CN205530280U - Novel prefabricated two walls unification foundation ditch enclosure system - Google Patents

Novel prefabricated two walls unification foundation ditch enclosure system Download PDF

Info

Publication number
CN205530280U
CN205530280U CN201620101393.XU CN201620101393U CN205530280U CN 205530280 U CN205530280 U CN 205530280U CN 201620101393 U CN201620101393 U CN 201620101393U CN 205530280 U CN205530280 U CN 205530280U
Authority
CN
China
Prior art keywords
novel
support system
prefabricated
foundation pit
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620101393.XU
Other languages
Chinese (zh)
Inventor
谢晓东
周玉石
谢曙东
谢益飞
裴奇斌
刘泽海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongji Engineering Shanghai Geotechnical Co ltd
Original Assignee
Shanghai Chengdi Rock Soil Design Co ltd
Shanghai Chengdi Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Chengdi Rock Soil Design Co ltd, Shanghai Chengdi Construction Co ltd filed Critical Shanghai Chengdi Rock Soil Design Co ltd
Priority to CN201620101393.XU priority Critical patent/CN205530280U/en
Application granted granted Critical
Publication of CN205530280U publication Critical patent/CN205530280U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a novel prefabricated two walls unification foundation ditch enclosure system, this novel prefabricated two walls unification foundation ditch enclosure system comprises envelope and support system. Envelope is become by novel stagnant water centrifugation pile cluster, novel stagnant water centrifugation stake adoption guide slot docks mutually, the pile bolck sets up the concrete and bears down on one the mode of roof beam and connect, support system adopts the compartment to pour the building roof, support system plugs into ware and novel stagnant water centrifugation stake through pre -buried reinforcing bar and is connected. Compare with current piping lane class foundation ditch enclosure, the utility model has the advantages of construction cycle is short, pollution -free, low noise, envelope stability is strong, engineering cost is low, little to the surrounding environment influence.

Description

A kind of novel prefabricated two wall unification foundation pit systems
Technical field
This utility model relates to a kind of novel prefabricated two wall unification foundation pit systems, mainly applies In the ground foundation pit enclosure of piping lane class civic building and prevent the fields such as cubic metre of earth displacement.
Background technology
Modern city land resource is the deficientest, and civilian infrastructure construction is provided by soil The strictest restrictions such as source, urban planning, urban look and environmental conservation, various Cable, pipeline are comprehensively placed extremely urgent.Underground municipal administration synthesis pipe gallery, has another name called common trench, i.e. Specialize in various government utility in underground setting and put the raceway groove of cable, pipeline.Underground pipe gallery It is the most more advanced infrastructure pipe net arrangement form, is urban construction and city The trend of development and trend, be the effective means making full use of the underground space.At present, city is combined Close the construction of piping lane foundation pit enclosure also exist less economical, efficiency of construction is low, environmental effect is big etc. lacks Point.For disadvantages mentioned above, this utility model relates to that a kind of economy is good, efficiency of construction is high, Novel prefabricated two wall unification foundation pit system and the contrary sequence methods thereof that environmental effect is little, this goes along with sb. to guard him knot Structure is unified with building structure exterior wall two wall, and support system is unified with top board, and economy is good;Enclose Protection structure is prefabricated, and efficiency of construction is high;Novel water-stop centrifugal pile soil compaction is little, and environmental effect is little.
Utility model content
It is big that the purpose of this utility model is just to provide a kind of bearing capacity, good water insulation effect, construction Convenient, efficiency is high, and building enclosure is unified with external wall two wall, support system and building top Unification, foundation pit system that cost is low and construction method thereof.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of novel prefabricated two wall unification foundation pit systems, these novel prefabricated two wall unification foundation ditches Retaining design is made up of building enclosure and support system, and described building enclosure is centrifuged by Novel water-stop Stake composition, guide groove docks the employing of described Novel water-stop centrifugal pile mutually, stake top arranges concrete and bears down on one The mode of beam connects, and described support system uses compartment to pour building top, described support system It is connected with Novel water-stop centrifugal pile by pre-buried reinforcing bar connector.
Described Novel water-stop centrifugal pile is prefabricated pile.
Described Novel water-stop centrifugal pile guide groove uses slip casting to ensure retaining design sealing.
Described building enclosure doubles as external wall, building top doubles as support system, the most novel Sealing centrifugal pile doubles as external wall, building top doubles as support system.
Described Novel water-stop centrifugal pile connects at building base plate and building top position embedded bar Refute device.
Compared with existing piping lane class foundation pit system and construction method, this utility model has as follows Advantage:
1, going along with sb. to guard him and the unification of building structure two wall, support system is unified with top board, building enclosure With building structure perfect adaptation, good in economic efficiency.
2, Novel water-stop centrifugal pile is prefabricated pile, and efficiency of construction is high, it is not necessary to unnecessary curing time Construction period is short;Novel water-stop centrifugal pile soil compaction is little, and environmental effect is little.
Accompanying drawing explanation
Fig. 1 is foundation pit enclosure schematic diagram
1 Novel water-stop centrifugal pile 2 building top 3 inwall 4 builds base plate 5 reinforcing bar connector 6 concrete capping beams
Fig. 2 is the form that building enclosure connects
6 concrete capping beam 7 guide grooves
Fig. 3 is skirt piles machine
8 skirt piles machine 9 static press devices
Detailed description of the invention
With specific embodiment, this utility model is described in detail below in conjunction with the accompanying drawings.This enforcement Example is implemented premised on technical solutions of the utility model, give detailed embodiment and Concrete operating process, but protection domain of the present utility model is not limited to following embodiment.
Embodiment
As it is shown in figure 1, a kind of novel prefabricated two wall unification foundation pit system and contrary sequence methods thereof, This novel foundation pit system is combined support system by building enclosure and forms.Described building enclosure by Novel water-stop centrifugal pile 1 forms, and this Novel water-stop centrifugal pile 1 uses the docking of guide groove 7 phase, stake Top arranges the mode of concrete capping beam 6 and connects, as shown in Figure 2;Described support system uses Compartment pours building top 2 to ensure the stability of foundation ditch;Described building top 2 is by pre-buried Part reinforcing bar connector 5 is connected with Novel water-stop centrifugal pile 1.
The novel prefabricated two walls unification foundation pit systems of one involved by this utility model and Contrary sequence method, uses skirt piles machine 8 to construct, and it concretely comprises the following steps:
1) smooth construction site, releases full pattern according to construction drawing;
2), after Novel water-stop centrifugal pile 1 site acceptance, stack to the position being easy to construction;
3) remote pilot skirt piles machine 8 moves to construction lofting position, starts Power Component, limit Stake machine arm by step 2) in Novel water-stop centrifugal pile 1 winch to skirt piles machine static press device 9;
4) remote pilot starts skirt piles machine static press device 9, is depressed into by Novel water-stop centrifugal pile 1 Designed elevation;
5) remote pilot skirt piles machine 8 shifts, and rotates skirt piles machine arm, by step 2) in new Type sealing centrifugal pile 1 winches to skirt piles machine static press device 9, by this guide groove 7 and pile body of constructing Guide groove 7 phase is docked, and remote pilot starts skirt piles machine static press device 9, and this stake is depressed into design mark High;
6) step 5 is repeated until completing whole foundation pit enclosure structure Novel water-stop centrifugal pile 1 and executing Work;
7) carry out Novel water-stop centrifugal pile 1 top concrete capping beam 6 to construct;
8), after concrete capping beam 6 reaches desired strength, excavation of foundation pit is plugged into embedded bar Device 5 is completely exposed, and compartment carries out building top 2 and constructs, and compartment length calculates really according to design Fixed;
9) after building top 2 intensity meets requirement, it is excavated to cheat end embedded bar connector 5 are completely exposed;
10) carry out building base plate 4 reinforcing bar binding and concrete pouring construction;
11) upwards carry out building top 2 at inwall 3 and residue compartment to construct;
12), after all having constructed, it is backfilled to terrace absolute altitude.

Claims (5)

1. novel prefabricated two wall unification foundation pit systems, these novel prefabricated two wall unifications Foundation pit system is made up of building enclosure and support system, and described building enclosure is by Novel water-stop Centrifugal pile forms, and guide groove docks the employing of described Novel water-stop centrifugal pile mutually, stake top arranges concrete The mode of capping beam connects, and described support system uses compartment to pour building top, described support System is connected with Novel water-stop centrifugal pile by pre-buried reinforcing bar connector.
The novel prefabricated two wall unification foundation pit systems of one the most according to claim 1, It is characterized in that, described Novel water-stop centrifugal pile is prefabricated pile.
The novel prefabricated two wall unification foundation pit systems of one the most according to claim 1, It is characterized in that, described Novel water-stop centrifugal pile guide groove uses slip casting to ensure fender body tying Water.
The novel prefabricated two wall unification foundation pit systems of one the most according to claim 1, It is characterized in that, described building enclosure doubles as external wall, building top doubles as support system, I.e. Novel water-stop centrifugal pile doubles as external wall, building top doubles as support system.
The novel prefabricated two wall unification foundation pit systems of one the most according to claim 1, It is characterized in that, described Novel water-stop centrifugal pile is pre-buried at building base plate and building top position Reinforcing bar connector.
CN201620101393.XU 2016-02-01 2016-02-01 Novel prefabricated two walls unification foundation ditch enclosure system Active CN205530280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620101393.XU CN205530280U (en) 2016-02-01 2016-02-01 Novel prefabricated two walls unification foundation ditch enclosure system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620101393.XU CN205530280U (en) 2016-02-01 2016-02-01 Novel prefabricated two walls unification foundation ditch enclosure system

Publications (1)

Publication Number Publication Date
CN205530280U true CN205530280U (en) 2016-08-31

Family

ID=56775057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620101393.XU Active CN205530280U (en) 2016-02-01 2016-02-01 Novel prefabricated two walls unification foundation ditch enclosure system

Country Status (1)

Country Link
CN (1) CN205530280U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284412A (en) * 2016-09-29 2017-01-04 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery and construction method
CN106368211A (en) * 2016-09-20 2017-02-01 俞晓东 Rectangular concrete piles used for constructing side wall of pipe gallery
CN106480875A (en) * 2016-09-21 2017-03-08 俞晓东 For building the rectangular concrete pile of piping lane side wall
CN106836287A (en) * 2017-03-28 2017-06-13 新疆维泰开发建设(集团)股份有限公司 A kind of construction method of pipe gallery
CN107023015A (en) * 2016-02-01 2017-08-08 上海城地建设股份有限公司 A kind of new prefabricated two walls unification foundation pit system and its contrary sequence method
CN108797637A (en) * 2017-04-26 2018-11-13 杭州南联土木工程科技有限公司 Prefabricated board combined cast-in-situ concrete considers the underground pipe gallery construction method of structure and ground

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023015A (en) * 2016-02-01 2017-08-08 上海城地建设股份有限公司 A kind of new prefabricated two walls unification foundation pit system and its contrary sequence method
CN106368211A (en) * 2016-09-20 2017-02-01 俞晓东 Rectangular concrete piles used for constructing side wall of pipe gallery
CN106368211B (en) * 2016-09-20 2018-10-23 俞晓东 Rectangular concrete pile for building piping lane side wall
CN106480875A (en) * 2016-09-21 2017-03-08 俞晓东 For building the rectangular concrete pile of piping lane side wall
CN106284412A (en) * 2016-09-29 2017-01-04 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery and construction method
CN106284412B (en) * 2016-09-29 2017-05-31 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery and construction method
CN106836287A (en) * 2017-03-28 2017-06-13 新疆维泰开发建设(集团)股份有限公司 A kind of construction method of pipe gallery
CN106836287B (en) * 2017-03-28 2019-03-22 新疆维泰开发建设(集团)股份有限公司 A kind of construction method of pipe gallery
CN108797637A (en) * 2017-04-26 2018-11-13 杭州南联土木工程科技有限公司 Prefabricated board combined cast-in-situ concrete considers the underground pipe gallery construction method of structure and ground

Similar Documents

Publication Publication Date Title
CN205530280U (en) Novel prefabricated two walls unification foundation ditch enclosure system
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN101408025B (en) Pit construction method by using major structure as bearing point
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN103726495B (en) Coastal waters deep foundation pit supporting structure and construction method thereof
CN111851597B (en) Penetration protection structure of pipe jacking close-distance downward-penetrating pipe gallery and construction method
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN204098043U (en) After staying soil, excavation is in conjunction with inner support Retaining Structure with Double-row Piles
CN202194148U (en) Waterproof curtain
CN107747308A (en) A kind of diaphram wall and construction method
CN101793023A (en) Foundation pit construction method
CN103334452A (en) Underground engineering mixed construction method
CN104234057A (en) Polymer grouting curtain and prestressed pipe pile combined foundation pit supporting structure
CN101824825B (en) Deep foundation pit open cutting construction method
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN203654309U (en) Pile-caisson hydraulic structure
CN104895079A (en) Reverse construction method for piling steel sheet piles
CN103397634A (en) Anchoring construction method for fastener steel tube pile cofferdam
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN109594574A (en) Large-scale push pipe open caisson reversed construction method based on the confined space
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
CN106638670B (en) Half prefabricated piping lane and construction method
CN202706049U (en) Reinforced concrete basin open caisson
CN202881967U (en) Transmission tower plate type three-cable base structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 201806, B, Lane 518, Lane 1, Heng Yong Road, Shanghai, Jiading District 502-1

Co-patentee after: SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd.

Patentee after: Shanghai chengdixiangjiang Data Technology Co.,Ltd.

Address before: 201806, B, Lane 518, Lane 1, Heng Yong Road, Shanghai, Jiading District 502-1

Co-patentee before: SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd.

Patentee before: SHANGHAI CHENGDI CONSTRUCTION Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20231220

Address after: Room J815, 3rd Floor, No. 5358 Huyi Road, Jiading District, Shanghai, June 2018

Patentee after: Zhongji Engineering (Shanghai) Geotechnical Co.,Ltd.

Address before: 502-1, area B, No.1, Lane 518, Hengyong Road, Jiading District, Shanghai, 201806

Patentee before: Shanghai chengdixiangjiang Data Technology Co.,Ltd.

Patentee before: SHANGHAI CHENGDI ROCK-SOIL DESIGN Co.,Ltd.

TR01 Transfer of patent right