CN108086136A - A kind of assembled solid steel tube constrains reinforced column squat pier - Google Patents

A kind of assembled solid steel tube constrains reinforced column squat pier Download PDF

Info

Publication number
CN108086136A
CN108086136A CN201611046933.XA CN201611046933A CN108086136A CN 108086136 A CN108086136 A CN 108086136A CN 201611046933 A CN201611046933 A CN 201611046933A CN 108086136 A CN108086136 A CN 108086136A
Authority
CN
China
Prior art keywords
concrete column
foundation
pier
steel
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611046933.XA
Other languages
Chinese (zh)
Other versions
CN108086136B (en
Inventor
刘界鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Zhongke Construction Technology Co Ltd
Original Assignee
Chongqing Zhongke Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Zhongke Construction Technology Co Ltd filed Critical Chongqing Zhongke Construction Technology Co Ltd
Priority to CN201611046933.XA priority Critical patent/CN108086136B/en
Publication of CN108086136A publication Critical patent/CN108086136A/en
Application granted granted Critical
Publication of CN108086136B publication Critical patent/CN108086136B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Abstract

The present invention provides a kind of assembled solid steel tubes to constrain reinforced column squat pier.The assembled solid steel tube constraint only column squat pier of armored concrete is that the solid steel tube constraint only column squat pier of armored concrete is prefabricated in the factory and reserves grout sleeve and pier bottom groove in pier, cast in situs basis and reserved steel bar and shaped steel shear key or basic groove, connect finally by grouting.The present invention have makes full use of the strength of materials, fire-resistance anti-seismic performance is good, it is good in economic efficiency the advantages that.The present invention using fabricated construction, have many advantages, such as speed of application is fast, construction quality is high, construction environment improvement, working condition improvement, energy resource saving, cost savings.The present invention reserves pier bottom groove in pier bottom, reserved shaped steel shear key or basic groove on basis, and connects the two by way of injecting grouting material and fix;The more existing assembled column of which can effectively improve pier bottom with basic connection mode and is more convenient with the basic reliability being connected and construction.

Description

A kind of assembled solid steel tube constrains reinforced column squat pier
Technical field
The invention belongs to a kind of bridge structure component, the more particularly to assembled solid steel tube constraint only column of armored concrete is short Pier and its mounting process.
Background technology
Steel tube confinement armored concrete is the fill concrete in thin-wall steel tube, and steel pipe does not directly take on external loads, and A kind of combined member of effect of contraction is mainly played to core concrete.Steel tube confinement reinforced column high capacity, antidetonation and Fire resistance is superior, can make full use of the intensity of high-strength steel and concrete.When steel tube confinement reinforced concrete member Covered with Angles Manage for circle when, steel pipe constrains core concrete uniform, can make full use of the tensile strength of steel pipe, economic benefit is good.Mesh Preceding China just progressively promotes building industrialization, and industrialized building is not only with speed of application is fast, construction quality is high, construction environment changes The advantages that kind, and meet sustainable development requirement.Assembled solid steel tube constraint steel is proposed according to industrialized building feature The only column bridge pier of reinforced concrete.
The content of the invention
In order to promote novel fabricated steel tube confinement reinforced concrete structure in bridge structure, its structural mechanics is played Energy advantage, makes full use of material and reduces materials'use amount, improves economic performance, accelerates construction progress, the present invention provides Technical solution on the assembled steel tube constraint only column squat pier of armored concrete.
To realize the present invention purpose and the technical solution adopted is that such, a kind of assembled solid steel tube constraint reinforcing bar mixes Solidifying earth pillar squat pier, including the concrete column being prefabricated in the factory and the foundation of site operation.
The concrete column outside steel pipe.The lower surface of the concrete column has pier bottom groove and grout sleeve.
When the pier bottom groove is precast concrete column, in the centre bore that concrete column lower surface center is formed.Institute It states before grout sleeve formed, a ring around pier bottom groove need to be reserved in concrete column lower surface in precast concrete column Connected in star.
The outer surface of the steel pipe has several holes.The outer surface of these holes connection steel pipe and annular groove.
The foundation is by concreting, internal pre-buried several longitudinal reinforcements and shaped steel shear key.These longitudinal directions The upper surface of foundation is exposed in the upper end of reinforcing bar, and surrounds a border circular areas.Also expose the upper end of the shaped steel shear key The upper surface of foundation, and the center in the border circular areas.
At least one grout lines are reserved in the foundation.
When the concrete column is lifted into the foundation top, the lower end of the steel pipe and the foundation Upper surface contact.There is gap between the upper surface of the concrete column and the foundation.The longitudinal reinforcement it is upper End is stretched into the annular groove.The upper end of the shaped steel shear key is stretched into pier bottom groove.One end of the grout lines Nozzle is covered by concrete column, other end nozzle is not covered by concrete column.
Grouting material is poured by the space of the hole and/or grout lines between concrete column and foundation. The grouting material is filled in annular groove, forms grout sleeve.
Another embodiment is:
A kind of assembled solid steel tube constrains reinforced column squat pier, it is characterised in that:It is mixed including what is be prefabricated in the factory The foundation of solidifying earth pillar and site operation.
The concrete column outside steel pipe.The lower surface of the concrete column has pier bottom groove and grout sleeve.
When the pier bottom groove is precast concrete column, in the centre bore that concrete column lower surface center is formed.Institute It states before grout sleeve formed, a ring around pier bottom groove need to be reserved in concrete column lower surface in precast concrete column Connected in star.
The outer surface of the steel pipe has several holes.The outer surface of these holes connection steel pipe and annular groove.
The foundation is by concreting, internal pre-buried several longitudinal reinforcements.The upper end dew of these longitudinal reinforcements Go out the upper surface of foundation, and surround a border circular areas.The center of the border circular areas has basic groove.
At least one grout lines are reserved in the foundation.
When the concrete column is lifted into the foundation top, the lower end of the steel pipe and the foundation Upper surface contact.There is gap between the upper surface of the concrete column and the foundation.The longitudinal reinforcement it is upper End is stretched into the annular groove.The basis groove is docked with pier bottom groove.One end nozzle of the grout lines is mixed Solidifying earth pillar covering, other end nozzle are not covered by concrete column.
Grouting material is poured by the space of the hole and/or grout lines between concrete column and foundation. The grouting material is filled in annular groove, forms grout sleeve.
Further, steel pipe is welded by clod wash, using Q235 steel, Q345 steel, Q390 steel or Q420 steel systems Into.
Further, longitudinal reinforcement, stirrup use HRB335, HRB400, RRB400 or HRB500 reinforcing bar
Further, the shaped steel shear key is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
The solution have the advantages that unquestionable:
1. solid steel tube constrains reinforced concrete circular column, the strength of materials can be made full use of, fire-resistance anti-seismic performance is good, economical It is profitable etc..
2. fabricated construction, with speed of application is fast, construction quality is high, construction environment improves, working condition improves, resource The advantages that energy conservation, cost savings.
3. pier bottom groove is reserved in pier bottom, reserved shaped steel shear key or basic groove on basis, and pass through injection grouting material Mode by the two connect fix;The more existing assembled column of which can effectively improve pier bottom with basic connection mode and connect with basis The reliability and construction connect is more convenient.
Description of the drawings
Fig. 1 assembleds solid steel tube constrains the only column squat pier front view of armored concrete.
Fig. 2 assembleds solid steel tube constrains the only column squat pier top view of armored concrete.
Fig. 3 assembleds solid steel tube constrains the only column squat pier 1-1 sectional views of armored concrete.
Fig. 4 assembleds solid steel tube constrains the only column squat pier 2-2 sectional views of armored concrete.
The only column squat pier 3-3 sectional views of Fig. 5 assembleds solid steel tube constraint armored concrete (the pre-buried shaped steel in basis).
Fig. 6 assembleds solid steel tube constraint only column squat pier 3-3 sectional views of armored concrete (basic preformed groove).
In figure:Concrete 1, steel pipe 2, shaped steel shear key 3, longitudinal reinforcement 4, stirrup 5, grout sleeve 6, grouting material 7, pier bottom Groove 8, basic groove 9, grout lines 10, hole 11, foundation 12.
Specific embodiment
With reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used With means, various replacements and change are made, should all be included within the scope of the present invention.
Embodiment 1:
Referring to Fig. 1 and Fig. 2, a kind of assembled solid steel tube constrains reinforced column squat pier, including what is be prefabricated in the factory The foundation 12 of concrete column 1 and site operation.
Referring to Fig. 3, the concrete column 1 includes the muscle cage and concrete of 5 grade compositions of stirrup, outside have outsourced steel pipe 2.The lower surface of the concrete column 1 has pier bottom groove 8 and grout sleeve 6.
Referring to Fig. 4, when the pier bottom groove 8 is precast concrete column 1, the one of the formation of 1 lower surface of concrete column center A centre bore.Before the grout sleeve 6 is formed, a ring need to be reserved in 1 lower surface of concrete column in precast concrete column 1 Around the annular groove of pier bottom groove 8.
The outer surface of the steel pipe 2 has several holes 11.The outer surface of these holes 11 connection steel pipe 2 and annular are recessed Slot.
The foundation 12 is by concreting, internal pre-buried several longitudinal reinforcements 4 and shaped steel shear key 3.These The upper surface of foundation 12 is exposed in the upper end of longitudinal reinforcement 4, and surrounds a border circular areas.The shaped steel shear key 3 it is upper Also the upper surface of foundation 12, and the center in the border circular areas are exposed in end.In embodiment, as shown in the figure, the type Steel shear key 3 is a cross steel member.
At least one grout lines 10 are reserved in the foundation 12.
When the concrete column 1 is lifted into 12 top of foundation, lower end and the basis of the steel pipe 2 The upper surface contact of part 12.There is gap between the concrete column 1 and the upper surface of the foundation 12.The longitudinal direction The upper end of reinforcing bar 4 is stretched into the annular groove.The upper end of the shaped steel shear key 3 is stretched into pier bottom groove 8.The grouting One end nozzle of pipeline 10 is covered by concrete column 1, other end nozzle is not covered by concrete column 1.
It is poured by the space of the hole 11 and/or grout lines 10 between concrete column 1 and foundation 12 Grouting material 7.The grouting material 7 is filled in annular groove, forms grout sleeve 6.
Embodiment 2:
Referring to Fig. 1 and Fig. 2, a kind of assembled solid steel tube constrains reinforced column squat pier, including what is be prefabricated in the factory The foundation 12 of concrete column 1 and site operation.
Referring to Fig. 3, the concrete column 1 includes the muscle cage and concrete of 5 grade compositions of stirrup, outside have outsourced steel pipe 2.The lower surface of the concrete column 1 has pier bottom groove 8 and grout sleeve 6.
Referring to Fig. 4, when the pier bottom groove 8 is precast concrete column 1, the one of the formation of 1 lower surface of concrete column center A centre bore.Before the grout sleeve 6 is formed, a ring need to be reserved in 1 lower surface of concrete column in precast concrete column 1 Around the annular groove of pier bottom groove 8.
The outer surface of the steel pipe 2 has several holes 11.The outer surface of these holes 11 connection steel pipe 2 and annular are recessed Slot.
The foundation 12 is by concreting, internal pre-buried several longitudinal reinforcements 4.These longitudinal reinforcements 4 it is upper The upper surface of foundation 12 is exposed at end, and surrounds a border circular areas.The center of the border circular areas has basic groove 9.
At least one grout lines 10 are reserved in the foundation 12.
When the concrete column 1 is lifted into 12 top of foundation, lower end and the basis of the steel pipe 2 The upper surface contact of part 12.There is gap between the concrete column 1 and the upper surface of the foundation 12.The longitudinal direction The upper end of reinforcing bar 4 is stretched into the annular groove.The basis groove 9 is docked with pier bottom groove 8.The grout lines 10 One end nozzle is covered by concrete column 1, other end nozzle is not covered by concrete column 1.
It is poured by the space of the hole 11 and/or grout lines 10 between concrete column 1 and foundation 12 Grouting material 7.The grouting material 7 is filled in annular groove, forms grout sleeve 6.

Claims (5)

1. a kind of assembled solid steel tube constrains reinforced column squat pier, it is characterised in that:Including the coagulation being prefabricated in the factory The foundation (12) of earth pillar (1) and site operation;
Concrete column (1) outside steel pipe (2);The lower surface of the concrete column (1) has pier bottom groove (8) and grouting set Cylinder (6);
When the pier bottom groove (8) is precast concrete column (1), at the center that concrete column (1) lower surface center is formed Hole;Before the grout sleeve (6) is formed, a ring need to be reserved in concrete column (1) lower surface at precast concrete column (1) Annular groove around pier bottom groove (8);
The outer surface of the steel pipe (2) has several holes (11);The outer surface of these holes (11) connection steel pipe (2) and ring Connected in star;
The foundation (12) is by concreting, internal pre-buried several longitudinal reinforcements (4) and shaped steel shear key (3);This The upper surface of foundation (12) is exposed in the upper end of a little longitudinal reinforcements (4), and surrounds a border circular areas;The shaped steel shear key (3) upper surface of foundation (12), and the center in the border circular areas are also exposed in upper end;
At least one grout lines (10) are reserved in the foundation (12);
When the concrete column (1) is lifted into above the foundation (12), lower end and the base of the steel pipe (2) The upper surface contact of plinth part (12);There is gap between the upper surface of the concrete column (1) and the foundation (12); The upper end of the longitudinal reinforcement (4) is stretched into the annular groove;Pier bottom groove is stretched into the upper end of the shaped steel shear key (3) (8) in;One end nozzle of the grout lines (10) is covered by concrete column (1), other end nozzle is not by concrete column (1) Covering;
Pass through the space of the hole (11) and/or grout lines (10) between concrete column (1) and foundation (12) Pour into grouting material (7);The grouting material (7) is filled in annular groove, forms grout sleeve (6).
2. a kind of assembled solid steel tube constrains reinforced column squat pier, it is characterised in that:Including the coagulation being prefabricated in the factory The foundation (12) of earth pillar (1) and site operation;
Concrete column (1) outside steel pipe (2);The lower surface of the concrete column (1) has pier bottom groove (8) and grouting set Cylinder (6);
When the pier bottom groove (8) is precast concrete column (1), at the center that concrete column (1) lower surface center is formed Hole;Before the grout sleeve (6) is formed, a ring need to be reserved in concrete column (1) lower surface at precast concrete column (1) Annular groove around pier bottom groove (8);
The outer surface of the steel pipe (2) has several holes (11);The outer surface of these holes (11) connection steel pipe (2) and ring Connected in star;
The foundation (12) is by concreting, internal pre-buried several longitudinal reinforcements (4);These longitudinal reinforcements (4) The upper surface of foundation (12) is exposed in upper end, and surrounds a border circular areas;The center of the border circular areas has basic recessed Slot (9);
At least one grout lines (10) are reserved in the foundation (12);
When the concrete column (1) is lifted into above the foundation (12), lower end and the base of the steel pipe (2) The upper surface contact of plinth part (12);There is gap between the upper surface of the concrete column (1) and the foundation (12); The upper end of the longitudinal reinforcement (4) is stretched into the annular groove;The basis groove (9) is docked with pier bottom groove (8);Institute One end nozzle for stating grout lines (10) is not covered by concrete column (1) covering, other end nozzle by concrete column (1);
Pass through the space of the hole (11) and/or grout lines (10) between concrete column (1) and foundation (12) Pour into grouting material (7);The grouting material (7) is filled in annular groove, forms grout sleeve (6).
3. a kind of assembled solid steel tube constraint reinforced column squat pier according to claim 1, it is characterised in that:Steel Pipe (2) is welded by clod wash, is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
4. a kind of assembled solid steel tube constraint reinforced column squat pier according to claim 1, it is characterised in that:It is vertical HRB335, HRB400, RRB400 or HRB500 reinforcing bar are used to reinforcing bar (4), stirrup (5).
5. a kind of assembled solid steel tube constraint reinforced column squat pier according to claim 1, it is characterised in that:Institute Shaped steel shear key (3) is stated to be made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
CN201611046933.XA 2016-11-23 2016-11-23 Assembled solid steel pipe constraint reinforced concrete column short pier Active CN108086136B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611046933.XA CN108086136B (en) 2016-11-23 2016-11-23 Assembled solid steel pipe constraint reinforced concrete column short pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611046933.XA CN108086136B (en) 2016-11-23 2016-11-23 Assembled solid steel pipe constraint reinforced concrete column short pier

Publications (2)

Publication Number Publication Date
CN108086136A true CN108086136A (en) 2018-05-29
CN108086136B CN108086136B (en) 2023-10-27

Family

ID=62170235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611046933.XA Active CN108086136B (en) 2016-11-23 2016-11-23 Assembled solid steel pipe constraint reinforced concrete column short pier

Country Status (1)

Country Link
CN (1) CN108086136B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106780A (en) * 2019-05-14 2019-08-09 山东省交通规划设计院 A kind of connection structure, the construction method of Precast Pier Columns and pile foundation
CN113737950A (en) * 2021-09-17 2021-12-03 福州大学 Self-resetting long round steel pipe restrained reinforced concrete column base joint and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020089690A (en) * 2001-05-23 2002-11-30 주식회사유신코퍼레이션 A pier structure of assembly elevated road for a vehicle under 4.5 ton
CN105421223A (en) * 2015-12-21 2016-03-23 上海市城市建设设计研究总院 Prefabricated pier upright column, cushion cap spigot and insertion groove combined connection structure and splicing method
CN105803925A (en) * 2016-03-17 2016-07-27 浙江大学 Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam
CN205444475U (en) * 2016-03-11 2016-08-10 中民筑友有限公司 Prefab and basic connected node
CN106088348A (en) * 2016-07-29 2016-11-09 初明进 A kind of precast concrete method of attachment
CN206359882U (en) * 2016-11-23 2017-07-28 重庆市中科大业建筑科技有限公司 A kind of assembled solid steel tube constrains reinforced column squat pier

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020089690A (en) * 2001-05-23 2002-11-30 주식회사유신코퍼레이션 A pier structure of assembly elevated road for a vehicle under 4.5 ton
CN105421223A (en) * 2015-12-21 2016-03-23 上海市城市建设设计研究总院 Prefabricated pier upright column, cushion cap spigot and insertion groove combined connection structure and splicing method
CN205444475U (en) * 2016-03-11 2016-08-10 中民筑友有限公司 Prefab and basic connected node
CN105803925A (en) * 2016-03-17 2016-07-27 浙江大学 Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam
CN106088348A (en) * 2016-07-29 2016-11-09 初明进 A kind of precast concrete method of attachment
CN206359882U (en) * 2016-11-23 2017-07-28 重庆市中科大业建筑科技有限公司 A kind of assembled solid steel tube constrains reinforced column squat pier

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106780A (en) * 2019-05-14 2019-08-09 山东省交通规划设计院 A kind of connection structure, the construction method of Precast Pier Columns and pile foundation
CN113737950A (en) * 2021-09-17 2021-12-03 福州大学 Self-resetting long round steel pipe restrained reinforced concrete column base joint and construction method

Also Published As

Publication number Publication date
CN108086136B (en) 2023-10-27

Similar Documents

Publication Publication Date Title
CN103074941B (en) Assembling regeneration concrete node and the practice of steel bar girder beam are contained in a kind of end
CN206512590U (en) A kind of assembled hollow steel pipe constrains reinforced column squat pier
CN206844314U (en) A kind of new prefabricated assembled bean column node
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN106049691A (en) Fully-prefabricated assembling type steel tube constraint frame node
CN206512588U (en) A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled
CN106320537A (en) Prefabricated concrete-filled square steel tube column and steel girder connecting joint
CN108086130A (en) A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled
CN208533868U (en) A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column
CN108086134A (en) A kind of assembled hollow steel pipe constrains armored concrete pillar height pier
CN109098201A (en) A kind of super plane area portions prestressed concrete well foundation and its construction method
CN103790176B (en) A kind of construction method of pre-buried manomelia rod structure
CN206928519U (en) A kind of reinforced concrete combination post
CN210458914U (en) Connecting structure of prefabricated bridge pier stud and capping beam
CN106592777B (en) Assembled steel-is mixed to combine beam-column node structure and its implementation method
CN208763204U (en) A kind of vertical connecting structure of low layer assembled architecture prefabricated panel
CN206359882U (en) A kind of assembled solid steel tube constrains reinforced column squat pier
CN108086136A (en) A kind of assembled solid steel tube constrains reinforced column squat pier
CN205224025U (en) Prestressing force anti -floating pile
CN207032010U (en) A kind of assembled solid steel tube constrains armored concrete pillar height pier
CN103924676B (en) Prestressing force connects beams of concrete concrete-filled circular steel tube column node
CN207211366U (en) The attachment structure of prefabricated beam column
CN108103925A (en) A kind of assembled hollow steel pipe constrains reinforced column squat pier
CN108265823A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L-shaped connecting node
CN206359881U (en) A kind of assembled hollow steel pipe constrains armored concrete pillar height pier

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant