted into the sleeve of the reinforcement foundation It is interior, the grouting construction in the sleeve of the reinforcement foundation, after grouting, to the butted part of the prefabricated wall column of first layer and wall column basis It is poured after envelope mould.
Preferably, after the 5th step, roof steel bar is passed through to the pre- of the upper end for being currently located at the prefabricated wall column of the top Reinforcing bar is stayed, reinforcing bar connection is carried out, Feng Mohou pours top plate.
By techniques disclosed above scheme it is found that compared with prior art, beneficial effects of the present invention are as follows:
(1) reinforcing bar uses sleeve connection, one end, that is, lower end of sleeve and a prefabricated wall column between prefabricated wall column of the invention That is the reserved steel bar of the prefabricated wall column in lower section is bolted, and the other end, that is, upper end of sleeve is top dry wall for another prefabricated wall column The reserved steel bar of column is inserted into and passes through grouting connection, improves the strength and stiffness connected between reinforcing bar, ensure that the peace of structure Entirely, and the toxic and harmful gas generated using electric welding connection is avoided, ensures the working security of construction personnel, is conducive to environment Protection.
(2) it is prefabricated to pass through lower section to horizontal structure reinforcing bar of the invention before the butted part of the prefabricated wall column of upper and lower pours The reserved steel bar of the upper end of wall column, and reinforcing bar connection is carried out, the butted part formed by integrally casting of horizontal structure and upper and lower prefabricated wall column It forms, the top of concrete of the prefabricated wall column in lower section is close to the lower surface of the horizontal structure.Due to pre- in each upper and lower When wall column processed is attached, therefore one layer of horizontal structure of all constructing simultaneously only needs one between each layer, that is, adjacent level structure The connection of secondary dry wall intercolumniation is effectively reduced compared to the way of dry wall intercolumniation connection twice in Normal practice, that is, each layer The use dosage of the steel such as sleeve, reduces construction cost.
(3) prefabrication and assembly construction rate of the invention is higher, and prefabricated wall column can be prefabricated in advance, does not account for the duration, high in machining efficiency, energy It is enough effectively to accelerate construction progress.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the prefabricated wall column one-part form steel bar connecting structure of one embodiment of the invention;
Fig. 2 is the structural schematic diagram of the prefabricated wall column one-part form steel bar connecting structure of one embodiment of the invention;
In figure: the prefabricated wall column of 1-, 2- reserved steel bar, 3- sleeve, 4 horizontal structure reinforcing bars, 5- horizontal structure.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.According to following explanation and right Claim, advantages and features of the invention will become apparent from.This hair will be described in detail by cited embodiment combination attached drawing below Bright technology contents and feature.Need in addition it illustrate, attached drawing is all made of very simplified form and uses non-accurate ratio Example, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.For sake of convenience, "upper" described below, "lower" is consistent with the upper and lower direction of attached drawing, but this can't be the limitation of technical solution of the present invention.
Embodiment one
Referring to Fig. 1, Fig. 1 is the structural representation of the 1 one-part form steel bar connecting structure of prefabricated wall column of one embodiment of the invention Figure.It is each pre- present embodiment discloses a kind of prefabricated 1 one-part form steel bar connecting structure of wall column, including the prefabricated wall column 1 of upper and lower Reserved steel bar 2 is arranged in a staggered manner in the upper and lower end of wall column 1 processed respectively, and the top of the reserved steel bar 2 of the upper end of the prefabricated wall column 1 is set Have external screw thread (not shown) and be threadedly coupled a sleeve 3, the sleeve 3 up and down, the lower end of the sleeve 3 open up for The internal screw thread (not shown) that the reserved steel bar 2 of prefabricated wall column 1 is threadedly coupled opens up one on the upper end barrel of the sleeve 3 One end of sleeve 3 is arranged on two prefabricated wall columns 1 respectively upward for grout hole (not shown), the lower end of the prefabricated wall column 1 in top it is pre- It stays reinforcing bar 2 to be inserted in the sleeve 3 of the upper end of the prefabricated wall column 1 in lower section, is in the milk in the sleeve 3 by the grout hole, upper, The butted part concreting of the prefabricated wall column 1 in lower section.The present invention not only realizes the convenience of two prefabricated wall columns 1 using sleeve 3 Connection, and being reliably connected for two prefabricated wall columns 1 can be improved, one end, that is, lower end of sleeve 3 and a prefabricated wall column 1 are that lower section is pre- The reserved steel bar 2 of wall column 1 processed is bolted, and the other end, that is, upper end of sleeve 3 is the prefabricated wall column 1 in top for another prefabricated wall column 1 Reserved steel bar 2 be inserted into and by grouting connection, effectively increase the strength and stiffness connected between reinforcing bar i.e. reinforcing bar, a side Face ensure that the safety of structure, on the other hand, avoids the toxic and harmful gas generated using electric welding connection, has ensured constructor The working security of member.
It preferably, further include horizontal structure reinforcing bar 4 in above-mentioned 1 one-part form steel bar connecting structure of prefabricated wall column, it is described Horizontal structure reinforcing bar 4 is before the butted part of the prefabricated wall column 1 of upper and lower pours, across the reserved of the upper end of the prefabricated wall column 1 in lower section Reinforcing bar 2, and reinforcing bar connection is carried out, horizontal structure 5 and the butted part formed by integrally casting of upper and lower prefabricated wall column 1 form, i.e. in Fig. 1 Dotted portion formed by integrally casting form, the top of concrete of the prefabricated wall column 1 in lower section is close to the following table of the horizontal structure 5 Face.Due to one layer of horizontal structure 5 of when the prefabricated wall column 1 of each upper and lower is attached, all constructing simultaneously, therefore, each layer is The connection (i.e. reinforcing bar one-part form connects) between primary prefabricated wall column 1 is only needed between adjacent level structure 5, is compared to Normal practice Way twice is connected in each layer between prefabricated wall column 1,3 dosage of sleeve is effectively reduced, reduces construction cost.
It is in the milk in sleeve 3 in order to as much as possible, it is preferred that connect knot in above-mentioned 1 one-part form reinforcing bar of prefabricated wall column In structure, the grout hole is located at the top of the barrel of the sleeve 3.
In order to provide enough operating spaces to construction personnel, it is preferred that connect in above-mentioned 1 one-part form reinforcing bar of prefabricated wall column In binding structure, the length in reserve of the reserved steel bar 2 is 500mm-1000mm.It is not needed when between the prefabricated wall column 1 of two docking When horizontal structure 5 is set, when the length in reserve of usual reserved steel bar 2 is 500mm or so, behaviour needed for construction personnel can be met Make space;When between the prefabricated wall column 1 of two docking needing that horizontal structure 5 is arranged, need to increase the level in reserved length The thickness of structure 5, at this point, generally reserved length is between 800mm-1000mm.
Please continue to refer to Fig. 1, the present embodiment also discloses a kind of 1 one-part form connecting method for reinforcing bars of prefabricated wall column, i.e., prefabricated The construction method of fabricated construction, using the 1 one-part form steel bar connecting structure of prefabricated wall column as described in embodiment one, including such as Lower step:
The first step, the prefabricated wall column 1 of first layer of constructing on the basis of wall column;
Second step lifts the prefabricated wall column 1 of the second layer, by the lower end as the prefabricated wall column 1 of the second layer of the prefabricated wall column 1 in top Sleeve 3 of the insertion of reserved steel bar 2 as the reserved steel bar 2 of the upper end of the prefabricated wall column 1 of first layer when front lower place dry wall column 1 It is interior, and using grouting material by reserving grout hole grouting construction in sleeve 3;
Third step passes through horizontal structure reinforcing bar 4 as the upper of the prefabricated wall column 1 of first layer when front lower place dry wall column 1 The reserved steel bar 2 at end, and carry out reinforcing bar connection;
4th step, Feng Mohou integrally pour the butted part of horizontal structure 5 and current upper and lower two prefabricated wall column 1 It builds.
5th step repeats second step to the 4th step, constructs upwards in turn, until completing the construction of all prefabricated wall columns 1 of layer.
On the one hand, reinforcing bar is connected using sleeve 3 between prefabricated wall column 1 of the invention, one end of sleeve 3 and a prefabricated wall column 1 reserved steel bar 2 is bolted, and the other end of sleeve 3 is inserted into for the reserved steel bar 2 of another prefabricated wall column 1 and is connected by grouting It connects, improves the strength and stiffness connected between reinforcing bar, ensure that the safety of structure, and avoid using electric welding connection generation Toxic and harmful gas ensures the working security of construction personnel, is conducive to environmental protection.
On the other hand, the present invention is in each two neighboring prefabricated wall column 1 connection, while carrying out the construction of horizontal structure 5, Therefore, the connection (i.e. reinforcing bar one-part form connects) between primary prefabricated wall column 1 is only needed between each layer, that is, adjacent level structure 5, Compared to the way connected between prefabricated wall column 1 in each layer of Normal practice twice, 3 dosage of sleeve is effectively reduced, construction is reduced Cost.In addition, prefabricated wall column 1 can be prefabricated in advance in the present invention, do not account for the duration, it is high in machining efficiency, it can effectively accelerate to construct Progress.
Preferably, in the first step, be staggered reserved reinforcement foundation on the basis of the wall column, the top spiral shell of reinforcement foundation Line connects a sleeve 3 as described above, and the reserved steel bar 2 of the lower end of the prefabricated wall column 1 of first layer is inserted into the set of the reinforcement foundation In cylinder 3, the grouting construction in the sleeve 3 of the reinforcement foundation, after grouting, to pair of the prefabricated wall column of first layer 1 and wall column basis It is poured after socket part enfeoffment mould.It is constructed and is finished together with wall column basis in advance due to bottom plate, in the prefabricated wall column of first layer When being attached between 1 and wall column basis, the construction for carrying out horizontal structure 5 is not needed.
Preferably, after the 5th step, roof steel bar is passed through to the pre- of the upper end for being currently located at the prefabricated wall column 1 of the top Reinforcing bar 2 is stayed, reinforcing bar connection is carried out, Feng Mohou pours top plate.In this way, the top plate i.e. horizontal junction of top layer can be completed The construction of structure is reliably connected so that being formed between top plate and the prefabricated wall column 1 of the top.
In the present embodiment, the prefabricated wall column 1 is prefabricated post.Certainly, the prefabricated wall column 1 is also possible to dry wall, such as Shown in Fig. 2.It is to reserve steel plate between floor, prefabricated panel compared to existing conventional precast wall body connection method, then uses Bolt carries out being mechanically connected or using electric welding connection, and the precast wall body between adjacent level structure at least needs to connect twice to apply Work, not only time-consuming and laborious, the usage amount of corresponding steel plate is larger, causes the problem that cost is excessively high, between prefabricated wall column of the invention Reinforcing bar uses sleeve connection, and one end, that is, lower end of sleeve and a prefabricated wall column are that the reserved steel bar bolt of the prefabricated wall column in lower section connects It connects, the other end, that is, upper end of sleeve, which is inserted into for the reserved steel bar that another prefabricated wall column is the prefabricated wall column in top and passes through grouting, to be connected It connects, improves the strength and stiffness connected between reinforcing bar, ensure that the safety of structure, and avoid using electric welding connection generation Toxic and harmful gas ensures the working security of construction personnel, is conducive to environmental protection.
In addition, for horizontal structure reinforcing bar of the invention before the butted part of the prefabricated wall column of upper and lower pours, it is pre- to pass through lower section The reserved steel bar of the upper end of wall column processed, and reinforcing bar connection is carried out, the butted part of horizontal structure and upper and lower prefabricated wall column integrally pours It builds, the top of concrete of the prefabricated wall column in lower section is close to the lower surface of the horizontal structure.Due in each upper and lower When prefabricated wall column is attached, therefore one layer of horizontal structure of all constructing simultaneously only needs between each layer, that is, adjacent level structure The connection of dry wall intercolumniation is effectively reduced compared to the way of dry wall intercolumniation connection twice in Normal practice, that is, each layer The use dosage of the steel such as sleeve, reduces construction cost.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (7)

1. a kind of prefabricated wall column one-part form connecting method for reinforcing bars, which is characterized in that using a prefabricated wall column one-part form reinforcing bar connection Structure includes the following steps:
The first step, the prefabricated wall column of first layer of constructing on the basis of wall column;
Second step lifts the prefabricated wall column of the second layer, and steel is reserved in the lower end as the prefabricated wall column of the second layer of the prefabricated wall column in top In sleeve of the muscle insertion as the reserved steel bar of the upper end of the prefabricated wall column of first layer when front lower place dry wall column, and using grouting Material is by reserving grout hole grouting construction in the sleeve;
Horizontal structure reinforcing bar is passed through the reserved of the upper end as the prefabricated wall column of first layer when front lower place dry wall column by third step Reinforcing bar, and carry out reinforcing bar connection;
4th step, Feng Mohou carry out formed by integrally casting to the butted part of horizontal structure and current upper and lower two prefabricated wall column;
5th step repeats second step to the 4th step, constructs upwards in turn, until completing the construction of all prefabricated wall columns of layer;
The prefabricated wall column one-part form steel bar connecting structure, including the prefabricated wall column of upper and lower, the upper and lower end of each prefabricated wall column Reserved steel bar is arranged in a staggered manner respectively, which is characterized in that the top of the reserved steel bar of the upper end of the prefabricated wall column is equipped with external screw thread And it is threadedly coupled a sleeve, up and down, the lower end of the sleeve is opened up for connecting with the reserved steel bar screw thread sleeve The internal screw thread connect, a grout hole is opened up on the upper end barrel of the sleeve, and the reserved steel bar of the lower end of the prefabricated wall column in top is planted In in the sleeve of the upper end of the prefabricated wall column in lower section, it is in the milk in the sleeve by the grout hole, the prefabricated wall column of upper and lower Butted part concreting further includes horizontal structure reinforcing bar, pair of the horizontal structure reinforcing bar in the prefabricated wall column of upper and lower Before socket part point pours, the reserved steel bar across the upper end of the prefabricated wall column in lower section, and carry out reinforcing bar connection, horizontal structure and upper and lower The butted part formed by integrally casting of prefabricated wall column forms, and the top of concrete of the prefabricated wall column in lower section is close to the horizontal structure Lower surface.
2. prefabricated wall column one-part form connecting method for reinforcing bars as described in claim 1, which is characterized in that in the first step, described Be staggered reserved reinforcement foundation on the basis of wall column, and the screw top of reinforcement foundation connects a sleeve as described above, and first layer is prefabricated The reserved steel bar of the lower end of wall column is inserted into the sleeve of the reinforcement foundation, the grouting construction in the sleeve of the reinforcement foundation, After grouting, to being poured after the prefabricated wall column of first layer and the docking section enfeoffment mould on wall column basis.
3. prefabricated wall column one-part form connecting method for reinforcing bars as described in claim 1, which is characterized in that, will after the 5th step Roof steel bar passes through the reserved steel bar for being currently located at the upper end of prefabricated wall column of the top, carries out reinforcing bar connection, Feng Mohou, to top Plate is poured.
4. prefabricated wall column one-part form connecting method for reinforcing bars as described in claim 1, which is characterized in that the grout hole is located at institute State the top of the barrel of sleeve.
5. prefabricated wall column one-part form connecting method for reinforcing bars as described in claim 1, which is characterized in that the reserved steel bar it is pre- Staying length is 500mm-1000mm.
6. prefabricated wall column one-part form connecting method for reinforcing bars as described in claim 1, which is characterized in that the prefabricated wall column is pre- Wall processed.
7. prefabricated wall column one-part form connecting method for reinforcing bars as described in claim 1, which is characterized in that the prefabricated wall column is pre- Column processed.
CN201610191697.4A 2016-03-30 2016-03-30 Prefabricated wall column one-part form steel bar connecting structure and method Active CN105735466B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610191697.4A CN105735466B (en) 2016-03-30 2016-03-30 Prefabricated wall column one-part form steel bar connecting structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610191697.4A CN105735466B (en) 2016-03-30 2016-03-30 Prefabricated wall column one-part form steel bar connecting structure and method

Publications (2)

Publication Number Publication Date
CN105735466A CN105735466A (en) 2016-07-06
CN105735466B true CN105735466B (en) 2018-12-18

Family

ID=56252507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610191697.4A Active CN105735466B (en) 2016-03-30 2016-03-30 Prefabricated wall column one-part form steel bar connecting structure and method

Country Status (1)

Country Link
CN (1) CN105735466B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703291A (en) * 2016-11-30 2017-05-24 上海建工二建集团有限公司 Joint pouring structure between prefabricated columns and construction method thereof
CN108204131A (en) * 2016-12-16 2018-06-26 李聪 A kind of prefabricated partition wall construction method
CN107975151A (en) * 2017-12-29 2018-05-01 广东省建筑科学研究院集团股份有限公司 The strong ties of first floor vertical member and basement roof construct and construction method
CN109487955A (en) * 2018-02-13 2019-03-19 浙江中成建工集团有限公司 A kind of precast concrete column in-situ cast-in-place construction method
CN110005135B (en) * 2019-04-30 2023-06-06 广东铝遊家科技有限公司 Multi-layer modularized house support column connection structure and connection method
CN112411887B (en) * 2020-11-27 2022-04-29 湖南大学 Preparation method of multistage embedded prefabricated part of steel bar grouting sleeve connecting joint
CN112627387A (en) * 2020-12-29 2021-04-09 中国建筑第七工程局有限公司 Rib-free type side connection method for prefabricated external wall panel
CN113047530A (en) * 2021-05-17 2021-06-29 吉林建筑大学设计研究院有限责任公司 Vertical steel bar connecting sleeve and connecting method of concrete member or finished steel bar cage
CN114718269B (en) * 2022-04-02 2023-09-08 中能建路桥工程有限公司 Building insulation board positioning and mounting device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425310A (en) * 2011-12-15 2012-04-25 中国二十二冶集团有限公司 Assembly-type residential shear wall structural wall body vertical connection construction method
CN103334497A (en) * 2013-06-17 2013-10-02 南京长江都市建筑设计股份有限公司 Connection method of scope system frame column steel bar
CN205557818U (en) * 2016-03-30 2016-09-07 上海建工二建集团有限公司 A prefabricated wall post segmentation steel bar connection structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011017208A (en) * 2009-07-10 2011-01-27 Takenaka Komuten Co Ltd Method of manufacturing precast concrete member, precast concrete member, and form for guide surface molding

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425310A (en) * 2011-12-15 2012-04-25 中国二十二冶集团有限公司 Assembly-type residential shear wall structural wall body vertical connection construction method
CN103334497A (en) * 2013-06-17 2013-10-02 南京长江都市建筑设计股份有限公司 Connection method of scope system frame column steel bar
CN205557818U (en) * 2016-03-30 2016-09-07 上海建工二建集团有限公司 A prefabricated wall post segmentation steel bar connection structure

Also Published As

Publication number Publication date
CN105735466A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN105735466B (en) Prefabricated wall column one-part form steel bar connecting structure and method
CN107700361B (en) A kind of dumb-bell shape grout sleeve and the method for carrying out assembly construction with the grout sleeve
CN207700443U (en) Exterior wall plate level has muscle grouted joint structure at a kind of fabricated shear wall architecture storey
CN107023121A (en) A kind of reinforcing bar grout sleeve connected for prefabricated concrete structure ductility
CN102691365B (en) Connecting structure for assembly type concrete shear wall edge member
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN107100290A (en) A kind of prefabricated shear wall and overlapping plate node
CN207003652U (en) A kind of compound concrete-filled tubular column and steel tube concrete beam composite frame structure
CN106968381A (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN105926775A (en) Novel concrete-filled steel tube beam column joint
CN106088327A (en) Manufacture method based on the assembling frame post that 3D prints
CN206873767U (en) A kind of reinforcing bar grout sleeve for the connection of prefabricated concrete structure ductility
CN106400982A (en) Stirrup-densified splicing joint for fabricated reinforced concrete columns
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN202611012U (en) Assembly type concrete shear wall edge member connection structure
CN205976072U (en) Assembly type structure wall body and prefabricated concrete structure
CN109812620A (en) Primary concreting large-diameter steel pipe concrete pack method
CN108708452A (en) The U-shaped integral prefabricated window member that floats, assembled float window joint structure and its construction method
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN103758207B (en) Semi-prefabricated semi-cast-in-place type frame structure of integrated building and construction method thereof
CN203684457U (en) Light assembled shear wall structure
CN206844316U (en) A kind of assembled steel reinforced concrete column with well and post splicing node
CN205654090U (en) Entrance to a cave strutting arrangement is reserved to floor
CN106703015A (en) Steel plate concrete prefabricated part, permanent-temporary combined underground enclosure system and construction methods

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant