CN109779013A - A kind of connection method of assembly concrete building prefabrication intercolumniation - Google Patents

A kind of connection method of assembly concrete building prefabrication intercolumniation Download PDF

Info

Publication number
CN109779013A
CN109779013A CN201910141775.3A CN201910141775A CN109779013A CN 109779013 A CN109779013 A CN 109779013A CN 201910141775 A CN201910141775 A CN 201910141775A CN 109779013 A CN109779013 A CN 109779013A
Authority
CN
China
Prior art keywords
concrete
intercolumniation
prefabricated post
column
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910141775.3A
Other languages
Chinese (zh)
Inventor
刘俊
刘广建
马文晶
刘亚雄
韩晓龙
李海林
姚喜宁
汪生亮
罗智斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU ANJU CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
GANSU ANJU CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU ANJU CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical GANSU ANJU CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201910141775.3A priority Critical patent/CN109779013A/en
Publication of CN109779013A publication Critical patent/CN109779013A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of connection methods of assembly concrete building prefabrication intercolumniation, the connection of column muscle and column muscle between upper prefabricated post and lower prefabricated post is using connection sleeve, it connects sleeve and carries out radial compression, so that connection sleeve is generated plastic deformation and be mutually twisted forming an entirety with column muscle.More efficient, quality the controllability that the invention can be such that column pours with column connected node is stronger, process more simplifies, facilitate easy to learn, solves the problems, such as material leakiness and Material shrinkage during slip casting, greatly improve the pouring quality of node and the stability of node.

Description

A kind of connection method of assembly concrete building prefabrication intercolumniation
Technical field
The invention belongs to assemble building field, it is related to a kind of connection method of assembly concrete building prefabrication intercolumniation.
Background technique
During prefabricated integral frame structure practice of construction, prefabricated components junction is often the difficult point institute to construct It is not easy to carry out construction positioning in, lifting components, and then reduces construction quality and assembly efficiency;Junction stress performance is poor, in turn Influence the stability etc. of total.
For assembled architecture, column-column connection is construction key place again, and the connection of column muscle mostly uses slip casting set at present The forms such as cylinder connects, screw shell is connected and is bolted, but also suffer from certain drawbacks simultaneously, such as slip casting sleeve connection exists Since worker's technology is irregular in mortar depositing construction, the later period, which does not see the effect of slip casting, can not touch, and not can guarantee the effect of slip casting Fruit finally influences construction quality.Screw shell is bolted the disadvantages of cumbersome presence construction, poor seismic behavior.
For assembled architecture, the connection of column-column belongs to longitudinally connected, and column has connect that there are one afterwards to pour with column reinforcing bar Section, this, which pours section and generallys use template enclosing, carries out cast-in-place, and Material shrinkage, which usually will cause, to be poured section leakiness and can not connect completely The problems such as connecing.
Summary of the invention
In view of this, the purpose of the present invention is to provide one kind to be able to solve material uncompacted assembly during slip casting The connection method of the prefabricated intercolumniation of formula concrete construction.
In order to achieve the above objectives, the invention provides the following technical scheme:
A kind of connection method of assembly concrete building prefabrication intercolumniation, column muscle between upper prefabricated post and lower prefabricated post with The connection of column muscle carries out radial compression using connection sleeve, connection sleeve, so that connection sleeve is generated plastic deformation and carries out with column muscle It is mutually twisted to form an entirety.
Further, concrete casting channel is reserved in upper prefabricated post, concrete is poured channel from the side of upper prefabricated post Wall extends through the bottom of prefabricated post obliquely.
Further, the concrete pouring gate in concrete casting channel is located on the side wall of upper prefabricated post, concrete casting Channel is tetragonous centrum, and small lower mouth suitable for reading is big.
Further, the quantity of concrete pouring gate can be 1-2.
Further, the casting section between upper prefabricated post and lower prefabricated post, which carries out pouring a section template in casting concrete, encloses Gear carries out floating processing in column side wall to after pouring completely by concrete casting channel progress casting concrete.
Further, at prefabricated upper prefabricated post lower end, pre-buried conduit in upper prefabricated post.
Further, the lower end of conduit is flushed with the lower end surface of upper prefabricated post.
Further, the casting section between upper prefabricated post and lower prefabricated post, which carries out pouring a section template in casting concrete, encloses Gear, by conduit, fill concrete, conduit are used for casting concrete and exhaust, pulp, are led until filling in casting section Pipe upper end smoothes out after overflowing concrete.
Further, it uses hydraulic pump as power source, sleeve will be connected by extruder and mutually squeezed along diameter.
The beneficial effects of the present invention are:
More efficient, quality the controllability that the invention can be such that column pours with column connected node is stronger, and process is more Simplify, facilitate easy to learn, solves the problems, such as material leakiness and Material shrinkage during slip casting, greatly improve The pouring quality of node and the stability of node.
Detailed description of the invention
In order to keep the purpose of the present invention, technical scheme and beneficial effects clearer, the present invention provides following attached drawing and carries out Illustrate:
Fig. 1 is that the upper prefabricated post of the invention and lower prefabricated post pass through the structural schematic diagram after connection sleeve connection;
Fig. 2 is that the casting section of the invention pours the structural schematic diagram after being poured in concrete.
Description of symbols:
1, upper prefabricated post;11, concrete is poured channel;111, concrete pouring gate;2, lower prefabricated post;3, sleeve is connected; 4, it is poured section.
Specific embodiment
Below in conjunction with attached drawing, a preferred embodiment of the present invention will be described in detail.
As shown in Figure 1, 2, a kind of connection method of assembly concrete building prefabrication intercolumniation, upper prefabricated post 1 are prefabricated under Column muscle column muscle between column 2, which connect sleeve 3 using squeeze with the connection of column muscle, convenient and efficient can be efficiently completed column muscle Connection.The column muscle of upper prefabricated post 1 and lower prefabricated post 2 is respectively protruding into connection sleeve 3, is used hydraulic pump as power source, is passed through Extruder will connect sleeve 3 and mutually squeeze along diameter, make to connect the generation of sleeve 3 plastic deformation and column muscle carries out being mutually twisted to form one It is whole.
Embodiment one, concrete casting channel 11 is reserved in upper prefabricated post 1, and concrete is poured channel 11 from upper prefabricated post 1 side wall extends through the bottom of prefabricated post 1 obliquely, and the concrete pouring gate 111 that concrete is poured channel 11 is located at upper pre- On the side wall of column 1 processed, it is tetragonous centrum that concrete, which is poured channel 11, and small lower mouth suitable for reading is big, and the quantity of concrete pouring gate 111 can Think 1-2.
This structure pours section constructing method are as follows:
Column muscle between upper prefabricated post 1 and lower prefabricated post 2 is connected by connection sleeve 3, carries out radial squeeze to connection sleeve Pressure makes to connect sleeve generation plastic deformation and column muscle be mutually twisted forming an entirety;Upper prefabricated post 1 and lower prefabricated post 2 Between casting section 4 carry out pouring 4 template enclosing of section in casting concrete, by concrete be poured channel 11 pour it is mixed Solidifying soil carries out floating processing in column side wall to after pouring completely.By concrete gravity, vibrating head has vibrated this method in addition The quality of connection of section 4 Yu prefabricated post can be guaranteed to pour entirely.
Penetration concrete in the chamber that section 4 is surrounded by dustpan mouth to its template is being poured, this method usually can not It fills completely.
Embodiment two, at prefabricated upper 1 lower end of prefabricated post, pre-buried conduit in upper prefabricated post 1, the lower end of conduit with it is upper prefabricated The lower end surface of column 1 flushes, and conduit is used for casting concrete and exhaust, pulp, smoothes out until filling spilling.
More efficient, quality the controllability that this method can be such that column pours with column connected node is stronger, and process more simplifies, Facilitate easy to learn, solves the problems, such as material leakiness and Material shrinkage during slip casting, greatly improve node Pouring quality.
Finally, it is stated that preferred embodiment above is only used to illustrate the technical scheme of the present invention and not to limit it, although logical It crosses above preferred embodiment the present invention is described in detail, however, those skilled in the art should understand that, can be Various changes are made to it in form and in details, without departing from claims of the present invention limited range.

Claims (9)

1. a kind of connection method of assembly concrete building prefabrication intercolumniation, it is characterised in that: upper prefabricated post (1) and lower prefabricated post (2) connection of column muscle and column muscle between carries out radial compression using connection sleeve (3), connection sleeve (3), makes to connect sleeve (3) plastic deformation is generated be mutually twisted forming an entirety with column muscle.
2. the connection method of assembly concrete building prefabrication intercolumniation according to claim 1, it is characterised in that: upper prefabricated Concrete casting channel (11) is reserved in column (1), concrete casting channel (11) is passed through obliquely from the side wall of upper prefabricated post (1) Through the bottom of upper prefabricated post (1).
3. the connection method of assembly concrete building prefabrication intercolumniation according to claim 2, it is characterised in that: concrete The concrete pouring gate (111) of casting channel (11) is located on the side wall of upper prefabricated post (1), and it is four that concrete, which is poured channel (11), Pyramid body, small lower mouth suitable for reading are big.
4. the connection method of assembly concrete building prefabrication intercolumniation according to claim 3, it is characterised in that: concrete The quantity at sprue gate (111) is 1-2.
5. the connection method of assembly concrete building prefabrication intercolumniation according to claim 2, it is characterised in that: upper prefabricated Casting section (4) between column (1) and lower prefabricated post (2) carries out pouring a section template (4) enclosing in casting concrete, passes through coagulation Soil casting channel (11) carries out casting concrete and carries out floating processing in column side wall to after pouring completely.
6. the connection method of assembly concrete building prefabrication intercolumniation according to claim 1, it is characterised in that: prefabricated When upper prefabricated post (1) lower end, pre-buried conduit in upper prefabricated post (1).
7. the connection method of assembly concrete building prefabrication intercolumniation according to claim 6, it is characterised in that: conduit Lower end is flushed with the lower end surface of upper prefabricated post (1).
8. the connection method of assembly concrete building prefabrication intercolumniation according to claim 6, it is characterised in that: upper prefabricated Casting section (4) between column (1) and lower prefabricated post (2) carries out pouring section (4) template enclosing in casting concrete, passes through conduit Toward casting section (3) interior fill concrete, conduit is used for casting concrete and exhaust, pulp, is overflow until filling conduit upper end It is smoothed out after concrete out.
9. the connection method of assembly concrete building prefabrication intercolumniation according to claim 1, it is characterised in that: with hydraulic Pump is used as power source, will connect sleeve (3) by extruder and mutually squeeze along diameter.
CN201910141775.3A 2019-02-26 2019-02-26 A kind of connection method of assembly concrete building prefabrication intercolumniation Pending CN109779013A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910141775.3A CN109779013A (en) 2019-02-26 2019-02-26 A kind of connection method of assembly concrete building prefabrication intercolumniation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910141775.3A CN109779013A (en) 2019-02-26 2019-02-26 A kind of connection method of assembly concrete building prefabrication intercolumniation

Publications (1)

Publication Number Publication Date
CN109779013A true CN109779013A (en) 2019-05-21

Family

ID=66486328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910141775.3A Pending CN109779013A (en) 2019-02-26 2019-02-26 A kind of connection method of assembly concrete building prefabrication intercolumniation

Country Status (1)

Country Link
CN (1) CN109779013A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216411A (en) * 2021-04-20 2021-08-06 王萍 Prefabricated column contact mounting and connecting method for prefabricated building
CN113882510A (en) * 2021-11-18 2022-01-04 中南大学 Fabricated concrete structure beam column joint connection structure and construction process
CN115419168A (en) * 2022-09-01 2022-12-02 中冶赛迪工程技术股份有限公司 Construction method for rapid pressure grouting of bottom of prefabricated column

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787733A (en) * 2010-03-03 2010-07-28 管乃彦 Prefabricated vertical member
CN205000554U (en) * 2015-09-25 2016-01-27 赵洪波 A concrete column for assembling overall structure
CN105951987A (en) * 2016-06-23 2016-09-21 杭州江润科技有限公司 Sub-frame post-cast joint with external permanent aluminum plate outer mold
CN106703291A (en) * 2016-11-30 2017-05-24 上海建工二建集团有限公司 Joint pouring structure between prefabricated columns and construction method thereof
CN107654021A (en) * 2017-10-25 2018-02-02 程丹松 A kind of assembling prefabricated reinforced concrete column and assembled combination frame building system
CN207211366U (en) * 2017-08-31 2018-04-10 怀化市港翔管桩有限公司 The attachment structure of prefabricated beam column
JP2018131899A (en) * 2018-04-20 2018-08-23 清水建設株式会社 PCa member

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787733A (en) * 2010-03-03 2010-07-28 管乃彦 Prefabricated vertical member
CN205000554U (en) * 2015-09-25 2016-01-27 赵洪波 A concrete column for assembling overall structure
CN105951987A (en) * 2016-06-23 2016-09-21 杭州江润科技有限公司 Sub-frame post-cast joint with external permanent aluminum plate outer mold
CN106703291A (en) * 2016-11-30 2017-05-24 上海建工二建集团有限公司 Joint pouring structure between prefabricated columns and construction method thereof
CN207211366U (en) * 2017-08-31 2018-04-10 怀化市港翔管桩有限公司 The attachment structure of prefabricated beam column
CN107654021A (en) * 2017-10-25 2018-02-02 程丹松 A kind of assembling prefabricated reinforced concrete column and assembled combination frame building system
JP2018131899A (en) * 2018-04-20 2018-08-23 清水建設株式会社 PCa member

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216411A (en) * 2021-04-20 2021-08-06 王萍 Prefabricated column contact mounting and connecting method for prefabricated building
CN113882510A (en) * 2021-11-18 2022-01-04 中南大学 Fabricated concrete structure beam column joint connection structure and construction process
CN115419168A (en) * 2022-09-01 2022-12-02 中冶赛迪工程技术股份有限公司 Construction method for rapid pressure grouting of bottom of prefabricated column

Similar Documents

Publication Publication Date Title
CN109779013A (en) A kind of connection method of assembly concrete building prefabrication intercolumniation
CN206646642U (en) A kind of assembled architecture post and column connected node
CN105298020B (en) Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof
CN103132656A (en) Connecting structure for vertical reinforcement bars of prefabricated wall parts
CN207332121U (en) A kind of PC components grout sleeve fixation kit
CN104895324B (en) A kind of construction method of the huge plug-in type suspension column structure of reinforced concrete composite structure
CN208220000U (en) A kind of prefabricated assembled component grout sleeve plug component
CN202265822U (en) Pile forming device for cast-in-situ concrete thin-wall piles
CN206971732U (en) A kind of doubly-linked beam forms pouring structure
CN109162199A (en) Assembling-type precast pier connection structure and its construction method
CN206570955U (en) A kind of prefabricated post single hole provisions for grouting
CN101255691A (en) Construction method for complete casing tube thin wall filling pile and movable internal mold
CN108412094A (en) The construction method and device of the hollow concrete wall of masonry between a kind of replacement shear wall
CN105804403B (en) Big scale of construction special-shaped stiffness concrete column body slips ball concrete pouring structure and method on the ground
CN206328954U (en) Node pouring structure between prefabricated assembled post and post
CN205577430U (en) Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground
CN108867361A (en) A kind of half grout sleeve connection prefabricated assembling type reinforced concrete side crashproof guardrail
CN108222656A (en) The construction method of Prefabricated enclosure wall
CN114704293B (en) Tunnel secondary lining vault anti-run-out multi-angle slip casting device
CN106703291A (en) Joint pouring structure between prefabricated columns and construction method thereof
CN102296593A (en) Cylindrical compound bored concrete pile of concrete gravels and construction process thereof
CN217204017U (en) Pre-buried grout structure of underground continuous wall framing department
CN206647046U (en) A kind of PHC pipe piles core device native clearly
CN105926652B (en) A kind of reinforcement means and structure of earth-retaining sloping core
CN202108039U (en) Cylindrical compound concrete macadam placepile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521