CN108086134A - A kind of assembled hollow steel pipe constrains armored concrete pillar height pier - Google Patents
A kind of assembled hollow steel pipe constrains armored concrete pillar height pier Download PDFInfo
- Publication number
- CN108086134A CN108086134A CN201611046790.2A CN201611046790A CN108086134A CN 108086134 A CN108086134 A CN 108086134A CN 201611046790 A CN201611046790 A CN 201611046790A CN 108086134 A CN108086134 A CN 108086134A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- concrete
- column
- foundation
- concrete column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 146
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 142
- 239000010959 steel Substances 0.000 title claims abstract description 142
- 239000000463 material Substances 0.000 claims abstract description 40
- 239000011440 grout Substances 0.000 claims description 65
- 230000002787 reinforcement Effects 0.000 claims description 24
- 210000003205 muscle Anatomy 0.000 claims description 18
- 210000005239 tubule Anatomy 0.000 claims description 13
- 239000011796 hollow space material Substances 0.000 claims description 11
- 239000011178 precast concrete Substances 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 238000009955 starching Methods 0.000 claims 2
- 238000010276 construction Methods 0.000 abstract description 11
- 230000008901 benefit Effects 0.000 abstract description 8
- 239000011150 reinforced concrete Substances 0.000 abstract description 7
- 238000005452 bending Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012946 outsourcing Methods 0.000 description 2
- 230000008602 contraction Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000008267 milk Substances 0.000 description 1
- 210000004080 milk Anatomy 0.000 description 1
- 235000013336 milk Nutrition 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/268—Composite concrete-metal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Bridges Or Land Bridges (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
A kind of assembled hollow steel pipe constrains armored concrete pillar height pier, it belongs to a kind of bridge structure component.In order to promote novel fabricated steel tube confinement reinforced concrete structure in bridge structure, play its structural mechanical property advantage, it makes full use of material and reduces materials'use amount, improve economic performance, it accelerates construction progress, the present invention provides a kind of assembled steel tubes to constrain the only pillar height pier of armored concrete.The assembled hollow steel pipe constraint only pillar height pier of armored concrete is that hollow steel pipe constraint Reinforced Concrete Short Column is prefabricated in the factory, and scene is connected by otic placode with steel plate, is connected finally by grouting.Precast hollow steel tube confinement reinforced concrete circular column in the present invention, which has, makes full use of the strength of materials, and fire-resistance anti-seismic performance is good, it is good in economic efficiency the advantages that.The present invention using fabricated construction, have many advantages, such as speed of application is fast, construction quality is high, construction environment improvement, working condition improvement, energy resource saving, cost savings.
Description
Technical field
The invention belongs to a kind of bridge structure components, more particularly to the assembled hollow steel pipe constraint only pillar height of armored concrete
Pier and its mounting process.
Background technology
Steel tube confinement armored concrete is the fill concrete in thin-wall steel tube, and steel pipe does not directly take on external loads, and
A kind of combined member of effect of contraction is mainly played to core concrete.Steel tube confinement reinforced column high capacity, antidetonation and
Fire resistance is superior, can make full use of the intensity of high-strength steel and concrete.When steel tube confinement reinforced concrete member Covered with Angles
Manage for circle when, steel pipe constrains core concrete uniform, can make full use of the tensile strength of steel pipe, economic benefit is good.With
The development of urban transportation, Urban Bridge is also higher and higher to bridge pier requirement, can save material using hollow section column, simultaneously
The bending resistance and anti-twisting property, the type bridge pier for improving bridge pier are found broad application in Urban Bridge.China just progressively pushes away at present
Wide building industrialization, industrialized building not only have many advantages, such as that speed of application is fast, construction quality is high, construction environment improves, and
Meet sustainable development requirement.The assembled hollow steel pipe constraint only column bridge of armored concrete is proposed according to industrialized building feature
Pier.
The content of the invention
In order in bridge structure promote novel fabricated steel tube confinement reinforced concrete structure, play its mechanical property,
It makes full use of material, improve economic performance, the advantages such as accelerate construction progress, and assembled steel tube is used in higher bridge
This technology of constraint armored concrete, the present invention provides a kind of assembled steel tubes to constrain the only pillar height pier of armored concrete.
For hollow existing the object of the invention the technical solution adopted is that such, a kind of assembled hollow steel pipe constrains reinforcing bar
Concrete pillar height pier, it is characterised in that:Including the pier bottom concrete column being prefabricated in the factory and several concrete short columns and scene
The foundation of construction.
There is the muscle cage of annular inside the pier bottom concrete column.The concrete column outside steel pipe.Among the muscle cage
It is lower end opening, the hollow space of upper end closed.The lower surface of the pier bottom concrete column has special grout sleeve.
Before the special grout sleeve is formed, two rings need to be reserved in concrete column lower surface in precast concrete column
Connected in star.Between the two annular grooves, there are several pipelines to communicate.
The outer surface of the steel pipe has several holes.The outer surface of these holes connection steel pipe and an outer ring
Connected in star.
The foundation is by concreting, internal pre-buried several longitudinal reinforcements and shaped steel shear key.These longitudinal directions
The upper surface of foundation is exposed in the upper end of reinforcing bar, and surrounds two annulus.Also basis is exposed in the upper end of the shaped steel shear key
Partial upper surface, and in the center of two annulus.
At least one grout lines are reserved in the foundation.
When the concrete column is lifted into the foundation top, the lower end of the steel pipe and the foundation
Upper surface contact.There is gap between the upper surface of the concrete column and the foundation.The longitudinal reinforcement
Upper end is stretched into two annular grooves.The upper end of the shaped steel shear key is stretched into hollow space.The grout lines
One end nozzle covered by concrete column, other end nozzle is not covered by concrete column.
Grouting material is poured by the space of the hole and/or grout lines between concrete column and foundation.
The grouting material is filled in two annular grooves, forms special grout sleeve.The special grout sleeve include grout sleeve I,
Grout sleeve II and tubule.Grout sleeve I and grout sleeve II is located in two annular grooves respectively, and tubule is to freeze solidly on connection
Grouting material in the pipeline of two annular grooves.
The concrete short column outside steel pipe.Have inside the concrete short column by short column longitudinal reinforcement and short column stirrup
Bind the muscle cage formed.
The lower end outer surface of the outside steel pipe is welded with several otic placodes.It equally welds outside steel pipe upper end outer surface
There are several otic placodes.By junction steel plate, the otic placode of outside steel pipe and outside steel pipe is linked together.The concrete short column and
Gap between pier bottom concrete column has grouting material.The grouting material is perfused by the through hole on outside steel pipe tube wall.
The present invention another hollow mode of applying be:A kind of assembled hollow steel pipe constrains armored concrete pillar height pier, including
The pier bottom concrete column and the foundation of site operation being prefabricated in the factory.
There is the muscle cage of annular inside the pier bottom concrete column.The concrete column outside steel pipe.Among the muscle cage
It is lower end opening, the hollow space of upper end closed.The lower surface of the pier bottom concrete column has special grout sleeve.
Before the special grout sleeve is formed, two rings need to be reserved in concrete column lower surface in precast concrete column
Connected in star.Between the two annular grooves, there are several pipelines to communicate.
The outer surface of the steel pipe has several holes.The outer surface of these holes connection steel pipe and an outer ring
Connected in star.
The foundation is by concreting, internal pre-buried several longitudinal reinforcements.The upper end dew of these longitudinal reinforcements
Go out the upper surface of foundation, and surround two annulus.The center of described two annulus has basic groove.
At least one grout lines are reserved in the foundation.
When the concrete column is lifted into the foundation top, the lower end of the steel pipe and the foundation
Upper surface contact.There is gap between the upper surface of the concrete column and the foundation.The longitudinal reinforcement
Upper end is stretched into two annular grooves.The basis groove is located at below hollow space.One end of the grout lines
Nozzle is covered by concrete column, other end nozzle is not covered by concrete column.
Grouting material is poured by the space of the hole and/or grout lines between concrete column and foundation.
The grouting material is filled in two annular grooves, forms special grout sleeve.The special grout sleeve include grout sleeve I,
Grout sleeve II and tubule.Grout sleeve I and grout sleeve II is located in two annular grooves respectively, and tubule is to freeze solidly on connection
Grouting material in the pipeline of two annular grooves.
The concrete short column outside steel pipe.Have inside the concrete short column by short column longitudinal reinforcement and short column stirrup
Bind the muscle cage formed.
The lower end outer surface of the outside steel pipe is welded with several otic placodes.It equally welds outside steel pipe upper end outer surface
There are several otic placodes.By junction steel plate, the otic placode of outside steel pipe and outside steel pipe is linked together.The concrete short column and
Gap between pier bottom concrete column has grouting material.The grouting material is perfused by the through hole on outside steel pipe tube wall.
Further, there is the concrete short column of several overlappings;Connection mode between upper and lower two-stage concrete short column is same
The connection mode of pier bottom concrete column and concrete short column.
Further, outside steel pipe and outside steel pipe are welded by clod wash, using Q235 steel, Q345 steel, Q390 steel
Material or Q420 steel are made.
Further, the longitudinal reinforcement and stirrup of the concrete short column and pier bottom concrete column using HRB335, HRB400,
RRB400 or HRB500 reinforcing bars.
Further, the shaped steel shear key is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
The only pillar height pier of assembled hollow steel pipe constraint armored concrete proposed by the present invention has following advantages:
1. hollow steel pipe constrains reinforced concrete circular column, the strength of materials can be made full use of, fire-resistance anti-seismic performance is good, economical
It is profitable etc..
2. hollow steel pipe constraint reinforced concrete circular column can be used in the bridge of bigger section requirement, and compared to sky
Heart Section Column can save material and improve bending resistance and torsional property.
3. fabricated construction, with speed of application is fast, construction quality is high, construction environment improves, working condition improves, resource
The advantages that energy conservation, cost savings.
4. bridge pier is when mounted, the high column of two sections is fixed using otic placode, is in the milk and fixed by reserving hole;Which compared with
Existing assembled long column connection mode can effectively improve the connection reliability between lower prop and construct and be more convenient, compared with ring flange
Connection is more economical and beautiful.
Description of the drawings
Fig. 1 assembleds hollow steel pipe constrains the only pillar height pier top view of armored concrete.
Fig. 2 assembleds hollow steel pipe constraint only pillar height pier front view of armored concrete (the 1-1 sectional views of Fig. 1).
(basis is pre- for the sectional view of the pier bottom concrete column of Fig. 3 assembleds hollow steel pipe constraint only pillar height pier of armored concrete
Bury shaped steel).
(basis is pre- for the sectional view of the pier bottom concrete column of Fig. 4 assembleds hollow steel pipe constraint only pillar height pier of armored concrete
Stay basic groove).
Fig. 5 assembleds hollow steel pipe constrains the only pillar height pier 2-2 sectional views of armored concrete.
Fig. 6 assembleds hollow steel pipe constrains the only pillar height pier 3-3 sectional views of armored concrete.
The special grout sleeves of Fig. 7 split schematic diagram;
Fig. 8 is pier bottom concrete column 1 and concrete short column 100 (or two-stage concrete short column 100 up and down) connection signal
Figure.
In figure:Pier bottom concrete column 1, steel pipe 2, shaped steel shear key 3, longitudinal reinforcement 4, stirrup 5, special grouting set
Cylinder 6, grouting material 7, basic groove 8, grout sleeve I9, grout sleeve II 10, tubule 11, grout lines 12, hole
13rd, foundation 14.
It is specifically hollow to apply mode
It applies example with reference to hollow the invention will be further described, but should not be construed the above-mentioned subject area of the present invention
It is only limitted to following hollow apply example.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge
And customary means, various replacements and change are made, should all be included within the scope of the present invention.
It is hollow to apply example 1:
A kind of assembled hollow steel pipe constrains armored concrete pillar height pier, it is characterised in that:Including the pier being prefabricated in the factory
The foundation 14 of base concrete column 1 and concrete short column 100 and site operation;
1 inside of pier bottom concrete column has the muscle cage of annular.1 outside steel pipe 2 of concrete column.In the muscle cage
Between be that lower end is open, the hollow space of upper end closed.The lower surface of the pier bottom concrete column 1 has special grout sleeve 6.
Before the special grout sleeve 6 is formed, two need to be reserved in 1 lower surface of concrete column in precast concrete column 1
Annular groove.Between the two annular grooves, there are several pipelines to communicate.
The outer surface of the steel pipe 2 has several holes 13.These holes 13 connection steel pipe 2 outer surface with it is outer
One annular groove.
The foundation 14 is by concreting, internal pre-buried several longitudinal reinforcements 4 and shaped steel shear key 3.These
The upper surface of foundation 14 is exposed in the upper end of longitudinal reinforcement 4, and surrounds two annulus.The upper end of the shaped steel shear key 3
Expose the upper surface of foundation 14, and in the center of two annulus.It is hollow to apply in example, as shown in the figure, the shaped steel shears
Part 3 is a cross steel member.
At least one grout lines 10 are reserved in the foundation 14.
When the concrete column 1 is lifted into 14 top of foundation, lower end and the basis of the steel pipe 2
The upper surface contact of part 14.There is gap between the concrete column 1 and the upper surface of the foundation 14.Described is vertical
It is stretched into the upper end of reinforcing bar 4 in two annular grooves.The upper end of the shaped steel shear key 3 is stretched into hollow space.Institute
One end nozzle for stating grout lines 12 is covered by concrete column 1, other end nozzle is not covered by concrete column 1.
It is poured by the space of the hole 13 and/or grout lines 12 between concrete column 1 and foundation 14
Grouting material 7.The grouting material 7 is filled in two annular grooves, forms special grout sleeve 6.The special grout sleeve 6 includes
Grout sleeve I9, grout sleeve II10 and tubule 11.Grout sleeve I9 and grout sleeve II10 is located at two annular grooves respectively
In, tubule 11 is the grouting material 7 in the pipeline for freeze solidly on two annular grooves of connection.
100 outside steel pipe 20 of concrete short column.100 inside of concrete short column has by short column longitudinal reinforcement 40
The muscle cage formed is bound with short column stirrup 50.
The lower end outer surface of the outside steel pipe 20 is welded with several otic placodes 14.The 2 upper end outer surface of outside steel pipe is same
Sample is welded with several otic placodes 14.By junction steel plate 13, the otic placode 14 of outside steel pipe 2 and outside steel pipe 20 is linked together.
Gap between the concrete short column 100 and pier bottom concrete column 1 has grouting material 70.The grouting material 70 is to pass through outsourcing
What the through hole on 20 tube wall of steel pipe was perfused.It is hollow to apply in example, also with the concrete short column 100 that several are overlapped;Upper and lower two-stage
Connection mode between concrete short column 100 is the same as the connection mode of pier bottom concrete column 1 and concrete short column 100.
It is hollow to apply example 2:
A kind of assembled hollow steel pipe constrains armored concrete pillar height pier, it is characterised in that:Including the pier being prefabricated in the factory
The foundation 14 of base concrete column 1 and concrete short column 100 and site operation;
1 inside of pier bottom concrete column has the muscle cage of annular.1 outside steel pipe 2 of concrete column.In the muscle cage
Between be that lower end is open, the hollow space of upper end closed.The lower surface of the pier bottom concrete column 1 has special grout sleeve 6.
Before the special grout sleeve 6 is formed, two need to be reserved in 1 lower surface of concrete column in precast concrete column 1
Annular groove.Between the two annular grooves, there are several pipelines to communicate.
The outer surface of the steel pipe 2 has several holes 13.These holes 13 connection steel pipe 2 outer surface with it is outer
One annular groove.
The foundation 14 is by concreting, internal pre-buried several longitudinal reinforcements 4.These longitudinal reinforcements 4 it is upper
The upper surface of foundation 14 is exposed at end, and surrounds two annulus.The center of described two annulus has basic groove 8.
At least one grout lines 10 are reserved in the foundation 14.
When the concrete column 1 is lifted into 14 top of foundation, lower end and the basis of the steel pipe 2
The upper surface contact of part 14.There is gap between the concrete column 1 and the upper surface of the foundation 14.Described is vertical
It is stretched into the upper end of reinforcing bar 4 in two annular grooves.The basis groove 8 is located at below hollow space.The grouting
One end nozzle of pipeline 12 is covered by concrete column 1, other end nozzle is not covered by concrete column 1.
It is poured by the space of the hole 13 and/or grout lines 12 between concrete column 1 and foundation 14
Grouting material 7.The grouting material 7 is filled in two annular grooves, forms special grout sleeve 6.Referring to Fig. 7, the special grouting
Sleeve 6 includes grout sleeve I9, grout sleeve II10 and tubule 11.Grout sleeve I9 and grout sleeve II10 is located at two respectively
In annular groove, tubule 11 is the grouting material 7 in the pipeline for freeze solidly on two annular grooves of connection.
100 outside steel pipe 20 of concrete short column.100 inside of concrete short column has by short column longitudinal reinforcement 40
The muscle cage formed is bound with short column stirrup 50.
The lower end outer surface of the outside steel pipe 20 is welded with several otic placodes 14.The 2 upper end outer surface of outside steel pipe is same
Sample is welded with several otic placodes 14.By junction steel plate 13, the otic placode 14 of outside steel pipe 2 and outside steel pipe 20 is linked together.
Gap between the concrete short column 100 and pier bottom concrete column 1 has grouting material 70.The grouting material 70 is to pass through outsourcing
What the through hole on 20 tube wall of steel pipe was perfused.It is hollow to apply in example, also with the concrete short column 100 that several are overlapped;Upper and lower two-stage
Connection mode between concrete short column 100 is the same as the connection mode of pier bottom concrete column 1 and concrete short column 100.
Claims (6)
1. a kind of assembled hollow steel pipe constrains armored concrete pillar height pier, it is characterised in that:Including the pier bottom being prefabricated in the factory
The foundation (14) of concrete column (1) and concrete short column (100) and site operation;
There is the muscle cage of annular inside the pier bottom concrete column (1);Concrete column (1) outside steel pipe (2);The muscle cage
Centre is lower end opening, the hollow space of upper end closed;The lower surface of the pier bottom concrete column (1) has special grout sleeve
(6);
Before the special grout sleeve (6) is formed, two need to be reserved in concrete column (1) lower surface at precast concrete column (1)
A annular groove;Between the two annular grooves, there are several pipelines to communicate;
The outer surface of the steel pipe (2) has several holes (13);The outer surface of these holes (13) connection steel pipe (2) is with leaning on
An outer annular groove;
The foundation (14) is by concreting, internal pre-buried several longitudinal reinforcements (4) and shaped steel shear key (3);This
The upper surface of foundation (14) is exposed in the upper end of a little longitudinal reinforcements (4), and surrounds two annulus;The shaped steel shear key (3)
Upper end also expose the upper surfaces of foundation (14), and in the center of two annulus;
At least one grout lines (10) are reserved in the foundation (14);
When the concrete column (1) is lifted into above the foundation (14), lower end and the base of the steel pipe (2)
The upper surface contact of plinth part (14);There is gap between the upper surface of the concrete column (1) and the foundation (14);
The upper end of the longitudinal reinforcement (4) is stretched into two annular grooves;During the upper end of the shaped steel shear key (3) is stretched into
In absolutely empty;One end nozzle of the grout lines (12) is covered by concrete column (1), other end nozzle is not by concrete column
(1) cover;
Pass through the space of the hole (13) and/or grout lines (12) between concrete column (1) and foundation (14)
Pour into grouting material (7);The grouting material (7) is filled in two annular grooves, forms special grout sleeve (6);The special filling
Starching sleeve (6) includes grout sleeve I (9), grout sleeve II (10) and tubule (11);Grout sleeve I (9) and grout sleeve II
(10) it is located at respectively in two annular grooves, tubule (11) is the grouting material in the pipeline for freeze solidly on two annular grooves of connection
(7);
Concrete short column (100) outside steel pipe (20);Have inside the concrete short column (100) by short column longitudinal reinforcement
(40) and short column stirrup (50) binds the muscle cage formed;
The lower end outer surface of the outside steel pipe (20) is welded with several otic placodes (15);Outside steel pipe (2) the upper end outer surface
Equally it is welded with several otic placodes (15);By junction steel plate (16), by outside steel pipe (2) and the otic placode (1) of outside steel pipe (20)
It links together;Gap between the concrete short column (100) and pier bottom concrete column (1) has grouting material (70);It is described
Grouting material (70) is perfused by the through hole on outside steel pipe (20) tube wall.
2. a kind of assembled hollow steel pipe constrains armored concrete pillar height pier, it is characterised in that:Including the pier bottom being prefabricated in the factory
The foundation (14) of concrete column (1) and concrete short column (100) and site operation;
There is the muscle cage of annular inside the pier bottom concrete column (1);Concrete column (1) outside steel pipe (20);The muscle
It is lower end opening, the hollow space of upper end closed among cage;There is special grouting to cover for the lower surface of the pier bottom concrete column (1)
Cylinder (6);
Before the special grout sleeve (6) is formed, two need to be reserved in concrete column (1) lower surface at precast concrete column (1)
A annular groove;Between the two annular grooves, there are several pipelines to communicate;
The outer surface of the steel pipe (2) has several holes (13);The outer surface of these holes (13) connection steel pipe (2) is with leaning on
An outer annular groove;
The foundation (14) is by concreting, internal pre-buried several longitudinal reinforcements (4);These longitudinal reinforcements (4)
The upper surface of foundation (14) is exposed in upper end, and surrounds two annulus;The center of described two annulus has basic groove
(8);
At least one grout lines (10) are reserved in the foundation (14);
When the concrete column (1) is lifted into above the foundation (14), lower end and the base of the steel pipe (2)
The upper surface contact of plinth part (14);There is gap between the upper surface of the concrete column (1) and the foundation (14);
The upper end of the longitudinal reinforcement (4) is stretched into two annular grooves;The basis groove (8) is located under hollow space
Side;One end nozzle of the grout lines (12) is covered by concrete column (1), other end nozzle is not covered by concrete column (1)
Lid;
Pass through the space of the hole (13) and/or grout lines (12) between concrete column (1) and foundation (14)
Pour into grouting material (7);The grouting material (7) is filled in two annular grooves, forms special grout sleeve (6);The special filling
Starching sleeve (6) includes grout sleeve I (9), grout sleeve II (10) and tubule (11);Grout sleeve I (9) and grout sleeve II
(10) it is located at respectively in two annular grooves, tubule (11) is the grouting material in the pipeline for freeze solidly on two annular grooves of connection
(7);
Concrete short column (100) outside steel pipe (20);Have inside the concrete short column (100) by short column longitudinal reinforcement
(40) and short column stirrup (50) binds the muscle cage formed;
The lower end outer surface of the outside steel pipe (20) is welded with several otic placodes (15);Outside steel pipe (2) the upper end outer surface
Equally it is welded with several otic placodes (15);By junction steel plate (16), by outside steel pipe (2) and the otic placode (1) of outside steel pipe (20)
It links together;Gap between the concrete short column (100) and pier bottom concrete column (1) has grouting material (70);It is described
Grouting material (70) is perfused by the through hole on outside steel pipe (20) tube wall.
3. a kind of assembled hollow steel pipe constraint armored concrete pillar height pier according to claim 1 or 2, feature exist
In:Concrete short column (100) with several overlappings;The same pier of connection mode between upper and lower two-stage concrete short column (100)
The connection mode of base concrete column (1) and concrete short column (100).
4. a kind of assembled hollow steel pipe constraint armored concrete pillar height pier according to claim 1, it is characterised in that:Outside
(2) are managed by Baogang and outside steel pipe (20) is welded by clod wash, using Q235 steel, Q345 steel, Q390 steel or Q420 steel
Material is made.
5. a kind of assembled hollow steel pipe constraint armored concrete pillar height pier according to claim 1, it is characterised in that:Institute
State concrete short column (100) and pier bottom concrete column (1) longitudinal reinforcement and stirrup using HRB335, HRB400, RRB400 or
HRB500 reinforcing bars.
6. a kind of assembled hollow steel pipe constraint armored concrete pillar height pier according to claim 1, it is characterised in that:Institute
Shaped steel shear key (3) is stated to be made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611046790.2A CN108086134B (en) | 2016-11-23 | 2016-11-23 | Assembled hollow steel pipe constraint reinforced concrete column high pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611046790.2A CN108086134B (en) | 2016-11-23 | 2016-11-23 | Assembled hollow steel pipe constraint reinforced concrete column high pier |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108086134A true CN108086134A (en) | 2018-05-29 |
CN108086134B CN108086134B (en) | 2024-01-23 |
Family
ID=62171096
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611046790.2A Active CN108086134B (en) | 2016-11-23 | 2016-11-23 | Assembled hollow steel pipe constraint reinforced concrete column high pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108086134B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797322A (en) * | 2018-08-15 | 2018-11-13 | 西安科技大学 | A kind of Anti-seismic beam bridge bridge pier |
CN108894100A (en) * | 2018-08-15 | 2018-11-27 | 西安科技大学 | A kind of the antidetonation bridge pier and its construction method of rigid frame bridge |
CN108978448A (en) * | 2018-08-15 | 2018-12-11 | 西安科技大学 | A kind of construction method of Anti-seismic beam bridge bridge pier |
CN109457599A (en) * | 2018-11-29 | 2019-03-12 | 福州大学 | Hollow pier and cushion cap splicing construction and construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105421223A (en) * | 2015-12-21 | 2016-03-23 | 上海市城市建设设计研究总院 | Prefabricated pier upright column, cushion cap spigot and insertion groove combined connection structure and splicing method |
CN105803925A (en) * | 2016-03-17 | 2016-07-27 | 浙江大学 | Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam |
CN205444475U (en) * | 2016-03-11 | 2016-08-10 | 中民筑友有限公司 | Prefab and basic connected node |
CN106088348A (en) * | 2016-07-29 | 2016-11-09 | 初明进 | A kind of precast concrete method of attachment |
CN206359881U (en) * | 2016-11-23 | 2017-07-28 | 重庆市中科大业建筑科技有限公司 | A kind of assembled hollow steel pipe constrains armored concrete pillar height pier |
-
2016
- 2016-11-23 CN CN201611046790.2A patent/CN108086134B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105421223A (en) * | 2015-12-21 | 2016-03-23 | 上海市城市建设设计研究总院 | Prefabricated pier upright column, cushion cap spigot and insertion groove combined connection structure and splicing method |
CN205444475U (en) * | 2016-03-11 | 2016-08-10 | 中民筑友有限公司 | Prefab and basic connected node |
CN105803925A (en) * | 2016-03-17 | 2016-07-27 | 浙江大学 | Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam |
CN106088348A (en) * | 2016-07-29 | 2016-11-09 | 初明进 | A kind of precast concrete method of attachment |
CN206359881U (en) * | 2016-11-23 | 2017-07-28 | 重庆市中科大业建筑科技有限公司 | A kind of assembled hollow steel pipe constrains armored concrete pillar height pier |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797322A (en) * | 2018-08-15 | 2018-11-13 | 西安科技大学 | A kind of Anti-seismic beam bridge bridge pier |
CN108894100A (en) * | 2018-08-15 | 2018-11-27 | 西安科技大学 | A kind of the antidetonation bridge pier and its construction method of rigid frame bridge |
CN108978448A (en) * | 2018-08-15 | 2018-12-11 | 西安科技大学 | A kind of construction method of Anti-seismic beam bridge bridge pier |
CN108797322B (en) * | 2018-08-15 | 2020-01-21 | 西安科技大学 | Anti-seismic beam bridge pier |
CN109457599A (en) * | 2018-11-29 | 2019-03-12 | 福州大学 | Hollow pier and cushion cap splicing construction and construction method |
CN109457599B (en) * | 2018-11-29 | 2023-07-07 | 福州大学 | Splicing structure of hollow pier and bearing platform and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN108086134B (en) | 2024-01-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105386405B (en) | Based on bolted Precast Concrete Segmental Bridges concrete pier of steel tube | |
CN206512590U (en) | A kind of assembled hollow steel pipe constrains reinforced column squat pier | |
CN205024965U (en) | Hollow rubber concrete column | |
CN108086134A (en) | A kind of assembled hollow steel pipe constrains armored concrete pillar height pier | |
CN100999913B (en) | Node of steel tube concrete pole and steel reinforced concrete beam and processing method thereof | |
CN206512588U (en) | A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled | |
CN105735112A (en) | Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier | |
CN108086130A (en) | A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled | |
CN107675610A (en) | A kind of construction and the practice of the connection of precast assembly bridge pier section | |
CN207211366U (en) | The attachment structure of prefabricated beam column | |
CN108086135B (en) | Assembled steel pipe constraint reinforced concrete bent bridge pier | |
CN103741812A (en) | Connection joint of steel reinforced concrete superposed beams and middle column | |
CN203603267U (en) | Connecting joint of steel reinforced concrete superposed beams and middle column | |
CN106638957B (en) | Cold formed steel structure external wall of house structural system | |
CN109403366A (en) | A kind of assembly concrete-filled steel tube pile foundation and its construction method | |
CN206359881U (en) | A kind of assembled hollow steel pipe constrains armored concrete pillar height pier | |
CN208501895U (en) | A kind of partial precast assembly steel reinforced concrete mixed column | |
CN208105477U (en) | Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L shape connecting node | |
CN207032010U (en) | A kind of assembled solid steel tube constrains armored concrete pillar height pier | |
CN108103925A (en) | A kind of assembled hollow steel pipe constrains reinforced column squat pier | |
CN206359882U (en) | A kind of assembled solid steel tube constrains reinforced column squat pier | |
CN108265823A (en) | Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L-shaped connecting node | |
CN208363421U (en) | Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam cross connecting node | |
CN206928517U (en) | Fiber reinforcement steel core concrete column and combinations thereof post | |
CN108086136A (en) | A kind of assembled solid steel tube constrains reinforced column squat pier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |