CN112411887B - A kind of preparation method of multi-stage pre-embedded prefabricated component of steel bar grouting sleeve connection joint - Google Patents
A kind of preparation method of multi-stage pre-embedded prefabricated component of steel bar grouting sleeve connection joint Download PDFInfo
- Publication number
- CN112411887B CN112411887B CN202011362437.1A CN202011362437A CN112411887B CN 112411887 B CN112411887 B CN 112411887B CN 202011362437 A CN202011362437 A CN 202011362437A CN 112411887 B CN112411887 B CN 112411887B
- Authority
- CN
- China
- Prior art keywords
- guide cylinder
- grouting sleeve
- sleeve
- embedded
- grouting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 46
- 239000010959 steel Substances 0.000 title claims abstract description 46
- 238000002360 preparation method Methods 0.000 title claims description 3
- 238000000034 method Methods 0.000 claims abstract description 21
- 239000004567 concrete Substances 0.000 claims abstract description 18
- 238000002955 isolation Methods 0.000 claims description 11
- 239000000463 material Substances 0.000 claims description 8
- 238000004519 manufacturing process Methods 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 8
- 239000011178 precast concrete Substances 0.000 description 5
- 239000004020 conductor Substances 0.000 description 2
- 238000000605 extraction Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000004743 Polypropylene Substances 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- -1 polypropylene Polymers 0.000 description 1
- 229920001155 polypropylene Polymers 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明提供了一种钢筋灌浆套筒连接接头多级预埋预制构件的制备方法,包括以下步骤:制备台模,在台模内设置钢筋(10);在钢筋底端连接灌浆套筒(8),在部分灌浆套筒(8)底部设置磁性导筒使得灌浆套筒(8)位置不在同一高度,错开预埋灌浆套筒(8);灌浆套筒(8)预埋位置设置好之后,浇筑混凝土;混凝土凝固之后,抽出磁性导筒,灌浆套筒(8)底部形成与外部连通的空腔,得到钢筋灌浆套筒连接接头多级预埋预制构件,磁性导筒循环利用。该方法可以很好的实现预制剪力墙的竖向错位连接,满足规定要求,而且施工方式简单,拆卸方便,磁性导筒可以回收利用。
The invention provides a method for preparing a multi-stage pre-embedded prefabricated component of a steel bar grouting sleeve connecting joint, comprising the following steps: preparing a table mold, arranging steel bars (10) in the table mold; connecting a grouting sleeve (8) at the bottom end of the steel bar ), set a magnetic guide tube at the bottom of part of the grouting sleeve (8) so that the position of the grouting sleeve (8) is not at the same height, and stagger the pre-embedded grouting sleeve (8); after the pre-embedded position of the grouting sleeve (8) is set, Concrete is poured; after the concrete is solidified, the magnetic guide cylinder is drawn out, and the bottom of the grouting sleeve (8) forms a cavity connected with the outside, and the multi-stage pre-embedded prefabricated component of the connection joint of the reinforced grouting sleeve is obtained, and the magnetic guide cylinder is recycled. The method can well realize the vertical dislocation connection of the prefabricated shear wall, which meets the specified requirements, and the construction method is simple, the disassembly is convenient, and the magnetic guide tube can be recycled.
Description
技术领域technical field
本发明涉及装配式建筑领域,具体涉及一种钢筋灌浆套筒连接接头多级预埋预制构件的制备方法。The invention relates to the field of prefabricated buildings, in particular to a preparation method of a multi-stage pre-embedded prefabricated component of a steel grouting sleeve connection joint.
背景技术Background technique
我国《混凝土结构设计规范》GB50010对钢筋混凝土结构的钢筋连接要求在同一连接区段内的受拉钢筋搭接接头面积百分率要求如下:对墙类构件,不宜大于25%;对柱类构件,不宜大于50%,对墙、柱及预制构件的拼接处可适当放宽。目前,装配式竖向受力预制混凝土构件半灌浆套筒连接钢筋接头一般预埋设置在竖向预制构件的框架柱或剪力(抗震)墙的同一连接区段内,在反复水平荷载作用下,特别在地震荷载作用下,若个别钢筋半套筒灌浆连接接头出现失效,将给该截面其他钢筋半套筒灌浆连接接头带来失效的巨大压力,从而给竖向受力预制构件带来连续破坏的风险。因此,装配式剪力墙或框架柱等竖向受力预制混凝土构件半灌浆套筒的钢筋连接方式不能满足我国《混凝土结构设计规范》GB50010对钢筋连接在同一连接区段内的受拉钢筋搭接接头面积百分率的规定要求。my country's "Code for Design of Concrete Structures" GB50010 requires the steel bar connection of reinforced concrete structures. The requirements for the area percentage of lap joints in the same connection section are as follows: for wall components, it should not be greater than 25%; for column components, it should not be more than 25%. More than 50%, the splicing of walls, columns and prefabricated components can be appropriately relaxed. At present, the semi-grouting sleeve connection steel joints of prefabricated vertical precast concrete members are generally embedded in the same connection section of the frame columns or shear (seismic) walls of the vertical precast members. Under the action of repeated horizontal loads , especially under the action of earthquake load, if the individual steel half-sleeve grouting connection joint fails, it will bring huge pressure of failure to the other steel half-sleeve grouting connection joints in the section, thus bringing continuous continuous force to the vertically stressed prefabricated components. risk of destruction. Therefore, the steel bar connection method of the semi-grouting sleeves of vertical precast concrete members such as fabricated shear walls or frame columns cannot meet the requirements of my country's "Code for Design of Concrete Structures" GB50010. The specified requirements for the percentage of joint area.
受拉钢筋搭接接头是目前装配式剪力墙或框架柱等竖向受力预制构件的构造处理难点问题之一,预制剪力墙的竖向错位连接结构(专利授权公告号:CN 210827921 U)采用半灌浆套筒与长套筒实现竖向钢筋错位连接,该方法需要对半灌浆套筒和长套筒的连接进行加工,长套筒直接预埋在预制剪力墙中,加工和安装对中较麻烦,成本较高。The lap joint of tension steel bars is one of the difficult problems in the structural treatment of prefabricated shear walls or frame columns and other vertical prefabricated components. ) Using the semi-grouting sleeve and the long sleeve to realize the vertical dislocation connection of steel bars, this method needs to process the connection between the semi-grouting sleeve and the long sleeve, and the long sleeve is directly embedded in the prefabricated shear wall, processing and installation The alignment is more troublesome and the cost is higher.
发明内容SUMMARY OF THE INVENTION
针对现有技术的不足,本发明的目的是提供一种钢筋灌浆套筒连接接头多级预埋预制构件的制备方法,通过设置可拆卸的磁性导筒,可以很好的实现预制剪力墙的竖向错位连接,满足我国《混凝土结构设计规范》GB50010对钢筋连接在同一连接区段内的受拉钢筋搭接接头面积百分率的规定要求,而且施工方式简单,磁性导筒可以回收利用。In view of the deficiencies of the prior art, the purpose of the present invention is to provide a method for preparing a multi-stage pre-embedded prefabricated member of a reinforced grouting sleeve connection joint. The vertical dislocation connection meets the requirements of GB50010 of my country's "Code for Design of Concrete Structures" on the area percentage of the lap joints where the steel bars are connected in the same connection section, and the construction method is simple, and the magnetic guide tube can be recycled.
本发明的方法能克服背景中的缺陷,同时,也可以用于预制框架混凝土柱中,在结构设计层面上可有效解决预制构件的框架柱或剪力(抗震)墙受力纵筋在同一连接区段内钢筋搭接接头问题,提高装配式结构的抗震性能和抗连续倒塌性能及结构的可靠性;在施工层面上该方法操作简单,成本低廉。The method of the invention can overcome the defects in the background, and at the same time, it can also be used in prefabricated frame concrete columns, and can effectively solve the problem that the frame columns of prefabricated components or the longitudinal reinforcement of shear force (seismic) walls are connected in the same connection at the structural design level. The problem of lap joints of steel bars in the section improves the seismic performance and continuous collapse resistance of the fabricated structure and the reliability of the structure; on the construction level, the method is simple to operate and low in cost.
为实现上述发明目的,本发明的技术方案是:In order to realize the above-mentioned purpose of the invention, the technical scheme of the present invention is:
一种钢筋灌浆套筒连接接头多级预埋预制构件的制备方法,包括以下步骤:A method for preparing a multi-stage pre-embedded prefabricated component for connecting a joint of a steel grouting sleeve, comprising the following steps:
步骤一:制备台模,在台模内设置钢筋;Step 1: Prepare a table mold, and set steel bars in the table mold;
步骤二:在钢筋底端连接灌浆套筒,在部分灌浆套筒底部设置磁性导筒使得灌浆套筒位置不在同一高度,错开预埋灌浆套筒;所述磁性导筒包括导筒本体,所述导筒本体分为导筒下部和导筒上部连接段,导筒上部连接段的外径小于所述导筒下部的外径;所述磁性导筒还包括限位环片、磁铁环和隔离薄膜套,所述磁铁环套接在导筒上部连接段外周,且位于导筒下部和导筒上部连接段连接处,所述限位环片设置在磁铁环上方,用于固定磁铁环;所述隔离薄膜套设置在导筒下部和导筒上部连接段外周;所述导筒上部连接段与灌浆套筒连接,且两者之间通过隔离薄膜套隔开;Step 2: Connect a grouting sleeve at the bottom end of the steel bar, set a magnetic guide cylinder at the bottom of part of the grouting sleeve so that the position of the grouting sleeve is not at the same height, and stagger the pre-embedded grouting sleeve; the magnetic guide cylinder includes a guide cylinder body, and the The main body of the guide cylinder is divided into the lower part of the guide cylinder and the upper part of the guide cylinder, and the outer diameter of the upper part of the guide cylinder is smaller than the outer diameter of the lower part of the guide cylinder; the magnetic guide cylinder also includes a limit ring piece, a magnet ring and an isolation film The magnet ring is sleeved on the outer periphery of the upper connecting section of the guide cylinder, and is located at the connection between the lower part of the guide cylinder and the upper connecting section of the guide cylinder, and the limiting ring piece is arranged above the magnet ring for fixing the magnet ring; the The isolating film sleeve is arranged on the outer periphery of the lower part of the guide cylinder and the upper connecting section of the guide cylinder; the upper connecting section of the guide cylinder is connected with the grouting sleeve, and the two are separated by the isolating film sleeve;
步骤三:灌浆套筒预埋位置设置好之后,浇筑混凝土;Step 3: After the pre-embedded position of the grouting sleeve is set, pour the concrete;
步骤四:混凝土凝固之后,抽出磁性导筒,灌浆套筒底部形成与外部连通的空腔,得到钢筋灌浆套筒连接接头多级预埋预制构件,磁性导筒循环利用。Step 4: After the concrete is solidified, the magnetic guide tube is drawn out, and the bottom of the grouting sleeve forms a cavity connected with the outside, and the multi-stage embedded prefabricated component of the connection joint of the reinforced grouting sleeve is obtained, and the magnetic guide tube is recycled.
优选的,所述导筒上部连接段设有与灌浆套筒内部形状匹配的螺纹连接结构。Preferably, the upper connecting section of the guide cylinder is provided with a threaded connection structure matching the internal shape of the grouting sleeve.
优选的,所述导筒下部、限位环片和磁铁环外径相同。Preferably, the outer diameter of the lower part of the guide cylinder, the limiting ring piece and the magnet ring are the same.
优选的,所述导筒下部直径与半灌浆套筒外径一致,导筒上部连接段直径与灌浆套筒的内径之间留有一定的间隙,用于设置隔离薄膜套。Preferably, the diameter of the lower part of the guide cylinder is the same as the outer diameter of the semi-grouting sleeve, and a certain gap is left between the diameter of the upper connecting section of the guide cylinder and the inner diameter of the grouting sleeve for setting the isolation film sleeve.
优选的,所述导筒上部连接段与套筒内剪力键之间间隙不超过1mm,所述导筒下部的长度、导筒上部连接段的长度和直径以及导筒的布置,可根据设计需要来确定。Preferably, the gap between the upper connecting section of the guide cylinder and the shear key in the sleeve is not more than 1 mm, and the length of the lower part of the guide cylinder, the length and diameter of the upper connecting section of the guide cylinder, and the arrangement of the guide cylinder can be designed according to the design. need to be sure.
优选的,套筒内剪力键为公知常识。Preferably, the shear key in the sleeve is common knowledge.
优选的,所述导筒上部连接段的底部设有拆卸用预留螺孔。当导筒拆卸时,用拆卸用螺栓与拆卸用预留螺孔连接,方便导筒拆卸。Preferably, the bottom of the upper connecting section of the guide cylinder is provided with reserved screw holes for disassembly. When the guide cylinder is dismantled, use the dismantling bolts to connect with the reserved screw holes for dismantling, so as to facilitate the dismantling of the guide cylinder.
导筒与套筒连接端具有磁性,以便和套筒形成可拆卸的稳固连接,在进行灌浆连接操作时辅助形成密闭腔室。The connecting end of the guide cylinder and the sleeve is magnetic, so as to form a detachable and stable connection with the sleeve, and assist in forming a closed chamber during the grouting connection operation.
导筒外部包有隔离薄膜套,使得灌浆料初凝后导筒可以抽出循环利用,所述隔离薄膜套的材料要求与制作要求一致。The outside of the guide cylinder is covered with an isolation film sleeve, so that the guide cylinder can be drawn out and recycled after the initial setting of the grouting material. The material requirements of the isolation film sleeve are consistent with the production requirements.
一种钢筋灌浆套筒连接接头多级预埋连接结构,包括预制构件混凝土、预制构件中钢筋和灌浆套筒,所述钢筋底端与灌浆套筒连接,其特征是,还包括磁性导筒,所述磁性导筒连接在灌浆套筒下方将灌浆套筒设置在预制构件混凝土内的不同高度位置。A multi-stage pre-embedded connection structure of a steel bar grouting sleeve connection joint, comprising a prefabricated component concrete, reinforcing bars in the prefabricated component, and a grouting sleeve, the bottom end of the reinforcing bar is connected to the grouting sleeve, and characterized in that it also includes a magnetic guide cylinder, The magnetic guide cylinder is connected under the grouting sleeve to set the grouting sleeve at different height positions in the concrete of the prefabricated component.
优选的,所述磁性导筒沿灌浆套筒的高度与布置,可根据设计需要来确定。Preferably, the height and arrangement of the magnetic guide cylinders along the grouting sleeve can be determined according to design requirements.
本发明的关键点有:The key points of the present invention are:
该方法通过安装不同长度磁性导筒可将半灌浆套筒放置到设计需要的截面上,从而达到装配式预制混凝土构件半灌浆套筒连接钢筋接头能够满足对钢筋连接在同一连接区段内的受拉钢筋搭接接头面积百分率的设计要求。In this method, the semi-grouting sleeve can be placed on the section required by the design by installing magnetic guide cylinders of different lengths, so that the semi-grouting sleeve of the prefabricated concrete member can connect the steel bar joints to meet the requirements of the steel bars connected in the same connection section. Design requirements for area percentage of lap joints for tension bars.
该方法设计了一套可拆卸的导筒,导筒通过固定磁环吸附在灌浆套筒上,套筒与混凝土接触外表面用聚丙(乙)烯纤维布或其他类似的材料包裹导筒,以便导筒拆卸。This method designs a set of detachable guide cylinders, which are adsorbed on the grouting sleeve through a fixed magnetic ring. Guide barrel removal.
本发明的优势是:The advantages of the present invention are:
1、不需要对半灌浆套筒进行任何加工处理,通过可拆卸的不同长度磁性导筒将半灌浆套筒钢筋放置在设计需要的截面上。通过使用不同长度磁性导筒可将半灌浆套筒放置到设计需要的截面上,可实现装配式预制混凝土构件半灌浆套筒连接钢筋接头分多级安装到设计需要的截面上。1. There is no need to perform any processing on the semi-grouting sleeve, and the steel bars of the semi-grouting sleeve are placed on the section required by the design through detachable magnetic guide cylinders of different lengths. By using different lengths of magnetic guide cylinders, the semi-grouting sleeve can be placed on the section required by the design, and the prefabricated precast concrete component half-grouting sleeve connecting the steel bar joints can be installed on the section required by the design in multiple stages.
2、通过错开钢筋连接接头的位置,能有效改善了装配式结构的抗震性能和抗连续倒塌性能,提高了结构的可靠性。2. By staggering the positions of the steel bar connection joints, the seismic performance and continuous collapse resistance of the fabricated structure can be effectively improved, and the reliability of the structure can be improved.
3、通过抽出磁性导筒形成的内腔,可解决不同高度的套筒灌浆困难的问题。3. By pulling out the inner cavity formed by the magnetic guide cylinder, the problem of difficult grouting of sleeves with different heights can be solved.
4、使用的磁性导筒可循环利用,成本较低,制作加工工序简单,价格便宜,导筒安装和拆卸操作简单,可重复使用。4. The magnetic guide tube used can be recycled, the cost is low, the manufacturing process is simple, the price is cheap, the installation and removal of the guide tube is simple, and it can be reused.
附图说明Description of drawings
图1为磁性导筒结构示意图;Fig. 1 is the structural schematic diagram of magnetic guide cylinder;
图2为磁性导筒与半灌浆套筒连接示意图;Figure 2 is a schematic diagram of the connection between the magnetic guide cylinder and the semi-grouting sleeve;
图3是现有技术套筒按一排布置示意图;Figure 3 is a schematic diagram of prior art sleeves arranged in a row;
图4是套筒按两排布置示意图;Figure 4 is a schematic diagram of the arrangement of sleeves in two rows;
图5是套筒按三排布置示意图;Figure 5 is a schematic diagram of the arrangement of sleeves in three rows;
图6是套筒钢筋连接接头示意图;Figure 6 is a schematic diagram of a sleeve steel bar connecting joint;
其中, 1─磁性导筒下部,2─磁性导筒上部连接段,3─限位环片,4─磁铁环,5─拆卸用预留螺孔,6─拆卸用螺栓,7─隔离薄膜套,8─灌浆套筒,9─预制构件混凝土, 10─钢筋。Among them, 1─the lower part of the magnetic guide cylinder, 2─the upper connecting section of the magnetic guide cylinder, 3─limiting ring piece, 4─magnet ring, 5─reserved screw holes for disassembly, 6─removal bolts, 7─isolation film sleeve , 8 ─ grouting sleeve, 9 ─ precast concrete, 10 ─ steel.
具体实施方式Detailed ways
以下结合附图和具体实施方式对本发明的详细结构作进一步描述。The detailed structure of the present invention will be further described below with reference to the accompanying drawings and specific embodiments.
一种钢筋灌浆套筒连接接头多级预埋预制构件的制备方法,包括以下步骤:A method for preparing a multi-stage pre-embedded prefabricated component for connecting a joint of a steel grouting sleeve, comprising the following steps:
(1)制备台模,在台模内设置钢筋10;(1) Prepare a table mold, and set
(2)在钢筋底端连接灌浆套筒8,在部分灌浆套筒8底部设置磁性导筒使得灌浆套筒8位置不在同一高度,错开预埋灌浆套筒8;所述磁性导筒包括导筒本体,所述导筒本体分为导筒下部1和导筒上部连接段2,导筒上部连接段2的外径小于所述导筒下部1的外径;所述磁性导筒还包括限位环片3、磁铁环4和隔离薄膜套7,所述磁铁环4套接在导筒上部连接段2外周,且位于导筒下部1和导筒上部连接段2连接处,所述限位环片3设置在磁铁环4上方,用于固定磁铁环4;所述隔离薄膜套7设置在导筒下部1和导筒上部连接段2外周;所述导筒上部连接段2与灌浆套筒连接,且两者之间通过隔离薄膜套7隔开;(2) Connect the
(3)灌浆套筒8预埋位置设置好之后,浇筑混凝土;(3) After the pre-embedded position of the
(4)混凝土凝固之后,抽出磁性导筒,灌浆套筒8底部形成与外部连通的空腔,得到钢筋灌浆套筒连接接头多级预埋预制构件,磁性导筒循环利用。(4) After the concrete is solidified, the magnetic guide cylinder is drawn out, and the bottom of the
图1图2所示磁性导体结构示意图,磁性导体的下部直径与半灌浆套筒外径一致,上部直径与灌浆套筒的内径基本一致并留一定的间隙,材质可采用钢材或其他具有较好刚性的材料,下部表面光滑便于在构件中形成孔道和抽离,上部车有螺纹,磁铁环的内径略大于导筒上部杆的外径且不大于下部杆外径,能套于上部杆上且在导筒截面变阶处卡住,再用配套螺帽拧紧,将磁铁固定在导筒上。隔离薄膜套外表面要求好脱模,材质可采用聚丙乙烯纤维布或其他类似的材料。Figure 1 and Figure 2 show the schematic diagram of the structure of the magnetic conductor. The diameter of the lower part of the magnetic conductor is the same as the outer diameter of the semi-grouting sleeve, and the diameter of the upper part is basically the same as the inner diameter of the grouting sleeve with a certain gap. The material can be steel or other materials with better Rigid material, the lower surface is smooth to facilitate the formation of holes and extraction in the component, the upper part is threaded, the inner diameter of the magnet ring is slightly larger than the outer diameter of the upper rod of the guide cylinder and not larger than the outer diameter of the lower rod, and can be sleeved on the upper rod and It is stuck at the step change of the section of the guide cylinder, and then tightened with the matching nut to fix the magnet on the guide cylinder. The outer surface of the isolation film sleeve requires good mold release, and the material can be polypropylene fiber cloth or other similar materials.
图3为现阶段在施工过程中常采用的做法,将套筒布置在同一截面中,相当于钢筋都在同一连接区段内连接。Figure 3 shows a common practice in the construction process at this stage. The sleeves are arranged in the same section, which is equivalent to the steel bars being connected in the same connection section.
图4和图5即采用了本发明的设置结构,一种钢筋灌浆套筒连接接头多级预埋连接结构,包括预制构件混凝土9、预制构件中钢筋10和灌浆套筒8,所述钢筋10底端与灌浆套筒8连接,还包括磁性导筒,所述磁性导筒连接在灌浆套筒下方将灌浆套筒8设置在预制构件混凝土9内的不同高度位置。将套筒按两排或三排布置,各排间距按设计要求进行布置。通过将套筒埋设位置错开,达到使得钢筋接头位置错位的目的。Figures 4 and 5 adopt the setting structure of the present invention, a multi-level embedded connection structure of a steel bar grouting sleeve connection joint, including a
图6为套筒为三种不同布置深度时的设置结构图,为了使得内置的套筒在浇筑构件时能形成灌浆所需的空腔,通过与套筒一起预埋一个可抽离导筒的方式,在构件的浇筑过程中形成所需的孔道。导筒顶端为直径略小于套筒内径的直杆,直接伸入套筒内一定长度,在导筒截面变阶处设置有磁铁环,通过磁铁环使得导筒和套筒紧密连接,在进行构件浇筑时不至于脱开。在整个导筒的表面(包括伸入套筒部分),都包有一层隔离薄膜套,用于隔离导筒与构件混凝土,方便构件浇筑完成后抽出导筒。导筒的长度可以根据套筒的埋设深度确定。Figure 6 is a structural diagram of the arrangement when the sleeves are arranged at three different depths. In order to enable the built-in sleeve to form the cavity required for grouting when pouring components, a detachable guide cylinder can be pre-buried together with the sleeve. In this way, the desired channel is formed during the pouring process of the component. The top of the guide cylinder is a straight rod with a diameter slightly smaller than the inner diameter of the sleeve, which directly extends into the sleeve for a certain length. A magnet ring is arranged at the step change of the cross section of the guide cylinder. It won't come off when pouring. The entire surface of the guide cylinder (including the part extending into the sleeve) is covered with a layer of isolating film sleeve, which is used to isolate the guide cylinder from the concrete of the component, so as to facilitate the extraction of the guide cylinder after the component is poured. The length of the guide cylinder can be determined according to the embedded depth of the sleeve.
本发明提供了一种竖向受力预制构件制作时半灌浆套筒连接钢筋接头分级预埋设置结构,通过可拆卸的不同长度磁性导筒将连接钢筋的灌浆套筒错落地预埋在预制构件中,拆卸磁性导筒后形成的腔室既可导入下部预制构件的钢筋,又可与预制构件之间的灌浆腔室连通,从而解决了内置套筒灌浆现场装配施工的困难。由于灌浆套筒钢筋的连接接头可放置在设计需要的截面上,这样就避免了传统的竖向受力预制构件的钢筋半灌浆套筒连接接头将灌浆套筒统一预埋在构件边缘的做法,使得预制构件半灌浆套筒连接钢筋接头不在同一连接区段内,因此,本发明使得装配式竖向受力预制混凝土构件半灌浆套筒连接钢筋接头容易实现在同一连接区段内的受拉钢筋搭接接头面积百分率的设计要求。The invention provides a graded pre-embedding structure for semi-grouting sleeves connecting steel bar joints in the production of vertical force prefabricated components. The grouting sleeves connecting steel bars are staggered and pre-embedded in the prefabricated components through detachable magnetic guide tubes of different lengths. , the cavity formed after dismantling the magnetic guide cylinder can not only introduce the steel bars of the lower prefabricated components, but also communicate with the grouting chamber between the prefabricated components, thus solving the difficulty of on-site assembly and construction of the built-in sleeve grouting. Since the connecting joint of the grouting sleeve steel bar can be placed on the section required by the design, it avoids the traditional practice of pre-embedding the grouting sleeve at the edge of the component with the half-grouting sleeve connecting joint of the steel bar of the traditional vertically stressed prefabricated component. The prefabricated half-grouting sleeve connecting the steel bar joints is not in the same connection section, therefore, the present invention makes it easy to realize the tension steel bar in the same connecting section of the prefabricated vertical stress precast concrete component half-grouting sleeve connecting the steel bar joints Design requirements for area percentage of lap joints.
以上所述为本发明的具体实施方式,但本发明的保护范围不局限于此,任何熟悉技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其构思加以等同替换或改变,都应涵盖在本发明权利要求的保护范围之内。The above is the specific embodiment of the present invention, but the protection scope of the present invention is not limited to this, any person skilled in the art is within the technical scope disclosed by the present invention, according to the technical solution of the present invention and its concept to be equivalently replaced Or changes should be covered within the protection scope of the claims of the present invention.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011362437.1A CN112411887B (en) | 2020-11-27 | 2020-11-27 | A kind of preparation method of multi-stage pre-embedded prefabricated component of steel bar grouting sleeve connection joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011362437.1A CN112411887B (en) | 2020-11-27 | 2020-11-27 | A kind of preparation method of multi-stage pre-embedded prefabricated component of steel bar grouting sleeve connection joint |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112411887A CN112411887A (en) | 2021-02-26 |
CN112411887B true CN112411887B (en) | 2022-04-29 |
Family
ID=74843841
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011362437.1A Active CN112411887B (en) | 2020-11-27 | 2020-11-27 | A kind of preparation method of multi-stage pre-embedded prefabricated component of steel bar grouting sleeve connection joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112411887B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10046738A1 (en) * | 2000-09-21 | 2002-04-25 | Deha Ankersysteme | Coupling to connect reinforcing rod ends of concrete components has coupling section with external thread upon which is screwed conical clamping sleeve with widening conical bore to accommodate longitudinally slotted clamping cage |
CN104652467A (en) * | 2014-12-28 | 2015-05-27 | 中国二冶集团有限公司 | Construction method for reserved hole of equipment foundation bolt |
CN105735466A (en) * | 2016-03-30 | 2016-07-06 | 上海建工二建集团有限公司 | Prefabricated wall column one-segment type steel rib connection structure and method |
CN109083285A (en) * | 2018-10-09 | 2018-12-25 | 中铁隆昌铁路器材有限公司 | Conduit installation embedded sleeve barrel and conduit localization method |
CN209413001U (en) * | 2018-09-29 | 2019-09-20 | 宁波普利凯建筑科技有限公司 | A kind of rubber built-in fitting |
CN209855055U (en) * | 2019-02-28 | 2019-12-27 | 中建八局第三建设有限公司 | Be used for prefabricated wallboard and prefabricated post grout antidetonation sleeve subassembly |
CN210713237U (en) * | 2019-07-12 | 2020-06-09 | 湖南德立铁路桥工程材料有限公司 | Embedded sleeve combination |
CN210827921U (en) * | 2019-08-05 | 2020-06-23 | 中建科技有限公司 | Vertical dislocation connection structure of prefabricated shear wall |
-
2020
- 2020-11-27 CN CN202011362437.1A patent/CN112411887B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10046738A1 (en) * | 2000-09-21 | 2002-04-25 | Deha Ankersysteme | Coupling to connect reinforcing rod ends of concrete components has coupling section with external thread upon which is screwed conical clamping sleeve with widening conical bore to accommodate longitudinally slotted clamping cage |
CN104652467A (en) * | 2014-12-28 | 2015-05-27 | 中国二冶集团有限公司 | Construction method for reserved hole of equipment foundation bolt |
CN105735466A (en) * | 2016-03-30 | 2016-07-06 | 上海建工二建集团有限公司 | Prefabricated wall column one-segment type steel rib connection structure and method |
CN209413001U (en) * | 2018-09-29 | 2019-09-20 | 宁波普利凯建筑科技有限公司 | A kind of rubber built-in fitting |
CN109083285A (en) * | 2018-10-09 | 2018-12-25 | 中铁隆昌铁路器材有限公司 | Conduit installation embedded sleeve barrel and conduit localization method |
CN209855055U (en) * | 2019-02-28 | 2019-12-27 | 中建八局第三建设有限公司 | Be used for prefabricated wallboard and prefabricated post grout antidetonation sleeve subassembly |
CN210713237U (en) * | 2019-07-12 | 2020-06-09 | 湖南德立铁路桥工程材料有限公司 | Embedded sleeve combination |
CN210827921U (en) * | 2019-08-05 | 2020-06-23 | 中建科技有限公司 | Vertical dislocation connection structure of prefabricated shear wall |
Also Published As
Publication number | Publication date |
---|---|
CN112411887A (en) | 2021-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110259184B (en) | Column pulling construction method based on joist and column pulling combined supporting and jacking system | |
CN103790265B (en) | A kind of prefabricated assembled steel tube concrete core pillar is put more energy into the making assembly method of shear wall | |
KR101269639B1 (en) | The core-type sleeve of precast concrete for member of framework | |
CN105888108A (en) | Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall | |
WO2013119016A1 (en) | Arch block assembly, method for manufacturing same, and method for constructing same | |
CN109281438A (en) | Multilayer prefabricated post and construction method of the one-pass molding with bracket | |
ITRM20130600A1 (en) | METHOD TO IMPROVE THE STRUCTURAL STABILITY OF A BUILDING CONSTRUCTION | |
KR101652943B1 (en) | Reinforced concrete column manufacturing method for high building | |
CN112411887B (en) | A kind of preparation method of multi-stage pre-embedded prefabricated component of steel bar grouting sleeve connection joint | |
CN112324009A (en) | A kind of prefabricated concrete hollow thermal insulation wall structure and construction technology | |
CN105908899A (en) | Core-grouted assembly-type concrete column and construction method of same | |
KR102197106B1 (en) | Slab unit implanted with means for pressing pile and the method for carrying out the construction of the steel column using it | |
JP3342891B2 (en) | Construction method of horizontal beam erected on columnar structure | |
CN112873527A (en) | Manufacturing mold and method for supporting pile | |
KR102197107B1 (en) | Slab unit implanted with means for pressing pile and the method for carrying out the construction of the reinforced concrete column using it | |
CN111719411A (en) | Prefabricated hollow column structure and its forming method | |
CN111519899A (en) | Cast-in-place casting mold and casting body for prefabricated building and construction method thereof | |
CN106677133A (en) | Large-sized multi-rib precast aqueduct formwork anti-deformation supporting device and construction method | |
CN206512923U (en) | Multilayer prefabricated post of the one-shot forming with bracket | |
CN115595873A (en) | A prefabricated concrete bridge pier connected by outsourcing UHPC steel pipes and its construction method | |
CN209798804U (en) | assembled concrete-filled steel tube pile foundation | |
KR100747665B1 (en) | Slab formwork and slab construction method using the same | |
KR20090022451A (en) | Gangpom for underground wall and construction method of underground wall using the same | |
CN214302568U (en) | Magnetic guide cylinder and connecting structure for multistage pre-embedded arrangement of steel bar grouting sleeve connecting joint | |
CN105729622A (en) | Production process of concrete hollow square pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |