CN207211366U - The attachment structure of prefabricated beam column - Google Patents

The attachment structure of prefabricated beam column Download PDF

Info

Publication number
CN207211366U
CN207211366U CN201721114611.4U CN201721114611U CN207211366U CN 207211366 U CN207211366 U CN 207211366U CN 201721114611 U CN201721114611 U CN 201721114611U CN 207211366 U CN207211366 U CN 207211366U
Authority
CN
China
Prior art keywords
prefabricated post
prefabricated
chamber
attachment structure
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721114611.4U
Other languages
Chinese (zh)
Inventor
李敏勇
甘立华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaihua Gangxiang Pipe Ltd Co
Original Assignee
Huaihua Gangxiang Pipe Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaihua Gangxiang Pipe Ltd Co filed Critical Huaihua Gangxiang Pipe Ltd Co
Priority to CN201721114611.4U priority Critical patent/CN207211366U/en
Application granted granted Critical
Publication of CN207211366U publication Critical patent/CN207211366U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

It the utility model is related to a kind of attachment structure of prefabricated beam column, it includes prefabricated post, lower prefabricated post and multiple precast beams, the end of the precast beam is provided with boss, the boss is provided with preformed hole, the preformed hole on the boss passes through the lower prop bar splicing of the lower prefabricated post in the lower prefabricated post, the upper prop reinforcing bar of the upper prefabricated post is provided with sleeve, the lower prop reinforcing bar and the docking sleeve, the surrounding of the upper prop reinforcing bar, which is poured, builds up side wall, make the bottom formation one end open of the upper prefabricated post pours chamber, the side for pouring chamber is reserved with pouring hole.Upper prefabricated post, lower prefabricated post and the precast beam structure that the utility model uses, structural strength is high after connection, the upper prefabricated post is designed to that bottom has the structure for pouring chamber, when there is 4 precast beam overlap joints, it can make to pour the cavity that chamber forms relatively closing, it can avoid carrying out pouring die-filling, greatly improve efficiency of construction, while also reduce manpower and materials.

Description

The attachment structure of prefabricated beam column
Technical field
It the utility model is related to building field, more particularly to a kind of attachment structure of prefabricated beam column.
Background technology
With the fast development of building trade, traditional cast in situs is due to wasting time and energy, construction cost is high, construction is not square Just the arena of history is gradually backed out, the substitute is the emergence of prefabrication.Current assembled architecture is prefabricated There are various ways, what wherein structural strength was higher is by the way of after-pouring is overlapped, and in reality in the attachment structure of beam column In the work progress on border, pouring needs to carry out die-filling, and existing prefabricated beam column attachment structure design is unreasonable, causes die-filling work Measure larger, have a strong impact on the progress of engineering, also add manpower and materials.
Utility model content
In view of the shortcomings of the prior art, a kind of structure stable connection of the utility model offer is reliable, can reduce or avoid dress The attachment structure of the prefabricated beam column of mould workload.
Technical scheme is used by the utility model solves its technical problem:The attachment structure of the prefabricated beam column includes Upper prefabricated post, lower prefabricated post and multiple precast beams, the end of the precast beam are provided with boss, and the boss is provided with preformed hole, The preformed hole on the boss passes through the lower prop bar splicing of the lower prefabricated post in the lower prefabricated post, described prefabricated The upper prop reinforcing bar of post is provided with sleeve, the lower prop reinforcing bar and the docking sleeve, and the surrounding of the upper prop reinforcing bar, which is poured, builds up side Wall, the bottom of the upper prefabricated post is formed one end open and pour chamber, the side for pouring chamber is reserved with pouring hole.
In a kind of preferred embodiment of the attachment structure of prefabricated beam column provided by the utility model, the chamber that pours passes through Pouring hole penetration concrete.
In a kind of preferred embodiment of the attachment structure of prefabricated beam column provided by the utility model, the sleeve uses ripple The stainless steel sleeve of line shape.
In a kind of preferred embodiment of the attachment structure of prefabricated beam column provided by the utility model, the sleeve with it is described Welded after lower prop steel reinforcement abutting joints.
Compared with prior art, the beneficial effect of the attachment structure of prefabricated beam column provided by the utility model is:This practicality Upper prefabricated post, lower prefabricated post and the precast beam structure of new use, structural strength is high after connection, and the upper prefabricated post is designed to Bottom, which has, pours the structure of chamber, when there is 4 precast beams overlap joints, can make to pour the cavity that chamber forms relatively closing, can avoid into Row pours die-filling, greatly improves efficiency of construction, while also reduce manpower and materials.
Brief description of the drawings
, below will be to needed for embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model The accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings Other accompanying drawings are obtained, wherein:
Fig. 1 is the structural representation of the attachment structure of prefabricated beam column provided by the utility model.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only part of the embodiment of the present utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The all other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, the attachment structure 1 of the prefabricated beam column includes upper prefabricated post 11, lower prefabricated post 12 and multiple prefabricated Beam 13, the end of the precast beam 13 are provided with boss 132, and the boss 132 is provided with preformed hole 1320, on the boss 132 The preformed hole 1320 be overlapped in the lower prefabricated post 12 through the lower prop reinforcing bar 122 of the lower prefabricated post 12, it is described pre- The upper prop reinforcing bar 112 of post 11 processed is provided with sleeve 14, and the lower prop reinforcing bar 122 docks with the sleeve 14, the upper prop reinforcing bar 112 surrounding, which is poured, builds up side wall 111, makes what one end open formed on the bottom of the upper prefabricated post 11 to pour chamber 110, described to pour The side of chamber 110 is reserved with pouring hole 113.
Further, the chamber 110 that pours passes through the penetration concrete 15 of pouring hole 113.
Further, for the sleeve 14 using undulatory stainless steel sleeve, the connection that can improve sleeve and concrete is strong Degree.
Further, the sleeve 14 welds after being docked with the lower prop reinforcing bar 122.
The beneficial effect of the attachment structure 1 of prefabricated beam column provided by the utility model is:The utility model uses upper pre- Post 11, lower prefabricated post 12 and the structure of precast beam 13 processed, structural strength is high after connection, and the upper prefabricated post 11 is designed into bottom has There is the structure for pouring chamber 110, when there are 4 precast beams 13 to overlap, can make to pour the cavity that chamber 110 forms relatively closing, can avoid Pour die-filling, greatly improve efficiency of construction, while also reduce manpower and materials.
Embodiment of the present utility model is the foregoing is only, not thereby limits the scope of the claims of the present utility model, it is every The equivalent structure or equivalent flow conversion made using the utility model description, or directly or indirectly it is used in other phases The technical field of pass, similarly it is included within scope of patent protection of the present utility model.

Claims (4)

  1. A kind of 1. attachment structure of prefabricated beam column, it is characterised in that:Including upper prefabricated post, lower prefabricated post and multiple precast beams, institute The end for stating precast beam is provided with boss, and the boss is provided with preformed hole, and the preformed hole on the boss is through under described The lower prop bar splicing of prefabricated post is provided with sleeve, the lower prop in the lower prefabricated post, the upper prop reinforcing bar of the upper prefabricated post Reinforcing bar and the docking sleeve, the surrounding of the upper prop reinforcing bar, which is poured, builds up side wall, the bottom of the upper prefabricated post is formed one end Opening pours chamber, and the side for pouring chamber is reserved with pouring hole.
  2. 2. the attachment structure of prefabricated beam column according to claim 1, it is characterised in that:The chamber that pours is filled by pouring hole Enter concrete.
  3. 3. the attachment structure of prefabricated beam column according to claim 1, it is characterised in that:The sleeve using it is undulatory not Become rusty steel bushing.
  4. 4. the attachment structure of the prefabricated beam column according to claim 1 or 3, it is characterised in that:The sleeve and the lower prop Welded after steel reinforcement abutting joints.
CN201721114611.4U 2017-08-31 2017-08-31 The attachment structure of prefabricated beam column Expired - Fee Related CN207211366U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721114611.4U CN207211366U (en) 2017-08-31 2017-08-31 The attachment structure of prefabricated beam column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721114611.4U CN207211366U (en) 2017-08-31 2017-08-31 The attachment structure of prefabricated beam column

Publications (1)

Publication Number Publication Date
CN207211366U true CN207211366U (en) 2018-04-10

Family

ID=61826539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721114611.4U Expired - Fee Related CN207211366U (en) 2017-08-31 2017-08-31 The attachment structure of prefabricated beam column

Country Status (1)

Country Link
CN (1) CN207211366U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532834A (en) * 2018-06-22 2018-09-14 中国五冶集团有限公司 A kind of assembled architecture frame column reperfusion structure
CN108867860A (en) * 2018-07-16 2018-11-23 西北民族大学 A kind of precast reinforced concrete beam plate body system and prefabricated rod structure entirety assembling constructing method
CN109779013A (en) * 2019-02-26 2019-05-21 甘肃安居建设工程集团有限公司 A kind of connection method of assembly concrete building prefabrication intercolumniation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532834A (en) * 2018-06-22 2018-09-14 中国五冶集团有限公司 A kind of assembled architecture frame column reperfusion structure
CN108532834B (en) * 2018-06-22 2023-08-18 中国五冶集团有限公司 Assembled building frame post fills structure
CN108867860A (en) * 2018-07-16 2018-11-23 西北民族大学 A kind of precast reinforced concrete beam plate body system and prefabricated rod structure entirety assembling constructing method
CN109779013A (en) * 2019-02-26 2019-05-21 甘肃安居建设工程集团有限公司 A kind of connection method of assembly concrete building prefabrication intercolumniation

Similar Documents

Publication Publication Date Title
CN106381925A (en) Prefabricated reinforced concrete column and column splice joint with sleeves
CN107254884A (en) A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node
CN207211366U (en) The attachment structure of prefabricated beam column
CN108360678B (en) A kind of assembled beam-column node tenon connection structure
CN202831233U (en) Connected node of protracting inner diaphragm steel girder and concrete-filled steel-tubular columns inscribed a pipe coat
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN205242773U (en) Adopt prefabricated assembled steel - concrete combination beam of cant chisei connection
CN105926775A (en) Novel concrete-filled steel tube beam column joint
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN206512590U (en) A kind of assembled hollow steel pipe constrains reinforced column squat pier
CN210458914U (en) Connecting structure of prefabricated bridge pier stud and capping beam
CN209260897U (en) Assembly concrete beam column sleeve combination connecting node
CN205776755U (en) A kind of encased steel plate multi-cavity combination type shear wall core wall structure system
CN206844316U (en) A kind of assembled steel reinforced concrete column with well and post splicing node
CN108086134A (en) A kind of assembled hollow steel pipe constrains armored concrete pillar height pier
CN206693403U (en) A kind of steel core concrete column and connected mode
CN114135000A (en) Assembled beam-column connecting joint partially wrapped with U-shaped steel and construction method thereof
CN206428805U (en) A kind of concrete prefabricated balcony of assembled steel
CN202175949U (en) Cone-shaped light prefabricated concrete core pile
CN205530819U (en) Steel frame structure of embedded precast concrete shear force wall bending resistance simultaneously
CN210767266U (en) Prefabricated assembled type stiffening concrete column member node connecting structure
CN202831232U (en) Connected node of protracting inner diaphragm steel girder and concrete-filled steel-tubular columns containing a pipe coat
CN209457142U (en) A kind of precast concrete composite beam and prefabricated column connected node
CN204456670U (en) Fabricated construction straight screw sleeve connection joint
CN114263274B (en) Novel hollow interlayer steel pipe concrete member and connecting method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

Termination date: 20210831