CN108086134A - A kind of assembled hollow steel pipe constrains armored concrete pillar height pier - Google Patents

A kind of assembled hollow steel pipe constrains armored concrete pillar height pier Download PDF

Info

Publication number
CN108086134A
CN108086134A CN201611046790.2A CN201611046790A CN108086134A CN 108086134 A CN108086134 A CN 108086134A CN 201611046790 A CN201611046790 A CN 201611046790A CN 108086134 A CN108086134 A CN 108086134A
Authority
CN
China
Prior art keywords
steel pipe
concrete
column
foundation
concrete column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611046790.2A
Other languages
Chinese (zh)
Other versions
CN108086134B (en
Inventor
刘界鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Zhongke Construction Technology Co Ltd
Original Assignee
Chongqing Zhongke Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Zhongke Construction Technology Co Ltd filed Critical Chongqing Zhongke Construction Technology Co Ltd
Priority to CN201611046790.2A priority Critical patent/CN108086134B/en
Publication of CN108086134A publication Critical patent/CN108086134A/en
Application granted granted Critical
Publication of CN108086134B publication Critical patent/CN108086134B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

A kind of assembled hollow steel pipe constrains armored concrete pillar height pier, it belongs to a kind of bridge structure component.In order to promote novel fabricated steel tube confinement reinforced concrete structure in bridge structure, play its structural mechanical property advantage, it makes full use of material and reduces materials'use amount, improve economic performance, it accelerates construction progress, the present invention provides a kind of assembled steel tubes to constrain the only pillar height pier of armored concrete.The assembled hollow steel pipe constraint only pillar height pier of armored concrete is that hollow steel pipe constraint Reinforced Concrete Short Column is prefabricated in the factory, and scene is connected by otic placode with steel plate, is connected finally by grouting.Precast hollow steel tube confinement reinforced concrete circular column in the present invention, which has, makes full use of the strength of materials, and fire-resistance anti-seismic performance is good, it is good in economic efficiency the advantages that.The present invention using fabricated construction, have many advantages, such as speed of application is fast, construction quality is high, construction environment improvement, working condition improvement, energy resource saving, cost savings.

Description

A kind of assembled hollow steel pipe constrains armored concrete pillar height pier
Technical field
The invention belongs to a kind of bridge structure components, more particularly to the assembled hollow steel pipe constraint only pillar height of armored concrete Pier and its mounting process.
Background technology
Steel tube confinement armored concrete is the fill concrete in thin-wall steel tube, and steel pipe does not directly take on external loads, and A kind of combined member of effect of contraction is mainly played to core concrete.Steel tube confinement reinforced column high capacity, antidetonation and Fire resistance is superior, can make full use of the intensity of high-strength steel and concrete.When steel tube confinement reinforced concrete member Covered with Angles Manage for circle when, steel pipe constrains core concrete uniform, can make full use of the tensile strength of steel pipe, economic benefit is good.With The development of urban transportation, Urban Bridge is also higher and higher to bridge pier requirement, can save material using hollow section column, simultaneously The bending resistance and anti-twisting property, the type bridge pier for improving bridge pier are found broad application in Urban Bridge.China just progressively pushes away at present Wide building industrialization, industrialized building not only have many advantages, such as that speed of application is fast, construction quality is high, construction environment improves, and Meet sustainable development requirement.The assembled hollow steel pipe constraint only column bridge of armored concrete is proposed according to industrialized building feature Pier.
The content of the invention
In order in bridge structure promote novel fabricated steel tube confinement reinforced concrete structure, play its mechanical property, It makes full use of material, improve economic performance, the advantages such as accelerate construction progress, and assembled steel tube is used in higher bridge This technology of constraint armored concrete, the present invention provides a kind of assembled steel tubes to constrain the only pillar height pier of armored concrete.
For hollow existing the object of the invention the technical solution adopted is that such, a kind of assembled hollow steel pipe constrains reinforcing bar Concrete pillar height pier, it is characterised in that:Including the pier bottom concrete column being prefabricated in the factory and several concrete short columns and scene The foundation of construction.
There is the muscle cage of annular inside the pier bottom concrete column.The concrete column outside steel pipe.Among the muscle cage It is lower end opening, the hollow space of upper end closed.The lower surface of the pier bottom concrete column has special grout sleeve.
Before the special grout sleeve is formed, two rings need to be reserved in concrete column lower surface in precast concrete column Connected in star.Between the two annular grooves, there are several pipelines to communicate.
The outer surface of the steel pipe has several holes.The outer surface of these holes connection steel pipe and an outer ring Connected in star.
The foundation is by concreting, internal pre-buried several longitudinal reinforcements and shaped steel shear key.These longitudinal directions The upper surface of foundation is exposed in the upper end of reinforcing bar, and surrounds two annulus.Also basis is exposed in the upper end of the shaped steel shear key Partial upper surface, and in the center of two annulus.
At least one grout lines are reserved in the foundation.
When the concrete column is lifted into the foundation top, the lower end of the steel pipe and the foundation Upper surface contact.There is gap between the upper surface of the concrete column and the foundation.The longitudinal reinforcement Upper end is stretched into two annular grooves.The upper end of the shaped steel shear key is stretched into hollow space.The grout lines One end nozzle covered by concrete column, other end nozzle is not covered by concrete column.
Grouting material is poured by the space of the hole and/or grout lines between concrete column and foundation. The grouting material is filled in two annular grooves, forms special grout sleeve.The special grout sleeve include grout sleeve I, Grout sleeve II and tubule.Grout sleeve I and grout sleeve II is located in two annular grooves respectively, and tubule is to freeze solidly on connection Grouting material in the pipeline of two annular grooves.
The concrete short column outside steel pipe.Have inside the concrete short column by short column longitudinal reinforcement and short column stirrup Bind the muscle cage formed.
The lower end outer surface of the outside steel pipe is welded with several otic placodes.It equally welds outside steel pipe upper end outer surface There are several otic placodes.By junction steel plate, the otic placode of outside steel pipe and outside steel pipe is linked together.The concrete short column and Gap between pier bottom concrete column has grouting material.The grouting material is perfused by the through hole on outside steel pipe tube wall.
The present invention another hollow mode of applying be:A kind of assembled hollow steel pipe constrains armored concrete pillar height pier, including The pier bottom concrete column and the foundation of site operation being prefabricated in the factory.
There is the muscle cage of annular inside the pier bottom concrete column.The concrete column outside steel pipe.Among the muscle cage It is lower end opening, the hollow space of upper end closed.The lower surface of the pier bottom concrete column has special grout sleeve.
Before the special grout sleeve is formed, two rings need to be reserved in concrete column lower surface in precast concrete column Connected in star.Between the two annular grooves, there are several pipelines to communicate.
The outer surface of the steel pipe has several holes.The outer surface of these holes connection steel pipe and an outer ring Connected in star.
The foundation is by concreting, internal pre-buried several longitudinal reinforcements.The upper end dew of these longitudinal reinforcements Go out the upper surface of foundation, and surround two annulus.The center of described two annulus has basic groove.
At least one grout lines are reserved in the foundation.
When the concrete column is lifted into the foundation top, the lower end of the steel pipe and the foundation Upper surface contact.There is gap between the upper surface of the concrete column and the foundation.The longitudinal reinforcement Upper end is stretched into two annular grooves.The basis groove is located at below hollow space.One end of the grout lines Nozzle is covered by concrete column, other end nozzle is not covered by concrete column.
Grouting material is poured by the space of the hole and/or grout lines between concrete column and foundation. The grouting material is filled in two annular grooves, forms special grout sleeve.The special grout sleeve include grout sleeve I, Grout sleeve II and tubule.Grout sleeve I and grout sleeve II is located in two annular grooves respectively, and tubule is to freeze solidly on connection Grouting material in the pipeline of two annular grooves.
The concrete short column outside steel pipe.Have inside the concrete short column by short column longitudinal reinforcement and short column stirrup Bind the muscle cage formed.
The lower end outer surface of the outside steel pipe is welded with several otic placodes.It equally welds outside steel pipe upper end outer surface There are several otic placodes.By junction steel plate, the otic placode of outside steel pipe and outside steel pipe is linked together.The concrete short column and Gap between pier bottom concrete column has grouting material.The grouting material is perfused by the through hole on outside steel pipe tube wall.
Further, there is the concrete short column of several overlappings;Connection mode between upper and lower two-stage concrete short column is same The connection mode of pier bottom concrete column and concrete short column.
Further, outside steel pipe and outside steel pipe are welded by clod wash, using Q235 steel, Q345 steel, Q390 steel Material or Q420 steel are made.
Further, the longitudinal reinforcement and stirrup of the concrete short column and pier bottom concrete column using HRB335, HRB400, RRB400 or HRB500 reinforcing bars.
Further, the shaped steel shear key is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
The only pillar height pier of assembled hollow steel pipe constraint armored concrete proposed by the present invention has following advantages:
1. hollow steel pipe constrains reinforced concrete circular column, the strength of materials can be made full use of, fire-resistance anti-seismic performance is good, economical It is profitable etc..
2. hollow steel pipe constraint reinforced concrete circular column can be used in the bridge of bigger section requirement, and compared to sky Heart Section Column can save material and improve bending resistance and torsional property.
3. fabricated construction, with speed of application is fast, construction quality is high, construction environment improves, working condition improves, resource The advantages that energy conservation, cost savings.
4. bridge pier is when mounted, the high column of two sections is fixed using otic placode, is in the milk and fixed by reserving hole;Which compared with Existing assembled long column connection mode can effectively improve the connection reliability between lower prop and construct and be more convenient, compared with ring flange Connection is more economical and beautiful.
Description of the drawings
Fig. 1 assembleds hollow steel pipe constrains the only pillar height pier top view of armored concrete.
Fig. 2 assembleds hollow steel pipe constraint only pillar height pier front view of armored concrete (the 1-1 sectional views of Fig. 1).
(basis is pre- for the sectional view of the pier bottom concrete column of Fig. 3 assembleds hollow steel pipe constraint only pillar height pier of armored concrete Bury shaped steel).
(basis is pre- for the sectional view of the pier bottom concrete column of Fig. 4 assembleds hollow steel pipe constraint only pillar height pier of armored concrete Stay basic groove).
Fig. 5 assembleds hollow steel pipe constrains the only pillar height pier 2-2 sectional views of armored concrete.
Fig. 6 assembleds hollow steel pipe constrains the only pillar height pier 3-3 sectional views of armored concrete.
The special grout sleeves of Fig. 7 split schematic diagram;
Fig. 8 is pier bottom concrete column 1 and concrete short column 100 (or two-stage concrete short column 100 up and down) connection signal Figure.
In figure:Pier bottom concrete column 1, steel pipe 2, shaped steel shear key 3, longitudinal reinforcement 4, stirrup 5, special grouting set Cylinder 6, grouting material 7, basic groove 8, grout sleeve I9, grout sleeve II 10, tubule 11, grout lines 12, hole 13rd, foundation 14.
It is specifically hollow to apply mode
It applies example with reference to hollow the invention will be further described, but should not be construed the above-mentioned subject area of the present invention It is only limitted to following hollow apply example.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge And customary means, various replacements and change are made, should all be included within the scope of the present invention.
It is hollow to apply example 1:
A kind of assembled hollow steel pipe constrains armored concrete pillar height pier, it is characterised in that:Including the pier being prefabricated in the factory The foundation 14 of base concrete column 1 and concrete short column 100 and site operation;
1 inside of pier bottom concrete column has the muscle cage of annular.1 outside steel pipe 2 of concrete column.In the muscle cage Between be that lower end is open, the hollow space of upper end closed.The lower surface of the pier bottom concrete column 1 has special grout sleeve 6.
Before the special grout sleeve 6 is formed, two need to be reserved in 1 lower surface of concrete column in precast concrete column 1 Annular groove.Between the two annular grooves, there are several pipelines to communicate.
The outer surface of the steel pipe 2 has several holes 13.These holes 13 connection steel pipe 2 outer surface with it is outer One annular groove.
The foundation 14 is by concreting, internal pre-buried several longitudinal reinforcements 4 and shaped steel shear key 3.These The upper surface of foundation 14 is exposed in the upper end of longitudinal reinforcement 4, and surrounds two annulus.The upper end of the shaped steel shear key 3 Expose the upper surface of foundation 14, and in the center of two annulus.It is hollow to apply in example, as shown in the figure, the shaped steel shears Part 3 is a cross steel member.
At least one grout lines 10 are reserved in the foundation 14.
When the concrete column 1 is lifted into 14 top of foundation, lower end and the basis of the steel pipe 2 The upper surface contact of part 14.There is gap between the concrete column 1 and the upper surface of the foundation 14.Described is vertical It is stretched into the upper end of reinforcing bar 4 in two annular grooves.The upper end of the shaped steel shear key 3 is stretched into hollow space.Institute One end nozzle for stating grout lines 12 is covered by concrete column 1, other end nozzle is not covered by concrete column 1.
It is poured by the space of the hole 13 and/or grout lines 12 between concrete column 1 and foundation 14 Grouting material 7.The grouting material 7 is filled in two annular grooves, forms special grout sleeve 6.The special grout sleeve 6 includes Grout sleeve I9, grout sleeve II10 and tubule 11.Grout sleeve I9 and grout sleeve II10 is located at two annular grooves respectively In, tubule 11 is the grouting material 7 in the pipeline for freeze solidly on two annular grooves of connection.
100 outside steel pipe 20 of concrete short column.100 inside of concrete short column has by short column longitudinal reinforcement 40 The muscle cage formed is bound with short column stirrup 50.
The lower end outer surface of the outside steel pipe 20 is welded with several otic placodes 14.The 2 upper end outer surface of outside steel pipe is same Sample is welded with several otic placodes 14.By junction steel plate 13, the otic placode 14 of outside steel pipe 2 and outside steel pipe 20 is linked together. Gap between the concrete short column 100 and pier bottom concrete column 1 has grouting material 70.The grouting material 70 is to pass through outsourcing What the through hole on 20 tube wall of steel pipe was perfused.It is hollow to apply in example, also with the concrete short column 100 that several are overlapped;Upper and lower two-stage Connection mode between concrete short column 100 is the same as the connection mode of pier bottom concrete column 1 and concrete short column 100.
It is hollow to apply example 2:
A kind of assembled hollow steel pipe constrains armored concrete pillar height pier, it is characterised in that:Including the pier being prefabricated in the factory The foundation 14 of base concrete column 1 and concrete short column 100 and site operation;
1 inside of pier bottom concrete column has the muscle cage of annular.1 outside steel pipe 2 of concrete column.In the muscle cage Between be that lower end is open, the hollow space of upper end closed.The lower surface of the pier bottom concrete column 1 has special grout sleeve 6.
Before the special grout sleeve 6 is formed, two need to be reserved in 1 lower surface of concrete column in precast concrete column 1 Annular groove.Between the two annular grooves, there are several pipelines to communicate.
The outer surface of the steel pipe 2 has several holes 13.These holes 13 connection steel pipe 2 outer surface with it is outer One annular groove.
The foundation 14 is by concreting, internal pre-buried several longitudinal reinforcements 4.These longitudinal reinforcements 4 it is upper The upper surface of foundation 14 is exposed at end, and surrounds two annulus.The center of described two annulus has basic groove 8.
At least one grout lines 10 are reserved in the foundation 14.
When the concrete column 1 is lifted into 14 top of foundation, lower end and the basis of the steel pipe 2 The upper surface contact of part 14.There is gap between the concrete column 1 and the upper surface of the foundation 14.Described is vertical It is stretched into the upper end of reinforcing bar 4 in two annular grooves.The basis groove 8 is located at below hollow space.The grouting One end nozzle of pipeline 12 is covered by concrete column 1, other end nozzle is not covered by concrete column 1.
It is poured by the space of the hole 13 and/or grout lines 12 between concrete column 1 and foundation 14 Grouting material 7.The grouting material 7 is filled in two annular grooves, forms special grout sleeve 6.Referring to Fig. 7, the special grouting Sleeve 6 includes grout sleeve I9, grout sleeve II10 and tubule 11.Grout sleeve I9 and grout sleeve II10 is located at two respectively In annular groove, tubule 11 is the grouting material 7 in the pipeline for freeze solidly on two annular grooves of connection.
100 outside steel pipe 20 of concrete short column.100 inside of concrete short column has by short column longitudinal reinforcement 40 The muscle cage formed is bound with short column stirrup 50.
The lower end outer surface of the outside steel pipe 20 is welded with several otic placodes 14.The 2 upper end outer surface of outside steel pipe is same Sample is welded with several otic placodes 14.By junction steel plate 13, the otic placode 14 of outside steel pipe 2 and outside steel pipe 20 is linked together. Gap between the concrete short column 100 and pier bottom concrete column 1 has grouting material 70.The grouting material 70 is to pass through outsourcing What the through hole on 20 tube wall of steel pipe was perfused.It is hollow to apply in example, also with the concrete short column 100 that several are overlapped;Upper and lower two-stage Connection mode between concrete short column 100 is the same as the connection mode of pier bottom concrete column 1 and concrete short column 100.

Claims (6)

1. a kind of assembled hollow steel pipe constrains armored concrete pillar height pier, it is characterised in that:Including the pier bottom being prefabricated in the factory The foundation (14) of concrete column (1) and concrete short column (100) and site operation;
There is the muscle cage of annular inside the pier bottom concrete column (1);Concrete column (1) outside steel pipe (2);The muscle cage Centre is lower end opening, the hollow space of upper end closed;The lower surface of the pier bottom concrete column (1) has special grout sleeve (6);
Before the special grout sleeve (6) is formed, two need to be reserved in concrete column (1) lower surface at precast concrete column (1) A annular groove;Between the two annular grooves, there are several pipelines to communicate;
The outer surface of the steel pipe (2) has several holes (13);The outer surface of these holes (13) connection steel pipe (2) is with leaning on An outer annular groove;
The foundation (14) is by concreting, internal pre-buried several longitudinal reinforcements (4) and shaped steel shear key (3);This The upper surface of foundation (14) is exposed in the upper end of a little longitudinal reinforcements (4), and surrounds two annulus;The shaped steel shear key (3) Upper end also expose the upper surfaces of foundation (14), and in the center of two annulus;
At least one grout lines (10) are reserved in the foundation (14);
When the concrete column (1) is lifted into above the foundation (14), lower end and the base of the steel pipe (2) The upper surface contact of plinth part (14);There is gap between the upper surface of the concrete column (1) and the foundation (14); The upper end of the longitudinal reinforcement (4) is stretched into two annular grooves;During the upper end of the shaped steel shear key (3) is stretched into In absolutely empty;One end nozzle of the grout lines (12) is covered by concrete column (1), other end nozzle is not by concrete column (1) cover;
Pass through the space of the hole (13) and/or grout lines (12) between concrete column (1) and foundation (14) Pour into grouting material (7);The grouting material (7) is filled in two annular grooves, forms special grout sleeve (6);The special filling Starching sleeve (6) includes grout sleeve I (9), grout sleeve II (10) and tubule (11);Grout sleeve I (9) and grout sleeve II (10) it is located at respectively in two annular grooves, tubule (11) is the grouting material in the pipeline for freeze solidly on two annular grooves of connection (7);
Concrete short column (100) outside steel pipe (20);Have inside the concrete short column (100) by short column longitudinal reinforcement (40) and short column stirrup (50) binds the muscle cage formed;
The lower end outer surface of the outside steel pipe (20) is welded with several otic placodes (15);Outside steel pipe (2) the upper end outer surface Equally it is welded with several otic placodes (15);By junction steel plate (16), by outside steel pipe (2) and the otic placode (1) of outside steel pipe (20) It links together;Gap between the concrete short column (100) and pier bottom concrete column (1) has grouting material (70);It is described Grouting material (70) is perfused by the through hole on outside steel pipe (20) tube wall.
2. a kind of assembled hollow steel pipe constrains armored concrete pillar height pier, it is characterised in that:Including the pier bottom being prefabricated in the factory The foundation (14) of concrete column (1) and concrete short column (100) and site operation;
There is the muscle cage of annular inside the pier bottom concrete column (1);Concrete column (1) outside steel pipe (20);The muscle It is lower end opening, the hollow space of upper end closed among cage;There is special grouting to cover for the lower surface of the pier bottom concrete column (1) Cylinder (6);
Before the special grout sleeve (6) is formed, two need to be reserved in concrete column (1) lower surface at precast concrete column (1) A annular groove;Between the two annular grooves, there are several pipelines to communicate;
The outer surface of the steel pipe (2) has several holes (13);The outer surface of these holes (13) connection steel pipe (2) is with leaning on An outer annular groove;
The foundation (14) is by concreting, internal pre-buried several longitudinal reinforcements (4);These longitudinal reinforcements (4) The upper surface of foundation (14) is exposed in upper end, and surrounds two annulus;The center of described two annulus has basic groove (8);
At least one grout lines (10) are reserved in the foundation (14);
When the concrete column (1) is lifted into above the foundation (14), lower end and the base of the steel pipe (2) The upper surface contact of plinth part (14);There is gap between the upper surface of the concrete column (1) and the foundation (14); The upper end of the longitudinal reinforcement (4) is stretched into two annular grooves;The basis groove (8) is located under hollow space Side;One end nozzle of the grout lines (12) is covered by concrete column (1), other end nozzle is not covered by concrete column (1) Lid;
Pass through the space of the hole (13) and/or grout lines (12) between concrete column (1) and foundation (14) Pour into grouting material (7);The grouting material (7) is filled in two annular grooves, forms special grout sleeve (6);The special filling Starching sleeve (6) includes grout sleeve I (9), grout sleeve II (10) and tubule (11);Grout sleeve I (9) and grout sleeve II (10) it is located at respectively in two annular grooves, tubule (11) is the grouting material in the pipeline for freeze solidly on two annular grooves of connection (7);
Concrete short column (100) outside steel pipe (20);Have inside the concrete short column (100) by short column longitudinal reinforcement (40) and short column stirrup (50) binds the muscle cage formed;
The lower end outer surface of the outside steel pipe (20) is welded with several otic placodes (15);Outside steel pipe (2) the upper end outer surface Equally it is welded with several otic placodes (15);By junction steel plate (16), by outside steel pipe (2) and the otic placode (1) of outside steel pipe (20) It links together;Gap between the concrete short column (100) and pier bottom concrete column (1) has grouting material (70);It is described Grouting material (70) is perfused by the through hole on outside steel pipe (20) tube wall.
3. a kind of assembled hollow steel pipe constraint armored concrete pillar height pier according to claim 1 or 2, feature exist In:Concrete short column (100) with several overlappings;The same pier of connection mode between upper and lower two-stage concrete short column (100) The connection mode of base concrete column (1) and concrete short column (100).
4. a kind of assembled hollow steel pipe constraint armored concrete pillar height pier according to claim 1, it is characterised in that:Outside (2) are managed by Baogang and outside steel pipe (20) is welded by clod wash, using Q235 steel, Q345 steel, Q390 steel or Q420 steel Material is made.
5. a kind of assembled hollow steel pipe constraint armored concrete pillar height pier according to claim 1, it is characterised in that:Institute State concrete short column (100) and pier bottom concrete column (1) longitudinal reinforcement and stirrup using HRB335, HRB400, RRB400 or HRB500 reinforcing bars.
6. a kind of assembled hollow steel pipe constraint armored concrete pillar height pier according to claim 1, it is characterised in that:Institute Shaped steel shear key (3) is stated to be made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
CN201611046790.2A 2016-11-23 2016-11-23 Assembled hollow steel pipe constraint reinforced concrete column high pier Active CN108086134B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611046790.2A CN108086134B (en) 2016-11-23 2016-11-23 Assembled hollow steel pipe constraint reinforced concrete column high pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611046790.2A CN108086134B (en) 2016-11-23 2016-11-23 Assembled hollow steel pipe constraint reinforced concrete column high pier

Publications (2)

Publication Number Publication Date
CN108086134A true CN108086134A (en) 2018-05-29
CN108086134B CN108086134B (en) 2024-01-23

Family

ID=62171096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611046790.2A Active CN108086134B (en) 2016-11-23 2016-11-23 Assembled hollow steel pipe constraint reinforced concrete column high pier

Country Status (1)

Country Link
CN (1) CN108086134B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797322A (en) * 2018-08-15 2018-11-13 西安科技大学 A kind of Anti-seismic beam bridge bridge pier
CN108894100A (en) * 2018-08-15 2018-11-27 西安科技大学 A kind of the antidetonation bridge pier and its construction method of rigid frame bridge
CN108978448A (en) * 2018-08-15 2018-12-11 西安科技大学 A kind of construction method of Anti-seismic beam bridge bridge pier
CN109457599A (en) * 2018-11-29 2019-03-12 福州大学 Hollow pier and cushion cap splicing construction and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421223A (en) * 2015-12-21 2016-03-23 上海市城市建设设计研究总院 Prefabricated pier upright column, cushion cap spigot and insertion groove combined connection structure and splicing method
CN105803925A (en) * 2016-03-17 2016-07-27 浙江大学 Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam
CN205444475U (en) * 2016-03-11 2016-08-10 中民筑友有限公司 Prefab and basic connected node
CN106088348A (en) * 2016-07-29 2016-11-09 初明进 A kind of precast concrete method of attachment
CN206359881U (en) * 2016-11-23 2017-07-28 重庆市中科大业建筑科技有限公司 A kind of assembled hollow steel pipe constrains armored concrete pillar height pier

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421223A (en) * 2015-12-21 2016-03-23 上海市城市建设设计研究总院 Prefabricated pier upright column, cushion cap spigot and insertion groove combined connection structure and splicing method
CN205444475U (en) * 2016-03-11 2016-08-10 中民筑友有限公司 Prefab and basic connected node
CN105803925A (en) * 2016-03-17 2016-07-27 浙江大学 Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam
CN106088348A (en) * 2016-07-29 2016-11-09 初明进 A kind of precast concrete method of attachment
CN206359881U (en) * 2016-11-23 2017-07-28 重庆市中科大业建筑科技有限公司 A kind of assembled hollow steel pipe constrains armored concrete pillar height pier

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797322A (en) * 2018-08-15 2018-11-13 西安科技大学 A kind of Anti-seismic beam bridge bridge pier
CN108894100A (en) * 2018-08-15 2018-11-27 西安科技大学 A kind of the antidetonation bridge pier and its construction method of rigid frame bridge
CN108978448A (en) * 2018-08-15 2018-12-11 西安科技大学 A kind of construction method of Anti-seismic beam bridge bridge pier
CN108797322B (en) * 2018-08-15 2020-01-21 西安科技大学 Anti-seismic beam bridge pier
CN109457599A (en) * 2018-11-29 2019-03-12 福州大学 Hollow pier and cushion cap splicing construction and construction method
CN109457599B (en) * 2018-11-29 2023-07-07 福州大学 Splicing structure of hollow pier and bearing platform and construction method

Also Published As

Publication number Publication date
CN108086134B (en) 2024-01-23

Similar Documents

Publication Publication Date Title
CN105386405B (en) Based on bolted Precast Concrete Segmental Bridges concrete pier of steel tube
CN206512590U (en) A kind of assembled hollow steel pipe constrains reinforced column squat pier
CN205024965U (en) Hollow rubber concrete column
CN108086134A (en) A kind of assembled hollow steel pipe constrains armored concrete pillar height pier
CN100999913B (en) Node of steel tube concrete pole and steel reinforced concrete beam and processing method thereof
CN206512588U (en) A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled
CN105735112A (en) Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier
CN108086130A (en) A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled
CN107675610A (en) A kind of construction and the practice of the connection of precast assembly bridge pier section
CN207211366U (en) The attachment structure of prefabricated beam column
CN108086135B (en) Assembled steel pipe constraint reinforced concrete bent bridge pier
CN103741812A (en) Connection joint of steel reinforced concrete superposed beams and middle column
CN203603267U (en) Connecting joint of steel reinforced concrete superposed beams and middle column
CN106638957B (en) Cold formed steel structure external wall of house structural system
CN109403366A (en) A kind of assembly concrete-filled steel tube pile foundation and its construction method
CN206359881U (en) A kind of assembled hollow steel pipe constrains armored concrete pillar height pier
CN208501895U (en) A kind of partial precast assembly steel reinforced concrete mixed column
CN208105477U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L shape connecting node
CN207032010U (en) A kind of assembled solid steel tube constrains armored concrete pillar height pier
CN108103925A (en) A kind of assembled hollow steel pipe constrains reinforced column squat pier
CN206359882U (en) A kind of assembled solid steel tube constrains reinforced column squat pier
CN108265823A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L-shaped connecting node
CN208363421U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam cross connecting node
CN206928517U (en) Fiber reinforcement steel core concrete column and combinations thereof post
CN108086136A (en) A kind of assembled solid steel tube constrains reinforced column squat pier

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant