CN104652467A - Construction method for reserved hole of equipment foundation bolt - Google Patents

Construction method for reserved hole of equipment foundation bolt Download PDF

Info

Publication number
CN104652467A
CN104652467A CN201410856226.1A CN201410856226A CN104652467A CN 104652467 A CN104652467 A CN 104652467A CN 201410856226 A CN201410856226 A CN 201410856226A CN 104652467 A CN104652467 A CN 104652467A
Authority
CN
China
Prior art keywords
flitch
concrete
construction method
square pillar
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410856226.1A
Other languages
Chinese (zh)
Inventor
金洪力
马智勇
云恩平
哈斯高娃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN201410856226.1A priority Critical patent/CN104652467A/en
Publication of CN104652467A publication Critical patent/CN104652467A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Abstract

The invention relates to a construction method for a reserved hole of an equipment foundation bolt. The construction method is characterized by comprising the following steps: firstly selecting a columnar square pillar with a proper size according to the size of the reserved hole of the bolt, laminating a thin foam plate on the embedded part of the lower part of the square pillar, tightly enwinding plastic paper to wrap the square pillar, well fixing the square pillar before casting concrete, and then casting the concrete, casting the part, on which the plastic paper is enwound, of the square pillar into the concrete; after the concrete is solidified, pulling out the square pillar, mashing the foam plate, irrigating water into the hole so as to flush away the foam. The construction method has the advantages of simple construction process, convenience of template removal, cost-saving property, ensured construction quality and greatly improved construction efficiency.

Description

The construction method of apparatus foundation bolt preformed hole
Technical field
The present invention relates to a kind of construction method of apparatus foundation bolt preformed hole, belong to equipment installation Technology field.
Background technology
In the foundation construction that business equipment is installed, because equipment itself is complex-shaped various, cause basic end face to there is multiple different absolute altitude, this just requires that the bolt box position on connection device and basis is very accurate, requires that the concrete of final grouting and basis connect stubble reliable simultaneously.
In bolt box construction technology traditional in the past, the general wooden model that adopts installs preformed hole, conveniently can extract smoothly after concreting, often preformed hole template construct is become the lower large and wedged template that surface is very smooth young, suitable for reading.After this template is extracted, the general smoother of concrete surface, because template is lower little greatly upper, when pre-embedded bolt, the concrete that secondary is built and base concrete caking property very poor, add the contraction of secondary concreting, in equipment running process bolt be easy to loosen even be pulled out.In addition, when some preformed hole degree of depth are less, also adopt steel pipe to replace the technique of wooden model, establish special messenger constantly to rotate steel pipe when concreting, finally before concrete setting, extract steel pipe.
Along with updating of construction technology, some units in charge of construction start the technology adopting a kind of advanced person, namely utilize a kind of bolt sleeve by professional production manufacturer production.But in the construction of reality, model and the quantity of the bolt hole needed for each equipment Foundations are relatively less, if all entrust specialized factory to produce, this is unpractical.
In sum, traditional construction technology construction is complicated, reliability is low, not easy to operate; Then construction cost is improve by the bolt sleeve of professional production manufacturer production, and cannot extensive use in reality construction.
Summary of the invention
The object of this invention is to provide that a kind of construction technology is simple, form removal convenient, cost-saving, the construction method that ensures construction quality, apparatus foundation bolt preformed hole that efficiency of construction is high.
Technical scheme of the present invention is as follows:
First suitable column flitch is chosen according to the size dimension of bolt box, the pre-buried part of flitch bottom attaches the thin cystosepiment of one deck, and be wrapped on flitch with plastic paper winding tightly, before concreting, flitch is fixed, carry out concreting, the part being tied with plastic paper of flitch is cast in concrete, after concrete setting, extracts flitch, again cystosepiment is smashed to pieces, then pour water in hole and foam gone out.
Described column flitch preferred hexahedron column flitch.
Advantage of the present invention is: construction technology is simple, and form removal is convenient, and cost-saving, construction quality is guaranteed, and efficiency of construction is significantly heightened.
Accompanying drawing explanation
Fig. 1 is that flitch of the present invention buries schematic diagram underground.
In figure: 1. concrete foundation, 2. flitch, 3. cystosepiment.
Detailed description of the invention
Embodiment:
Company undertakes the construction of in the construction of cloud horse aircraft factory equipment Foundations, and the concrete foundation face of equipment exists multiple different absolute altitude, and the bolt box in concrete foundation has the specification requirement of the multiple degree of depth and thickness.The present embodiment selects the bolt box of a kind of specification wherein to be described.With reference to accompanying drawing 1, first suitable hexahedron column flitch 2 is chosen according to the size dimension of bolt box, the pre-buried part of flitch bottom attaches the thin cystosepiment 3 of one deck, and be wrapped on flitch with plastic paper winding tightly, before concreting, flitch is fixed, carry out concreting, the part being tied with plastic paper of flitch is cast in concrete, flitch is extracted after concrete foundation 1 is solidified, again cystosepiment is smashed to pieces, then pour water in hole and to be gone out by foam, bolt box has been constructed.Due to the pre-buried part of flitch being pasted with thin cystosepiment, without the need to making flitch movable in the process on concreting basis, be easy to extract flitch after concrete foundation is solidified, be wrapped in the plastic paper outside thin cystosepiment just broken in the process of concreting, and the thin cystosepiment stayed in preformed hole is easy to pulverize, foam of pouring water in preformed hole floats, and goes out outside hole.The upper and lower thickness of such bolt box is consistent, shows that fineness is poor, when pre-embedded bolt, the concrete that secondary is built and base concrete caking property very good, pre-buried bolt is very firm.Method of the present invention is used widely in the repeatedly construction of applicant, also demonstrates method construction technology of the present invention simple, and form removal is convenient, and saved cost, ensure that construction quality, efficiency of construction is significantly heightened.

Claims (2)

1. the construction method of an apparatus foundation bolt preformed hole, it is characterized in that: first choose suitable column flitch according to the size dimension of bolt box, the pre-buried part of flitch bottom attaches the thin cystosepiment of one deck, and be wrapped on flitch with plastic paper winding tightly, before concreting, flitch is fixed, carry out concreting, the part being tied with plastic paper of flitch is cast in concrete, flitch is extracted after concrete setting, again cystosepiment is smashed to pieces, then pour water in hole and foam gone out.
2. the construction method of apparatus foundation bolt preformed hole according to claim 1, is characterized in that: described column flitch is hexahedron column flitch.
CN201410856226.1A 2014-12-28 2014-12-28 Construction method for reserved hole of equipment foundation bolt Pending CN104652467A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410856226.1A CN104652467A (en) 2014-12-28 2014-12-28 Construction method for reserved hole of equipment foundation bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410856226.1A CN104652467A (en) 2014-12-28 2014-12-28 Construction method for reserved hole of equipment foundation bolt

Publications (1)

Publication Number Publication Date
CN104652467A true CN104652467A (en) 2015-05-27

Family

ID=53244061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410856226.1A Pending CN104652467A (en) 2014-12-28 2014-12-28 Construction method for reserved hole of equipment foundation bolt

Country Status (1)

Country Link
CN (1) CN104652467A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111636903A (en) * 2020-06-02 2020-09-08 中铁十二局集团有限公司 Construction method for protecting embedded part and reserving holes
CN112411887A (en) * 2020-11-27 2021-02-26 湖南大学 Preparation method of multistage embedded prefabricated part of steel bar grouting sleeve connecting joint
CN114934413A (en) * 2022-06-29 2022-08-23 中核华辰建筑工程有限公司 Group ground steel rail construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19537496A1 (en) * 1995-09-27 1997-04-03 Slaweyko Prof Dr Marinow Removable form for making openings in concrete roofs, walls and floors
CN202577970U (en) * 2012-04-23 2012-12-05 中国二冶集团有限公司 Reserved hole mold
CN103306303A (en) * 2013-06-14 2013-09-18 鞍钢集团工程技术有限公司 Forming method for device anchor bolt preformed hole
CN203247600U (en) * 2012-11-22 2013-10-23 陕西煤业化工建设(集团)有限公司 Equipment foundation bolt preformed hole die
CN203924102U (en) * 2014-07-01 2014-11-05 中国二十二冶集团有限公司 Building implements foundation bolt preformed hole construction mould

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19537496A1 (en) * 1995-09-27 1997-04-03 Slaweyko Prof Dr Marinow Removable form for making openings in concrete roofs, walls and floors
CN202577970U (en) * 2012-04-23 2012-12-05 中国二冶集团有限公司 Reserved hole mold
CN203247600U (en) * 2012-11-22 2013-10-23 陕西煤业化工建设(集团)有限公司 Equipment foundation bolt preformed hole die
CN103306303A (en) * 2013-06-14 2013-09-18 鞍钢集团工程技术有限公司 Forming method for device anchor bolt preformed hole
CN203924102U (en) * 2014-07-01 2014-11-05 中国二十二冶集团有限公司 Building implements foundation bolt preformed hole construction mould

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111636903A (en) * 2020-06-02 2020-09-08 中铁十二局集团有限公司 Construction method for protecting embedded part and reserving holes
CN112411887A (en) * 2020-11-27 2021-02-26 湖南大学 Preparation method of multistage embedded prefabricated part of steel bar grouting sleeve connecting joint
CN112411887B (en) * 2020-11-27 2022-04-29 湖南大学 Preparation method of multistage embedded prefabricated part of steel bar grouting sleeve connecting joint
CN114934413A (en) * 2022-06-29 2022-08-23 中核华辰建筑工程有限公司 Group ground steel rail construction method

Similar Documents

Publication Publication Date Title
CN203247600U (en) Equipment foundation bolt preformed hole die
CN103485537B (en) Super High horizontal secondary structure embedded bar construction method and structure thereof
CN104652467A (en) Construction method for reserved hole of equipment foundation bolt
CN203755334U (en) Single-pipe tower prefabricated spiral steel pipe pile foundation
CN205530280U (en) Novel prefabricated two walls unification foundation ditch enclosure system
KR20180084411A (en) Construction method of lower pier casion footing using PCC structure
CN102535530A (en) Miniature pile model used for model tests and manufacturing method thereof
CN104264984A (en) Formwork for concrete structure pouring and pouring construction method
CN206616827U (en) One kind box filled piece of built-in line of building
CN102535495A (en) U-shaped groove base for prefabricated building and construction method thereof
CN103669696A (en) Hollow precast concrete member and manufacturing method thereof
CN204282399U (en) A kind of subway space enclosing structure
CN204024041U (en) The double-deck shear wall formwork erecting structure of deformation joint
CN204326100U (en) The Preserved node of covered back-digging side wall bar splice
CN203625883U (en) Steel sheet support pile with pipes for foundation pit construction
CN204059418U (en) Deeply covered layer seepage prevention of dam founda wall construction
JP2012127050A5 (en)
CN204174922U (en) A kind of pre-embedded bolt punch die
CN104328913B (en) A kind of button-shaped concrete plug of spiral, Preparation method and use
CN103556629B (en) A kind of construction method of shaped pile
CN203821844U (en) Reserved transverse pipeline mold in cast-in-place concrete plate
CN203684509U (en) Grooved block masonry wall
CN105178365A (en) Deformation-resisting construction method for underground waterproof plate
CN204000823U (en) A kind of earth pressure gauge ejects erector
CN202990418U (en) Slurry-leaking protection device preventing cast-in-place concrete column root from rotting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150527

WD01 Invention patent application deemed withdrawn after publication