CN108086136A - A kind of assembled solid steel tube constrains reinforced column squat pier - Google Patents
A kind of assembled solid steel tube constrains reinforced column squat pier Download PDFInfo
- Publication number
- CN108086136A CN108086136A CN201611046933.XA CN201611046933A CN108086136A CN 108086136 A CN108086136 A CN 108086136A CN 201611046933 A CN201611046933 A CN 201611046933A CN 108086136 A CN108086136 A CN 108086136A
- Authority
- CN
- China
- Prior art keywords
- concrete column
- foundation
- pier
- steel
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 95
- 239000010959 steel Substances 0.000 title claims abstract description 95
- 239000007787 solid Substances 0.000 title claims abstract description 23
- 239000004567 concrete Substances 0.000 claims abstract description 74
- 239000011440 grout Substances 0.000 claims abstract description 36
- 239000000463 material Substances 0.000 claims abstract description 19
- 230000002787 reinforcement Effects 0.000 claims description 17
- 239000011178 precast concrete Substances 0.000 claims description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 230000015271 coagulation Effects 0.000 claims 2
- 238000005345 coagulation Methods 0.000 claims 2
- 238000010276 construction Methods 0.000 abstract description 11
- 230000008901 benefit Effects 0.000 abstract description 7
- 238000011065 in-situ storage Methods 0.000 abstract 1
- 239000011150 reinforced concrete Substances 0.000 description 4
- 239000000243 solution Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 230000008602 contraction Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/268—Composite concrete-metal
Abstract
The present invention provides a kind of assembled solid steel tubes to constrain reinforced column squat pier.The assembled solid steel tube constraint only column squat pier of armored concrete is that the solid steel tube constraint only column squat pier of armored concrete is prefabricated in the factory and reserves grout sleeve and pier bottom groove in pier, cast in situs basis and reserved steel bar and shaped steel shear key or basic groove, connect finally by grouting.The present invention have makes full use of the strength of materials, fire-resistance anti-seismic performance is good, it is good in economic efficiency the advantages that.The present invention using fabricated construction, have many advantages, such as speed of application is fast, construction quality is high, construction environment improvement, working condition improvement, energy resource saving, cost savings.The present invention reserves pier bottom groove in pier bottom, reserved shaped steel shear key or basic groove on basis, and connects the two by way of injecting grouting material and fix;The more existing assembled column of which can effectively improve pier bottom with basic connection mode and is more convenient with the basic reliability being connected and construction.
Description
Technical field
The invention belongs to a kind of bridge structure component, the more particularly to assembled solid steel tube constraint only column of armored concrete is short
Pier and its mounting process.
Background technology
Steel tube confinement armored concrete is the fill concrete in thin-wall steel tube, and steel pipe does not directly take on external loads, and
A kind of combined member of effect of contraction is mainly played to core concrete.Steel tube confinement reinforced column high capacity, antidetonation and
Fire resistance is superior, can make full use of the intensity of high-strength steel and concrete.When steel tube confinement reinforced concrete member Covered with Angles
Manage for circle when, steel pipe constrains core concrete uniform, can make full use of the tensile strength of steel pipe, economic benefit is good.Mesh
Preceding China just progressively promotes building industrialization, and industrialized building is not only with speed of application is fast, construction quality is high, construction environment changes
The advantages that kind, and meet sustainable development requirement.Assembled solid steel tube constraint steel is proposed according to industrialized building feature
The only column bridge pier of reinforced concrete.
The content of the invention
In order to promote novel fabricated steel tube confinement reinforced concrete structure in bridge structure, its structural mechanics is played
Energy advantage, makes full use of material and reduces materials'use amount, improves economic performance, accelerates construction progress, the present invention provides
Technical solution on the assembled steel tube constraint only column squat pier of armored concrete.
To realize the present invention purpose and the technical solution adopted is that such, a kind of assembled solid steel tube constraint reinforcing bar mixes
Solidifying earth pillar squat pier, including the concrete column being prefabricated in the factory and the foundation of site operation.
The concrete column outside steel pipe.The lower surface of the concrete column has pier bottom groove and grout sleeve.
When the pier bottom groove is precast concrete column, in the centre bore that concrete column lower surface center is formed.Institute
It states before grout sleeve formed, a ring around pier bottom groove need to be reserved in concrete column lower surface in precast concrete column
Connected in star.
The outer surface of the steel pipe has several holes.The outer surface of these holes connection steel pipe and annular groove.
The foundation is by concreting, internal pre-buried several longitudinal reinforcements and shaped steel shear key.These longitudinal directions
The upper surface of foundation is exposed in the upper end of reinforcing bar, and surrounds a border circular areas.Also expose the upper end of the shaped steel shear key
The upper surface of foundation, and the center in the border circular areas.
At least one grout lines are reserved in the foundation.
When the concrete column is lifted into the foundation top, the lower end of the steel pipe and the foundation
Upper surface contact.There is gap between the upper surface of the concrete column and the foundation.The longitudinal reinforcement it is upper
End is stretched into the annular groove.The upper end of the shaped steel shear key is stretched into pier bottom groove.One end of the grout lines
Nozzle is covered by concrete column, other end nozzle is not covered by concrete column.
Grouting material is poured by the space of the hole and/or grout lines between concrete column and foundation.
The grouting material is filled in annular groove, forms grout sleeve.
Another embodiment is:
A kind of assembled solid steel tube constrains reinforced column squat pier, it is characterised in that:It is mixed including what is be prefabricated in the factory
The foundation of solidifying earth pillar and site operation.
The concrete column outside steel pipe.The lower surface of the concrete column has pier bottom groove and grout sleeve.
When the pier bottom groove is precast concrete column, in the centre bore that concrete column lower surface center is formed.Institute
It states before grout sleeve formed, a ring around pier bottom groove need to be reserved in concrete column lower surface in precast concrete column
Connected in star.
The outer surface of the steel pipe has several holes.The outer surface of these holes connection steel pipe and annular groove.
The foundation is by concreting, internal pre-buried several longitudinal reinforcements.The upper end dew of these longitudinal reinforcements
Go out the upper surface of foundation, and surround a border circular areas.The center of the border circular areas has basic groove.
At least one grout lines are reserved in the foundation.
When the concrete column is lifted into the foundation top, the lower end of the steel pipe and the foundation
Upper surface contact.There is gap between the upper surface of the concrete column and the foundation.The longitudinal reinforcement it is upper
End is stretched into the annular groove.The basis groove is docked with pier bottom groove.One end nozzle of the grout lines is mixed
Solidifying earth pillar covering, other end nozzle are not covered by concrete column.
Grouting material is poured by the space of the hole and/or grout lines between concrete column and foundation.
The grouting material is filled in annular groove, forms grout sleeve.
Further, steel pipe is welded by clod wash, using Q235 steel, Q345 steel, Q390 steel or Q420 steel systems
Into.
Further, longitudinal reinforcement, stirrup use HRB335, HRB400, RRB400 or HRB500 reinforcing bar
Further, the shaped steel shear key is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
The solution have the advantages that unquestionable:
1. solid steel tube constrains reinforced concrete circular column, the strength of materials can be made full use of, fire-resistance anti-seismic performance is good, economical
It is profitable etc..
2. fabricated construction, with speed of application is fast, construction quality is high, construction environment improves, working condition improves, resource
The advantages that energy conservation, cost savings.
3. pier bottom groove is reserved in pier bottom, reserved shaped steel shear key or basic groove on basis, and pass through injection grouting material
Mode by the two connect fix;The more existing assembled column of which can effectively improve pier bottom with basic connection mode and connect with basis
The reliability and construction connect is more convenient.
Description of the drawings
Fig. 1 assembleds solid steel tube constrains the only column squat pier front view of armored concrete.
Fig. 2 assembleds solid steel tube constrains the only column squat pier top view of armored concrete.
Fig. 3 assembleds solid steel tube constrains the only column squat pier 1-1 sectional views of armored concrete.
Fig. 4 assembleds solid steel tube constrains the only column squat pier 2-2 sectional views of armored concrete.
The only column squat pier 3-3 sectional views of Fig. 5 assembleds solid steel tube constraint armored concrete (the pre-buried shaped steel in basis).
Fig. 6 assembleds solid steel tube constraint only column squat pier 3-3 sectional views of armored concrete (basic preformed groove).
In figure:Concrete 1, steel pipe 2, shaped steel shear key 3, longitudinal reinforcement 4, stirrup 5, grout sleeve 6, grouting material 7, pier bottom
Groove 8, basic groove 9, grout lines 10, hole 11, foundation 12.
Specific embodiment
With reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only
It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used
With means, various replacements and change are made, should all be included within the scope of the present invention.
Embodiment 1:
Referring to Fig. 1 and Fig. 2, a kind of assembled solid steel tube constrains reinforced column squat pier, including what is be prefabricated in the factory
The foundation 12 of concrete column 1 and site operation.
Referring to Fig. 3, the concrete column 1 includes the muscle cage and concrete of 5 grade compositions of stirrup, outside have outsourced steel pipe
2.The lower surface of the concrete column 1 has pier bottom groove 8 and grout sleeve 6.
Referring to Fig. 4, when the pier bottom groove 8 is precast concrete column 1, the one of the formation of 1 lower surface of concrete column center
A centre bore.Before the grout sleeve 6 is formed, a ring need to be reserved in 1 lower surface of concrete column in precast concrete column 1
Around the annular groove of pier bottom groove 8.
The outer surface of the steel pipe 2 has several holes 11.The outer surface of these holes 11 connection steel pipe 2 and annular are recessed
Slot.
The foundation 12 is by concreting, internal pre-buried several longitudinal reinforcements 4 and shaped steel shear key 3.These
The upper surface of foundation 12 is exposed in the upper end of longitudinal reinforcement 4, and surrounds a border circular areas.The shaped steel shear key 3 it is upper
Also the upper surface of foundation 12, and the center in the border circular areas are exposed in end.In embodiment, as shown in the figure, the type
Steel shear key 3 is a cross steel member.
At least one grout lines 10 are reserved in the foundation 12.
When the concrete column 1 is lifted into 12 top of foundation, lower end and the basis of the steel pipe 2
The upper surface contact of part 12.There is gap between the concrete column 1 and the upper surface of the foundation 12.The longitudinal direction
The upper end of reinforcing bar 4 is stretched into the annular groove.The upper end of the shaped steel shear key 3 is stretched into pier bottom groove 8.The grouting
One end nozzle of pipeline 10 is covered by concrete column 1, other end nozzle is not covered by concrete column 1.
It is poured by the space of the hole 11 and/or grout lines 10 between concrete column 1 and foundation 12
Grouting material 7.The grouting material 7 is filled in annular groove, forms grout sleeve 6.
Embodiment 2:
Referring to Fig. 1 and Fig. 2, a kind of assembled solid steel tube constrains reinforced column squat pier, including what is be prefabricated in the factory
The foundation 12 of concrete column 1 and site operation.
Referring to Fig. 3, the concrete column 1 includes the muscle cage and concrete of 5 grade compositions of stirrup, outside have outsourced steel pipe
2.The lower surface of the concrete column 1 has pier bottom groove 8 and grout sleeve 6.
Referring to Fig. 4, when the pier bottom groove 8 is precast concrete column 1, the one of the formation of 1 lower surface of concrete column center
A centre bore.Before the grout sleeve 6 is formed, a ring need to be reserved in 1 lower surface of concrete column in precast concrete column 1
Around the annular groove of pier bottom groove 8.
The outer surface of the steel pipe 2 has several holes 11.The outer surface of these holes 11 connection steel pipe 2 and annular are recessed
Slot.
The foundation 12 is by concreting, internal pre-buried several longitudinal reinforcements 4.These longitudinal reinforcements 4 it is upper
The upper surface of foundation 12 is exposed at end, and surrounds a border circular areas.The center of the border circular areas has basic groove 9.
At least one grout lines 10 are reserved in the foundation 12.
When the concrete column 1 is lifted into 12 top of foundation, lower end and the basis of the steel pipe 2
The upper surface contact of part 12.There is gap between the concrete column 1 and the upper surface of the foundation 12.The longitudinal direction
The upper end of reinforcing bar 4 is stretched into the annular groove.The basis groove 9 is docked with pier bottom groove 8.The grout lines 10
One end nozzle is covered by concrete column 1, other end nozzle is not covered by concrete column 1.
It is poured by the space of the hole 11 and/or grout lines 10 between concrete column 1 and foundation 12
Grouting material 7.The grouting material 7 is filled in annular groove, forms grout sleeve 6.
Claims (5)
1. a kind of assembled solid steel tube constrains reinforced column squat pier, it is characterised in that:Including the coagulation being prefabricated in the factory
The foundation (12) of earth pillar (1) and site operation;
Concrete column (1) outside steel pipe (2);The lower surface of the concrete column (1) has pier bottom groove (8) and grouting set
Cylinder (6);
When the pier bottom groove (8) is precast concrete column (1), at the center that concrete column (1) lower surface center is formed
Hole;Before the grout sleeve (6) is formed, a ring need to be reserved in concrete column (1) lower surface at precast concrete column (1)
Annular groove around pier bottom groove (8);
The outer surface of the steel pipe (2) has several holes (11);The outer surface of these holes (11) connection steel pipe (2) and ring
Connected in star;
The foundation (12) is by concreting, internal pre-buried several longitudinal reinforcements (4) and shaped steel shear key (3);This
The upper surface of foundation (12) is exposed in the upper end of a little longitudinal reinforcements (4), and surrounds a border circular areas;The shaped steel shear key
(3) upper surface of foundation (12), and the center in the border circular areas are also exposed in upper end;
At least one grout lines (10) are reserved in the foundation (12);
When the concrete column (1) is lifted into above the foundation (12), lower end and the base of the steel pipe (2)
The upper surface contact of plinth part (12);There is gap between the upper surface of the concrete column (1) and the foundation (12);
The upper end of the longitudinal reinforcement (4) is stretched into the annular groove;Pier bottom groove is stretched into the upper end of the shaped steel shear key (3)
(8) in;One end nozzle of the grout lines (10) is covered by concrete column (1), other end nozzle is not by concrete column (1)
Covering;
Pass through the space of the hole (11) and/or grout lines (10) between concrete column (1) and foundation (12)
Pour into grouting material (7);The grouting material (7) is filled in annular groove, forms grout sleeve (6).
2. a kind of assembled solid steel tube constrains reinforced column squat pier, it is characterised in that:Including the coagulation being prefabricated in the factory
The foundation (12) of earth pillar (1) and site operation;
Concrete column (1) outside steel pipe (2);The lower surface of the concrete column (1) has pier bottom groove (8) and grouting set
Cylinder (6);
When the pier bottom groove (8) is precast concrete column (1), at the center that concrete column (1) lower surface center is formed
Hole;Before the grout sleeve (6) is formed, a ring need to be reserved in concrete column (1) lower surface at precast concrete column (1)
Annular groove around pier bottom groove (8);
The outer surface of the steel pipe (2) has several holes (11);The outer surface of these holes (11) connection steel pipe (2) and ring
Connected in star;
The foundation (12) is by concreting, internal pre-buried several longitudinal reinforcements (4);These longitudinal reinforcements (4)
The upper surface of foundation (12) is exposed in upper end, and surrounds a border circular areas;The center of the border circular areas has basic recessed
Slot (9);
At least one grout lines (10) are reserved in the foundation (12);
When the concrete column (1) is lifted into above the foundation (12), lower end and the base of the steel pipe (2)
The upper surface contact of plinth part (12);There is gap between the upper surface of the concrete column (1) and the foundation (12);
The upper end of the longitudinal reinforcement (4) is stretched into the annular groove;The basis groove (9) is docked with pier bottom groove (8);Institute
One end nozzle for stating grout lines (10) is not covered by concrete column (1) covering, other end nozzle by concrete column (1);
Pass through the space of the hole (11) and/or grout lines (10) between concrete column (1) and foundation (12)
Pour into grouting material (7);The grouting material (7) is filled in annular groove, forms grout sleeve (6).
3. a kind of assembled solid steel tube constraint reinforced column squat pier according to claim 1, it is characterised in that:Steel
Pipe (2) is welded by clod wash, is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
4. a kind of assembled solid steel tube constraint reinforced column squat pier according to claim 1, it is characterised in that:It is vertical
HRB335, HRB400, RRB400 or HRB500 reinforcing bar are used to reinforcing bar (4), stirrup (5).
5. a kind of assembled solid steel tube constraint reinforced column squat pier according to claim 1, it is characterised in that:Institute
Shaped steel shear key (3) is stated to be made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611046933.XA CN108086136B (en) | 2016-11-23 | 2016-11-23 | Assembled solid steel pipe constraint reinforced concrete column short pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611046933.XA CN108086136B (en) | 2016-11-23 | 2016-11-23 | Assembled solid steel pipe constraint reinforced concrete column short pier |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108086136A true CN108086136A (en) | 2018-05-29 |
CN108086136B CN108086136B (en) | 2023-10-27 |
Family
ID=62170235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611046933.XA Active CN108086136B (en) | 2016-11-23 | 2016-11-23 | Assembled solid steel pipe constraint reinforced concrete column short pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108086136B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110106780A (en) * | 2019-05-14 | 2019-08-09 | 山东省交通规划设计院 | A kind of connection structure, the construction method of Precast Pier Columns and pile foundation |
CN113737950A (en) * | 2021-09-17 | 2021-12-03 | 福州大学 | Self-resetting long round steel pipe restrained reinforced concrete column base joint and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020089690A (en) * | 2001-05-23 | 2002-11-30 | 주식회사유신코퍼레이션 | A pier structure of assembly elevated road for a vehicle under 4.5 ton |
CN105421223A (en) * | 2015-12-21 | 2016-03-23 | 上海市城市建设设计研究总院 | Prefabricated pier upright column, cushion cap spigot and insertion groove combined connection structure and splicing method |
CN105803925A (en) * | 2016-03-17 | 2016-07-27 | 浙江大学 | Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam |
CN205444475U (en) * | 2016-03-11 | 2016-08-10 | 中民筑友有限公司 | Prefab and basic connected node |
CN106088348A (en) * | 2016-07-29 | 2016-11-09 | 初明进 | A kind of precast concrete method of attachment |
CN206359882U (en) * | 2016-11-23 | 2017-07-28 | 重庆市中科大业建筑科技有限公司 | A kind of assembled solid steel tube constrains reinforced column squat pier |
-
2016
- 2016-11-23 CN CN201611046933.XA patent/CN108086136B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020089690A (en) * | 2001-05-23 | 2002-11-30 | 주식회사유신코퍼레이션 | A pier structure of assembly elevated road for a vehicle under 4.5 ton |
CN105421223A (en) * | 2015-12-21 | 2016-03-23 | 上海市城市建设设计研究总院 | Prefabricated pier upright column, cushion cap spigot and insertion groove combined connection structure and splicing method |
CN205444475U (en) * | 2016-03-11 | 2016-08-10 | 中民筑友有限公司 | Prefab and basic connected node |
CN105803925A (en) * | 2016-03-17 | 2016-07-27 | 浙江大学 | Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam |
CN106088348A (en) * | 2016-07-29 | 2016-11-09 | 初明进 | A kind of precast concrete method of attachment |
CN206359882U (en) * | 2016-11-23 | 2017-07-28 | 重庆市中科大业建筑科技有限公司 | A kind of assembled solid steel tube constrains reinforced column squat pier |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110106780A (en) * | 2019-05-14 | 2019-08-09 | 山东省交通规划设计院 | A kind of connection structure, the construction method of Precast Pier Columns and pile foundation |
CN113737950A (en) * | 2021-09-17 | 2021-12-03 | 福州大学 | Self-resetting long round steel pipe restrained reinforced concrete column base joint and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN108086136B (en) | 2023-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103074941B (en) | Assembling regeneration concrete node and the practice of steel bar girder beam are contained in a kind of end | |
CN206512590U (en) | A kind of assembled hollow steel pipe constrains reinforced column squat pier | |
CN206844314U (en) | A kind of new prefabricated assembled bean column node | |
CN205894313U (en) | Prefabricated assembled steel pipe retrains frame node entirely | |
CN106049691A (en) | Fully-prefabricated assembling type steel tube constraint frame node | |
CN206512588U (en) | A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled | |
CN106320537A (en) | Prefabricated concrete-filled square steel tube column and steel girder connecting joint | |
CN108086130A (en) | A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled | |
CN208533868U (en) | A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column | |
CN108086134A (en) | A kind of assembled hollow steel pipe constrains armored concrete pillar height pier | |
CN109098201A (en) | A kind of super plane area portions prestressed concrete well foundation and its construction method | |
CN103790176B (en) | A kind of construction method of pre-buried manomelia rod structure | |
CN206928519U (en) | A kind of reinforced concrete combination post | |
CN210458914U (en) | Connecting structure of prefabricated bridge pier stud and capping beam | |
CN106592777B (en) | Assembled steel-is mixed to combine beam-column node structure and its implementation method | |
CN208763204U (en) | A kind of vertical connecting structure of low layer assembled architecture prefabricated panel | |
CN206359882U (en) | A kind of assembled solid steel tube constrains reinforced column squat pier | |
CN108086136A (en) | A kind of assembled solid steel tube constrains reinforced column squat pier | |
CN205224025U (en) | Prestressing force anti -floating pile | |
CN207032010U (en) | A kind of assembled solid steel tube constrains armored concrete pillar height pier | |
CN103924676B (en) | Prestressing force connects beams of concrete concrete-filled circular steel tube column node | |
CN207211366U (en) | The attachment structure of prefabricated beam column | |
CN108103925A (en) | A kind of assembled hollow steel pipe constrains reinforced column squat pier | |
CN108265823A (en) | Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L-shaped connecting node | |
CN206359881U (en) | A kind of assembled hollow steel pipe constrains armored concrete pillar height pier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |