CN201660899U - Combined piling righting structure - Google Patents

Combined piling righting structure Download PDF

Info

Publication number
CN201660899U
CN201660899U CN2009203511982U CN200920351198U CN201660899U CN 201660899 U CN201660899 U CN 201660899U CN 2009203511982 U CN2009203511982 U CN 2009203511982U CN 200920351198 U CN200920351198 U CN 200920351198U CN 201660899 U CN201660899 U CN 201660899U
Authority
CN
China
Prior art keywords
piling
barrel
pilot sleeve
pilot
stopping means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203511982U
Other languages
Chinese (zh)
Inventor
柴宝亮
常士龙
伍晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Richform Engineers & Constructor (shenzhen) Co Ltd
Original Assignee
Richform Engineers & Constructor (shenzhen) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Richform Engineers & Constructor (shenzhen) Co Ltd filed Critical Richform Engineers & Constructor (shenzhen) Co Ltd
Priority to CN2009203511982U priority Critical patent/CN201660899U/en
Application granted granted Critical
Publication of CN201660899U publication Critical patent/CN201660899U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a combined piling righting structure, which belongs to a marine piling auxiliary structure and comprises at least three pilot sleeves and a support structure 1 among the pilot sleeves, wherein as a rigid entirety, the connection between the support structure 1 and the pilot sleeves is detachable connection. At least three adjustable stop devices are evenly arranged along sleeve walls 4 in the pilot sleeves; each stop device comprises at least two sets of stop devices; each set of stop device comprises a stop block 8 and two adjusting bolts 9; the adjusting bolts 9 are connected with threaded holes 11 on the stop blocks 8 after passing through circular holes the diameters of which are slightly greater than those of the adjusting bolts 9 on the cylinder walls 4 and cylinder wall reinforced plates 10. The utility model has the advantages that the universality of the piling righting structure is improved by combining different number of pilot sleeves, replacing different length of support structure 1 and combining the serialized stop blocks 8 and the pilot sleeves, and moreover, on the premise of ensuring piling locating precision and verticality, the frequent pile sticking problem of the piling righting structure in the hoisting and recovering process is solved.

Description

Structure is set upright in a kind of combined type piling
Technical field
The utility model relates to a kind of marine guidance piling supplementary structure, especially is fit to the isolated stake piling in many seas, has both guaranteed the verticality of every stake and has guaranteed that the piling of pile spacing accuracy sets upright structure.
Background technology
At present, the isolated stake piling in known sea supplementary structure comprises piling centralizer and piling locating rack.The piling centralizer is the closed and unlatching that drives pilot sleeve with hydraulic power, does not have card stake phenomenon when therefore reclaiming, and has characteristics recyclable, that re-use.Because the piling centralizer has only a pilot sleeve, therefore be applicable to the marine guidance piling of the isolated stake of wall scroll; For many seas isolated stake piling situation, need transfer the piling centralizer successively and carry out piling work, whenever transfer and once can only squeeze into an isolated stake, therefore be difficult to guarantee many isolated stakes spacing accuracy to each other.The piling locating rack can be used for the piling supplementary structures that many isolated stake piling also can guarantee the pile spacing accuracy by what connecting elementss such as stull between a plurality of pilot sleeves and the pilot sleeve, diagonal brace were formed; Its weak point is: the verticality allowable error owing to every stake after piling is finished causes the piling locating rack in the lifting removal process phenomenon stuck by stake, that can not reclaim smoothly to be arranged often.In addition, the piling locating rack is prefabricated according to the diameter of piling bar in the specific pile works and the design of the design pitch between the piling bar, can't directly reuse, and causes the material cost of pile works to increase.
Summary of the invention
Block the problem of stake easily in order to solve repeated use of existing piling supplementary structure and removal process simultaneously, the utility model provides a kind of combined type piling to set upright structure.The combination of structure through simple member and parts set upright in this combined type piling, not only can reuse, and adapt to the piling work of multiple stake footpath and pile spacing, effectively avoided simultaneously the generation of card stake phenomenon in the removal process after piling is finished, reached raising pile works compliance and operability, and the purpose that reduces the integrated cost of pile works.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of combined type piling is set upright structure and is made up of the braced structures that is no less than between three pilot sleeves and the pilot sleeve, it is characterized in that the braced structures between adjacent two pilot sleeves is to removably connect as being connected between a rigid unitary and the pilot sleeve, can be that flange connects, also can be other forms of mechanical connection; Braced structures determines that according to the piling bar design pitch it connects length and form of structure.Be no less than the adjustable stopping means in three roads along even setting of barrel in the pilot sleeve.Pilot sleeve is made up of barrel, horn mouth and stopping means, it is characterized in that the per pass stopping means in the barrel comprises that quantity is no less than two cover stopping means; Every cover stopping means is regulated bolts by limited block and two and is formed, and two are regulated the screwed hole that bolt passes respectively on the interior limited block of circular hole that being slightly larger than on barrel and the barrel stiffener regulate the diameter of bolt and barrel and are connected.By screwing the adjusting bolt, can realize the advance and retreat of limited block with respect to barrel, make to be no less than the common restricted quarter of holding piling bar of forming of three road stopping means.Limited block can be according to pilot sleeve diameter and piling bar diameter commonly used according to its thickness seriation, and by changing the limited block of different-thickness, same guided diameter sleeve can adapt to the piling work of different-diameter piling bar.According to piling bar stake footpath, adjust the position of limited block in pilot sleeve of all stopping means, form the restricted quarter that is slightly larger than the piling bar diameter, thereby realize that the piling bar pitching pile goes into the accurate location of mud, also guaranteed that piling bar squeezes into verticality in the process simultaneously.After all piling bar piling is finished, before structure is set upright in lifting recovery piling, by screwing the adjusting bolt, limited block is retracted to be adjacent to the pilot sleeve inwall, gap between limited block and the piling bar increases to maximum, avoids reclaiming that configuration process is set upright in piling because stuck phenomenon between piling bar that the piling error of perpendicularity causes and the pilot sleeve.
The beneficial effects of the utility model are: 1) by the combination of varying number pilot sleeve, change the braced structures of different length, can adapt to the piling bar of varying number and the pile works project of piles with different distance; 2) combination of limited block and the pilot sleeve by seriation makes the pilot sleeve of same dimensions adapt to the piling work of different-diameter piling bar, having improved the versatility that structure is set upright in piling; 3) regulate the position of limited block in pilot sleeve by regulating bolt, under the prerequisite that guarantees piling positioning accuracy and verticality, solved piling and set upright the card stake problem that structure often runs in the lifting removal process.
Description of drawings
Be described further below in conjunction with drawings and Examples.
Fig. 1 is an elevation of the present utility model;
Fig. 2 is the partial sectional view of the utility model pilot sleeve
Fig. 3 is a vertical view of the present utility model;
Fig. 4 is the longitudinal sectional view of the utility model pilot sleeve;
Fig. 5 is the transverse sectional view of the utility model pilot sleeve;
Fig. 6~Fig. 8 is a removal process behind the utility model marine guidance piling.
Wherein: the 1-braced structures; The 2-flange; The 3-hanger; The 4-barrel; The 5-horn mouth; The 6-linking arm; The 7-mud mat; The 8-limited block; 9-regulates bolt; The 10-stiffener; The 11-screwed hole; The 12-piling bar; The 13-Current Collector Sleave.
The specific embodiment
As Fig. 1~shown in Figure 5, setting upright structure with the combined type piling that four road stopping means are arranged in four pilot sleeves, each pilot sleeve is example.This combined type piling is set upright structure and is made up of the braced structures 1 between four pilot sleeves and the pilot sleeve, braced structures 1 is connected by flange 2 as between an overall structure and the pilot sleeve between adjacent two pilot sleeves, suitable position is provided with hanger 3 on the braced structures 1, is convenient to structure assembly unit and integral hoisting; Pilot sleeve is made up of barrel 4, horn mouth 5 and flanged (FLGD) linking arm 6, between lower floor's two linking arms 6 mud mat 7 is set.Along barrel 4 four road stopping means (see figure 5)s are set evenly in the pilot sleeve, the per pass stopping means is made up of upper and lower two cover stopping means.Every cover stopping means is made up of limited block 8 and two adjusting bolts 9.Article two, regulating the screwed hole 11 greater than on the limited block 8 in the circular hole of regulating bolt 9 diameters and the pilot sleeve that bolt 9 passes respectively on barrel 4 and the barrel stiffener 10 is connected.
Set-up procedure and the piling state of structure before piling construction set upright in Fig. 4~5 reflection combined type piling.From the limited block 8 of seriation, select the limited block 8 of suitable thickness to be assembled on the pilot sleeve barrel 4 according to 12 footpaths of piling bar; Regulate bolt 9 by screwing, adjust the position of limited block 8 in pilot sleeve of all stopping means, form the restricted quarter that is slightly larger than piling bar 12 diameters; Piling bar 12 is put into mud and hammering under the restricted quarter, guaranteed piling positioning accuracy and verticality.
Fig. 6~Fig. 8 reflects that combined type piling sets upright the removal process of structure after piling construction is finished.After all piling bar 12 piling are finished, before structure is set upright in lifting recovery piling, regulate bolt 9, limited block 8 is retracted to be adjacent to pilot sleeve barrel 4 (see figure 7)s by screwing; Combined type piling is set upright structure and is hung Current Collector Sleave 13 back lifting (see figure 8)s, because the gap between limited block 8 and the piling bar 12 increases, avoided in the lifting process because stuck phenomenon between the piling bar 12 that the piling error of perpendicularity causes and the pilot sleeve barrel 4, combined type has been driven piles set upright structure and reclaim smoothly.

Claims (5)

1. combined type piling is set upright structure and is made up of the braced structures that is no less than between three pilot sleeves and the pilot sleeve, it is characterized in that the braced structures between adjacent two pilot sleeves is to removably connect as being connected between a rigid unitary and the pilot sleeve; Be no less than the adjustable stopping means in three roads along even setting of barrel in the pilot sleeve.
2. set upright structure according to the combined type piling of claim 1, said pilot sleeve is made up of barrel, horn mouth and stopping means, it is characterized in that the per pass stopping means in the barrel comprises that quantity is no less than two cover stopping means; Every cover stopping means is regulated bolts by limited block and two and is formed, and two are regulated the screwed hole that bolt passes respectively on the interior limited block of circular hole that being slightly larger than on barrel and the barrel stiffener regulate the diameter of bolt and barrel and are connected.
3. set upright structure according to the combined type piling of claim 1, said braced structures determines that according to the piling bar design pitch it connects length and form of structure.
4. set upright structure according to the combined type piling of claim 1, said removably connecting can be that flange connects, and also can be other forms of mechanical connection.
5. structure is set upright in piling according to the combined type of claim 2, and said limited block can be according to pilot sleeve diameter and piling bar diameter commonly used according to its thickness seriation.
CN2009203511982U 2009-12-25 2009-12-25 Combined piling righting structure Expired - Fee Related CN201660899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203511982U CN201660899U (en) 2009-12-25 2009-12-25 Combined piling righting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203511982U CN201660899U (en) 2009-12-25 2009-12-25 Combined piling righting structure

Publications (1)

Publication Number Publication Date
CN201660899U true CN201660899U (en) 2010-12-01

Family

ID=43231316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203511982U Expired - Fee Related CN201660899U (en) 2009-12-25 2009-12-25 Combined piling righting structure

Country Status (1)

Country Link
CN (1) CN201660899U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243732A (en) * 2012-02-01 2013-08-14 天津市海王星海上工程技术有限公司 Installing method of marine anemometer tower base structure
CN103711126A (en) * 2013-12-19 2014-04-09 吴根佑 Righting structure for piling
CN103953043A (en) * 2014-05-05 2014-07-30 广东明阳风电产业集团有限公司 Floating box type locating tool for piling offshore wind power foundation
CN105735248A (en) * 2016-03-14 2016-07-06 中冶成都勘察研究总院有限公司 Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force
CN106545014A (en) * 2016-11-07 2017-03-29 金陵科技学院 A kind of many pile-type, assembled pile sinking verticality control device
CN108118697A (en) * 2018-02-28 2018-06-05 浙江华蕴海洋工程技术服务有限公司 The convenient adjusting apparatus of marine guidance piling and method of adjustment
CN112411547A (en) * 2019-08-21 2021-02-26 江苏益迩森重工科技有限公司 Positioning mechanism of water platform and water platform thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243732A (en) * 2012-02-01 2013-08-14 天津市海王星海上工程技术有限公司 Installing method of marine anemometer tower base structure
CN103711126A (en) * 2013-12-19 2014-04-09 吴根佑 Righting structure for piling
CN103953043A (en) * 2014-05-05 2014-07-30 广东明阳风电产业集团有限公司 Floating box type locating tool for piling offshore wind power foundation
CN105735248A (en) * 2016-03-14 2016-07-06 中冶成都勘察研究总院有限公司 Construction method for guaranteeing that pile end of prefabricated pile enters bearing layer and improving bearing force
CN106545014A (en) * 2016-11-07 2017-03-29 金陵科技学院 A kind of many pile-type, assembled pile sinking verticality control device
CN106545014B (en) * 2016-11-07 2018-08-21 金陵科技学院 A kind of more pile-type, assembled pile sinking verticality control device
CN108118697A (en) * 2018-02-28 2018-06-05 浙江华蕴海洋工程技术服务有限公司 The convenient adjusting apparatus of marine guidance piling and method of adjustment
CN112411547A (en) * 2019-08-21 2021-02-26 江苏益迩森重工科技有限公司 Positioning mechanism of water platform and water platform thereof

Similar Documents

Publication Publication Date Title
CN201660899U (en) Combined piling righting structure
CN104652435B (en) A kind of intelligent pile machine equipment and method
CN109137915B (en) Pile plate type roadbed pipe pile dry-digging implantation module structure and construction method thereof
CN204435376U (en) A kind of intelligent pile machine equipment
CN201915824U (en) Truck-mounted rotary drilling rig with construction function of diaphragm wall
CN101691815A (en) Fast hoisting-aligning method for Large-sized steel frames, and steel frame base structure
CN213358594U (en) Constructional engineering pile
CN102747954A (en) Hole-drilling guiding positioning system suitable for inclined rock surface and construction method
CN219221752U (en) Construction auxiliary device
CN112538858A (en) Inclined support pile construction platform structure based on rotary drilling rig and construction method
CN201495556U (en) Structure for quickly hoisting and centering base of large steel frame
CN202131986U (en) Pile driver
CN216339588U (en) Foundation pit supporting beam structure
CN113090192B (en) Complex stratum rotary drilling steel sleeve matched hole forming method
CN208792943U (en) A kind of excavating device of Quick-moving type electric pole foundation pit
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN104975597A (en) Cast-in situ bored pile post-inserted steel reinforcement cage multi-point delivery device and use method
CN210127449U (en) Nuclear power plant water intake blocking net erecting mechanism
CN204703164U (en) For the plumbing device of pile pulling guide rod
CN203891006U (en) Protection plate for joint of underground continuous walls
CN220847553U (en) Hydraulic hammer pile driver convenient to installation
CN219218973U (en) Engineering pile construction auxiliary device
CN205934901U (en) Flood control hinders husky median
CN219137676U (en) Vibrating pile driver with multi-head impactor
CN210829068U (en) Pile driver for civil engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101201

Termination date: 20181225