CN105715094A - 一种高压线杆保护装置 - Google Patents
一种高压线杆保护装置 Download PDFInfo
- Publication number
- CN105715094A CN105715094A CN201610086778.8A CN201610086778A CN105715094A CN 105715094 A CN105715094 A CN 105715094A CN 201610086778 A CN201610086778 A CN 201610086778A CN 105715094 A CN105715094 A CN 105715094A
- Authority
- CN
- China
- Prior art keywords
- steel
- voltage wire
- anchor ear
- line pole
- voltage line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2292—Holders used for protection, repair or reinforcement of the post or pole
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明涉及一种高压线杆保护装置,包括高压线杆,所述高压线杆根部地下设有第一混凝土浇注层,所述高压线杆底端与地面接触处设有预埋钢板,所述预埋钢板上焊接若干第一工字钢,所述第一工字钢端面焊接有第一钢制抱箍,所述第一工字钢通过所述第一钢制抱箍将所述高压线杆底端抱紧;所述高压线杆顶端安装有第二钢制抱箍,所述第二钢制抱箍上焊接有若干第二工字钢,所述第二工字钢与地面接触处设有第二混凝土浇注层,所述第二混凝土浇注层上安装第二钢制预埋件,所述第二工字钢焊接在所述第二钢制预埋件上。本发明通过在高压线杆顶端、底端和根部均增设固定装置,保证了高压线杆的位置始终固定不动,从而保证施工过程中电线杆和施工人员的绝对安全。
Description
技术领域
本发明涉及电力用高压线杆防护技术领域,适用于在高压线杆下方地下进行施工时对高压线杆进行防护的场合。
背景技术
随着社会经济的发展,在一些城市主干道或者城市郊区的高压线杆、红绿灯杆或通讯光缆用线杆比较集中的场合,需要在其地下进行开辟商场或者地铁等民用或公用交通设施,地下施工前需要对地上的各种线杆进行加固保护措施,从而保证施工过程中电线杆和施工人员的安全。
现有的电线杆保护措施,仅仅是在施工过程中利用钢丝绳在线杆四周进行加固固定,由于钢丝绳固定为柔性固定,固定前需要找准电线杆的重心,否则会造成钢丝绳固定后由于位置不正确,造成电线杆倾斜,或者在施工过程中造成电线杆地陷下沉。
发明内容
本发明的目的在于当在高压线杆地下施工时,提供一种安全可靠的高压线杆保护装置,避免施工过程中造成高压线杆地陷下沉或者发生倾斜。
为实现上述目的,本发明采取的技术方案为:一种高压线杆保护装置,包括高压线杆,所述高压线杆根部地下设有第一混凝土浇注层,所述高压线杆底端与地面接触处设有预埋钢板,所述预埋钢板上焊接若干第一工字钢,所述第一工字钢端面焊接有第一钢制抱箍,所述第一工字钢通过所述第一钢制抱箍将所述高压线杆底端抱紧;所述高压线杆顶端安装有第二钢制抱箍,所述第二钢制抱箍上焊接有若干第二工字钢,所述第二工字钢与地面接触处设有第二混凝土浇注层,所述第二混凝土浇注层上安装第二钢制预埋件,所述第二工字钢焊接在所述第二钢制预埋件上。
上述方案中,所述第一混凝土浇注层上安装第一钢制预埋件,所述预埋钢板焊接在所述第一钢制预埋件上。
上述方案中,所述第一钢制抱箍和所述第二钢制抱箍的两侧均设有加固孔,所述第一钢制抱箍和所述第二钢制抱箍的弧度与电线杆的弧度相同。
上述方案中,所述第一钢制抱箍和所述第二钢制抱箍与高压线杆之间安放橡胶垫。
本发明的有益效果:本发明通过在高压线杆顶端、底端和根部均增设固定装置,保证了高压线杆的位置始终固定不动,从而保证施工过程中电线杆和施工人员的绝对安全。
附图说明
图1为本发明装置的主视示意图。
图2为本发明装置的俯视示意图。
图3为本发明装置的第一钢制抱箍和第二钢制抱箍结构示意图。
图4为本发明装置的预埋钢板结构示意图。
图中,1.高压线杆;2.第一混凝土浇注层;3.预埋钢板;4.第一工字钢;5.第一钢制抱箍;6.第二钢制抱箍;7.第二工字钢;8.第二混凝土浇注层;9.第二钢制预埋件;10.第一钢制预埋件;11.加固孔。
具体实施方式
如图1和图2所示,本发明的高压线杆保护装置,上部支撑采用第二工字钢7与高压线杆1连接,用第二钢制抱箍6将高压线杆1抱紧,第二钢制抱箍6与高压线杆1之间安放橡胶垫,以防止第二钢制抱箍6对高压线杆1的损坏,第二钢制抱箍6采用l0mm厚的钢板制作,第二钢制抱箍6两侧设有加固孔11(如图3所示),第二钢制抱箍6的弧度与高压线杆1的弧度相同,保证将电线杆抱紧,第二钢制抱箍6与第二工字钢7之间采用焊接连接。第二工字钢7在斜支撑底部用第二混凝土浇注层8支墩,尺寸为0.8m×0.8m×0.5m,并安装第二钢制预埋件9,预埋件为2根Φ48钢管,长60cm,第二钢制预埋件9与第二工字钢7之间用焊接的形式连接。在线杆底部采用第一混凝土浇注层2加固,第一混凝土浇注层2结构尺寸长2米,宽1.5米、深1.2米,第一混凝土浇注层2上安装第一钢制预埋件10,同时在线杆东、西放置预埋钢板3,预埋钢板3焊接在第一钢制预埋件10上,预埋钢板3尺寸长1.2m、宽0.2m、厚2cm,然后在高压线杆1底部通过第一钢制抱箍5(抱箍方式同上)将高压线杆1夹紧,用两根第一工字钢4托于第一钢制抱箍5底部,第一工字钢4长度12米,第一钢制抱箍5与第一工字钢4之间采用焊接连接,第一工字钢4与预埋钢板3焊接,防止线杆倾斜及下陷。
Claims (4)
1.一种高压线杆保护装置,包括高压线杆(1),其特征在于,所述高压线杆(1)根部地下设有第一混凝土浇注层(2),所述高压线杆底端与地面接触处设有预埋钢板(3),所述预埋钢板(3)上焊接若干第一工字钢(4),所述第一工字钢(4)端面焊接有第一钢制抱箍(5),所述第一工字钢(4)通过所述第一钢制抱箍(5)将所述高压线杆底端抱紧;所述高压线杆(1)顶端安装有第二钢制抱箍(6),所述第二钢制抱箍(6)上焊接有若干第二工字钢(7),所述第二工字钢(7)与地面接触处设有第二混凝土浇注层(8),所述第二混凝土浇注层(8)上安装第二钢制预埋件(9),所述第二工字钢(7)焊接在所述第二钢制预埋件(9)上。
2.根据权利要求1所述的一种高压线杆保护装置,其特征在于,所述第一混凝土浇注层(2)上安装第一钢制预埋件(10),所述预埋钢板(3)焊接在所述第一钢制预埋件(10)上。
3.根据权利要求1所述的一种高压线杆保护装置,其特征在于,所述第一钢制抱箍(5)和所述第二钢制抱箍(6)的两侧均设有加固孔(11),所述第一钢制抱箍(5)和所述第二钢制抱箍(6)的弧度与高压线杆(1)的弧度相同。
4.根据权利要求3所述的一种高压线杆保护装置,其特征在于,所述第一钢制抱箍(5)和所述第二钢制抱箍(6)与高压线杆(1)之间安放橡胶垫。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610086778.8A CN105715094B (zh) | 2016-02-16 | 2016-02-16 | 一种高压线杆保护装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610086778.8A CN105715094B (zh) | 2016-02-16 | 2016-02-16 | 一种高压线杆保护装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105715094A true CN105715094A (zh) | 2016-06-29 |
CN105715094B CN105715094B (zh) | 2019-05-03 |
Family
ID=56156788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610086778.8A Expired - Fee Related CN105715094B (zh) | 2016-02-16 | 2016-02-16 | 一种高压线杆保护装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105715094B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110132078A (zh) * | 2019-05-29 | 2019-08-16 | 五冶集团上海有限公司 | 一种紧邻高压电线杆的路堑控制爆破方法 |
CN110593590A (zh) * | 2019-08-15 | 2019-12-20 | 中电建十一局工程有限公司 | 一种深基坑开挖区既有高压线杆原位保护方法 |
CN111877833A (zh) * | 2020-07-10 | 2020-11-03 | 浙江德宝通讯科技股份有限公司 | 一种管塔加固装置及加固方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0473381A (ja) * | 1990-07-13 | 1992-03-09 | Nippon Chikou Kk | 自立電柱及びその建柱工法 |
CN201507142U (zh) * | 2009-09-18 | 2010-06-16 | 鞍钢集团矿业公司 | 高压电线杆稳定装置 |
CN201661108U (zh) * | 2010-03-18 | 2010-12-01 | 湖南省通信建设有限公司 | 一种用于固定自立式抱杆的斜撑 |
CN201865398U (zh) * | 2010-11-29 | 2011-06-15 | 河南省电力公司安阳供电公司 | 高压电线杆固定装置 |
CN202064679U (zh) * | 2011-03-31 | 2011-12-07 | 河南省电力公司济源供电公司 | 高压电线杆稳定装置 |
CN104213745A (zh) * | 2013-11-04 | 2014-12-17 | 袁见见 | 一种简易埋地安装固定架及其安装方法 |
CN204163458U (zh) * | 2014-10-29 | 2015-02-18 | 重钢西昌矿业有限公司 | 高压电线杆固定装置 |
-
2016
- 2016-02-16 CN CN201610086778.8A patent/CN105715094B/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0473381A (ja) * | 1990-07-13 | 1992-03-09 | Nippon Chikou Kk | 自立電柱及びその建柱工法 |
CN201507142U (zh) * | 2009-09-18 | 2010-06-16 | 鞍钢集团矿业公司 | 高压电线杆稳定装置 |
CN201661108U (zh) * | 2010-03-18 | 2010-12-01 | 湖南省通信建设有限公司 | 一种用于固定自立式抱杆的斜撑 |
CN201865398U (zh) * | 2010-11-29 | 2011-06-15 | 河南省电力公司安阳供电公司 | 高压电线杆固定装置 |
CN202064679U (zh) * | 2011-03-31 | 2011-12-07 | 河南省电力公司济源供电公司 | 高压电线杆稳定装置 |
CN104213745A (zh) * | 2013-11-04 | 2014-12-17 | 袁见见 | 一种简易埋地安装固定架及其安装方法 |
CN204163458U (zh) * | 2014-10-29 | 2015-02-18 | 重钢西昌矿业有限公司 | 高压电线杆固定装置 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110132078A (zh) * | 2019-05-29 | 2019-08-16 | 五冶集团上海有限公司 | 一种紧邻高压电线杆的路堑控制爆破方法 |
CN110593590A (zh) * | 2019-08-15 | 2019-12-20 | 中电建十一局工程有限公司 | 一种深基坑开挖区既有高压线杆原位保护方法 |
CN110593590B (zh) * | 2019-08-15 | 2021-05-18 | 中电建十一局工程有限公司 | 一种深基坑开挖区既有高压线杆原位保护方法 |
CN111877833A (zh) * | 2020-07-10 | 2020-11-03 | 浙江德宝通讯科技股份有限公司 | 一种管塔加固装置及加固方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105715094B (zh) | 2019-05-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101608624B1 (ko) | 송전철탑 상향공법 | |
CN201762709U (zh) | 水泥板胎膜 | |
CN101956457B (zh) | 一种矩形钢管混凝土柱施工工法 | |
CN103643971B (zh) | 隧道仰拱定型端模快速施工方法 | |
CN110485429A (zh) | 一种预应力型钢装配式组合内支撑施工方法 | |
CN105715094A (zh) | 一种高压线杆保护装置 | |
CN109629576B (zh) | 横穿基坑给水管悬吊保护体系及施工方法 | |
CN113482044B (zh) | 一种侵入地铁车站结构的电力管线改迁方法 | |
CN110424455A (zh) | 地下有限空间无肥槽结构侧墙大钢模板体系及施工方法 | |
US11473262B2 (en) | Bailey support system applied to cross protection of complex pipes and cables and construction method thereof | |
CN103132465B (zh) | 一种紧贴桩基承台的地下箱涵建造方法 | |
KR101368913B1 (ko) | 레일 일체형 사이드폼을 이용한 콘크리트 표면차수벽형 석괴댐의 차수벽 시공 방법 | |
CN204626453U (zh) | 城市地下综合管廊中管道的支承机构 | |
JP6314547B2 (ja) | 杭式構造物の改修構造および改修工法 | |
CN102296600A (zh) | 一种铺盖法修建地铁车站中间桩定位方法 | |
CN107338809A (zh) | 超高压线下地铁车站洞门模板及其快速安装施工方法 | |
CN106451271A (zh) | 一种电缆过道桥架结构及其安装方法 | |
CN108221954B (zh) | 一种易拆卸的预制地下连续墙、吊具以及施工方法 | |
CN107653787B (zh) | 一种保护跨越基坑的地下高压电缆箱涵的施工方法 | |
CN113775819B (zh) | 一种原位防护大直径油气管道混凝土结构的施工方法 | |
KR101030350B1 (ko) | 매설된 배전 지중 케이블에 의한 감전방지를 위한 보안장치 | |
CN104453937A (zh) | 一种隧道拱顶接地端子预埋装置及其预埋方法 | |
CN211057808U (zh) | 一种横跨基坑的管线悬吊保护结构 | |
CN114541414A (zh) | 地下管涵基坑逆作法开挖支护施工方法 | |
CN203905051U (zh) | 地铁施工高压线防护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190503 Termination date: 20200216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |