CN105696801A - Accurate positioning device for hoisting of prefabricated part - Google Patents

Accurate positioning device for hoisting of prefabricated part Download PDF

Info

Publication number
CN105696801A
CN105696801A CN201610071824.7A CN201610071824A CN105696801A CN 105696801 A CN105696801 A CN 105696801A CN 201610071824 A CN201610071824 A CN 201610071824A CN 105696801 A CN105696801 A CN 105696801A
Authority
CN
China
Prior art keywords
hole
positioning
lower floor
positioning device
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610071824.7A
Other languages
Chinese (zh)
Other versions
CN105696801B (en
Inventor
范玉
范佳琦
黄继战
董素玲
王凤清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Institute of Architectural Technology
Original Assignee
Jiangsu Institute of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Institute of Architectural Technology filed Critical Jiangsu Institute of Architectural Technology
Priority to CN201610071824.7A priority Critical patent/CN105696801B/en
Publication of CN105696801A publication Critical patent/CN105696801A/en
Application granted granted Critical
Publication of CN105696801B publication Critical patent/CN105696801B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an accurate positioning device for hoisting of a prefabricated part, and belongs to the technical field of building construction, wherein the accurate positioning device is mainly used for installing of a prefabricated wallboard. The accurate positioning device comprises a U-shaped vertical plate placed on a lower floor, and an inclined angle is chamfered on the inner edge of the upper end of the U-shaped vertical plate. The U-shaped vertical plate is provided with a positioning pin used for fixing the U-shaped vertical plate to the lower floor. A horizontal positioning bottom plate is fixed to the bottom of the U-shaped vertical plate. A first positioning hole matched with an embedded steel bar of the lower floor is formed in the positioning bottom plate. The accurate positioning device for hoisting of the prefabricated part further comprises a limiting positioning sleeve located on the positioning bottom plate and arranged on the embedded steel bar in a sleeving manner. During using, the embedded steel bar is inserted in an embedded connecting sleeve in the prefabricated wallboard, and the limiting positioning sleeve abuts against the lower end face of the connecting sleeve. The accurate positioning device is simple in structure, accurate in positioning and convenient to install, and the installing efficiency of the prefabricated wallboard is greatly improved. According to a novel grouting structure, the connecting strength between the prefabricated wallboard and the lower floor after construction is also guaranteed, and the construction quality is reliable.

Description

Prefabricated part hanging accurate positioning device
Technical field
The present invention relates to technical field of building construction, specifically a kind of prefabricated part hanging accurate positioning device being mainly used in prefabricated panel installation。
Background technology
Fabricated construction prefabricated reinforced concrete wall panel is in hoisting process, prefabricated reinforced concrete wall panel is in place is be inserted in the branch sleeve being reserved in prefabricated reinforced concrete wall panel by the lower floor's embedded bar on lower-layer concrete floor, then passes through grouting branch sleeve and is attached。Lift in operating process in reality, owing to branch sleeve is positioned at prefabricated reinforced concrete wall panel bottom recess, the relative position relation of reinforced bar sleeve and lower floor's embedded bar cannot be observed directly, operator need the relative position bending to go for lower floor's embedded bar with reinforcing steel bar connecting sleeve tube, then just can complete lifting operation, therefore result in prefabricated reinforced concrete wall panel hoisted in position process shortcoming slowly。
Summary of the invention
For solving above-mentioned technical problem, the present invention provides a kind of prefabricated part hanging accurate positioning device。
The present invention is achieved through the following technical solutions: a kind of prefabricated part hanging accurate positioning device, including the U-shaped riser being placed on lower floor's floor, the inner edge of U-shaped riser upper end has oblique angle;Described U-shaped riser is provided with the alignment pin for being fixed on lower floor's floor by U-shaped riser, is fixed with the positioning plate of level bottom U-shaped riser;Described positioning plate has the hole, location I that the embedded bar with lower floor floor coordinates;Described prefabricated part hanging accurate positioning device also includes the spacing positioning sleeve being positioned on positioning plate and being enclosed within embedded bar;During use, in the described embedded bar branch sleeve that to be inserted in prefabricated panel pre-buried, described spacing positioning sleeve is against branch sleeve lower surface。
It is further: described prefabricated panel upper end has the through hole of connection branch sleeve;Described prefabricated panel through-hole wall has vertical slip casting groove, is provided with connection reinforcing bar in prefabricated panel through hole。
Described slip casting groove has four, is crossing distribution along through-hole wall。
Described U-shaped riser has vertical installation through hole;Described positioning plate is elongated plates, and one end that positioning plate is connected with U-shaped riser has hole II, location;Described alignment pin is inserted into U-shaped riser and installs in through hole and hole, positioning plate location II and be fixed on lower floor's floor。
During construction, first placement positioning base plate, the embedded bar of hole I, the location traverse lower floor floor of positioning plate one end;
Spacing positioning sleeve is enclosed within embedded bar;
Place U-shaped riser, through hole, hole II, positioning plate location are installed by fixing to U-shaped riser, positioning plate and lower floor's floor connection by alignment pin, U-shaped riser;
Prefabricated part hanging accurate positioning device is arranged symmetrically with two, lays respectively at the two ends of prefabricated panel;
Hoisting prefabricated wallboard, by the oblique angle of U-shaped riser upper end, slips into tram by prefabricated panel;
In prefabricated panel through hole, slip casting groove carries out slip casting, and the concrete built is full of the gap between branch sleeve, spacing positioning sleeve and lower floor's floor and prefabricated panel。
Present configuration is simple, and accurate positioning is easy for installation, substantially increases the installation effectiveness of prefabricated panel, and novel slip casting structure also ensures the bonding strength between prefabricated panel and lower floor's floor after construction, reliable construction quality。
Accompanying drawing explanation
Fig. 1 is inventive structure schematic diagram;
Fig. 2 is top view in Fig. 1;
Fig. 3 is construction mounting structure schematic diagram of the present invention。
In figure: 1, lower floor's floor;2, U-shaped riser;3, alignment pin;4, prefabricated panel;4-1, slip casting groove;5, reinforcing bar is connected;6, branch sleeve;7, positioning plate;8, spacing positioning sleeve;9, embedded bar。
Detailed description of the invention
The following is the present invention a specific embodiment, in conjunction with accompanying drawing, the invention will be further described。
As shown in Figure 1 to Figure 3, a kind of prefabricated part hanging accurate positioning device, including the U-shaped riser 2 being placed on lower floor's floor 1, U-shaped riser 2 is to be formed by connecting by three straight plates, and the inner edge of its upper end has oblique angle。Being fixed with the positioning plate 7 of level bottom U-shaped riser 2, positioning plate 7 is attached on lower floor's floor 1, and its quantity is consistent with the quantity of embedded bar 9 on lower floor floor 1。Positioning plate 7 is elongated plates, and positioning plate 7 one end has the hole, location I that the embedded bar 9 with lower floor floor 1 coordinates, and the other end has hole II, location。Spacing positioning sleeve 8 is enclosed within embedded bar 9 and is attached to positioning plate 7 upper surface。Having vertical installation through hole on U-shaped riser 2, alignment pin 3 is inserted into U-shaped riser 2 and installs through hole and positioning plate 7 positions in hole II and is fixed on lower floor's floor 1。Prefabricated panel 4 upper end has the through hole of connection branch sleeve 6;Prefabricated panel 4 through-hole wall has vertical slip casting groove 4-1, is provided with connection reinforcing bar 5 in prefabricated panel 4 through hole。Slip casting groove has four, is crossing distribution along through-hole wall。
During construction, first placement positioning base plate, the embedded bar of hole I, the location traverse lower floor floor of positioning plate one end;
Spacing positioning sleeve is enclosed within embedded bar;
Place U-shaped riser, through hole, hole II, positioning plate location are installed by fixing to U-shaped riser, positioning plate and lower floor's floor connection by alignment pin, U-shaped riser;
Prefabricated part hanging accurate positioning device is arranged symmetrically with two, lays respectively at the two ends of prefabricated panel;
Hoisting prefabricated wallboard, by the oblique angle of U-shaped riser upper end, slips into tram by prefabricated panel;Spacing positioning sleeve 8 makes to leave certain interval between lower floor's floor and prefabricated panel;
In prefabricated panel through hole, slip casting groove carries out slip casting, and the concrete built is full of the gap between branch sleeve, spacing positioning sleeve and lower floor's floor and prefabricated panel。

Claims (3)

1. a prefabricated part hanging accurate positioning device, it is characterised in that: include the U-shaped riser (2) being placed on lower floor's floor (1), the inner edge of U-shaped riser (2) upper end has oblique angle;Described U-shaped riser (2) is provided with the alignment pin (3) for being fixed on by U-shaped riser (2) on lower floor's floor (1), and U-shaped riser (2) bottom is fixed with the positioning plate (7) of level;Described positioning plate (7) has the hole, location I that the embedded bar (9) with lower floor's floor (1) coordinates;Described prefabricated part hanging accurate positioning device also includes being positioned at the spacing positioning sleeve (8) that positioning plate (7) is upper and is enclosed within embedded bar (9);During use, described embedded bar (9) is inserted in branch sleeve (6) pre-buried in prefabricated panel (4), and described spacing positioning sleeve (8) is against branch sleeve (6) lower surface。
2. prefabricated part hanging accurate positioning device according to claim 1, it is characterised in that: described prefabricated panel (4) upper end has the through hole of connection branch sleeve (6);Described prefabricated panel (4) through-hole wall has vertical slip casting groove (4-1), is provided with connection reinforcing bar (5) in prefabricated panel (4) through hole。
3. prefabricated part hanging accurate positioning device according to claim 1, it is characterised in that: described U-shaped riser (2) has vertical installation through hole;Described positioning plate (7) is elongated plates, and one end that positioning plate (7) is connected with U-shaped riser (2) has hole II, location;Described alignment pin (3) is inserted into U-shaped riser (2) and installs in through hole and hole, positioning plate (7) location II and be fixed on lower floor's floor (1)。
CN201610071824.7A 2016-02-02 2016-02-02 Prefabricated part hanging accurate positioning device Active CN105696801B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610071824.7A CN105696801B (en) 2016-02-02 2016-02-02 Prefabricated part hanging accurate positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610071824.7A CN105696801B (en) 2016-02-02 2016-02-02 Prefabricated part hanging accurate positioning device

Publications (2)

Publication Number Publication Date
CN105696801A true CN105696801A (en) 2016-06-22
CN105696801B CN105696801B (en) 2017-10-13

Family

ID=56230078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610071824.7A Active CN105696801B (en) 2016-02-02 2016-02-02 Prefabricated part hanging accurate positioning device

Country Status (1)

Country Link
CN (1) CN105696801B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476586A (en) * 2017-08-09 2017-12-15 安徽兰兮工程技术开发有限公司 The erecting device of house PC prefabricated components and the installation method of PC prefabricated components
CN107620477A (en) * 2017-10-20 2018-01-23 浙江萧云建设有限公司 The mounting and positioning device and its installation and locating method of prefabricated wallboard
CN108643347A (en) * 2018-04-27 2018-10-12 长江大学 Steel reinforced concrete frame-reinforced concrete wall panel Mixed Architecture
CN109113349A (en) * 2017-06-24 2019-01-01 李聪 A kind of positioning device and its localization method of precast floor slab
CN109296061A (en) * 2018-11-30 2019-02-01 中国冶集团有限公司 The simple aligning device of vestibule supporting leg and installation method
CN109914823A (en) * 2019-04-15 2019-06-21 谷尚坤 A kind of assembled architecture prefabricated panel installation method
CN109914822A (en) * 2019-04-15 2019-06-21 谷尚坤 The sliding groove structure of device is built towards assembled architecture wallboard
CN110387821A (en) * 2018-04-23 2019-10-29 东宏建设股份有限公司 Bridge beam slab lifts spacer bar accurate placement technology
CN110541495A (en) * 2019-08-19 2019-12-06 惠州市鸿泰建筑工程有限公司 Prefabricated wall body of prefabricated building
CN112411741A (en) * 2020-11-28 2021-02-26 中实翊(福建)建设工程有限公司 Fabricated building structure and construction method
CN112814146A (en) * 2020-12-31 2021-05-18 湖北创威建筑装饰工程有限公司 BIM technology-based wall green construction method
CN113802861A (en) * 2021-10-29 2021-12-17 广州城市职业学院 Steel structure assembly type wall plate movable suspension hoisting construction method
CN116181075A (en) * 2023-03-17 2023-05-30 北京珠穆朗玛绿色建筑科技有限公司 Mounting construction method and connecting structure of assembled concrete hollow wallboard

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007186923A (en) * 2006-01-13 2007-07-26 Kayaba System Machinery Kk Plumbing adjusting device
CN102392540A (en) * 2011-10-24 2012-03-28 上海市第二市政工程有限公司 High-precision method and structure for positioning high-precision precast beam
CN105040989A (en) * 2015-06-26 2015-11-11 南京长江都市建筑设计股份有限公司 Anchoring device for anchoring prefabricated laminated slab and prefabricated component and construction method of anchoring device
CN204826680U (en) * 2015-07-28 2015-12-02 湖南省三新建筑工业股份有限公司 Prefabricated component spacing guider of installation and prefabricated component mounting structure
CN204983701U (en) * 2015-08-07 2016-01-20 中国建筑第八工程局有限公司 A guiding device for prefabricating wall body is assembled

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007186923A (en) * 2006-01-13 2007-07-26 Kayaba System Machinery Kk Plumbing adjusting device
CN102392540A (en) * 2011-10-24 2012-03-28 上海市第二市政工程有限公司 High-precision method and structure for positioning high-precision precast beam
CN105040989A (en) * 2015-06-26 2015-11-11 南京长江都市建筑设计股份有限公司 Anchoring device for anchoring prefabricated laminated slab and prefabricated component and construction method of anchoring device
CN204826680U (en) * 2015-07-28 2015-12-02 湖南省三新建筑工业股份有限公司 Prefabricated component spacing guider of installation and prefabricated component mounting structure
CN204983701U (en) * 2015-08-07 2016-01-20 中国建筑第八工程局有限公司 A guiding device for prefabricating wall body is assembled

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113349A (en) * 2017-06-24 2019-01-01 李聪 A kind of positioning device and its localization method of precast floor slab
CN107476586B (en) * 2017-08-09 2020-04-10 东莞市建安住宅工业有限公司 Installation device and method for house PC prefabricated part
CN107476586A (en) * 2017-08-09 2017-12-15 安徽兰兮工程技术开发有限公司 The erecting device of house PC prefabricated components and the installation method of PC prefabricated components
CN107620477A (en) * 2017-10-20 2018-01-23 浙江萧云建设有限公司 The mounting and positioning device and its installation and locating method of prefabricated wallboard
CN107620477B (en) * 2017-10-20 2022-12-06 浙江萧云建设有限公司 Mounting and positioning device and method for prefabricated wall panel
CN110387821A (en) * 2018-04-23 2019-10-29 东宏建设股份有限公司 Bridge beam slab lifts spacer bar accurate placement technology
CN108643347A (en) * 2018-04-27 2018-10-12 长江大学 Steel reinforced concrete frame-reinforced concrete wall panel Mixed Architecture
CN108643347B (en) * 2018-04-27 2020-11-24 长江大学 Steel reinforced concrete frame-reinforced concrete wallboard mixed structure system
CN109296061A (en) * 2018-11-30 2019-02-01 中国冶集团有限公司 The simple aligning device of vestibule supporting leg and installation method
CN109914823A (en) * 2019-04-15 2019-06-21 谷尚坤 A kind of assembled architecture prefabricated panel installation method
CN109914822A (en) * 2019-04-15 2019-06-21 谷尚坤 The sliding groove structure of device is built towards assembled architecture wallboard
CN109914823B (en) * 2019-04-15 2021-03-02 锦汇建设集团有限公司 Method for installing prefabricated wall board of prefabricated building
CN109914822B (en) * 2019-04-15 2021-01-15 南通建诚混凝土有限公司 Sliding chute structure of device is built towards assembled building wallboard
CN110541495B (en) * 2019-08-19 2020-09-18 惠州市鸿泰建筑工程有限公司 Prefabricated wall body of prefabricated building
CN110541495A (en) * 2019-08-19 2019-12-06 惠州市鸿泰建筑工程有限公司 Prefabricated wall body of prefabricated building
CN112411741A (en) * 2020-11-28 2021-02-26 中实翊(福建)建设工程有限公司 Fabricated building structure and construction method
CN112814146A (en) * 2020-12-31 2021-05-18 湖北创威建筑装饰工程有限公司 BIM technology-based wall green construction method
CN113802861A (en) * 2021-10-29 2021-12-17 广州城市职业学院 Steel structure assembly type wall plate movable suspension hoisting construction method
CN113802861B (en) * 2021-10-29 2022-11-25 广州城市职业学院 Steel structure assembly type wallboard movable suspension hoisting construction method
CN116181075A (en) * 2023-03-17 2023-05-30 北京珠穆朗玛绿色建筑科技有限公司 Mounting construction method and connecting structure of assembled concrete hollow wallboard

Also Published As

Publication number Publication date
CN105696801B (en) 2017-10-13

Similar Documents

Publication Publication Date Title
CN105696801A (en) Accurate positioning device for hoisting of prefabricated part
CN209636847U (en) A kind of adjustable tower crane built-in fitting accurate positioning tool
CN103643971B (en) Tunnel invert sizing end mould rapid constructing method
CN203821867U (en) Shear wall body assembling and aligning device
CN206289619U (en) Guide wall form board mounting structure and wall casting system
CN202194394U (en) Rapid hoisting, positioning and adjusting piece for prefabricated wall board
CN203878981U (en) Improved wall attaching key for hydraulic climbing formwork
CN102733608B (en) Construction method for spray head layer of granulation tower
CN107747367A (en) A kind of autoclaved lightweight sand aerated concrete(AAC)Sheet material construction method
CN205709343U (en) The inverse dress special building hoist of moldeed depth foundation ditch
CN203769274U (en) Horizontal floor tile laying positioning device
CN204983593U (en) Modular elevartor shaft construction operation platform
CN102865087B (en) Embedded grout pipe device in lining concrete of chamber and construction method
CN209686857U (en) Deep basal pit outer wall of basement shape steel bracket diagonal brace single side formwork system
CN202745402U (en) Hard protection structure for construction of high-rise elevator shaft
CN106284978A (en) A kind of movement joint both sides shear wall synchronous construction technique and canalization template
CN103982049B (en) Shear wall body assembling machine straightening device
CN102605945B (en) Manufacturing method of big wood formwork
CN113585079B (en) Method for quickly installing steel structure stand column
CN205742952U (en) Elevator civil engineering mobile platform
CN209686833U (en) Operating platform support frame and operating platform
CN209145018U (en) A kind of connection structure of the partition plate of cantilever stair and floor beam
CN202788874U (en) Embedded grouting guide tube device in chamber lining concrete
CN209620636U (en) Prefabricated assembled concrete structure outer hanging plate elevation of bottom regulating device
CN208666878U (en) Small space profile hoisting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181206

Address after: 233010 Pioneering Building 316, Huineng Small and Micro Enterprises Pioneering Center, 1750 Shengli West Road, Yuhui District, Bengbu City, Anhui Province

Patentee after: Bengbu Dingrong Science and Technology Information Consulting Co., Ltd.

Address before: No. 26, Xue Yuan Road, Quanshan District, Xuzhou, Jiangsu

Patentee before: Jiangsu Institute of Architectural Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181229

Address after: No. 26, Xue Yuan Road, Quanshan District, Xuzhou, Jiangsu

Patentee after: Jiangsu Institute of Architectural Technology

Address before: 233010 Pioneering Building 316, Huineng Small and Micro Enterprises Pioneering Center, 1750 Shengli West Road, Yuhui District, Bengbu City, Anhui Province

Patentee before: Bengbu Dingrong Science and Technology Information Consulting Co., Ltd.