CN105735248A - Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force - Google Patents

Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force Download PDF

Info

Publication number
CN105735248A
CN105735248A CN201610140404.XA CN201610140404A CN105735248A CN 105735248 A CN105735248 A CN 105735248A CN 201610140404 A CN201610140404 A CN 201610140404A CN 105735248 A CN105735248 A CN 105735248A
Authority
CN
China
Prior art keywords
prefabricated pile
pile
construction method
prefabricated
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610140404.XA
Other languages
Chinese (zh)
Inventor
李耀家
彭涛
高晓峰
邓安
任东兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CREEC Chengdu Survey Design and Research Co Ltd
Original Assignee
CREEC Chengdu Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREEC Chengdu Survey Design and Research Co Ltd filed Critical CREEC Chengdu Survey Design and Research Co Ltd
Priority to CN201610140404.XA priority Critical patent/CN105735248A/en
Publication of CN105735248A publication Critical patent/CN105735248A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles

Abstract

The invention belongs to the technical field of prefabricated pile construction, and discloses a construction method for guaranteeing that the pile end of a prefabricated pile enters a bearing layer and improving the bearing force to solve the problems that according to an existing prefabricated pile construction method, the construction period is long, the construction cost is high, and a pile end cannot enter a designed bearing layer. The construction method comprises the following steps that firstly, a pile hole is manufactured, the pile hole goes deep to the bearing layer of a soil body, and the size of the cross section of the pile hole is larger than that of the cross section of the prefabricated pile; secondly, a centering guide is arranged at the upper end of the pile hole, then the prefabricated pile is hoisted up and penetrates the centering guide to enter the pile hole, and the lower end of the prefabricated pile arrives at the designed bearing layer of the soil body; thirdly, the part between the prefabricated pile and the pile hole wall is backfilled with materials; and fourthly, the backfilled materials are tamped, and construction of the prefabricated pile is finished. Compared with an existing prefabricated pile construction method, the construction method has the beneficial effects of being short in construction period, low in construction cost and high in bearing force.

Description

A kind of construction method ensureing prefabricated pile stake end entrance supporting course and improving bearing capacity
Technical field
The invention belongs to construction of prefabricated piles technical field, be specifically related to a kind of construction method ensureing prefabricated pile stake end entrance design supporting course and improving bearing capacity.
Background technology
Traditional construction of prefabricated piles method mainly has static pressure method and hammering method, but pile body is produced damage by both approaches on the one hand, can produce soil compaction effect on the other hand, affect stake self construction quality and surrounding enviroment.For solving these problems, have developed and replant the embedded type construction method into prefabricated pile by boring in advance.
Such as application number be 201510320942.2 patent of invention disclose the construction method of a kind of prefabricated pile to hold holding capacity, comprise the steps:
Step one, stake holes make, and casing is sunk to desired depth;Utilize the hammer of the single motor oscillating on walking or crawler type piling machine to clamp casing wall, casing is sink to desired depth;Or the knocking casing front end soil body forms hole, casing is sink to desired depth;Or by long auger, then casing is sunk to desired depth;Or form stake holes by holing with slurry wall protection mode, then casing is sink to desired depth;Or utilize diesel hammer directly to ram casing mouth top casing is sunk to desired depth.
Step 2, predetermined reinforcing soil layer is reinforced, formed and reinforce soil layer;Repeatedly ram inserts by elongated hammer, predetermined reinforcing soil layer is carried out closely knit formation compacting body;Repeatedly ramming inserts by elongated hammer, the method that predetermined reinforcing soil layer carries out closely knit formation compacting body is:
A, in casing first time fill the inserts of 0.1-0.5m3, repeatedly ram inserts with elongated hammer, until the elongated hammer hammer end does not go out bottom casing mouth, and exceed 4-10cm bottom casing mouth;
B, in batches, repeatedly in casing, fill inserts, repeatedly ram with elongated hammer until the inserts of each batch is rammed out bottom casing mouth;
C reinforces soil layer total filler amount requirement until the loading of inserts meets, and casing inner filling material is rammed out outside casing by elongated hammer, until meeting design requirement;Described inserts is rubble, brickbat, slag, broken concrete or dry concrete;
Step 3, labelling casing centre coordinate;
Step 4, by quiet for prefabricated pile be pressed in stake holes or adopt hang the mode of stake and directly prefabricated pile hung in and in casing, be put into the end face reinforcing soil layer;Prefabricated pile static pressure is entered the method in stake holes is:
A, extracting casing, Static pressure pile driver is in place, and centering is label stake site coordinate;
B, ready made prefabricated pile is fixed into Pile feeder, checks centre coordinate;
C, Static pressure pile driver or are hammered onto prefabricated pile static pressure above the reinforcing soil layer in step 2 with static pressure or hammer mode, or enter in reinforcing soil layer, complete the construction of whole stake;
Adopt and hang the mode of stake and directly prefabricated pile is hung in the method being put into the end face reinforcing soil layer in casing be: adopt crane directly vertically to be sling by precast pile and put into casing, or adopt hoist engine on stake machine to put into casing after directly being sling by prefabricated pile, then gently buckle precast pile head end face with elongated hammer and prefabricated pile is compacted to the end face reinforcing soil layer, complete the construction of whole stake.
But, the construction method of existing prefabricated pile also exists following problem:
Construction is long-term long, requires over piling machine and squeezed in stake holes by casing after making stake holes, and after casing puts in place, it is necessary to carry out compacting process to the bottom of stake holes;Thus causing long construction period.And due to some areas owing to geological stratification is very soft, occur substantial amounts of across hole in the process squeeze into casing, in order to ensure the position that casing is installed, it is necessary to pour into a mould in soil body upper end, then punch, then squeeze into casing;Thus it is long-term to extend construction further, cause that construction cost is high.
Summary of the invention
The present invention is to solve long construction period that existing prefabricated pile construction method exists and the high problem of construction cost;And provide a kind of and ensure that prefabricated pile stake end enters design supporting course and improves the construction method of bearing capacity, compared to existing construction of prefabricated piles method, shortens construction period, reduces construction cost;Improve the bearing capacity of prefabricated pile simultaneously.
For solving above-mentioned technical problem, the technical solution adopted in the present invention is:
A kind of construction method ensureing prefabricated pile stake end entrance supporting course and improving bearing capacity, comprises the steps:
One, making stake holes, the degree of depth of stake holes is until the design supporting course of foundation soil;The cross sectional dimensions of stake holes is more than the cross sectional dimensions of prefabricated pile;
Two, installing centralizer in the upper end of stake holes, then being sling by prefabricated pile and passing centralizer enters in stake holes, and the lower end of prefabricated pile arrives the design supporting course of foundation soil;
Three, backfill with material between prefabricated pile and stake holes wall;
Four, backfill material is carried out compacting process, complete the construction of prefabricated pile.
Carry out backfilling between prefabricated pile and stake holes wall backfilling with concrete.
Backfill with crushed stone aggregate between prefabricated pile and stake holes wall.
Described prefabricated pile is for wishing pile tube, precast square pile or prefabricated polygonal pile.
Described stake holes adopts churning driven to make.
In above-mentioned steps 2, adopt crane to be sling by prefabricated pile and pass in centralizer entrance stake holes.
Described centralizer includes upper shell and lower shell, and described upper shell is horn-like, and described lower shell and prefabricated pile are mutually adapted;The outer wall of described upper shell or lower shell is connected to for the mounting bracket that centralizer is fixing.
Described lower shell includes inner core and urceolus, and the outer wall of described inner core is horizontally installed with ball bearing, and described inner core offers through hole, and the inside of inner core is stretched into through through hole in the side of described ball bearing;Described urceolus is set in the periphery of inner core.
It is 2.5-5mm that described ball bearing stretches into the length within inner core.
Compared with prior art, the method have the advantages that
The present invention ensures that prefabricated pile stake end enters supporting course and improves the construction method of bearing capacity, in whole work progress, even if there is the situation across hole (particularly soil is than relatively soft area) in the process of pore-forming, also without installing casing, also without promoting casing, thus shortening construction period, reduce the cost of construction.
The present invention avoids the generation destroying soil body supporting course in work progress, improves the bearing capacity of prefabricated pile.Owing to existing prefabricated pile passes through in work progress, by piling machine casing squeezed in the process of stake holes, there is casing and soil body supporting course is destroyed the situation of (punching), thus causing that the bearing capacity of prefabricated pile is relatively low.The present invention, in whole work progress, damages all without to supporting course, thus improving the bearing capacity of prefabricated pile.
Meanwhile, the present invention has carried out backfill process at periphery aggregate or the concrete of prefabricated pile, further increases the bearing capacity of prefabricated pile.
Accompanying drawing explanation
Fig. 1 is the structural representation of the centralizer of the present invention;
Fig. 2 is the sectional view structural representation at A-A place in Fig. 1;
Labelling in figure: 1, upper shell, 2, lower shell, 3, mounting bracket.
Detailed description of the invention
Below in conjunction with embodiment, the invention will be further described, and described embodiment is only a part of embodiment of the present invention, is not whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art obtain under not making creative work premise other used by embodiment, broadly fall into protection scope of the present invention.
The present invention ensures that prefabricated pile stake end enters supporting course and improves the construction method of bearing capacity, comprises the steps:
One, making stake holes, the degree of depth of stake holes is until the supporting course of the soil body;The cross sectional dimensions of stake holes is more than the cross sectional dimensions of prefabricated pile;
Two, installing centralizer in the upper end of stake holes, then being sling by prefabricated pile and passing centralizer enters in stake holes, and the lower end of prefabricated pile arrives the supporting course of the soil body;The present invention is by installing centralizer, it is possible to ensure the perpendicularity of prefabricated pile, thus decreasing the operation of subsequent detection detection precast pile inclination degree.Simultaneously by centralizer, there is feature easy to use.
Three, backfill with material between prefabricated pile and stake holes wall;
Four, backfill material is carried out compacting process, complete the construction of prefabricated pile.
As the mode of a kind of selection of the present invention, carry out backfilling between prefabricated pile and stake holes wall backfilling with concrete.
As the mode that another kind of the present invention selects, backfill with crushed stone aggregate between prefabricated pile and stake holes wall.
Wherein, the selection of concrete and crushed stone aggregate is to descend the situation of water and soil body to determine in combination, and those skilled in the art can be appreciated and understood that, does not repeat them here.
Situation according to prefabricated pile, it is possible to select as requested to wish pile tube, precast square pile or prefabricated polygonal pile.
Described stake holes adopts churning driven to make.
In above-mentioned steps 2, adopt crane to be sling by prefabricated pile and pass in centralizer entrance stake holes.
In conjunction with accompanying drawing 1 and accompanying drawing 2, as a kind of preferred mode of the present invention, described centralizer includes upper shell 1 and lower shell 2, and described upper shell 1 is in horn-like, and described lower shell 2 is mutually adapted with prefabricated pile;Being connected on the outer wall of described upper shell 1 or lower shell 2 for the mounting bracket 3 that centralizer is fixing, mounting bracket 3 is arranged on lower shell.
Described lower shell 2 includes inner core 5 and urceolus 4, and the outer wall of described inner core 5 is horizontally installed with ball bearing 3, and described inner core 5 offers through hole, and the inside of inner core 5 is stretched into through through hole in the side of described ball bearing 3;Described urceolus 4 is set in the periphery of inner core 5, thus the ball bearing being arranged on inner core 5 is protected.It is 2.5-5mm that described ball bearing 6 stretches into the length within inner core 5.The centralizer of the present invention has simple in construction, feature easy to use, decreases the friction between prefabricated pile and centralizer simultaneously, it is simple to transferring of prefabricated pile.In the process of construction, first pass through mounting bracket and centralizer is fixed, when hoisting prefabricated stake, ensured the perpendicularity of prefabricated pile by the effect of centralizer.If square prefabricated pile, each ball bearing is arranged along the radial direction of lower shell.
The present invention ensures that prefabricated pile stake end enters supporting course and improves the construction method of bearing capacity, in whole work progress, even if there is the situation across hole (particularly soil is than relatively soft area) in the process of pore-forming, also without installing casing, also without promoting casing, thus shortening construction period, reduce the cost of construction.
The present invention avoids the generation destroying soil body supporting course in work progress, improves the bearing capacity of prefabricated pile.Owing to existing prefabricated pile passes through in work progress, by piling machine casing squeezed in the process of stake holes, there is casing and soil body supporting course is destroyed the situation of (punching), thus causing that the bearing capacity of prefabricated pile is relatively low.The present invention, in whole work progress, damages all without to supporting course, thus improving the bearing capacity of prefabricated pile.
Meanwhile, the present invention has carried out backfill process at periphery aggregate or the concrete of prefabricated pile, further increases the bearing capacity of prefabricated pile.
Embodiment one
Ensureing prefabricated pile stake end entrance supporting course and improving the construction method of bearing capacity of the present embodiment, comprises the steps:
One, adopting churning driven to carry out making stake holes, the degree of depth of stake holes is until the supporting course of the soil body;The cross sectional dimensions of stake holes is more than the cross sectional dimensions of prefabricated pile;
Two, centralizer is installed in the upper end of stake holes, then adopts crane to be sling by prefabricated pile and pass in centralizer entrance stake holes, and the lower end of prefabricated pile arrives the supporting course of the soil body;
Three, carry out backfilling between prefabricated pile and stake holes wall backfilling with concrete.
Four, fill concrete is carried out compacting process, complete the construction of prefabricated pile.
Embodiment two
Ensureing prefabricated pile stake end entrance supporting course and improving the construction method of bearing capacity of the present embodiment, comprises the steps:
One, adopting churning driven to carry out making stake holes, the degree of depth of stake holes is until the supporting course of the soil body;The cross sectional dimensions of stake holes is more than the cross sectional dimensions of prefabricated pile;
Two, centralizer is installed in the upper end of stake holes, then adopts crane to be sling by prefabricated pile and pass in centralizer entrance stake holes, and the lower end of prefabricated pile arrives the supporting course of the soil body;
Three, carry out backfilling between prefabricated pile and stake holes wall backfilling with crushed stone aggregate.
Four, crushed stone aggregate is carried out compacting process, complete the construction of prefabricated pile.
Embodiment three
Ensureing prefabricated pile stake end entrance supporting course and improving the construction method of bearing capacity of the present embodiment, comprises the steps:
One, adopting churning driven to carry out making stake holes, the degree of depth of stake holes is until the supporting course of the soil body;The cross sectional dimensions of stake holes is more than the cross sectional dimensions of prefabricated pile;
Two, centralizer is installed in the upper end of stake holes, then adopts crane to be sling by square prefabricated pile and pass in centralizer entrance stake holes, and the lower end of prefabricated pile arrives the supporting course of the soil body;
Three, carry out backfilling between prefabricated pile and stake holes wall backfilling with crushed stone aggregate.
Four, crushed stone aggregate is carried out compacting process, complete the construction of prefabricated pile.
Embodiment four
On the basis of any of the above-described embodiment, described centralizer includes upper shell and lower shell, and described upper shell is horn-like, and described lower shell and prefabricated pile are mutually adapted;The outer wall of described upper shell or lower shell is connected to for the mounting bracket that centralizer is fixing.
Embodiment five
On the basis of embodiment four, described lower shell includes inner core and urceolus, and the outer wall of described inner core is horizontally installed with ball bearing, and described inner core offers through hole, and the inside of inner core is stretched into through through hole in the side of described ball bearing;Described urceolus is set in the periphery of inner core.
Embodiment six
On the basis of embodiment five, it is 2.5-5mm that described ball bearing stretches into the length within inner core.

Claims (9)

1. one kind ensures that prefabricated pile stake end enters design supporting course and improves the construction method of bearing capacity, it is characterised in that comprise the steps:
One, making stake holes, the degree of depth of stake holes is until designing the supporting course of foundation soil;The cross sectional dimensions of stake holes is more than the cross sectional dimensions of prefabricated pile;
Two, installing centralizer in the upper end of stake holes, then being sling by prefabricated pile and passing centralizer enters in stake holes, and the lower end of prefabricated pile arrives the supporting course of the soil body;
Three, backfill with material between prefabricated pile and stake holes wall;
Four, backfill material is carried out compacting process, complete the construction of prefabricated pile.
2. guarantee prefabricated pile stake end according to claim 1 enters design supporting course and improves the construction method of bearing capacity, it is characterised in that step 3 backfills with concrete for carrying out backfilling between prefabricated pile and stake holes wall.
3. guarantee prefabricated pile stake end according to claim 1 enters design supporting course and improves the construction method of bearing capacity, it is characterised in that backfill with crushed stone aggregate between prefabricated pile and stake holes wall.
4. according to arbitrary described the ensureing prefabricated pile stake end entrance design supporting course and improve the construction method of bearing capacity of claim 1-3, it is characterised in that described prefabricated pile is prefabricated tubular pile, precast square pile or prefabricated polygonal pile.
5. guarantee prefabricated pile stake end according to claim 1 enters design supporting course and improves the construction method of bearing capacity, it is characterised in that described stake holes adopts churning driven to make.
6. guarantee prefabricated pile stake end according to claim 1 enters design supporting course and improves the construction method of bearing capacity, it is characterised in that in above-mentioned steps 2, adopts crane to be sling by prefabricated pile and passes in centralizer entrance stake holes.
7. guarantee prefabricated pile stake end according to claim 1 enters design supporting course and improves the construction method of bearing capacity, it is characterised in that described centralizer includes upper shell and lower shell, and described upper shell is horn-like, and described lower shell and prefabricated pile are mutually adapted;The outer wall of described upper shell or lower shell is connected to the mounting bracket for being fixed by centralizer.
8. guarantee prefabricated pile stake end according to claim 7 enters design supporting course and improves the construction method of bearing capacity, it is characterized in that, described lower shell includes inner core and urceolus, the outer wall of described inner core is horizontally installed with ball bearing, described inner core offers through hole, and the inside of inner core is stretched into through through hole in the side of described ball bearing;Described urceolus is set in the periphery of inner core.
9. guarantee prefabricated pile stake end according to claim 9 enters design supporting course and improves the construction method of bearing capacity, it is characterised in that it is 2.5-5mm that described ball bearing stretches into the length within inner core.
CN201610140404.XA 2016-03-14 2016-03-14 Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force Pending CN105735248A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610140404.XA CN105735248A (en) 2016-03-14 2016-03-14 Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610140404.XA CN105735248A (en) 2016-03-14 2016-03-14 Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force

Publications (1)

Publication Number Publication Date
CN105735248A true CN105735248A (en) 2016-07-06

Family

ID=56250380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610140404.XA Pending CN105735248A (en) 2016-03-14 2016-03-14 Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force

Country Status (1)

Country Link
CN (1) CN105735248A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024558A (en) * 2018-07-21 2018-12-18 四川启创建设工程有限公司 A kind of construction of prefabricated piles method improving bearing capacity and torsional property

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040085799A (en) * 2003-04-01 2004-10-08 주식회사 스마텍엔지니어링 Method for Driving Pile having End Tip Apparatus for Reducing Opening Cross Section of Pile
CN201660899U (en) * 2009-12-25 2010-12-01 利丰海洋工程(天津)有限公司 Combined piling righting structure
CN102644271A (en) * 2011-02-17 2012-08-22 上海奥米制药装备有限公司 Precast-concrete tubular pile
CN102770601A (en) * 2010-01-05 2012-11-07 Ihc海洋钢铁有限公司 Method and apparatus for driving a pile into a substrate
CN102900080A (en) * 2012-09-05 2013-01-30 上海中技桩业股份有限公司 Soil-squeezing-free preformed pile soil sampling and embedding method
CN203296047U (en) * 2013-02-07 2013-11-20 古国维 Centering guide for driving underwater anchor pile
CN103711126A (en) * 2013-12-19 2014-04-09 吴根佑 Righting structure for piling
CN104099925A (en) * 2014-07-25 2014-10-15 王继忠 Construction device for concrete pile and construction method thereof
CN104452715A (en) * 2013-09-23 2015-03-25 中石化胜利油建工程有限公司 Special operation platform suitable for single pile offshore construction
CN105040699A (en) * 2015-08-14 2015-11-11 四川省建筑科学研究院 Drilling pile planting method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040085799A (en) * 2003-04-01 2004-10-08 주식회사 스마텍엔지니어링 Method for Driving Pile having End Tip Apparatus for Reducing Opening Cross Section of Pile
CN201660899U (en) * 2009-12-25 2010-12-01 利丰海洋工程(天津)有限公司 Combined piling righting structure
CN102770601A (en) * 2010-01-05 2012-11-07 Ihc海洋钢铁有限公司 Method and apparatus for driving a pile into a substrate
CN102644271A (en) * 2011-02-17 2012-08-22 上海奥米制药装备有限公司 Precast-concrete tubular pile
CN102900080A (en) * 2012-09-05 2013-01-30 上海中技桩业股份有限公司 Soil-squeezing-free preformed pile soil sampling and embedding method
CN203296047U (en) * 2013-02-07 2013-11-20 古国维 Centering guide for driving underwater anchor pile
CN104452715A (en) * 2013-09-23 2015-03-25 中石化胜利油建工程有限公司 Special operation platform suitable for single pile offshore construction
CN103711126A (en) * 2013-12-19 2014-04-09 吴根佑 Righting structure for piling
CN104099925A (en) * 2014-07-25 2014-10-15 王继忠 Construction device for concrete pile and construction method thereof
CN105040699A (en) * 2015-08-14 2015-11-11 四川省建筑科学研究院 Drilling pile planting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024558A (en) * 2018-07-21 2018-12-18 四川启创建设工程有限公司 A kind of construction of prefabricated piles method improving bearing capacity and torsional property

Similar Documents

Publication Publication Date Title
CN103835284B (en) A kind of Pile In Drill In Karst Terrain structure and construction method
CN104234055B (en) A kind of prefabricated pile post-grouting device and technique thereof
CN102733378B (en) Construction method of concrete pile
US20060088388A1 (en) Method and apparatus for providing a rammed aggregate pier
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN203741820U (en) Cast-in-situ bored pile structure for karst area
CN104294818B (en) The construction method of concrete-pile
CN111395330B (en) Construction method for concrete cast-in-situ bored pile complete steel casing penetrating through underground gallery
CN107975375A (en) A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN102635110B (en) Construction method for concrete pile
CN105926594A (en) Double-pipe construction method for static pressure pipe-sinking carrier cast-in-place pile
CN104895078B (en) A kind of to hold the construction method of the prefabricated pile of holding capacity
CN106930274A (en) The a full set of cylinder rotatory boring castinplace pile construction method that a kind of reinforcing bar cage location is fixed
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN203808055U (en) Screw post-reinforced compacted pile
CN110792077A (en) Supporting disc pile device suitable for muddy soft soil and construction process thereof
CN105735248A (en) Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force
CN102605775B (en) Combination pile of flexible pile and rigid pile concentrically arranged at upper end and lower end and pile forming method
CN205776209U (en) The construction equipment of concrete-pile
CN211113598U (en) Karst cave handling system for deep foundation pit pile foundation construction in karst area
CN208251078U (en) A kind of bottom-expanding sinking-pipe pilework
CN111058451A (en) Pile foundation gunny bag slurry wrapping, water plugging, hole filling and wall building method
CN220099894U (en) Rectangular section bored concrete pile of double-sleeve construction
CN204940257U (en) A kind of pore-creating filling pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160706