KR101652943B1 - Reinforced concrete column manufacturing method for high building - Google Patents

Reinforced concrete column manufacturing method for high building Download PDF

Info

Publication number
KR101652943B1
KR101652943B1 KR1020150078828A KR20150078828A KR101652943B1 KR 101652943 B1 KR101652943 B1 KR 101652943B1 KR 1020150078828 A KR1020150078828 A KR 1020150078828A KR 20150078828 A KR20150078828 A KR 20150078828A KR 101652943 B1 KR101652943 B1 KR 101652943B1
Authority
KR
South Korea
Prior art keywords
reinforced concrete
steel pipe
concrete column
mold
separating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020150078828A
Other languages
Korean (ko)
Inventor
최재관
Original Assignee
피씨에스솔루션 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 피씨에스솔루션 주식회사 filed Critical 피씨에스솔루션 주식회사
Priority to KR1020150078828A priority Critical patent/KR101652943B1/en
Application granted granted Critical
Publication of KR101652943B1 publication Critical patent/KR101652943B1/en
Assigned to 문정호 reassignment 문정호 권리의 일부이전등록 Assignors: 피씨에스솔루션 주식회사
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

본 발명은 고층 건축물의 철근 콘크리트 기둥 제조 공법에 관한 것으로,
거푸집 위에 분리 가능한 강관을 설치하는 강관 설치 공정과,
상기 강관의 외주연부와 모서리 부분에 슬리브와, 수직 철근을 설치한 뒤, 상기 강관 외주연부의 수직 철근의 외부에 나선 철근을 두르고, 이들 수직 철근을 결속 철근으로 상호 결속시키는 철근 결속 공정과,
상기 거푸집의 측면을 막고, 상측면에 개구부를 형성시키는 거푸집 설치 공정과,
상기 거푸집 내부에 콘크리트를 주입하는 콘크리트 타설 공정과,
상기 거푸집 내부에 주입된 콘크리트를 양생시키는 콘크리트 양생 공정과,
상기 양생된 콘크리트에서 강관을 분리시켜, 중심부에 중공부를 형성시키는 강관 분리 공정과,
상기 철근 콘크리트 기둥에서 거푸집을 분리시키는 거푸집 분리 공정으로 이루어진 것으로서,
양생된 철근 콘크리트에서 강관을 해체 분리시켜, 철근 콘크리트 기둥을 제작한 뒤, 건축 현장으로 운반, 조립한 후, 중공부에 콘크리트를 주입하여 양생함으로써,
고가의 강관이 철근 콘크리트 기둥 내부에 매설되지 않게 되어, 제조 원가를 크게 낮출 수 있을 뿐만 아니라,
철근 콘크리트 기둥의 중량이 가벼워져, 건축 현장으로의 운송비가 절감되고, 철근 콘크리트 기둥의 길이를 길게 제작하는 것이 가능해지게 되어, 철근 콘크리트 기둥 구축에 소요되는 공사 기간과 공사비를 크게 절감할 수 있는 고층 건축물의 철근 콘크리트 기둥 제조 공법을 제공할 수 있도록 한 것이다.
The present invention relates to a method of manufacturing a reinforced concrete column for a high-rise building,
A step of installing a steel pipe to be detachable on a formwork,
A reinforcing bar bonding step of installing a sleeve and a vertical reinforcing bar on the outer peripheral edge and corner portions of the steel pipe, placing a spiral reinforcing bar outside the vertical reinforcing bars of the steel pipe outer peripheral edge,
A mold setting step of closing a side surface of the mold and forming an opening portion on an upper surface thereof,
A concrete casting step of injecting concrete into the mold,
A concrete curing step of curing the concrete injected into the mold,
A steel pipe separating step of separating the steel pipe from the cured concrete and forming a hollow part in the center part;
And a mold separating step of separating the form from the reinforced concrete column,
By separating the steel pipe from the cured reinforced concrete, the reinforced concrete column is manufactured, and then it is transported and assembled to the construction site. Then, the concrete is injected into the hollow portion and cured,
An expensive steel pipe is not buried in the reinforced concrete column, so that the manufacturing cost can be greatly reduced,
The weight of the reinforced concrete column is reduced, the transportation cost to the construction site is reduced, and the length of the reinforced concrete column can be made longer, so that the construction period required for constructing the reinforced concrete column and the construction cost Thereby providing a method of manufacturing a reinforced concrete column of a building.

Description

고층 건축물의 철근 콘크리트 기둥 제조 공법{REINFORCED CONCRETE COLUMN MANUFACTURING METHOD FOR HIGH BUILDING}TECHNICAL FIELD [0001] The present invention relates to a reinforced concrete column manufacturing method for a high-

본 발명은 고층 건축물의 철근 콘크리트 기둥 제조 공법에 관한 것으로,The present invention relates to a method of manufacturing a reinforced concrete column for a high-rise building,

대형 고층 건축물의 철근 콘크리트 기둥 제조시,In the manufacture of reinforced concrete columns for large high-rise buildings,

보다 효율적인 공법으로 고층 건축물의 철근 콘크리트 기둥을 제조할 수 있게 함으로써,By making the reinforced concrete columns of high-rise buildings more efficient,

대형 고층 건축물의 철근 콘크리트 기둥의 제조 단가와 운송비를 크게 절감할 수 있게 하고,It is possible to greatly reduce manufacturing cost and transportation cost of reinforced concrete columns of large high-rise buildings,

철근 콘크리트 기둥의 구축에 소요되는 공사 기간을 대폭 단축하여,The construction period required for the construction of the reinforced concrete column is greatly shortened,

공사비를 크게 절감시킬 수 있도록 한 고층 건축물의 철근 콘크리트 기둥 제조 공법에 관한 것이다.
The present invention relates to a method of manufacturing a reinforced concrete column of a high-rise building, which can greatly reduce construction cost.

일반적으로 대형 고층 건축물의 철근 콘크리트 기둥 구축시,Generally, when constructing a reinforced concrete column of a large high-rise building,

종래에는 여러 가닥의 철근을 수직으로 엮어 세우고, 그 주위에 거푸집을 씌운 뒤, 거푸집 안에 콘크리트를 주입하여 양생시킨 후, 구축된 철근 콘크리트 기둥 위에 다시 철근 콘크리트를 연속적으로 양생시켜, 철근 콘크리트 기둥을 고층으로 구축시켜 가는 방식이 주로 사용되어 왔다.
Conventionally, a plurality of strands are weaved vertically, a mold is placed around the strands, concrete is injected into the molds, and then reinforced concrete is continuously cured on the constructed reinforced concrete columns, As a result, it has been used mainly.

그러나 이와 같은 전통적인 철근 콘크리트 기둥 구축 방식은 철근을 수직으로 역어 세운 뒤, 그 주위에 거푸집을 씌우고, 거푸집 안에 콘크리트를 부워 양생시키는 일련의 작업 과정에 많은 작업 인원과 시간이 투입되어야 하고, 우천이나 혹한 등의 기후 조건의 영향 등으로 공사 기간이 지연되어 공사비가 상승하게 되는 단점이 있었다.
However, in the conventional method of constructing a reinforced concrete pillar, a lot of workmen and time must be put into a series of work processes in which reinforcing bars are vertically set up, a form is placed around the reinforcing bars, concrete is poured in the form, The construction period is delayed due to the influence of climatic conditions such as temperature and the like.

이러한 문제점을 해소하기 위하여, 최근 별도의 철근 콘크리트 기둥 제조 공장에서 속이 빈 강관이나 강판 외부에 철근을 수직, 수평 방향으로 엮어 그 주위에 콘크리트를 양생시켜, 일정한 길이의 단위 철근 콘크리트 기둥을 제조한 뒤, 이를 건축 현장으로 옮겨와 조립한 후, 철근 콘크리트 기둥의 강관 또는 강판 내부에 콘크리트를 부워 양생시켜, 철근 콘크리트 기둥을 고층으로 연속적으로 구축시키는 방식이 도입되어 시행되고 있다.
In order to solve these problems, recently, a separate reinforced concrete column manufacturing plant has been used to manufacture reinforced concrete pillars of a certain length by curing concrete around a hollow steel pipe or a steel plate by weaving reinforcing bars vertically and horizontally , It is transferred to the construction site and assembled, and concrete is poured into the steel pipe or the steel plate of the reinforced concrete column to cure it, and the method of constructing the reinforced concrete column continuously in the high layer is introduced.

그러나 이 경우, 제조된 철근 콘크리트 기둥 내부에 강관 또는 강판이 삽입됨으로 인하여,However, in this case, since the steel pipe or steel plate is inserted into the manufactured reinforced concrete column,

철근 콘크리트 기둥의 제조 원가와 운송비가 크게 상승하게 되고,The manufacturing costs and transportation costs of reinforced concrete columns have increased significantly,

특히, 대형 철근 콘크리트 기둥의 경우, 그 중량이 운송 차량의 화물 허용 중량을 초과하게 되어 운송 자체가 불가능하게 됨으로써, 철근 콘크리트 기둥의 길이를 제한하게 되고, 그에 따라 철근 콘크리트 기둥 구축에 소요되는 공사 기간이 지연되어 공사비가 상승하게 되는 결과를 초래하게 된다.
In particular, in the case of a large reinforced concrete column, the weight of the reinforced concrete column exceeds the allowable cargo weight of the transportation vehicle, so that the transportation itself becomes impossible, thereby limiting the length of the reinforced concrete column. Resulting in an increase in the construction cost.

본 발명은 이와 같은 종래의 고층 건축물의 철근 콘크리트 기둥의 제조 공법이 갖고 있는 제반 문제점을 감안하여 연구된 것으로서,The present invention has been studied in view of the problems of the conventional method of manufacturing a reinforced concrete column of a high-rise building,

본 발명의 목적은 철근 콘크리트 기둥의 제조 공법을 개선함으로써,It is an object of the present invention to improve the manufacturing method of a reinforced concrete column,

철근 콘크리트 기둥의 제조 원가를 낮추고 운송을 간편하게 하여,By lowering manufacturing costs and simplifying transportation of reinforced concrete columns,

철근 콘크리트 기둥 구축에 소요되는 공사 기간과 공사비를 크게 절감할 수 있는 고층 건축물의 철근 콘크리트 기둥 제조 공법을 제공하는 데 있다.
The present invention provides a method of manufacturing a reinforced concrete column for a high-rise building, which can significantly reduce a construction period and a construction cost required to construct a reinforced concrete column.

이를 위하여,To this end,

본 발명은 철근 콘크리트 기둥의 제조 공법을 개선하여,The present invention improves the manufacturing method of a reinforced concrete column,

거푸집 위에 분리 가능한 강관을 설치하는 강관 설치 공정과,A step of installing a steel pipe to be detachable on a formwork,

상기 강관의 외주연부와 모서리 부분에 슬리브와, 수직 철근을 설치한 뒤, 상기 강관 외주연부의 수직 철근의 외부에 나선 철근을 두르고, 이들 수직 철근을 결속 철근으로 상호 결속시키는 철근 결속 공정과,A reinforcing bar bonding step of installing a sleeve and a vertical reinforcing bar on the outer peripheral edge and corner portions of the steel pipe, placing a spiral reinforcing bar outside the vertical reinforcing bars of the steel pipe outer peripheral edge,

상기 거푸집의 측면을 막고, 상측면에 개구부를 형성시키는 거푸집 설치 공정과,A mold setting step of closing a side surface of the mold and forming an opening portion on an upper surface thereof,

상기 거푸집 내부에 콘크리트를 주입하는 콘크리트 타설 공정과,A concrete casting step of injecting concrete into the mold,

상기 거푸집 내부에 주입된 콘크리트를 양생시키는 콘크리트 양생 공정과,A concrete curing step of curing the concrete injected into the mold,

상기 양생된 콘크리트에서 강관을 분리시켜, 중심부에 중공부를 형성시키는 강관 분리 공정과,A steel pipe separating step of separating the steel pipe from the cured concrete and forming a hollow part in the center part;

상기 철근 콘크리트 기둥에서 거푸집을 분리시키는 거푸집 분리 공정으로 이루어진 것으로서,And a mold separating step of separating the form from the reinforced concrete column,

양생된 철근 콘크리트에서 강관을 해체 분리시켜, 철근 콘크리트 기둥을 제작한 뒤, 건축 현장으로 운반, 조립한 후, 중공부에 콘크리트를 주입하여 양생함으로써,By separating the steel pipe from the cured reinforced concrete, the reinforced concrete column is manufactured, and then it is transported and assembled to the construction site. Then, the concrete is injected into the hollow portion and cured,

고가의 강관이 철근 콘크리트 기둥 내부에 매설되지 않게 되어, 제조 원가를 크게 낮출 수 있을 뿐만 아니라,An expensive steel pipe is not buried in the reinforced concrete column, so that the manufacturing cost can be greatly reduced,

철근 콘크리트 기둥의 중량이 가벼워져, 건축 현장으로의 운송비가 절감되고, 철근 콘크리트 기둥의 길이를 길게 제작하는 것이 가능해지게 되어, 철근 콘크리트 기둥 구축에 소요되는 공사 기간과 공사비를 크게 절감할 수 있는 고층 건축물의 철근 콘크리트 기둥 제조 공법을 제공할 수 있도록 한 것을 특징으로 한다.
The weight of the reinforced concrete column is reduced, the transportation cost to the construction site is reduced, and the length of the reinforced concrete column can be made longer, so that the construction period required for constructing the reinforced concrete column and the construction cost The present invention provides a method of manufacturing a reinforced concrete column of a building.

본 발명의 고층 건축물의 철근 콘크리트 기둥 제조 공법은 양생된 철근 콘크리트에서 강관을 해체 분리시켜, 철근 콘크리트 기둥을 제작한 뒤, 건축 현장으로 운반 조립한 후, 중공부에 콘크리트를 다시 주입하여 양생함으로써,The method of manufacturing a reinforced concrete column of a high-rise building of the present invention comprises disassembling and separating a steel pipe from a cured reinforced concrete, preparing a reinforced concrete column, transporting and assembling the reinforced concrete column to a construction site,

고가의 강관이 철근 콘크리트 기둥 내부에 매설되지 않게 되어, 제조 원가를 크게 낮출 수 있을 뿐만 아니라,An expensive steel pipe is not buried in the reinforced concrete column, so that the manufacturing cost can be greatly reduced,

철근 콘크리트 기둥의 중량이 가벼워져, 건축 현장으로의 운송비가 절감되고, 철근 콘크리트 기둥의 길이를 길게 제작하는 것이 가능해지게 되어, 철근 콘크리트 기둥 구축에 소요되는 공사 기간과 공사비를 크게 절감할 수 있는 효과가 있다.
As the weight of the reinforced concrete column is reduced, the transportation cost to the construction site is reduced, and the length of the reinforced concrete column can be made longer, which can greatly reduce the construction period and cost for constructing the reinforced concrete column .

도 1 은 본 발명에 의한 철근 콘크리트 기둥의 종단면도,
도 2 는 본 발명에 의한 철근 콘크리트 기둥의 내부 구성 상태를 보여주는 횡단면도,
도 3 은 본 발명에 적용된 슬리브의 부분 종단면도,
도 4, 5 는 본 발명의 철근 콘크리트 기둥에 수평보가 설치되는 상태를 나타낸 조립 구성도,
도 6 은 본 발명의 거푸집의 설치 상태를 나타낸 사시도,
도 7 은 본 발명에 적용된 강관 분리 수단의 바람직한 일실시예의 횡단면도,
도 8 은 본 발명의 공정 흐름도.
1 is a longitudinal sectional view of a reinforced concrete column according to the present invention,
FIG. 2 is a cross-sectional view showing the internal construction of the reinforced concrete column according to the present invention,
3 is a partial longitudinal cross-sectional view of a sleeve applied to the present invention,
FIGS. 4 and 5 are assembly views showing a state in which a horizontal beam is installed on the reinforced concrete column of the present invention,
FIG. 6 is a perspective view showing a state in which the formwork of the present invention is installed,
7 is a cross-sectional view of a preferred embodiment of the steel pipe separating means applied to the present invention,
8 is a process flow diagram of the present invention.

이하, 본 발명에 따른 고층 건축물의 철근 콘크리트 기둥 제조 공법을 첨부 도면을 참조하며 구체적으로 설명하면 다음과 같다.
Hereinafter, a method for manufacturing a reinforced concrete column of a high-rise building according to the present invention will be described in detail with reference to the accompanying drawings.

제조 공정Manufacture process

강관 설치 공정Steel pipe installation process

거푸집(1) 위에 강관 분리 수단(4)이 구비된 분리 가능한 강관(5)을 설치한다. 상기 강관 분리 수단(4)은 도 7 에 도시한 바와 같이, 상측 보강편(41)과 중간 보강편(42) 및 단부 보강편(43)(43') 사이에 절개부(44)가 구비되어, 상측 보강편(41)과 단부 보강편(43)(43') 사이에 연결된 유압 실린더(45)의 작동으로 중간 보강편(42)이 내측으로 이동하면서 양생된 콘크리트(15)로 부터 강관(5)이 분리되게 하는 방식으로 구성되어 있다.
A separable steel pipe (5) equipped with a steel pipe separating means (4) is provided on the formwork (1). 7, the steel pipe separating means 4 is provided with a cutout portion 44 between the upper reinforcing piece 41, the intermediate reinforcing piece 42 and the end reinforcing pieces 43, 43 ' The intermediate reinforcing pieces 42 are moved inward by the operation of the hydraulic cylinder 45 connected between the upper reinforcing pieces 41 and the end reinforcing pieces 43 and 43 ' 5 are separated from each other.

철근 결속 공정Reinforcing bar bonding process

상기 강관(5)의 외주연부와 모서리 부분에 도 1 내지 도 3 에 도시한 바와 같이, 철근 삽입공(7)이 구비된 슬리브(9)를 설치하고, 상기 철근 삽입공(7)에 상단부에 수평보 연결부(10)가 구비된 수직 철근(11)(11')을 삽입한 뒤, 상기 철근 삽입공(7)과 수직 철근(11)(11') 사이에 시멘트물을 주입하여 수직 철근(11)(11')을 고정시킨 상태에서, 상기 강관(5) 외주연부의 수직 철근(11)의 외부에 나선 철근(12)을 두르고, 이들 수직 철근(11)(11')을 결속 철근(13)(13')(13")으로 상호 결속시킨다.
As shown in Figs. 1 to 3, a sleeve 9 having a reinforcing bar insertion hole 7 is provided at an outer peripheral edge and a corner of the steel pipe 5, After inserting the vertical reinforcing bars 11 and 11 provided with the horizontal beam connecting portion 10 and injecting cement water between the reinforcing bar insertion holes 7 and the vertical reinforcing bars 11 and 11 ' A spiral reinforcing bar 12 is placed outside the vertical reinforcing bars 11 on the outer circumferential edge of the steel pipe 5 while the reinforcing bars 11 and 11 ' 13) (13 ') (13'').

거푸집 설치 공정Formwork Installation Process

상기 거푸집(1)의 측면을 막고, 도 6 에서와 같이, 상측면에 개구부(3)가 형성되게 거푸집(1)을 설치한다.
As shown in FIG. 6, the mold 1 is installed so that the opening 3 is formed on the upper side of the mold 1.

콘크리트 타설 공정Concrete casting process

상기 거푸집(1) 내부에 콘크리트(15)를 주입한다.
Concrete (15) is injected into the mold (1).

콘크리트 양생 공정Concrete curing process

상기 거푸집(1) 내부에 주입된 콘크리트(15)를 양생시킨다.
The concrete 15 injected into the mold 1 is cured.

강관 분리 공정Steel pipe separation process

상기 양생된 콘크리트(15)에서 강관(5)을 상기한 강관 분리 수단(4)에 의하여 분리시켜, 철근 콘크리트 기둥(19)의 중심부에 중공부(21)를 형성시킨다.
The steel pipe 5 is separated from the cured concrete 15 by the steel pipe separating means 4 to form the hollow portion 21 at the center of the reinforced concrete column 19. [

거푸집 분리 공정Form separation process

상기 철근 콘크리트 기둥(19)에서 거푸집(1)을 분리시켜 철근 콘크리트 기둥(19)의 제작을 완료한다.
The mold 1 is separated from the reinforced concrete column 19 to complete the manufacture of the reinforced concrete column 19. [

이와 같은 공법을 거쳐 제조된 본 발명에 의한 고층 건축물의 철근 콘크리트 기둥(19)은 양생된 철근 콘크리트(15)에서 강관(5)을 분리시켜 철근 콘크리트 기둥(19)을 제작한 뒤,The reinforced concrete column 19 of the high-rise building according to the present invention manufactured through such a method is produced by separating the steel pipe 5 from the cured reinforced concrete 15 to form the reinforced concrete column 19,

건축 현장으로 운반하여 조립한 후,After being transported to the construction site and assembled,

중공부(21)에 콘크리트를 연속적으로 주입, 양생시켜 가면서 철근 콘크리트 기둥을 고층으로 구축시키게 되는데,The reinforced concrete column is constructed as a high-rise structure by continuously injecting and curing concrete into the hollow portion 21,

고가의 강관(5)이 철근 콘크리트 기둥(19) 내부에 매설되어 있지 않기 때문에,Since the expensive steel pipe 5 is not embedded in the reinforced concrete column 19,

제조 원가를 크게 낮출 수 있을 뿐만 아니라,Not only the manufacturing cost can be greatly reduced,

철근 콘크리트 기둥(19)의 중량이 가벼워져 건축 현장으로의 운송비가 절감되고,The weight of the reinforced concrete column 19 is lightened, the transportation cost to the construction site is reduced,

철근 콘크리트 기둥(19)의 길이를 길게 제작하는 것이 가능해지게 되어, 철근 콘크리트 기둥(19)의 구축에 소요되는 공사 기간을 대폭 단축하고, 공사비를 크게 절감할 수 있게 된다.
It is possible to make the length of the reinforced concrete column 19 long, thereby greatly shortening the construction period required for constructing the reinforced concrete column 19 and greatly reducing the construction cost.

따라서 이와 같은 본 발명에 의한 고층 건축물의 철근 콘크리트 기둥 제조 공법은 양생된 철근 콘크리트(15)에서 강관(5)을 해체 분리시켜, 철근 콘크리트 기둥(19)을 제작한 뒤, 건축 현장으로 운반, 조립한 후, 중공부(21)에 콘크리트를 주입하여 양생함으로써,Therefore, in the method of manufacturing a reinforced concrete column of a high-rise building according to the present invention, the steel pipe 5 is disassembled and separated from the cured reinforced concrete 15 to form a reinforced concrete column 19, After the concrete is injected into the hollow portion 21 and cured,

고가의 강관(5)이 철근 콘크리트 기둥(19) 내부에 매설되지 않게 되어, 제조 원가를 크게 낮출 수 있을 뿐만 아니라,The expensive steel pipe 5 is not buried in the reinforced concrete column 19, so that the manufacturing cost can be greatly reduced,

철근 콘크리트 기둥(19)의 중량이 가벼워져, 건축 현장으로의 운송비가 절감되고, 철근 콘크리트 기둥(19)의 길이를 길게 제작하는 것이 가능해지게 되어, 철근 콘크리트 기둥(19)의 구축에 소요되는 공사 기간과 공사비를 크게 줄일 수 있는 장점이 있다.
The weight of the reinforced concrete column 19 is reduced and the transportation cost to the construction site is reduced and the length of the reinforced concrete column 19 can be made longer so that the construction required for constructing the reinforced concrete column 19 It has the advantage of greatly reducing the period and cost of construction.

이상에서는 본 발명을 특정한 실시예에 의거하여 설명하였으나, 본 발명은 본 발명의 기술적 사상 내에서 여러 변형예가 가능하다. 일예를 들면, 상기 강관 분리 수단(4)은 여러 다른 방식으로도 변형하여 양생된 철근 콘크리트(15)에서 강관(5)을 분리시키는 것이 가능하며, 상기 실시예 만으로 본 발명의 기술적 사상이 한정되는 것은 물론 아니다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments. For example, the steel pipe separating means 4 may be deformed in various other ways to separate the steel pipe 5 from the cured reinforced concrete 15, and the technical idea of the present invention is limited only by the above embodiments Of course not.

1 : 거푸집
3 : 개구부
4 : 강관 분리 수단
5 : 강관
7 : 철근 삽입공
9 : 슬리브
10 : 수평보 연결부
11, 11' : 수직 철근
12 : 나선 철근
13, 13', 13" : 결속 철근
15 : 콘크리트
19 : 철근 콘크리트 기둥
21 : 중공부
41 : 상측 보강편
42 : 중간 보강편
43 : 단부 보강편
44 : 절개부
45 : 유압 실린더
1: Form
3: opening
4: steel pipe separating means
5: Steel pipe
7: Reinforcing rod
9: Sleeve
10: Horizontal beam connection
11, 11 ': vertical reinforcement
12: Spiral reinforcing bars
13, 13 ', 13 ": bonded steel bars
15: Concrete
19: Reinforced Concrete Column
21:
41: upper side reinforcement piece
42: Medium reinforcement piece
43:
44: incision
45: Hydraulic cylinder

Claims (2)

거푸집 위에 분리 가능한 강관을 설치하는 강관 설치 공정과,
상기 강관의 외주연부와 모서리 부분에 철근 삽입공이 구비된 슬리브를 설치하고, 상기 철근 삽입공에 수직 철근을 삽입한 뒤, 시멘트물을 주입하여 수직 철근을 고정시킨 상태에서, 상기 강관 외주연부의 수직 철근의 외부에 나선 철근을 두르고, 상기 수직 철근을 결속 철근으로 상호 결속시키는 철근 결속 공정과,
상기 거푸집의 측면을 막고, 상측면에 개구부를 형성시키는 거푸집 설치 공정과,
상기 거푸집 내부에 콘크리트를 주입하는 콘크리트 타설 공정과,
상기 거푸집 내부에 주입된 콘크리트를 양생시키는 콘크리트 양생 공정과,
상기 양생된 콘크리트에서 강관을 분리시켜, 중심부에 중공부를 형성시키는 강관 분리 공정과,
상기 철근 콘크리트 기둥에서 거푸집을 분리시키는 거푸집 분리 공정으로 이루어진 것을 특징으로 하는 고층 건축물의 철근 콘크리트 기둥 제조 공법.
A step of installing a steel pipe to be detachable on a formwork,
A vertical reinforcing bar is inserted into the reinforcing bar insertion hole, and then a vertical reinforcing bar is fixed by injecting cement water. In this state, the vertical direction of the outer periphery of the steel pipe A reinforcing bar bonding step of placing a reinforcing bar on the outside of the reinforcing bars and bonding the reinforcing bars to the reinforcing bars,
A mold setting step of closing a side surface of the mold and forming an opening portion on an upper surface thereof,
A concrete casting step of injecting concrete into the mold,
A concrete curing step of curing the concrete injected into the mold,
A steel pipe separating step of separating the steel pipe from the cured concrete and forming a hollow part in the center part;
And a mold separating step of separating the form from the reinforced concrete column.
삭제delete
KR1020150078828A 2015-06-03 2015-06-03 Reinforced concrete column manufacturing method for high building Expired - Fee Related KR101652943B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150078828A KR101652943B1 (en) 2015-06-03 2015-06-03 Reinforced concrete column manufacturing method for high building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150078828A KR101652943B1 (en) 2015-06-03 2015-06-03 Reinforced concrete column manufacturing method for high building

Publications (1)

Publication Number Publication Date
KR101652943B1 true KR101652943B1 (en) 2016-09-22

Family

ID=57102360

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150078828A Expired - Fee Related KR101652943B1 (en) 2015-06-03 2015-06-03 Reinforced concrete column manufacturing method for high building

Country Status (1)

Country Link
KR (1) KR101652943B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567500A (en) * 2016-11-07 2017-04-19 沈阳建筑大学 High-strength steel and high-strength grouting material combined ultrahigh-strength column structure and construction method
CN106760213A (en) * 2017-01-23 2017-05-31 石家庄铁道大学 Carbon cloth constrains the manufacture method of ultra-high performance concrete post in advance
KR20220087065A (en) * 2020-12-17 2022-06-24 선진정공 주식회사 Construction method of heavy weight concrete pillar structure
KR20220087069A (en) * 2020-12-17 2022-06-24 선진정공 주식회사 Inner form apparatus for manufacturing hollow concrete structure
KR20230114790A (en) * 2022-01-24 2023-08-02 피씨에스솔루션 주식회사 Bracket reinforcement structure of hollow-core column and its construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060040558A (en) * 2005-04-07 2006-05-10 주식회사 충주산업 Method for manufacturing hollow precast reinforced concrete columns and reinforced concrete columns and constructing reinforced concrete columns
KR101412678B1 (en) * 2012-12-21 2014-06-27 김영기 Carbon fiber reinforced precast concrete column and its manufacturing method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060040558A (en) * 2005-04-07 2006-05-10 주식회사 충주산업 Method for manufacturing hollow precast reinforced concrete columns and reinforced concrete columns and constructing reinforced concrete columns
KR101412678B1 (en) * 2012-12-21 2014-06-27 김영기 Carbon fiber reinforced precast concrete column and its manufacturing method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567500A (en) * 2016-11-07 2017-04-19 沈阳建筑大学 High-strength steel and high-strength grouting material combined ultrahigh-strength column structure and construction method
CN106760213A (en) * 2017-01-23 2017-05-31 石家庄铁道大学 Carbon cloth constrains the manufacture method of ultra-high performance concrete post in advance
CN106760213B (en) * 2017-01-23 2019-02-01 石家庄铁道大学 Carbon cloth constrains the manufacturing method of ultra-high performance concrete column in advance
KR20220087065A (en) * 2020-12-17 2022-06-24 선진정공 주식회사 Construction method of heavy weight concrete pillar structure
KR20220087069A (en) * 2020-12-17 2022-06-24 선진정공 주식회사 Inner form apparatus for manufacturing hollow concrete structure
KR102448276B1 (en) * 2020-12-17 2022-09-28 선진정공 주식회사 Internal formwork device for the manufacture of hollow concrete structures
KR102451429B1 (en) * 2020-12-17 2022-10-07 선진정공 주식회사 Construction method of heavy weight concrete pillar structure
KR20230114790A (en) * 2022-01-24 2023-08-02 피씨에스솔루션 주식회사 Bracket reinforcement structure of hollow-core column and its construction method
KR102634082B1 (en) * 2022-01-24 2024-02-06 피씨에스솔루션 주식회사 Bracket reinforcement structure of hollow-core column and its construction method

Similar Documents

Publication Publication Date Title
KR101652943B1 (en) Reinforced concrete column manufacturing method for high building
KR101903628B1 (en) Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof
KR101645462B1 (en) Precast crossing beam manufacturing method for bridge and precast crossing beam construction method for bridge
KR101663132B1 (en) Self-supporting type column structure
KR102011412B1 (en) Joint for Precast Beam and Columns
KR101410602B1 (en) construction method of concrete structure house
KR101626428B1 (en) Manufacturing Method for Hollow Precast Concret-encased Steel Column and Dry-splicing Methods for the Same
KR101269639B1 (en) The core-type sleeve of precast concrete for member of framework
KR101053644B1 (en) Plywood Formwork for Apartment House
KR102658468B1 (en) Precast wall structure using fixing support parts and the construction method thereof
CN104153579A (en) Pouring formwork structure for non-standard layer structure and construction method
KR101264501B1 (en) Headed coupler form-tie connecting panel and construction method using the same
JP5155380B2 (en) Method for manufacturing reinforced concrete member
KR101458435B1 (en) Half precast concrete column manufacturing method using saddle-type ties and dual hoops and constructing method using the same
KR102000534B1 (en) Construction method using textile reinforcing panel of high durability for combined usage of permanent form
KR20180114821A (en) Joining structure for holloness type precast concrete column and thereof method
KR102209116B1 (en) Manufacturing method of precast concrete member using tube
KR101451267B1 (en) System forms for manufacturing assembly type PC members and method of producing PC members using the same
KR101576224B1 (en) Prefabricated precast concrete girder for building construction
KR20190046336A (en) Sandwich precast concrete wall and manufacturing method thereof
KR101399778B1 (en) Manufacture method of concrete structure body for concrete house
KR102012481B1 (en) Connection structure of large-sized precast double-wall panel and middle accouplement
KR101763162B1 (en) The interference cushioning device between cross beam and form for pre-stressed concrete girder
KR101270502B1 (en) Precast concrete for member of framework with none sleeve
KR101054381B1 (en) How to buy bolts for precast concrete structures

Legal Events

Date Code Title Description
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

PA0302 Request for accelerated examination

St.27 status event code: A-1-2-D10-D17-exm-PA0302

St.27 status event code: A-1-2-D10-D16-exm-PA0302

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-3-3-R10-R18-oth-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

T11-X000 Administrative time limit extension requested

St.27 status event code: U-3-3-T10-T11-oth-X000

E13-X000 Pre-grant limitation requested

St.27 status event code: A-2-3-E10-E13-lim-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
GRNT Written decision to grant
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R14-asn-PN2301

FPAY Annual fee payment

Payment date: 20190824

Year of fee payment: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

S17-X000 Non-exclusive voluntary license recorded

St.27 status event code: A-4-4-S10-S17-lic-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 5

PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20210826

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20210826

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000