CN205557818U - A prefabricated wall post segmentation steel bar connection structure - Google Patents

A prefabricated wall post segmentation steel bar connection structure Download PDF

Info

Publication number
CN205557818U
CN205557818U CN201620256127.4U CN201620256127U CN205557818U CN 205557818 U CN205557818 U CN 205557818U CN 201620256127 U CN201620256127 U CN 201620256127U CN 205557818 U CN205557818 U CN 205557818U
Authority
CN
China
Prior art keywords
prefabricated wall
wall column
steel bar
prefabricated
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620256127.4U
Other languages
Chinese (zh)
Inventor
李凯阳
章谊
何永顺
王恒
龙莉波
李成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201620256127.4U priority Critical patent/CN205557818U/en
Application granted granted Critical
Publication of CN205557818U publication Critical patent/CN205557818U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a prefabricated wall post segmentation steel bar connection structure, this connection structure include the prefabricated wall post of upper and lower side, and the upper and lower end of every prefabricated wall post staggers respectively and sets up preformed reinforcement bar, and the preformed reinforcement bar's of the upper end of prefabricated wall post top is equipped with an external screw thread and a threaded connection sleeve, and the sleeve link up from top to bottom, telescopic lower extreme set up be used for with a grout hole is seted up to preformed reinforcement bar threaded connection's internal thread on the section of thick bamboo wall of telescopic upper end, the preformed reinforcement bar that the top prefabricated the lower extreme of wall post plants in the below prefabricates the sleeve of the upper end of wall post, and is past through the grout hole grout in the sleeve, concrete placement is used to the butt joint part of the prefabricated wall post of upper and lower side. It has improved between the reinforcing bar intensity and rigidity of connecting, and each layer only needs the once connection of prefabricated wall intercolumniation promptly between the adjacent horizontal structure, compares the prefabricated wall intercolumniation of conventional each in situ and connects twice way, has effectively reduced the use quantity of steel such as sleeve, has reduced construction cost.

Description

Prefabricated wall column one-part form steel bar connecting structure
Technical field
This utility model relates to building engineering field, particularly relates to a kind of prefabricated wall column one-part form bar connecting knot Structure.
Background technology
Prefabricated construction system is with prefabricated components as main member, through assembling, connect, part cast-in-place Xoncrete structure.This xoncrete structure has that build guality is stable, production efficiency high, environmental pollution Little, the wasting of resources is few, be conducive to the advantage such as social sustainable development.But the reinforcing bar between assembled wallboard Connect owing to cost is high or construction precision requires high factor, always affect the skill that this system is promoted on a large scale Art bottleneck.
The precast wall body method of attachment of existing routine is reserved steel plate between floor, prefabricated panel, then adopts Carrying out being mechanically connected or use electric welding to connect with bolt, the precast wall body between adjacent level structure at least needs Wanting twice connection construction, not only waste time and energy, the usage amount of corresponding steel plate is relatively big, causes high cost.Existing It is not prefabricated for having pillar in fabricated construction technology, is all to pour in the later stage, and wet trade is more, needs to make Use substantial amounts of template.
Therefore, how to simplify the construction method of prefabricated construction, reduce the link cost of prefabricated wall column, Improve the prefabrication and assembly construction rate of building, be this area technical problem urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated wall column one-part form steel bar connecting structure, improves steel The strength and stiffness connected between muscle, it is ensured that the safety of structure, and avoid using electric welding to connect generation Toxic and harmful, ensures the working security of workmen.
For solving above-mentioned technical problem, this utility model following technical scheme of offer:
A kind of prefabricated wall column one-part form steel bar connecting structure, including the prefabricated wall column of upper and lower, each dry wall The upper and lower end of post staggers respectively and arranges reserved steel bar, the top of the reserved steel bar of the upper end of described prefabricated wall column Be provided with external screw thread a threaded sleeve, described sleeve up/down perforation, the lower end of described sleeve offer for The female thread threadeded with the described reserved steel bar of prefabricated wall column, the upper end barrel of described sleeve offers one Grout hole, the reserved steel bar of the lower end of the prefabricated wall column in top is inserted in the sleeve of the upper end of the prefabricated wall column in lower section In, it is in the milk in described sleeve by described grout hole, the butted part coagulation of the prefabricated wall column of upper and lower Soil pours.
Preferably, in above-mentioned prefabricated wall column one-part form steel bar connecting structure, also include horizontal structure reinforcing bar, Described horizontal structure reinforcing bar before the butted part of the prefabricated wall column of upper and lower pours, the prefabricated wall column through lower section The reserved steel bar of upper end, and carry out bar connecting, the butted part of horizontal structure and upper and lower prefabricated wall column Formed by integrally casting forms, and the top of concrete of the prefabricated wall column in described lower section is close to the lower surface of described horizontal structure.
Preferably, in above-mentioned prefabricated wall column one-part form steel bar connecting structure, described grout hole is positioned at described The top of the barrel of sleeve.
Preferably, in above-mentioned prefabricated wall column one-part form steel bar connecting structure, reserving of described reserved steel bar A length of 500mm-1000mm.
Preferably, in above-mentioned prefabricated wall column one-part form steel bar connecting structure, described prefabricated wall column is prefabricated Wall or prefabricated post.
From techniques disclosed above scheme, compared with prior art, the beneficial effects of the utility model are such as Under:
(1) between prefabricated wall column of the present utility model, reinforcing bar uses sleeve connection, one end of sleeve i.e. lower end Being connected with a prefabricated wall column i.e. reserved steel bar bolt of the prefabricated wall column in lower section, the i.e. upper end of the other end of sleeve is for another The one prefabricated wall column i.e. reserved steel bar of the prefabricated wall column in top is inserted and is connected by grouting, improves between reinforcing bar The strength and stiffness connected, it is ensured that the safety of structure, and avoid using poisonous the having of electric welding connection generation Evil gas, ensures the working security of workmen, beneficially environmental conservation.
(2) horizontal structure reinforcing bar of the present utility model is before the butted part of the prefabricated wall column of upper and lower pours, The reserved steel bar of the upper end of prefabricated wall column through lower section, and carry out bar connecting, horizontal structure is pre-with upper and lower The butted part formed by integrally casting of wall column processed forms, and the top of concrete of the prefabricated wall column in described lower section is close to described water The lower surface of flat structure.Owing to when the prefabricated wall column of each upper and lower is attached, constructing one layer the most simultaneously Horizontal structure, therefore, has only to the connection of a dry wall intercolumniation between each layer i.e. adjacent level structure, Compare dry wall intercolumniation in the most each layer of Normal practice and connect the way of twice, effectively reduce the steel such as sleeve Use consumption, reduce construction cost.
(3) prefabrication and assembly construction rate of the present utility model is higher, and prefabricated wall column can be the most prefabricated, does not accounts for the duration, Working (machining) efficiency is high, it is possible to effectively accelerating construction progress.
Accompanying drawing explanation
Fig. 1 is the structural representation of the prefabricated wall column one-part form steel bar connecting structure of this utility model one embodiment Figure;
Fig. 2 is the structural representation of the prefabricated wall column one-part form steel bar connecting structure of this utility model one embodiment Figure;
In figure: the prefabricated wall column of 1-, 2-reserved steel bar, 3-sleeve, 4 horizontal structure reinforcing bars, 5-horizontal structure.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, this utility model is described in further detail.According to following Illustrating and claims, advantage of the present utility model and feature will be apparent from.Below will be by cited real Execute example and combine accompanying drawing, describe technology contents of the present utility model and feature in detail.Need to additionally illustrate, attached Figure all uses the form simplified very much and all uses non-ratio accurately, only in order to facilitate, to assist lucidly The purpose of bright this utility model embodiment.For sake of convenience, described below " on ", D score and accompanying drawing Upper and lower direction consistent, but this can not become the restriction of technical solutions of the utility model.
Refer to the prefabricated wall column 1 one-part form bar connecting knot that Fig. 1, Fig. 1 are this utility model one embodiment The structural representation of structure.Present embodiment discloses a kind of prefabricated wall column 1 one-part form steel bar connecting structure, including The prefabricated wall column of upper and lower 1, the upper and lower end of each prefabricated wall column 1 staggers respectively and arranges reserved steel bar 2, The top of the reserved steel bar 2 of the upper end of described prefabricated wall column 1 is provided with external screw thread (not shown) threaded One sleeve 3, described sleeve 3 up/down perforation, the lower end of described sleeve 3 offer for prefabricated wall column 1 The female thread (not shown) that described reserved steel bar 2 is threaded, the upper end barrel of described sleeve 3 is offered One grout hole (not shown), two prefabricated wall columns 1 arranges one end of sleeve 3 the most upward, and top is pre- In the sleeve 3 of the upper end that the reserved steel bar 2 of the lower end of wall column 1 processed is inserted in the prefabricated wall column 1 in lower section, pass through Described grout hole is toward grouting in described sleeve 3, and the butted part concrete of the prefabricated wall column of upper and lower 1 waters Build.This utility model utilizes sleeve 3 not only to realize the convenient connection of two prefabricated wall columns 1, and can improve Being reliably connected of two prefabricated wall columns 1, one end of sleeve 3 i.e. lower end and an i.e. lower section dry wall of prefabricated wall column 1 Reserved steel bar 2 bolt of post 1 connects, and the i.e. upper end of the other end of sleeve 3 is for another prefabricated i.e. top of wall column 1 The reserved steel bar 2 of prefabricated wall column 1 is inserted and is connected by grouting, is effectively increased between reinforcing bar i.e. reinforcing bar and connects The strength and stiffness connect, on the one hand, ensure that the safety of structure, on the other hand, it is to avoid use electric welding to connect The toxic and harmful produced, has ensured the working security of workmen.
Preferably, in above-mentioned prefabricated wall column 1 one-part form steel bar connecting structure, horizontal structure steel is also included Muscle 4, described horizontal structure reinforcing bar 4, before the butted part of the prefabricated wall column of upper and lower 1 pours, passes down The reserved steel bar 2 of the upper end of the prefabricated wall column 1 in side, and carry out bar connecting, horizontal structure 5 is pre-with upper and lower The butted part formed by integrally casting of wall column 1 processed forms, i.e. dotted portion formed by integrally casting in Fig. 1 forms, described The top of concrete of the prefabricated wall column 1 in lower section is close to the lower surface of described horizontal structure 5.Due on every time, When the prefabricated wall column 1 in lower section is attached, one layer of horizontal structure 5 of construction the most simultaneously, therefore, each layer i.e. phase Border on the river the connection (i.e. reinforcing bar one-part form connect) having only between flat structure 5 between the most prefabricated wall column 1, phase Connect the way of twice in layer more each than Normal practice between prefabricated wall column 1, effectively reduce sleeve 3 consumption, Reduce construction cost.
In order to as much as possible toward grouting in sleeve 3, it is preferred that at above-mentioned prefabricated wall column 1 one-part form steel In muscle attachment structure, described grout hole is positioned at the top of the barrel of described sleeve 3.
In order to provide enough working place to workmen, it is preferred that at above-mentioned prefabricated wall column 1 one sections In formula steel bar connecting structure, the length in reserve of described reserved steel bar 2 is 500mm-1000mm.When two is right When need not arrange horizontal structure 5 between the prefabricated wall column 1 connect, the length in reserve of usual reserved steel bar 2 is During about 500mm, the working place needed for workmen can be met;Prefabricated wall column 1 when two docking Between when needing to arrange horizontal structure 5, reserved length needs to increase the thickness of this horizontal structure 5, this Time, general reserved length is between 800mm-1000mm.
Please continue to refer to Fig. 1, the present embodiment also discloses a kind of prefabricated wall column 1 one-part form connecting method for reinforcing bars, The i.e. construction method of prefabricated construction, uses the prefabricated wall column 1 one-part form steel as described in embodiment one Muscle attachment structure, comprises the steps:
The first step, the prefabricated wall column of ground floor 1 of constructing on the basis of wall column;
Second step, lifts the prefabricated wall column of the second layer 1, using the second layer dry wall of wall column 1 prefabricated as top It is upper that the lower end reserved steel bar 2 of post 1 inserts as the prefabricated wall column of ground floor 1 when front lower place dry wall post 1 In the sleeve 3 of the reserved steel bar 2 of end, and grouting material is used to be executed toward grouting in sleeve 3 by reserved grout hole Work;
3rd step, using horizontal structure reinforcing bar 4 through as when the ground floor dry wall of front lower place dry wall post 1 The reserved steel bar 2 of the upper end of post 1, and carry out bar connecting;
4th step, Feng Mohou, to horizontal structure 5 and the butted part of the most upper and lower two prefabricated wall columns 1 Carry out formed by integrally casting.
5th step, repetition second step, to the 4th step, is the most upwards constructed, until completing the prefabricated wall column of all layers The construction of 1.
On the one hand, between prefabricated wall column 1 of the present utility model, reinforcing bar uses sleeve 3 to connect, the one of sleeve 3 End is connected with reserved steel bar 2 bolt of a prefabricated wall column 1, and the other end of sleeve 3 is for another prefabricated wall column 1 Reserved steel bar 2 insert and connected by grouting, improve between reinforcing bar connect strength and stiffness, it is ensured that The safety of structure, and avoid using electric welding to connect the toxic and harmful produced, ensure workmen's Working security, beneficially environmental conservation.
On the other hand, this utility model, when the most adjacent two prefabricated wall columns 1 connect, carries out level simultaneously The construction of structure 5, therefore, has only to the most prefabricated wall column 1 between each layer i.e. adjacent level structure 5 Between connection (i.e. reinforcing bar one-part form connect), connect two in comparing each layer of Normal practice between prefabricated wall column 1 Secondary way, effectively reduces sleeve 3 consumption, reduces construction cost.Additionally, it is pre-in this utility model Wall column 1 processed can be the most prefabricated, does not accounts for the duration, and working (machining) efficiency is high, it is possible to effectively accelerating construction progress.
Preferably, in the described first step, stagger on the basis of described wall column reserved reinforcement foundation, reinforcement foundation Screw top connect a sleeve 3 as above, the reserved steel bar 2 of the lower end of the prefabricated wall column of ground floor 1 Insert in the sleeve 3 of described reinforcement foundation, grouting construction in the sleeve 3 of described reinforcement foundation, after grouting, Wall column 1 prefabricated to ground floor pours after the docking section enfeoffment mould on wall column basis.Due to base plate in advance with Wall column basis is constructed complete together, therefore, is attached between the prefabricated wall column of ground floor 1 and wall column basis Time, it is not necessary to carry out the construction of horizontal structure 5.
Preferably, after the 5th step, by roof steel bar through the prefabricated wall column 1 being currently located at the top The reserved steel bar 2 of upper end, carry out bar connecting, Feng Mohou, top board poured.So, permissible Complete the construction of the top board i.e. horizontal structure of the superiors so that shape between top board and the prefabricated wall column 1 of the top One-tenth is reliably connected.
In the present embodiment, described prefabricated wall column 1 is prefabricated post.Certainly, described prefabricated wall column 1 can also be Dry wall, as shown in Figure 2.The precast wall body method of attachment comparing existing routine is at floor, prefabricated panel Between reserved steel plate, then use bolt to carry out being mechanically connected or use electric welding to connect, adjacent level structure Between precast wall body at least need twice connection construction, not only waste time and energy, the usage amount of corresponding steel plate Relatively big, the problem causing high cost, between prefabricated wall column of the present utility model, reinforcing bar uses sleeve connection, One end of sleeve i.e. lower end is connected with a prefabricated wall column i.e. reserved steel bar bolt of the prefabricated wall column in lower section, sleeve The i.e. upper end of the other end is inserted for another the prefabricated wall column i.e. reserved steel bar of the prefabricated wall column in top and passes through grouting even Connect, improve the strength and stiffness connected between reinforcing bar, it is ensured that the safety of structure, and avoid using electricity Weldering connects the toxic and harmful produced, and ensures the working security of workmen, beneficially environmental conservation.
Additionally, horizontal structure reinforcing bar of the present utility model is before the butted part of the prefabricated wall column of upper and lower pours, The reserved steel bar of the upper end of prefabricated wall column through lower section, and carry out bar connecting, horizontal structure is pre-with upper and lower The butted part formed by integrally casting of wall column processed forms, and the top of concrete of the prefabricated wall column in described lower section is close to described water The lower surface of flat structure.Owing to when the prefabricated wall column of each upper and lower is attached, constructing one layer the most simultaneously Horizontal structure, therefore, has only to the connection of a dry wall intercolumniation between each layer i.e. adjacent level structure, Compare dry wall intercolumniation in the most each layer of Normal practice and connect the way of twice, effectively reduce the steel such as sleeve Use consumption, reduce construction cost.
Foregoing description is only the description to this utility model preferred embodiment, not to this utility model scope Any restriction, any change that the those of ordinary skill in this utility model field does according to the disclosure above content, Modify, belong to the protection domain of claims.

Claims (5)

1. a prefabricated wall column one-part form steel bar connecting structure, including the prefabricated wall column of upper and lower, each pre- The upper and lower end of wall column processed staggers respectively and arranges reserved steel bar, it is characterised in that the upper end of described prefabricated wall column The top of reserved steel bar be provided with external screw thread a threaded sleeve, described sleeve up/down perforation, described set The lower end of cylinder offers the female thread for threadeding with described reserved steel bar, on the upper end barrel of described sleeve Offering a grout hole, the reserved steel bar of the lower end of the prefabricated wall column in top is inserted in the upper end of the prefabricated wall column in lower section In sleeve, being in the milk in described sleeve by described grout hole, the butted part of the prefabricated wall column of upper and lower is used Concreting.
2. the prefabricated wall column one-part form steel bar connecting structure described in claim 1, it is characterised in that also wrap Include horizontal structure reinforcing bar, described horizontal structure reinforcing bar before the butted part of the prefabricated wall column of upper and lower pours, The reserved steel bar of the upper end of prefabricated wall column carry out bar connecting through lower section, horizontal structure is prefabricated with upper and lower The butted part formed by integrally casting of wall column forms, and the top of concrete of the prefabricated wall column in described lower section is close to described level The lower surface of structure.
Prefabricated wall column one-part form steel bar connecting structure the most as claimed in claim 1, it is characterised in that institute The length in reserve stating reserved steel bar is 500mm-1000mm.
Prefabricated wall column one-part form steel bar connecting structure the most as claimed in claim 1, it is characterised in that institute Stating prefabricated wall column is dry wall.
Prefabricated wall column one-part form steel bar connecting structure the most as claimed in claim 1, it is characterised in that institute Stating prefabricated wall column is prefabricated post.
CN201620256127.4U 2016-03-30 2016-03-30 A prefabricated wall post segmentation steel bar connection structure Expired - Fee Related CN205557818U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620256127.4U CN205557818U (en) 2016-03-30 2016-03-30 A prefabricated wall post segmentation steel bar connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620256127.4U CN205557818U (en) 2016-03-30 2016-03-30 A prefabricated wall post segmentation steel bar connection structure

Publications (1)

Publication Number Publication Date
CN205557818U true CN205557818U (en) 2016-09-07

Family

ID=56813232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620256127.4U Expired - Fee Related CN205557818U (en) 2016-03-30 2016-03-30 A prefabricated wall post segmentation steel bar connection structure

Country Status (1)

Country Link
CN (1) CN205557818U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735466A (en) * 2016-03-30 2016-07-06 上海建工二建集团有限公司 Prefabricated wall column one-segment type steel rib connection structure and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735466A (en) * 2016-03-30 2016-07-06 上海建工二建集团有限公司 Prefabricated wall column one-segment type steel rib connection structure and method
CN105735466B (en) * 2016-03-30 2018-12-18 上海建工二建集团有限公司 Prefabricated wall column one-part form steel bar connecting structure and method

Similar Documents

Publication Publication Date Title
CN105735466B (en) Prefabricated wall column one-part form steel bar connecting structure and method
CN104947803B (en) A kind of prefabricated sheet-pile mortise and tenon type connecting node and installation method
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN207211366U (en) The attachment structure of prefabricated beam column
CN205242773U (en) Adopt prefabricated assembled steel - concrete combination beam of cant chisei connection
CN105926775A (en) Novel concrete-filled steel tube beam column joint
CN106567458A (en) Assembly type steel-concrete combined beam column frame structure system
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN207003634U (en) A kind of balcony slab installs node
CN110424529B (en) Prefabricated cantilever beam balcony and construction method
CN205557818U (en) A prefabricated wall post segmentation steel bar connection structure
CN206844316U (en) A kind of assembled steel reinforced concrete column with well and post splicing node
CN206352340U (en) Connecting node between precast concrete column and pedestal
CN206128281U (en) Balcony board installation node
CN205654090U (en) Entrance to a cave strutting arrangement is reserved to floor
CN204570446U (en) The T-shaped simply supported beam of a kind of precast assembly
CN205712471U (en) A kind of prefabricated building structure post
CN206359882U (en) A kind of assembled solid steel tube constrains reinforced column squat pier
CN206625348U (en) A kind of assembled integral bean column node
CN205976166U (en) Assembled composite floor slab
CN206233359U (en) A kind of assembled architecture reinforced concrete member
CN205712473U (en) A kind of PC beam column node connection device
CN207032011U (en) A kind of assembled steel tube constrains reinfored concrete line frame bridge pier

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant