CN105689715A - Mold plasma 3D rapid prototyping remanufacturing device and method - Google Patents

Mold plasma 3D rapid prototyping remanufacturing device and method Download PDF

Info

Publication number
CN105689715A
CN105689715A CN201610121809.9A CN201610121809A CN105689715A CN 105689715 A CN105689715 A CN 105689715A CN 201610121809 A CN201610121809 A CN 201610121809A CN 105689715 A CN105689715 A CN 105689715A
Authority
CN
China
Prior art keywords
plasma
mould
printing
distance
repaired
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610121809.9A
Other languages
Chinese (zh)
Inventor
华云峰
程国君
郝勇
魏志宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinoadditive Manufacturing Equipment Co Ltd
Original Assignee
Sinoadditive Manufacturing Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinoadditive Manufacturing Equipment Co Ltd filed Critical Sinoadditive Manufacturing Equipment Co Ltd
Priority to CN201610121809.9A priority Critical patent/CN105689715A/en
Publication of CN105689715A publication Critical patent/CN105689715A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F10/00Additive manufacturing of workpieces or articles from metallic powder
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F10/00Additive manufacturing of workpieces or articles from metallic powder
    • B22F10/20Direct sintering or melting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F12/00Apparatus or devices specially adapted for additive manufacturing; Auxiliary means for additive manufacturing; Combinations of additive manufacturing apparatus or devices with other processing apparatus or devices
    • B22F12/50Means for feeding of material, e.g. heads
    • B22F12/53Nozzles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F12/00Apparatus or devices specially adapted for additive manufacturing; Auxiliary means for additive manufacturing; Combinations of additive manufacturing apparatus or devices with other processing apparatus or devices
    • B22F12/70Gas flow means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F12/00Apparatus or devices specially adapted for additive manufacturing; Auxiliary means for additive manufacturing; Combinations of additive manufacturing apparatus or devices with other processing apparatus or devices
    • B22F12/90Means for process control, e.g. cameras or sensors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F5/00Manufacture of workpieces or articles from metallic powder characterised by the special shape of the product
    • B22F5/007Manufacture of workpieces or articles from metallic powder characterised by the special shape of the product of moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B33ADDITIVE MANUFACTURING TECHNOLOGY
    • B33YADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3-D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3-D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
    • B33Y10/00Processes of additive manufacturing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B33ADDITIVE MANUFACTURING TECHNOLOGY
    • B33YADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3-D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3-D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
    • B33Y30/00Apparatus for additive manufacturing; Details thereof or accessories therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Analytical Chemistry (AREA)
  • Automation & Control Theory (AREA)

Abstract

The invention discloses a mold plasma 3D rapid prototyping remanufacturing device and method. The device comprises a monitoring system, a plasma beam processing system, a machining device used for machining a to-be-repaired mold, a level printing table used for placing the to-be-repaired mold, and a temporary fixing part used for temporarily fixing the to-be-repaired mold, wherein the plasma beam processing system comprises a plasma generator, an air supply device, a wire feeding device and a printing position adjusting device; the monitoring system comprises a horizontal motion controller, a temperature detection unit, a distance detection unit, a printing distance adjustment controller and a rotation controller; and the temperature detection unit and the printing distance adjustment controller form a temperature regulating device. The remanufacturing method comprises the steps of I, mold defect detection and II, mold repairing. According to the mold plasma 3D rapid prototyping remanufacturing device and the method, the design is reasonable, the operation is simple and convenient, the efficiency is high, the using effect is good, a sealed shaping room is not needed, the repairing process is directly carried out in the atmospheric environment, and the quality of the mold is good after repairing.

Description

A kind of mould plasma 3D rapid shaping remanufactures Apparatus and method for
Technical field
The invention belongs to rapid shaping technique field, especially relate to a kind of mould plasma 3D rapid shaping and remanufacture Apparatus and method for。
Background technology
Mould refers to the various moulds and the instrument that obtain required product in commercial production in order to methods such as injection moulding, blowing, extrusion, die casting or forging forming, smelting, punching presses。In brief, mould is used to the instrument of shaped article。The forming surface of mould refers to the surface in order to moulded products (also referred to as product), and forming surface is the surface directly contacted with institute moulded products。Wherein, the forming surface of die cavity refers to the outer surface in order to moulded products, and the forming surface of core is then the inner surface in order to moulded products。The crudy of mould surface, machining accuracy and serviceability all require higher, directly determine crudy and the machining accuracy of institute moulded products, and multiple operations such as in machining, mould surface need to be machined, cleans, polishing just can machine。In mould use procedure, forming surface effectively need to be protected, once the defects such as breakage, cracking, abrasion occurs in forming surface, then directly affect the molding effect of mould, even result in mould and scrap。
Owing to mould is the important tool in formed product processing, expense accounts for the 10%~30% of product cost。The failure mode of mould has surface abrasion, surfacial spalling, collapses angle, face crack etc., and mould invalidation causes that product is defective and scraps with mould。Product is defective makes direct production cost improve;Manufacturing new mould and replace that the expense of inefficacy mould is huge, the production cycle is long, mould invalidation part only accounts for a little part for mould, and mould is scrapped and caused the huge wasting of resources。In order to reduce product cost, economize on resources, mould invalidation position is remanufactured be mould use unit common method。
At present, when mould is remanufactured, main employing is laser cladding method。Publication number as disclosed in 11 days October in 2007 is in the Chinese invention patent " material of laser repairing high-hardness engine parts scrap mould and method for making and application " of CN101054667A, discloses a kind of method adopting laser melting coating to remanufacture and repairs high-hardness engine parts scrap mould。Publication number disclosed in 4 days Mays in 2011 is in the Chinese invention patent " application in mould repair of the surface cladding technology " of CN102041502A, discloses a kind of method adopting laser melting coating to remanufacture repairing mould。Publication number disclosed in JIUYUE in 2011 14 days is in the Chinese invention patent " a kind of method of remanufacturing die with gradient function by repairing micro zone through laser " of CN102248164A, discloses a kind of method adopting coaxial powder-feeding laser melting coating to remanufacture composition gradient functional layer repairing mould。Publication number disclosed in 25 days January in 2012 is a kind of method adopting laser melting coating repairing mould disclosed in the Chinese invention patent application file of CN102330084A。Publication number disclosed in 14 days March in 2012 is in the Chinese invention patent application file of CN102373468A, discloses and a kind of adopts broadband laser cladding reparation or the method carrying out surface peening mould。Publication number disclosed in 17 days October in 2012 is the technique of a kind of laser repairing automobile die disclosed in the Chinese invention patent application file of CN102732831A, first mould is carried out low-temperature prewarming, then abrading section die cavity is programmed reenact technique to repair, also discloses that a kind of Fe base alloy powder repaired simultaneously。Publication number disclosed in 27 days March in 2013 is a kind of method adopting laser melting coating repairing mould fatigue crack disclosed in the clearly demarcated patent application document of China of CN102995001A, adopts different crackle Treatment technique for processings and laser melting and coating process with the crackle be more than or equal to 0.5mm to less than 0.5mm。Publication number disclosed in December in 2013 25 days is a kind of automobile gearbox gear hot forged mould laser remanufacturing renovation technique disclosed in the Chinese invention patent application file of CN103469198A, adopts alloy powder, to carrying out flaw detection after mould cladding。Publication number disclosed in 22 days January in 2014 is a kind of method of laser fuse repairing mould disclosed in the Chinese invention patent application file of CN103521923A, it is necessary to mould is preheated。Publication number disclosed in December in 2014 24 days is a kind of method adopting high-wearing feature laser cladding of material repairing mould disclosed in the Chinese invention patent application file of CN104233289A, it is necessary to mould is preheated, adopts CW CO after cladding2Laser machine carries out laser irradiation process, in laser cladding process, mould is carried out vibrating failure process。
But at present, the laser melting coating adopted remanufactures the method for mould, is primarily present following three aspect problems:
The first, laser cladding equipment is expensive, simultaneously as the life-span of device core device Optical Maser System is short, price is high, and replacing, maintenance cost height so that the cost that employing laser melting coating remanufactures mould is very high;
The second, the mechanical property requirements of mould is significantly high, in order to reach good performance after laser melting coating, it is desirable to metal dust has good mobility, generally should adopt globular metallic powder, causes that laser melting coating remanufactures the material cost height of mould;
3rd, laser melting coating remanufactures in mold process, it is necessary to molten bath is carried out inert atmosphere protection or all processes and carries out in protective atmosphere。If molten bath is carried out inert atmosphere protection, molten bath cooling is too fast, makes cladding layer stress higher, meanwhile, is also easily caused dusty material and disperses, make fusing insufficient, cause that the mold performance remanufactured is poor, and even cracking is scrapped, and efficiency is low。
It addition, when nowadays mould being remanufactured, there is also welding method。As disclosed in 16 days June in 2010 publication number is a kind of method for quick repair welding, restoring and reproducing of high-alloy cold-working mould disclosed in the Chinese invention patent application file of CN101733512A, mould is carried out 300 DEG C~370 DEG C preheatings by it, then adopt welding wire tungsten argon arc soldering method to carry out Bead weld repair, after built-up welding, carry out the tempering destressing heat treatment of 300 DEG C~370 DEG C。Publication number disclosed in 16 days November in 2011 is a kind of hot forged mould Bead weld repair and remanufacture with special welding rod disclosed in the Chinese invention patent application file of CN102240872A, can not carrying out mould and die preheating and post weld heat treatment, after reparation, hardness is 35~45HRC。Publication number disclosed in 18 days July in 2012 is the restorative procedure of a kind of hot forged mould disclosed in the Chinese invention patent application file of CN102581543A, first the fatigue layer in mould thorax is removed, then with welding wire, impression heap is welded to full for impression filling, last machine-shaping。Publication number disclosed in December in 2012 26 days is the renovation technique of a kind of diel disclosed in the Chinese invention patent application file of CN102837106A, first mould is carried out heat treatment, then adopts welding rod built-up welding, finally carry out temper。Publication number disclosed in 3 days July in 2013 is a kind of roll forging die enabling surfacing manufacturing renovation technique disclosed in the Chinese invention patent application file of CN103182618A, first mould is carried out heat treatment, then prime coat, transition zone and the working lining that successively built-up welding hardness gradually rises, finally carry out temper, and cool to 90 DEG C~190 DEG C with the furnace and come out of the stove。
But at present, the built-up welding adopted remanufactures the method for mould, is primarily present following two aspect problems:
The first, built-up welding remanufactures mould owing to localized heat input quantity is high, poor process control, it is generally required to preheating and tempering heat treatment, simultaneously, it is difficult to built-up welding mechanical property exceedes the material of mold materials itself, causes mould process complexity, poor performance that built-up welding remanufactures;
The second, built-up welding remanufactures mold surface roughness height, and particularly some mould needs to be welded to impression heap impression is filled full, last machine-shaping, and resurfacing welding material consumption is too high, cost is high, and allowance is big。
Publication number disclosed in December in 2014 24 days be disclosed in the Chinese invention patent application file of CN104233159A a kind of forging mold remanufacture technique, by mould is carried out surface treatment, then adopt plasma spraying Ni60A-ZrO2Coating carries out mould and remanufactures。Publication number disclosed in 25 days March in 2015 be disclosed in the Chinese invention patent application file of CN104451523A a kind of tire-mold remanufacture technique, by mould is carried out surface treatment, then adopt HVAF W-Cr-Co coating to carry out mould and remanufacture。But when mould is remanufactured by above-mentioned employing spraying method, spray-on coating and mould itself are physical bond, and interface bond strength is usually no more than 70MPa, and interface bond strength is low, in mold cold Thermal Cycling or when bearing greater impact power, the coating remanufactured easily is peeled off。
Publication number disclosed in December in 2014 24 days is the restorative procedure of a kind of automobile large-scale covering drawing die disclosed in the Chinese invention patent application file of CN104233238A, by mould is carried out surface treatment, then adopt chemical Ni-P plating to carry out mould and remanufacture。The surface abrasion of mould lost efficacy, and except overall wear also has the more heavy wear at local crowning position, the thickness of Electroless Ni-P Plating is thin, it is difficult to meet mould overall wear and demand is repaired in concentrated wear。
At present, domestic and international metal parts rapid shaping technique is mainly precinct laser fusion rapid molding technology (Selectivelasermelting, SLM)。The basic functional principle of precinct laser fusion rapid molding equipment is: first utilize Pro/e on computers, UG, the 3D sculpting softwares such as CATIA design the three-dimensional entity model (i.e. three-dimensional stereo model) of part, then pass through Slice Software and this threedimensional model is carried out hierarchy slicing, obtain the outline data in each cross section, generated by outline data and fill scanning pattern, tile certain thickness powder in working cylinder, control according to computer, laser beam optionally melts fore-put powder layer by the mode of vibration mirror scanning according to the slicing treatment result of three-dimensional parts figure;Subsequently, working cylinder decline certain distance also spreads powder again, and laser beam completes the manufacture of next layer of parts under the drive of galvanometer again according to the 3-D graphic of parts;So repeat degradation operation under paving powder, scanning and working cylinder, thus realizing the manufacture of three-dimensional parts。Nowadays, precinct laser fusion rapid molding technology is primarily present following three aspect problems: the first, precinct laser fusion rapid molding technology needs protective atmosphere or vacuum environment, to avoid the oxidation of metal parts in forming process。This makes precinct laser fusion rapid molding device structure complicated, and forming part size is restricted, and energy source Optical Maser System price is high, and former is expensive;The second, precinct laser fusion rapid molding technology needs the moulding cylinder system of paving powder。This makes precinct laser fusion rapid molding device structure complicated, and not only forming part size is restricted, and shaping efficiency is relatively low;3rd, in order to ensure part mechanical property, precinct laser fusion rapid molding technology needs the globular metallic powder of good fluidity。This makes precinct laser fusion rapid molding equipment operating cost significantly high。
It addition, metal parts rapid shaping technique also has electron beam rapid shaping technique。But at present, Selected area electron bundle rapid shaping technique is primarily present following three aspect problems: the first, electron beam rapid shaping technique needs vacuum environment, to form energy source electron beam and to avoid the oxidation of metal parts in forming process。This makes electron beam rapid forming equipment structure complicated, and forming part size is restricted, and former is expensive;The second, electron beam rapid shaping technique needs paving powder system or moulding material feed system。This makes electron beam rapid forming equipment structure complicated, and not only forming part size is restricted, and shaping efficiency is relatively low;3rd, in order to ensure part mechanical property, electron beam rapid shaping technique needs the globular metallic powder of good fluidity。This makes precinct laser fusion rapid molding equipment operating cost significantly high。
Summary of the invention
The technical problem to be solved is in that for above-mentioned deficiency of the prior art, a kind of mould plasma 3D rapid shaping is provided to remanufacture equipment, its simple in construction, reasonable in design and use easy and simple to handle, efficiency is high, result of use good, without airtight forming room, repair process directly carries out under atmospheric environment, repairs rear mold quality good。
For solving above-mentioned technical problem, the technical solution used in the present invention is: a kind of mould plasma 3D rapid shaping remanufactures equipment, it is characterised in that: by monitoring system, plasma beam system of processing, treat machining set-up that repairing mould is machined out, the horizontal stamp pad placed for mould to be repaired and treat repairing mould and carry out interim fixing temporary fixing piece and form;Described machining tool is setting in above horizontal stamp pad;Described temporary fixing piece is laid on horizontal stamp pad;
Described plasma beam system of processing is by being provided with shower nozzle and for producing the plasma generator of beam-plasma, providing the feeder of working gas for described plasma generator, form for the wire feeder and the print position adjusting apparatus that print position is adjusted sending processed silk material continuously, described plasma generator and described wire feeder are respectively positioned on above horizontal stamp pad, and described wire feeder is positioned at described plasma generator side;Described feeder is connected with the air inlet opened on described plasma generator by air supply pipe;The outer end of described processed silk material is melting end, described melting end be positioned at described shower nozzle outlet lower section and its be positioned on the central axis of described beam-plasma;Described print position adjusting apparatus includes driving the described plasma generator horizontally moving device that in the horizontal plane move Tong Bu with described wire feeder and driving described plasma generator, described wire feeder and described horizontally moving device synchronizing moving and tackle the printing distance adjusting means that the distance exported between horizontal stamp pad of described shower nozzle is adjusted mutually, described plasma generator and described wire feeder are installed on described horizontally moving device, and described horizontally moving device is arranged in described printing distance adjusting means;
Described monitoring system includes moving horizontally controller to what described horizontally moving device was controlled, described plasma beam system of processing Working position place temperature on mould to be repaired is carried out the temperature detecting unit of detection in real time, the distance detection unit that distance between outlet and the horizontal stamp pad of described shower nozzle is carried out detection in real time and the printing distance regulable control device that described printing distance adjusting means is controlled, the described controller that moves horizontally is connected with described horizontally moving device, the described distance regulable control device that prints is connected with described printing distance adjusting means, described temperature detecting unit and distance detection unit are all connected apart from regulable control device with printing;Described temperature detecting unit forms temperature control device with printing distance regulable control device。
Above-mentioned a kind of mould plasma 3D rapid shaping remanufactures equipment, it is characterized in that: described mould to be repaired is the mould that there is local defect and/or surface abrasion defect, described local defect is there is damaged or cracking in the forming surface of mould to be repaired, and the forming surface that described surface abrasion defect is mould to be repaired exists abrasion;Being provided above of described horizontal stamp pad treats ultrasonic detection device or the three-dimensional laser scanner that the defect existed on repairing mould carries out detecting。
Above-mentioned a kind of mould plasma 3D rapid shaping remanufactures equipment, it is characterized in that: described plasma generator includes plasma gun, and described shower nozzle is the anode nozzle of plasma gun front end;Described plasma gun includes having the gun body of described air inlet, being positioned at the anode nozzle of gun body dead ahead and be plugged in the negative electrode of gun body, described anode nozzle is positioned on front side of negative electrode, described arc chamber is positioned on front side of negative electrode and it is positioned at the posterior medial of anode nozzle, and the front inner of described anode nozzle is spout;Described anode nozzle, negative electrode and arc chamber are all laid in coaxial with gun body;Described air inlet is positioned on rear side of gun body, described spout and gun body in coaxial laying or and gun body central axis between angle be 30 °~45 °;
Detection of gas flow rate unit that plasma generator controller that described monitoring system also includes described plasma generator is controlled, gas flow to air supply pipe carry out detection in real time and the gas flow controller that the flow control valve installed on air supply pipe is controlled, described plasma generator controller is connected with described plasma generator, and described detection of gas flow rate unit is connected with gas flow controller。
Above-mentioned a kind of mould plasma 3D rapid shaping remanufactures equipment, it is characterized in that: described wire feeder includes top and is wound with the wire tray of processed silk material, the wire feeder that processed silk material is carried and the wire feed driving mechanism that described wire feeder is driven, and described wire feeder is positioned at inside wire tray and is connected with described wire feeder;Described wire tray is coaxially mounted in rotating shaft and can rotate around described rotating shaft。
Above-mentioned a kind of mould plasma 3D rapid shaping remanufactures equipment, it is characterized in that: described wire feeder is wire pushing roller, described wire pushing roller includes active roller group and return idler group, described active roller group includes two and is driven by wire feed driving mechanism and active roller that rotation direction is contrary, it is contrary and lay respectively at the return idler of processed silk material both sides that described return idler group includes two rotation directions, described active roller group is positioned at described return idler group side, and two described active rollers lay respectively at processed silk material both sides;
Described monitoring system also includes the speed detection unit that the wire feed rate of processed silk material carries out detection in real time and the wire feed rate controller that wire feed driving mechanism is controlled, and described speed detection unit is connected with wire feed rate controller。
Above-mentioned a kind of mould plasma 3D rapid shaping remanufactures equipment, it is characterized in that: the angle between central axis and the vertical plane of the beam-plasma that described plasma generator produces is not more than 45 °;Described printing distance adjusting means is the adjusting apparatus up and down described shower nozzle adjusted up and down along the central axis of described beam-plasma, and described distance detection unit is to the distance detection device carrying out detection in real time along the central axis of described beam-plasma from the distance exported between horizontal stamp pad of described shower nozzle;
Described horizontal stamp pad is be arranged on stamp pad position regulator and the mobile platform that can move up and down;
Described monitoring system also includes the position adjustment controller that described stamp pad position regulator is controlled, and described position adjustment controller is connected with described stamp pad position regulator。
Meanwhile, the invention discloses the mould plasma 3D rapid shaping reproducing method that a kind of method step is simple, reasonable in design and realization is convenient, result of use is good, it is characterised in that: the method comprises the following steps:
Step one, mold defect detect: be first positioned on horizontal stamp pad by mould to be repaired, and make the forming surface of mould to be repaired upward;Treat the defect existed on repairing mould again to detect, and the position detecting each defect is recorded respectively;
The defect existed on described mould to be repaired is local defect and/or surface abrasion defect, and described local defect is there is damaged or cracking in the forming surface of mould to be repaired, and the forming surface that described surface abrasion defect is mould to be repaired exists abrasion;
Step 2, mould repair: adopt described mould plasma 3D rapid shaping to remanufacture equipment, repair respectively to the defect existed on the mould to be repaired detected in step one, and process is as follows:
Step 201, local defect reparation judge: according to the mold defect testing result in step one, judge whether to carry out local defect reparation: when step one detects there is described local defect in mould to be repaired time, repairing mould need to be treated and carry out local defect reparation, and enter step 202;Otherwise, step 203 is entered;
Step 202, local defect reparation: according to the mold defect testing result in step one, treat each local defect existed on repairing mould and repair respectively, until completing the repair process of all local defects existed on mould to be repaired;
On described mould to be repaired, the restorative procedure of all local defects is all identical;Treat any one the described local defect existed on repairing mould when repairing, comprise the following steps:
Step 2021, rejected region are removed: adopt described machining set-up to treat region residing for current repaired local defect on repairing mould and be removed, it is thus achieved that the to be filled region corresponding with current repaired local defect;
Step 2022, plasma 3D print: adopt described plasma beam system of processing, region to be filled described in step 2021 is carried out plasma 3D printing, complete the repair process of current repaired local defect;
Step 203, surface abrasion defect repair judge: according to the mold defect testing result in step one, judge whether to carry out surface abrasion defect repair: when step one detects there is surface abrasion defect in mould to be repaired time, repairing mould need to be treated and carry out surface abrasion defect repair, and enter step 204;Otherwise, what complete mould to be repaired remanufactures process;
Step 204, surface abrasion defect repair: according to the mold defect testing result in step one, adopt described plasma beam system of processing, and the eroded area treated in the forming surface of repairing mould is repaired, and what complete mould to be repaired remanufactures process。
Above-mentioned mould is carried out the method that plasma 3D rapid shaping remanufactures, it is characterized in that: when carrying out mold defect detection in step one, ultrasonic detection device or three-dimensional laser scanner that the horizontal stamp pad of employing is provided above are treated the defect existed on repairing mould and are detected;
After step 2 completes mould repair, it is thus achieved that repair rear mold;Afterwards, adopt machining set-up that described reparation rear mold is carried out polish。
Above-mentioned mould is carried out the method that plasma 3D rapid shaping remanufactures, it is characterized in that: when carrying out surface abrasion defect repair in step 204, process is as follows:
Step 2041, three-dimensional stereo model obtain and hierarchy slicing processes: adopt described data handling equipment and call the three-dimensional stereo model of eroded area in the forming surface of described image processing module acquisition mould to be repaired, recall the hierarchy slicing module three-dimensional stereo model to described eroded area and carry out hierarchy slicing, and obtain multiple layering cross-sectional image;
Multiple described layering cross-sectional images are the image obtaining multiple layering cross section after the three-dimensional stereo model to described eroded area carries out hierarchy slicing, and multiple described layering cross sections are uniformly laid from the inside to the outside;
Step 2042, scanning pattern are filled: adopt data handling equipment and call described image processing module, described layering cross-sectional images multiple in step 2041 are respectively processed, and complete the scanning pattern filling process in multiple described layering cross section, it is thus achieved that the scanning pattern in multiple described layering cross sections;
Step 2043, printing path obtain: the described data handling equipment scanning pattern according to the multiple described layering cross section obtained in step 2042, it is thus achieved that the printing path in multiple described layering cross sections;The printing path in each described layering cross section is all identical with the scanning pattern in this layering cross section;
Step 2044, from the bottom to top successively printing: the printing path according to the multiple described layering cross section obtained in step 2043, successively described eroded area is printed from the bottom to top, make described eroded area be filled with by multiple shape layers stacking from the bottom to top;The quantity of described shape layer is identical with the quantity being layered cross section described in step one, the installation position of multiple described shape layers is all identical with the installation position one_to_one corresponding in multiple described layering cross sections and its thickness respectively, distance between the thickness of described shape layer with adjacent two described layering cross sections is identical, the printing path of the printing path in multiple described layering cross sections respectively multiple described shape layers in step 3;When described eroded area is printed, process is as follows:
Step 401, bottom print: described in move horizontally the controller printing path according to current institute printing shaping layer acquired in step 2043, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto on mould to be repaired by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of current institute printing shaping layer;
In this step, current institute printing shaping layer is the shape layer being positioned at bottommost in multiple described shape layer;
Step 402, last layer print, and comprise the following steps:
Step 4021, printing are apart from regulating: horizontal stamp pad in the vertical direction is once moved down and moved down highly identical with the thickness of described shape layer, or drive described plasma generator in the vertical direction once to move up and move up highly identical with the thickness of described shape layer by printing apart from the regulable control device described printing distance adjusting means of control;
Step 4022, print and synchronize temperature control: described in move horizontally the controller printing path according to current institute printing shaping layer acquired in step 3, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto on the upper surface of the current printed described shape layer of the next one by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of current institute printing shaping layer;
In this step, in described plasma generator moving process in the horizontal plane synchronize with described wire feeder, carrying out detecting in real time and by detected temperature information synchronous driving to printing distance regulable control device to the upper surface temperature of the current printed described shape layer of the next one by temperature detecting unit, the distance simultaneously detected between unit outlet and horizontal stamp pad to described shower nozzle by distance carries out detection in real time and by the range information synchronous driving detected to printing apart from regulable control device;Described print temperature information that distance regulable control device detects according to temperature detecting unit and be adjusted by controlling the distance between described printing distance adjusting means outlet and horizontal stamp pad to described shower nozzle, making 0.6 times of the upper surface temperature of the currently printed described shape layer of the next one material fusing point not higher than described printed material;
In the moving process in the horizontal plane synchronize with described wire feeder of plasma generator described in step 401 and step 4022, processed silk material is sent by described wire feeder continuously, the melting end of processed silk material is melted by the beam-plasma simultaneously produced by described plasma beam system of processing, and makes the molten melt drop that the fusing of described melting end is formed continuously and form liquid stream;Described liquid stream is distributed in described beam-plasma, the plasma beam of the melted liquid stream of band in being formed;
Step 403, repeatedly repetition step 402, until completing the print procedure of all shape layers of described eroded area。
Above-mentioned mould carrying out the method that plasma 3D rapid shaping remanufactures, it is characterized in that: adopt described plasma beam system of processing in step 2022, region to be filled described in step 2021 carries out plasma 3D when printing, process is as follows:
Step A, three-dimensional stereo model obtain and hierarchy slicing processes: the three-dimensional stereo model according to the mould finished product of mould to be repaired, adopt data handling equipment and call the three-dimensional stereo model in the described region to be filled of image processing module acquisition, recall the hierarchy slicing module three-dimensional stereo model to described region to be filled and carry out hierarchy slicing, and obtain multiple layering cross-sectional image;
In this step, multiple described layering cross-sectional images are the image obtaining multiple layering cross section after the three-dimensional stereo model to described region to be filled carries out hierarchy slicing, and multiple described layering cross sections are uniformly laid from the bottom to top;
Step B, scanning pattern are filled: adopt data handling equipment and call described image processing module, described layering cross-sectional images multiple in step A are respectively processed, and complete the scanning pattern filling process in multiple described layering cross section, it is thus achieved that the scanning pattern in multiple described layering cross sections;
Step C, printing path obtain: the described data handling equipment scanning pattern according to the multiple described layering cross section obtained in step B, it is thus achieved that the printing path in multiple described layering cross sections;The printing path in each described layering cross section is all identical with the scanning pattern in this layering cross section;
Step D, from the bottom to top successively printing: the printing path according to the multiple described layering cross section obtained in step C, successively described region to be filled is printed from the bottom to top, make described region to be filled be filled with by multiple shape layers stacking from the bottom to top;The quantity of described shape layer is identical with the quantity being layered cross section described in step A, the installation position of multiple described shape layers is all identical with the installation position one_to_one corresponding in multiple described layering cross sections and its thickness respectively, distance between the thickness of described shape layer two described layering cross sections adjacent with step A is identical, the printing path of multiple described shape layers in the printing path in multiple described layering cross sections respectively described region to be filled in step C;In described region to be filled, the Method of printing of multiple described shape layers is all identical;When described region to be filled is printed, process is as follows:
Step D1, bottom print: described in move horizontally the controller printing path according to current institute printing shaping layer acquired in step C, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto in described region to be filled by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of current institute printing shaping layer in described region to be filled;
In this step, current institute printing shaping layer is the shape layer being positioned at bottommost in described region to be filled in multiple described shape layers;
Step D2, last layer print, and comprise the following steps:
Step D21, printing are apart from regulating: horizontal stamp pad in the vertical direction is once moved down and moved down highly identical with the thickness of described shape layer, or drive described plasma generator in the vertical direction once to move up and move up highly identical with the thickness of described shape layer by printing apart from the regulable control device described printing distance adjusting means of control;
Step D22, printing and synchronize temperature control: described in move horizontally the controller printing path according to current institute printing shaping layer acquired in step C, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto on the upper surface of the current printed described shape layer of the next one by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of current institute printing shaping layer;
In this step, in described plasma generator moving process in the horizontal plane synchronize with described wire feeder, carrying out detecting in real time and by detected temperature information synchronous driving to printing distance regulable control device to the upper surface temperature of the described shape layer of the next one current printed in described region to be filled by temperature detecting unit, the distance simultaneously detected between unit outlet and horizontal stamp pad to described shower nozzle by distance carries out detection in real time and by the range information synchronous driving detected to printing apart from regulable control device;Described print temperature information that distance regulable control device detects according to temperature detecting unit and be adjusted by controlling the distance between described printing distance adjusting means outlet and horizontal stamp pad to described shower nozzle, making 0.6 times of the upper surface temperature of the currently printed described shape layer of the next one material fusing point not higher than described printed material;
In the moving process in the horizontal plane synchronize with described wire feeder of plasma generator described in step D1 and step D22, processed silk material is sent by described wire feeder continuously, the melting end of processed silk material is melted by the beam-plasma simultaneously produced by described plasma beam system of processing, and makes the molten melt drop that the fusing of described melting end is formed continuously and form liquid stream;Described liquid stream is distributed in described beam-plasma, the plasma beam of the melted liquid stream of band in being formed;
Step D3, repeatedly repetition step D2, until completing the print procedure of all shape layers in described region to be filled。
The present invention compared with prior art has the advantage that
1, it is convenient that the mould plasma 3D rapid shaping adopted remanufactures that device structure is simple, reasonable in design and input cost is relatively low, processing and fabricating and installing is laid。
2, the mould plasma 3D rapid shaping adopted remanufactures equipment without airtight forming room, and does not need protective atmosphere or vacuum environment, and repair process (namely remanufactures process) directly to carry out under atmospheric environment。Thus, structure is very simple, and it is unrestricted to remanufacture accessory size, and equipment price is relatively low。
3, mould plasma 3D rapid shaping remanufactures printed material (the i.e. processed silk material) supply of equipment in energy source beam-plasma (the drop plasma beam of material), the moulding cylinder system that need not spread powder need not spread powder system, only needing a wire feeder, structure significantly simplifies。
4, the mould plasma 3D rapid shaping adopted remanufactures equipment easy and simple to handle, the intelligence degree of use and efficiency is high, result of use is good, and institute's mould quality is good。The distance moving horizontally controller, printing position temperature being carried out between the temperature detecting unit of detection in real time, outlet and the horizontal stamp pad to shower nozzle that the monitoring system adopted includes that horizontally moving device is controlled carries out the real-time distance detected detection unit and to printing the printing distance regulable control device that distance adjusting means is controlled, printing and be connected with printing distance adjusting means apart from regulable control device, temperature detecting unit and distance detection unit are all connected apart from regulable control device with printing;Temperature detecting unit forms temperature control device with printing distance regulable control device。
In actually used process, printing distance regulable control device in temperature control device is controlled printing distance adjusting means according to the detected information of temperature detecting unit, make to print distance energy Automatic adjusument, so can prevent because printing the problem that hypotelorism causes the shape layer printed to occur fusing again, and the formed precision caused because of printing hypertelorism also can be prevented relatively low, there is the problems such as solidification before a printable layer outer surface in molten melt drop on being sprayed onto, make forming process easily controllable, and realize conveniently, can effectively prevent the surface of mould surface from aoxidizing simultaneously, because of without arranging airtight vacuum environment。It addition, the monitoring system adopted also includes gas flow Automatic adjusument and powder mass flow Automatic adjusument function, intelligence degree is high。
5, mould plasma 3D rapid shaping remanufactures the energy source of equipment employing is beam-plasma, and beam-plasma power is up to tens of kilowatt, energy molten ceramic material, it is achieved the plasma casting rapid shaping of metal, ceramic metal and ceramic part。Producing plasma generator (specifically plasma gun) simple in construction of beam-plasma, operation expense is low, and plasma casting rapid forming equipment cost is low。
6, mould plasma 3D rapid shaping remanufactures the drop of equipment institute printed material in plasma beam; beam-plasma itself has protective effect; add the effect of working gas; can effectively prevent the oxidation of printed material; this equipment does not need protective atmosphere or vacuum environment; directly use under atmospheric environment, the advantage such as have that device structure is simple, operating cost is low, to remanufacture accessory size unrestricted。
7, mould plasma 3D rapid shaping remanufacture equipment adopt wire feeder processed silk material is delivered in beam-plasma continuously, printed material cost is low。
8, when mould plasma 3D rapid shaping remanufactures equipment printing, materials behavior is become solid-state by settable liquid, and technical process simplifies, and reduces the 3D technology difficulty printed and cost。Simultaneously, under the effect of working gas (beam-plasma includes unionized working gas), the melting end of processed silk material heats in beam-plasma and is fused into molten condition and forms small drop, molten melt drop after fusing continuously and forms liquid stream and sprays in the lump with beam-plasma, the plasma beam of the melted liquid stream of band in being formed;Due to processed silk material through fusing after formed melted liquid stream with beam-plasma spray after, melt the microstream of liquid stream with printed material in being formed, form casting type molding, the rounded constrictions phenomenon produced when avoiding molten drop cooled and solidified molding, part mechanical property is high, smooth surface, reduces the technology difficulty of rapid shaping。
9, adopted mould plasma 3D rapid shaping remanufacture functions of the equipments comprehensively and use easy and simple to handle, occupation mode flexible, and has defects detection and machining function。This equipment less costly, in adopted plasma beam system of processing, plasma gun price is low, change, maintenance cost low, and use cost is low。Adopt the local defect that the present invention can treat repairing mould to carry out rapid shaping to remanufacture, it also is able to that die surface wear-out defect is carried out rapid shaping remanufacture, the mould that rapid shaping can also be remanufactured carries out polish, makes the mould that rapid shaping remanufactures be directly used in production。
10, the mould plasma 3D rapid shaping reproducing method adopted is simple, reasonable in design and realization is convenient, result of use is good, and the local defect that mould exists and surface abrasion defect can carry out simplicity, quick and high-quality reparation。
11, the plasma 3D Method of printing step of adopted plasma beam system of processing simple, reasonable in design and realize convenient, result of use is good, improved by plasma gun structure and powder is sent directly in beam-plasma and makes powder smelting, the drop plasma beam of formation institute printed material。Beam-plasma has protective effect, it is not necessary to protective atmosphere or vacuum environment, directly prints under atmospheric environment。Further, printed material supplies in energy source beam-plasma (the drop plasma beam of material), it is not necessary to the moulding cylinder system of paving powder。During printing, materials behavior is become solid-state by settable liquid, and technical process simplifies, and reduces the 3D technology difficulty printed and cost, and it is no longer size-limited to print part。As shown in the above, traditional plasma surfacing method is substantially improved by the present invention, the generally individually plasma arc voltage Height-adjusting device that is provided with of existing plasma surfacing method, and the distance of plasma gun and surface of the work is not more than 15mm, and the scope of application is limited。And in the present invention, print distance can on a large scale in be adjusted, adapting to unlike material prints demand, and can be effectively ensured workpiece (i.e. mould) Forming Quality。
Adopt energy efficient solution of the present invention to determine the problems referred to above that precinct laser fusion rapid molding technology and electron beam rapid shaping technique exist, and provide a kind of brand-new mould reproducing method for mould, can effectively solve the various problems that existing laser cladding method exists, have that efficiency height, Forming Quality be good, between printing shaping layer and mould to be repaired, bonding strength is high, repair the advantages such as rear mold quality is good。
12, the printed material material of similar nature (namely identical with mould material therefor or) fusing in beam-plasma forms drop, beam-plasma has protection and purification effect, it is to avoid material contamination, and mold performance is stable;Further, printed material in beam-plasma and beam-plasma power high, fusing is fully, in printed material layering print procedure, droplet solidification speed is fast, and material grains is tiny, without causing element segregation, the performance remanufacturing mould is good, does not have cracking and even scraps phenomenon;When adopting print die of the present invention, in next layer of printed material print procedure, last layer printed material can be carried out synchronizing heat treatment by plasma beam, thermal stress is little, not havinging micro-crack or cracking, yield rate can reach absolutely, thus remanufactures the function admirable of mould;When adopting the present invention to remanufacture mould, technical process is simple, and technological process is short, and equipment cost is low, compared with existing mold reproducing method, reduces technology difficulty and cost。Owing to beam-plasma power is high, rapid shaping remanufactures process control, different metal, ceramic metal or ceramic powders can being selected to carry out rapid shaping and remanufacture for different moulds, it is unrestricted that selected rapid shaping remanufactures material, remanufactures material and mold materials similar nature;Remanufacturing it is also possible to carry out the rapid shaping of high performance material for position easy to wear, improve service life further, the mould designability that plasma 3D rapid shaping remanufactures is strong, technique is simple, stable and reliable for performance。It addition, plasma beam system of processing disclosed in this invention can directly use under atmospheric environment, during molding, printed material can be fused into liquid stream, realize continuous micro-casting rapid shaping, technical process simplifies, and reduces technology difficulty and cost that traditional moulds manufactures, improves the performance of mould。
13, rapid shaping remanufactures (namely print remanufacture) process and can carry out under atmospheric environment, and the handling treating repairing mould are easy, and remediation efficiency is high。Adopt the present invention can effectively reduce technology difficulty and the cost that traditional moulds remanufactures, improve the efficiency and performance that remanufacture mould, and rapid shaping can be remanufactured mould and carry out polish, enable to directly apply in production。
Below by drawings and Examples, technical scheme is described in further detail。
Accompanying drawing explanation
Fig. 1 is the structural representation that inventive die plasma 3D rapid shaping remanufactures equipment。
Fig. 2 is the structural representation of plasma gun in the embodiment of the present invention 1。
Fig. 3 is the schematic block circuit diagram that the present invention monitors system。
Fig. 4 is the structural representation of air inlet ring of the present invention。
Fig. 5 is the structural representation of air inlet ring body of the present invention。
Fig. 6 is the FB(flow block) of inventive die plasma 3D rapid shaping reproducing method。
Fig. 7 is the structural representation of plasma gun in the embodiment of the present invention 2。
Description of reference numerals:
1 feeder;2 processed materials;3 moulds to be repaired;
4 horizontal stamp pads;5 air supply pipes;6 wire trays;
7 plasma generator controllers;8 distance detection unit;9 temperature detecting units;
10 print distance regulable control device;11 detection of gas flow rate unit;
12 gas flow controllers;13 plasma guns;13-1 gun body;
13-2 anode nozzle;13-3 negative electrode;13-4 arc chamber;
13-5 spout;13-6 insulating barrier;14 wire feed driving mechanisms;
15 position adjustment controllers;16 three axis numerically controlled machines;About 17 adjusting apparatus;
18 speed detection unit;19 wire pushing rollers;20 wire feed rate controllers;
21 air inlet rings;21-1 air inlet ring body;21-2 annular sealing cover;
21-3 annular air inlet duct;Air inlet outside 21-4;Air inlet inside 21-5;
22 three-dimensional regulation supports;22-1 X-axis travel mechanism;
22-2 Y-axis moving mechanism;23 PCs;24 move horizontally controller;
25 flow control valves;27 machining set-ups;28 ultrasonic detection devices;
29 3 axle travel mechanisms。
Detailed description of the invention
Embodiment 1
A kind of mould plasma 3D rapid shaping as shown in Figure 1 remanufactures equipment, by monitoring system, plasma beam system of processing, treat machining set-up 27 that repairing mould 3 is machined out, the horizontal stamp pad 4 placed for mould 3 to be repaired and treat repairing mould 3 and carry out interim fixing temporary fixing piece and form。Described machining set-up 27 is positioned at above horizontal stamp pad 4。Described temporary fixing piece is laid on horizontal stamp pad 4。
Described plasma beam system of processing is by being provided with shower nozzle and for producing the plasma generator of beam-plasma, providing the feeder 1 of working gas for described plasma generator, form for the wire feeder and the print position adjusting apparatus that print position is adjusted sending processed silk material 2 continuously, described plasma generator and described wire feeder are respectively positioned on above horizontal stamp pad 4, and described wire feeder is positioned at described plasma generator side。Described feeder 1 is connected with the air inlet opened on described plasma generator by air supply pipe 5。The outer end of described processed silk material 2 is melting end, described melting end be positioned at described shower nozzle outlet lower section and its be positioned on the central axis of described beam-plasma。Described print position adjusting apparatus includes driving the described plasma generator horizontally moving device that in the horizontal plane move Tong Bu with described wire feeder and driving described plasma generator, described wire feeder and described horizontally moving device synchronizing moving and tackle the printing distance adjusting means that the distance exported between horizontal stamp pad 4 of described shower nozzle is adjusted mutually, described plasma generator and described wire feeder are installed on described horizontally moving device, and described horizontally moving device is arranged in described printing distance adjusting means。Described printed material is processed silk material 2。
As shown in Figure 3, what described monitoring system included described horizontally moving device is controlled moves horizontally controller 24, described plasma beam system of processing Working position place temperature on mould 3 to be repaired is carried out the temperature detecting unit 9 of detection in real time, the distance detection unit 8 that distance between outlet and the horizontal stamp pad 4 of described shower nozzle is carried out detection in real time and the printing distance regulable control device 10 that described printing distance adjusting means is controlled, the described controller 24 that moves horizontally is connected with described horizontally moving device, the described distance regulable control device 10 that prints is connected with described printing distance adjusting means, described temperature detecting unit 9 and distance detection unit 8 are all connected apart from regulable control device 10 with printing;Described temperature detecting unit 9 forms temperature control device with printing distance regulable control device 10。
In the present embodiment, described temporary fixing piece is clamping device (being not drawn in Fig. 1)。Time actually used, described temporary fixing piece can also adopt other temporary securing mechanism such as fixture。
In the present embodiment, described temperature detecting unit 9 is that described plasma beam system of processing Working position place on mould 3 to be repaired (i.e. print position place or repair position) temperature is carried out the infrared temperature sensor of detection in real time。Described distance detection unit 8 is laser range sensor。
When actual laying is installed, described temperature detecting unit 9 is positioned at above mould 3 to be repaired。In the present embodiment, described temperature detecting unit 9 is positioned at the surface of mould 3 to be repaired。
In the present embodiment, described mould 3 to be repaired is the mould that there is local defect and/or surface abrasion defect, and described local defect is there is damaged or cracking in the forming surface of mould 3 to be repaired, and the forming surface that described surface abrasion defect is mould 3 to be repaired exists abrasion。
Time actually used, being provided above of described horizontal stamp pad 4 treats ultrasonic detection device 28 or the three-dimensional laser scanner that the defect existed on repairing mould 3 carries out detecting。
During actual installation, described machining set-up 27 is installed in same three axle travel mechanisms 29, described three axle travel mechanisms 29 can drive ultrasonic detection device 28 and machining set-up 27 to synchronize the travel mechanism moved in X-axis, Y-axis and Z-direction, as three axle mobile platforms, three-dimensional mechanical hand, three axles regulate support, gimbal etc.。In the present embodiment, described three axle travel mechanisms 29 are positioned at above horizontal stamp pad 4。
In the present embodiment, described three axle travel mechanisms 29 are that three axles regulate support, described three axles regulate supports include base, the Z axis regulating arm being arranged on described base, the X-axis regulating arm being arranged on described Z axis regulating arm and the Y-axis regulating arm that is arranged on described X-axis regulating arm, described Y-axis regulating arm is provided with a vertical mounting rod, and described machining set-up 27 is arranged on described vertical mounting rod。
During actual installation, described ultrasonic detection device 28 or three-dimensional laser scanner can also be arranged in three axle travel mechanisms 29, and are arranged on described vertical mounting rod。
In the present embodiment, described horizontally moving device includes driving the described plasma generator X-axis travel mechanism 22-1 that in the X-axis direction carry out move horizontally Tong Bu with described wire feeder and driving described plasma generator and described wire feeder to synchronize the Y-axis moving mechanism 22-2 carrying out in the Y-axis direction moving horizontally, thus described horizontally moving device is X-Y shaft moving device。
Further, described plasma generator and described wire feeder are installed on Y-axis moving mechanism 22-2, and described Y-axis moving mechanism 22-2 is arranged on X-axis travel mechanism 22-1, and described X-axis travel mechanism 22-1 is arranged in described printing distance adjusting means。In actually used process, driven by Y-axis moving mechanism 22-2 that described plasma generator is Tong Bu with described wire feeder moves horizontally in the Y-axis direction, drive Y-axis moving mechanism 22-2 by X-axis travel mechanism 22-1, described plasma generator is Tong Bu with described wire feeder moves horizontally in the X-axis direction, and by the described printing distance adjusting means described horizontally moving device of drive, described plasma generator is Tong Bu with described wire feeder moves on the central axis of described beam-plasma。
In the present embodiment, described Y-axis moving mechanism 22-2, X-axis travel mechanism 22-1 and described printing distance adjusting means composition drive described plasma generator (specifically plasma gun 13) and described wire feeder to be synchronously performed the mechanical hand of three-dimensional motion。
In the present embodiment, detection of gas flow rate unit 11 that plasma generator controller 7 that described monitoring system also includes described plasma generator is controlled, gas flow to air supply pipe 5 carry out detection in real time and the gas flow controller 12 that the flow control valve 25 installed on air supply pipe 5 is controlled, described plasma generator controller 7 is connected with described plasma generator, and described detection of gas flow rate unit 11 is connected with gas flow controller 12。
As in figure 2 it is shown, described plasma generator includes plasma gun 13, described shower nozzle is the anode nozzle 13-2 of plasma gun 13 front end。Described plasma gun 13 includes having the gun body 13-1 of described air inlet, being positioned at the anode nozzle 13-2 of gun body 13-1 dead ahead and be plugged in the negative electrode 13-3 of gun body 13-1, described anode nozzle 13-2 is positioned on front side of negative electrode 13-3, described arc chamber 13-4 is positioned on front side of negative electrode 13-3 and it is positioned at the posterior medial of anode nozzle 13-2, and the front inner of described anode nozzle 13-2 is spout 13-5;Described anode nozzle 13-2, negative electrode 13-3 and arc chamber 13-4 all lay in coaxial with gun body 13-1;Described air inlet is positioned on rear side of gun body 13-1, described spout 13-5 and gun body 13-1 in coaxial laying or and described gun body 13-1 central axis between angle be 30 °~45 °。
Time actually used, described plasma gun 13 is arranged on Y-axis moving mechanism 22-2。
Time actually used, described plasma gun 13 can also adopt other plasma gun of routine。
In the present embodiment, between described anode nozzle 13-2 and gun body 13-1, it is provided with insulating barrier 13-6。
In the present embodiment, as in figure 2 it is shown, described spout 13-5 and gun body 13-1 lays in coaxial。
In the present embodiment, described air supply pipe 5 is connected with the air inlet opened on described plasma generator by air inlet ring 21。Further, uniformly supplied in described plasma generator by air inlet ring 21。
Such as Fig. 4, shown in Fig. 5, described air inlet ring 21 be annular and it include air inlet ring body 21-1 and lid be contained on air inlet ring body 21-1 annular sealing cover 21-2, described air inlet ring body 21-1 has an annular air inlet duct 21-3 on annular and its medial wall, described air inlet ring body 21-1 has an outside air inlet 21-4 connected with air supply pipe 5 and its inside have multiple inner side air inlet 21-5, multiple described inner side air inlet 21-5 along the circumferential direction uniformly lay and it is respectively positioned on inside annular air inlet duct 21-3, described outside air inlet 21-4 is positioned at outside annular air inlet duct 21-3, described outside air inlet 21-4 and multiple described inner side air inlet 21-5 all communicates with inside annular air inlet duct 21-3。
Further, described gun body 13-1 along the circumferential direction has multiple respectively with multiple described inner side air inlet 21-5 gun body air inlet communicated。
In plasma gun 13 use procedure as shown in Figure 2, producing plasma in described arc chamber 13-4, produced plasma forms beam-plasma and sprays through spout 13-5。
In the present embodiment, described working gas is noble gas or H2Gas。
Wherein, noble gas is Ar gas, He gas and N2Gas。
In the present embodiment, described horizontal stamp pad 4 is be arranged on stamp pad position regulator and the mobile platform that can move up and down。
Described monitoring system also includes the position adjustment controller 15 that described stamp pad position regulator is controlled, and described position adjustment controller 15 is connected with described stamp pad position regulator。
In the present embodiment, described stamp pad position regulator is three axis numerically controlled machine 16。
Further, described position adjustment controller 15 is the controller of three axis numerically controlled machine 16。
Time actually used, described stamp pad position regulator can also adopt other can complete the device of X, Y and the motion of three directions of Z axis or can the vertically movable device that moves up and down of in the vertical direction。
In actually used process, described horizontal stamp pad 4 can also adopt the fixed fixed platform in position。
In actually used process, the angle between central axis and the vertical plane of the beam-plasma that described plasma generator produces is not more than 45 °;Described printing distance adjusting means is adjusting apparatus 17 up and down described shower nozzle adjusted up and down along the central axis of described beam-plasma, and described distance detection unit 8 be to the distance detection device carrying out from the distance exported between horizontal stamp pad 4 of described shower nozzle detecting in real time along the central axis of described beam-plasma。
In the present embodiment, described upper and lower adjusting apparatus 17 is Z-direction adjusting apparatus。
Further, described upper and lower adjusting apparatus 17 is telescopic hydraulic cylinder。
In the present embodiment, the central axis of the beam-plasma that described plasma generator produces is in vertically to laying。Time actually used, can according to specific needs, the angle between central axis and the vertical plane of the beam-plasma that described plasma generator produces be adjusted accordingly。
In the present embodiment, described wire feeder includes top and is wound with the wire tray 6 of processed silk material 2, the wire feeder that processed silk material 2 is carried and the wire feed driving mechanism 14 that described wire feeder is driven, and described wire feeder is positioned at inside wire tray 6 and is connected with described wire feeder;Described wire tray 6 is coaxially mounted in rotating shaft and can rotate around described rotating shaft。
In the present embodiment, described Y-axis moving mechanism 22-2, X-axis travel mechanism 22-1 and described printing distance adjusting means form three-dimensional regulation support 22。Time actually used, in X-axis, Y-axis and Z-direction, the wire feed direction of processed silk material 2 and the position of plasma gun 13 are adjusted respectively by three-dimensional regulation support 22。
In the present embodiment, described wire feeder is wire pushing roller 19, described wire pushing roller 19 includes active roller group and return idler group, described active roller group includes two and is driven by wire feed driving mechanism 14 and active roller that rotation direction is contrary, it is contrary and lay respectively at the return idler of processed silk material 2 both sides that described return idler group includes two rotation directions, described active roller group is positioned at described return idler group side, and two described active rollers lay respectively at processed silk material 2 both sides。
In the present embodiment, described wire feed driving mechanism 14 is motor。In actually used process, by changing the rotating speed of described motor, the wire feed rate of described wire feeder is carried out simplicity, quickly adjusts。
Further, the wire feed rate of described wire feeder is at the uniform velocity。
During actual installation, described wire tray 6, described wire feeder and wire feed driving mechanism 14 are installed on Y-axis moving mechanism 22-2。
In the present embodiment, described monitoring system also includes the speed detection unit 18 that the wire feed rate of processed silk material 2 carries out detection in real time and the wire feed rate controller 20 that wire feed driving mechanism 14 is controlled, and described speed detection unit 18 is connected with wire feed rate controller 20。
Time actually used, described monitoring system also includes the displacement in X-axis, Y-axis and Z-direction of the horizontal stamp pad 4 carries out the first displacement detecting unit of detection, the second displacement detecting unit and triple motion detection unit respectively in real time, and described first displacement detecting unit, the second displacement detecting unit and triple motion detection unit are all connected with position adjustment controller 15。
In the present embodiment, described monitoring system also includes respectively to Y-axis moving mechanism 22-2 horizontal displacement in the Y-axis direction, carry out the 4th displacement detecting unit of detection, the 5th displacement detecting unit and the 6th displacement detecting unit in real time to X-axis travel mechanism 22-1 horizontal displacement in the X-axis direction with to the horizontal displacement in the Z-axis direction of upper and lower adjusting apparatus 17, described 4th displacement detecting unit and the 5th displacement detecting unit all with move horizontally controller 24 and be connected, described 6th displacement detecting unit is connected with printing distance regulable control device 10。
In the present embodiment, described plasma generator controller 7, gas flow controller 12, position adjustment controller 15, printing distance regulable control device 10 and wire feed rate controller 20 all connect with described data handling equipment, and described data handling equipment is PC 23。Described feeder 1 is carried out on off control by PC 23。
In the present embodiment, described ultrasonic detection device 28, three-dimensional laser scanner and machining set-up 27 are all connected with described data handling equipment, described ultrasonic detection device 28 and three-dimensional laser scanner are by its testing result synchronous driving to described data handling equipment, and described machining set-up 27, ultrasonic detection device 28 and three-dimensional laser scanner are controlled by described data handling equipment。Described three axle travel mechanisms 29 are controlled by described data handling equipment and it is connected with data handling equipment。
In the present embodiment, described machining set-up 27 includes polishing utensil and removal tool, and described removal tool is drilling tool or cutting tool。
During actual installation, described polishing utensil and removal tool can be installed on a Multifunctional knife rack dish。
A kind of mould plasma 3D rapid shaping reproducing method as shown in Figure 6, comprises the following steps:
Step one, mold defect detect: be first positioned on horizontal stamp pad 4 by mould 3 to be repaired, and make the forming surface of mould 3 to be repaired upward;Treat the defect existed on repairing mould 3 again to detect, and the position detecting each defect is recorded respectively;
The defect existed on described mould to be repaired 3 is local defect and/or surface abrasion defect, and described local defect is there is damaged or cracking in the forming surface of mould 3 to be repaired, and the forming surface that described surface abrasion defect is mould 3 to be repaired exists abrasion;
Step 2, mould repair: adopt described mould plasma 3D rapid shaping to remanufacture equipment, repair respectively to the defect existed on the mould to be repaired 3 detected in step one, and process is as follows:
Step 201, local defect reparation judge: according to the mold defect testing result in step one, judge whether to carry out local defect reparation: when step one detects there is described local defect in mould 3 to be repaired time, repairing mould 3 need to be treated and carry out local defect reparation, and enter step 202;Otherwise, step 203 is entered;
Step 202, local defect reparation: according to the mold defect testing result in step one, treat each local defect existed on repairing mould 3 and repair respectively, until completing the repair process of all local defects existed on mould 3 to be repaired;
On described mould to be repaired 3, the restorative procedure of all local defects is all identical;Treat any one the described local defect existed on repairing mould 3 when repairing, comprise the following steps:
Step 2021, rejected region are removed: adopt described machining set-up 27 to treat region residing for current repaired local defect on repairing mould 3 and be removed, it is thus achieved that the to be filled region corresponding with current repaired local defect;
Step 2022, plasma 3D print: adopt described plasma beam system of processing, region to be filled described in step 2021 is carried out plasma 3D printing, complete the repair process of current repaired local defect;
Step 203, surface abrasion defect repair judge: according to the mold defect testing result in step one, judge whether to carry out surface abrasion defect repair: when step one detects there is surface abrasion defect in mould 3 to be repaired time, repairing mould 3 need to be treated and carry out surface abrasion defect repair, and enter step 204;Otherwise, what complete mould 3 to be repaired remanufactures process;
Step 204, surface abrasion defect repair: according to the mold defect testing result in step one, adopt described plasma beam system of processing, and the eroded area treated in the forming surface of repairing mould 3 is repaired, and what complete mould 3 to be repaired remanufactures process。Wherein, when the eroded area in described forming surface is repaired, adopt described plasma beam system of processing that the eroded area in described forming surface carries out plasma 3D printing。
In the present embodiment, when carrying out mold defect detection in step one, ultrasonic detection device 28 or three-dimensional laser scanner that the horizontal stamp pad 4 of employing is provided above are treated the defect existed on repairing mould 3 and are detected。
Further, carrying out in mold defect detection process in step one, adopt ultrasonic detection device 28 to treat the defect existed on repairing mould 3 when detecting, ultrasonic detection method conventionally detects。Correspondingly, adopting described three-dimensional laser scanner to treat the defect existed on repairing mould 3 when detecting, Laser Scanning conventionally detects。
In the present embodiment, after step 2 completes mould repair, it is thus achieved that repair rear mold;Afterwards, adopt machining set-up 27 that described reparation rear mold is carried out polish。
The structure of described reparation rear mold is all identical with the structure of the mould finished product of mould 3 to be repaired and size with size, and the mould finished product of mould 3 to be repaired is the mould being absent from any defect。Thus, when adopting machining set-up 27 that described reparation rear mold is carried out polish, specifically the size of described reparation rear mold is carried out polish or the outer surface (specifically described forming surface) of described reparation rear mold is polished, by the size of described reparation rear mold is carried out the dimensional requirement that polish makes its size can meet mould finished product, by the requirement making its surface roughness can meet mould finished product that the outer surface of described reparation rear mold is polished, so that described reparation rear mold prodigiosin directly applies in production。
In the present embodiment, when adopting machining set-up 27 that described reparation rear mold is carried out polish, machining set-up 27 is adopted only the outer surface of described reparation rear mold to be polished so that it is surface roughness can meet the requirement of mould finished product。
In the present embodiment, when carrying out surface abrasion defect repair in step 204, process is as follows:
Step 2041, three-dimensional stereo model obtain and hierarchy slicing processes: adopt described data handling equipment and call the three-dimensional stereo model of eroded area in the forming surface of described image processing module acquisition mould 3 to be repaired, recall the hierarchy slicing module three-dimensional stereo model to described eroded area and carry out hierarchy slicing, and obtain multiple layering cross-sectional image;
Multiple described layering cross-sectional images are the image obtaining multiple layering cross section after the three-dimensional stereo model to described eroded area carries out hierarchy slicing, and multiple described layering cross sections are uniformly laid from the inside to the outside;
Step 2042, scanning pattern are filled: adopt data handling equipment and call described image processing module, described layering cross-sectional images multiple in step 2041 are respectively processed, and complete the scanning pattern filling process in multiple described layering cross section, it is thus achieved that the scanning pattern in multiple described layering cross sections;
Step 2043, printing path obtain: the described data handling equipment scanning pattern according to the multiple described layering cross section obtained in step 2042, it is thus achieved that the printing path in multiple described layering cross sections;The printing path in each described layering cross section is all identical with the scanning pattern in this layering cross section;
Step 2044, from the bottom to top successively printing: the printing path according to the multiple described layering cross section obtained in step 2043, successively described eroded area is printed from the bottom to top, make described eroded area be filled with by multiple shape layers stacking from the bottom to top;The quantity of described shape layer is identical with the quantity being layered cross section described in step one, the installation position of multiple described shape layers is all identical with the installation position one_to_one corresponding in multiple described layering cross sections and its thickness respectively, distance between the thickness of described shape layer with adjacent two described layering cross sections is identical, the printing path of the printing path in multiple described layering cross sections respectively multiple described shape layers in step 3;When described eroded area is printed, process is as follows:
Step 401, bottom print: described in move horizontally the controller 24 printing path according to current institute printing shaping layer acquired in step 2043, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto on mould 3 to be repaired by described plasma beam system of processing continuously;After sprayed molten melt drop (specifically flowing to the melted liquid stream on mould 3 to be repaired) all solidifies, complete the print procedure of current institute printing shaping layer;
In this step, current institute printing shaping layer is the shape layer being positioned at bottommost in multiple described shape layer;
Step 402, last layer print, and comprise the following steps:
Step 4021, printing distance regulate: horizontal stamp pad 4 in the vertical direction is once moved down and moved down height identical with the thickness of described shape layer, or controlling described printing distance adjusting means by printing distance regulable control device 10 drives described plasma generator in the vertical direction once to move up and move up highly identical with the thickness of described shape layer, and now described wire feeder and described plasma generator are synchronously performed movement;
Step 4022, print and synchronize temperature control: described in move horizontally the controller 24 printing path according to current institute printing shaping layer acquired in step 3, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto on the upper surface of the current printed described shape layer of the next one by described plasma beam system of processing continuously;After sprayed molten melt drop (specifically flowing to the melted liquid stream on the upper surface of the current printed described shape layer of the next one) all solidifications, complete the print procedure of current institute printing shaping layer;
In this step, in described plasma generator moving process in the horizontal plane synchronize with described wire feeder, carrying out detecting in real time and by detected temperature information synchronous driving to printing distance regulable control device 10 to the upper surface temperature of the current printed described shape layer of the next one by temperature detecting unit 9, the distance simultaneously detected between the unit 8 outlet and horizontal stamp pad 4 to described shower nozzle by distance carries out detection in real time and by the range information synchronous driving detected to printing apart from regulable control device 10;Described print temperature information that distance regulable control device 10 detects according to temperature detecting unit 9 and be adjusted by controlling the distance between described printing distance adjusting means outlet and horizontal stamp pad 4 to described shower nozzle, making 0.6 times of the upper surface temperature of the currently printed described shape layer of the next one material fusing point not higher than described printed material;
In the moving process in the horizontal plane synchronize with described wire feeder of plasma generator described in step 401 and step 4022, processed silk material 2 is sent by described wire feeder continuously, the melting end of processed silk material 2 is melted by the beam-plasma simultaneously produced by described plasma beam system of processing, and makes the molten melt drop that the fusing of described melting end is formed continuously and form liquid stream;Described liquid stream is distributed in described beam-plasma, the plasma beam of the melted liquid stream of band in being formed;
Step 403, repeatedly repetition step 402, until completing the print procedure of all shape layers of described eroded area。
In actually used process, described wire feeder is synchronous wire feeding device。Further, described melted liquid stream moves along the central axis of described beam-plasma under the effect of described working gas (beam-plasma includes unionized working gas)。
When the plasma beam of melted for interior band liquid stream is sprayed onto on mould 3 to be repaired by plasma beam system of processing continuously described in step 401, the melted liquid stream of interior band synchronizes to flow on die matrix 3-1 (specifically the outer surface of mould 3 to be repaired)。When the plasma beam of melted for interior band liquid stream is sprayed onto on the upper surface of the current printed described shape layer of the next one by plasma beam system of processing continuously described in step 4022, the melted liquid stream of interior band synchronizes to flow on the upper surface of the current printed described shape layer of the next one。
In actually used process, when step 4021 carries out printing distance adjustment, controlling described printing distance adjusting means by printing distance regulable control device 10 drives described plasma generator in the vertical direction once to move up, after described plasma generator moves into place, the height of described plasma generator is recorded, and now the height of described plasma generator is the basis printing height of current institute printing shaping layer;When step 402 carries out next layer of printing, after step 4022 completing print and synchronize temperature control, also need to control described printing distance adjusting means by printing distance regulable control device 10, described plasma generator in the vertical direction is driven to move up and down, until being that in step 4021, the basis of current institute printing shaping layer prints height by the height adjustment of described plasma generator。
In the present embodiment, when mould 3 to be repaired is positioned on horizontal stamp pad 4 by step one, also needs to treat repairing mould 3 by described temporary fixing piece and fix temporarily。
Actual add man-hour, described printed material is that mould 3 material to be repaired is identical or the material of similar nature, such as the composite of aluminium alloy, copper alloy, cast iron, steel, titanium alloy, hard alloy or enhancing, the composite of described enhancing is that granule strengthens or the aluminum matrix composite of whisker reinforcement, Cu-base composites, iron base composite material, base steel composite material or titanium matrix composite。
Thus, described printed material is aluminium alloy, copper alloy, cast iron, steel, titanium alloy or hard alloy。Further, described printed material can also strengthen or the aluminum matrix composite of whisker reinforcement (i.e. whisker dispersion-strengtherning), Cu-base composites, iron base composite material, base steel composite material or titanium matrix composite for granule。
In the present embodiment, when step 2041 obtains the three-dimensional stereo model of described eroded area, three-dimensional stereo model according to mould 3 to be repaired and the three-dimensional stereo model of the mould finished product (i.e. certified products) of mould to be repaired 3, obtain the three-dimensional stereo model of described eroded area。
In the present embodiment, when step 2044 successively prints from the bottom to top, process is as follows: the printing path according to the multiple described layering cross section obtained in step 2041, described eroded area is successively printed by mould 3 to be repaired from the bottom to top, it is thus achieved that the eroded area stacking from the inside to the outside by multiple shape layers repairs structure;Shape layer described herein is the shape layer that described eroded area repairs in structure, the quantity of described shape layer is identical with the quantity being layered cross section described in step 2041, the installation position one_to_one corresponding in multiple described layering cross sections and its thickness are all identical with step 2041 respectively for the installation position of multiple described shape layers, distance between the thickness of described shape layer two described layering cross sections adjacent with step 2041 is identical, the printing path of the printing path in multiple described layering cross sections respectively multiple described shape layers in step 2043。
In the present embodiment, before step 2044 successively prints from the bottom to top, data handling equipment described in step 2041 is first according to the material fusing point pre-build and printing range data storehouse, and combine the Material Name of described printed material pre-entered by parameter input unit, the basis of described printed material is printed distance and is determined;Described parameter input unit connects with described data handling equipment;
In described material fusing point and printing range data storehouse, storage has the material fusing point of various material and prints range information, and the material fusing point of every kind of described material and printing range information all include the title of this kind of material, fusing point and basis printing distance;It is 5mm~1000mm that described basis prints distance, and material fusing point is more high, and it is more near that basis prints distance;
Carrying out in step 401 before bottom printing, the distance exported between horizontal stamp pad 4 of described shower nozzle is adjusted to described basis printing distance according to the range information detected apart from detection unit 8 and by controlling described printing distance adjusting means by described printing distance regulable control device 10;In step 401 in bottom print procedure, the distance between outlet and the horizontal stamp pad 4 of described shower nozzle is that described basis prints distance;
When step 4021 carries out printing distance adjustment, horizontal stamp pad 4 in the vertical direction is once moved down and is moved down height identical with the thickness of described shape layer;Before step 4022 carrying out print and synchronize temperature control, described printing distance regulable control device 10 detects, according to distance, range information the moving down number of times and moving down highly every time in conjunction with horizontal stamp pad 4 that unit 8 detects, and by controlling described printing distance adjusting means, the distance between outlet and the upper surface of the currently printed described shape layer of the next one of described shower nozzle is adjusted to described basis printing distance;When distance between outlet and the horizontal stamp pad 4 of described shower nozzle is adjusted by step 4022, described print temperature information that distance regulable control device 10 detects according to temperature detecting unit 9 and combine the range information that distance detection unit 8 detects the distance between outlet and the horizontal stamp pad 4 of described shower nozzle is adjusted, making the upper surface temperature of the current printed described shape layer of the next one control between 0.1 times~0.6 times of the material fusing point at described printed material;Further, when the distance between outlet and the horizontal stamp pad 4 of described shower nozzle is adjusted, the amplitude of accommodation is 5mm~60mm, and material fusing point is more high, and the amplitude of accommodation is more little。
In the present embodiment, before step 2044 successively prints from the bottom to top, data handling equipment described in step 2041 is first according to the gas flow pre-build and wire feed rate data base, and in conjunction with the thickness of described shape layer set in advance, the base gas flow of air supply pipe 5 and the wire feed rate of described wire feeder are determined;
Described gas flow and wire feed rate databases contain the wire feed rate needed for the shape layer of multiple different thickness and base gas flow;Described base gas flow is 50ml/min~15000ml/min, and the wire feed rate of described wire feeder is more big, and described base gas flow is more big;
In the moving process in the horizontal plane synchronize with described wire feeder of plasma generator described in step 401 and step 4022, the wire feed rate of described wire feeder is carried out detection in real time and detected synchronizing information is sent to wire feed rate controller 20 by described speed detection unit 18, described wire feed rate controller 20 is according to the wire feed rate of predetermined described wire feeder and in conjunction with 18 detection information of speed detection unit, wire feed driving mechanism 14 is controlled, and the wire feed rate making described wire feeder is all identical with predetermined wire feed rate;
Carrying out in step 401 before bottom printing, the gas flow of air supply pipe 5 is adjusted to described base gas flow according to 11 detection information of detection of gas flow rate unit and by controlling flow control valve 25 by described gas flow controller 12;In step 401 in bottom print procedure, the gas flow of described air supply pipe 5 is described base gas flow;
Step 4022 carries out print and synchronize in temperature control process, described gas flow controller 12 is according to 11 detection information of detection of gas flow rate unit and combines distance detection 8 detecting distance information of unit, and by controlling flow control valve 25, the gas flow of air supply pipe 5 carries out increase and decrease adjustment;Further, the distance between outlet and the horizontal stamp pad 4 of described shower nozzle is more big, and the gas flow of described air supply pipe 5 is more big。
In the present embodiment, when obtaining the three-dimensional stereo model of described eroded area, utilize the three-dimensional graphics software such as pro/e, UG, CATIA to design the three-dimensional stereo model (i.e. three-dimensional entity model) of described eroded area, or utilize reverse engineering to solve the three-dimensional stereo model of described eroded area;Again through described hierarchy slicing module, this three-dimensional stereo model is carried out hierarchy slicing, and obtain the outline data in each cross section, generated by outline data and fill scanning pattern, the corresponding printing path (i.e. the printing path in each layering cross section) obtaining described plasma beam system of processing。Thus, the method adopted in step 2041 and step 2042 is identical with the method that conventional laser selective melting molding or electron beam selective melting molding adopt。Afterwards, carry out in X and Y direction motor process in the horizontal plane according to the printing path obtained, the interior plasma beam with molten melt drop is sprayed onto on mould 3 to be repaired or on the upper surface of the current printed described shape layer of the next one by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of a shape layer;Then, described three axis numerically controlled machine 16 declines in the Z-axis direction, successively prints, thus completing the print procedure of 3 d part。
In the present embodiment, in the moving process in the horizontal plane synchronize with described wire feeder of plasma generator described in step 401 and step 4022, the diameter of described processed silk material 2 is 0.02mm~10mm, and the wire feed rate of described processed silk material 2 is 0.1m~10m/min。Wherein, the diameter of processed silk material 2 is more big, and wire feed rate is more slow;And the material fusing point of processed silk material 2 is more high, wire feed rate is more slow。
Distance between melting end and the print job face of described processed silk material 2 is 5mm~1000mm。Wherein, print job face is the plane residing for current institute printing shaping layer, and the distance between melting end and the described print job face of processed silk material 2 is wire feed height。
Before successively printing from the inside to the outside in step 2044, the distance between the melting end of processed silk material 4 and print job face being adjusted to wire feed height set in advance, described wire feed height is 5mm~1000mm;In step 2044 from the inside to the outside successively in print procedure, the melting end height of processed silk material 2 is constant。In step 401, the distance between melting end and the die matrix 3-1 top of processed silk material 2 is wire feed height, and in step 4022, the distance between melting end and a current printed upper described shape layer upper surface of processed silk material 2 is wire feed height。
Owing to horizontal stamp pad 4 is the mobile platform being arranged on stamp pad position regulator, thus the printing path in each described layering cross section acquired in step 2043 can also be the machining path of three axis numerically controlled machine 16, now described plasma beam system of processing is not moved in the horizontal plane, but by horizontal stamp pad 4 in horizontal on be moved, thus completing the print procedure of each shape layer。
In the present embodiment, adopting described plasma beam system of processing in step 2022, when region to be filled described in step 2021 carries out plasma 3D printing, process is as follows:
Step A, three-dimensional stereo model obtain and hierarchy slicing processes: the three-dimensional stereo model according to the mould finished product of mould 3 to be repaired, adopt data handling equipment and call the three-dimensional stereo model in the described region to be filled of image processing module acquisition, recall the hierarchy slicing module three-dimensional stereo model to described region to be filled and carry out hierarchy slicing, and obtain multiple layering cross-sectional image;
In this step, multiple described layering cross-sectional images are the image obtaining multiple layering cross section after the three-dimensional stereo model to described region to be filled carries out hierarchy slicing, and multiple described layering cross sections are uniformly laid from the bottom to top;
Step B, scanning pattern are filled: adopt data handling equipment and call described image processing module, described layering cross-sectional images multiple in step A are respectively processed, and complete the scanning pattern filling process in multiple described layering cross section, it is thus achieved that the scanning pattern in multiple described layering cross sections;
Step C, printing path obtain: the described data handling equipment scanning pattern according to the multiple described layering cross section obtained in step B, it is thus achieved that the printing path in multiple described layering cross sections;The printing path in each described layering cross section is all identical with the scanning pattern in this layering cross section;
Step D, from the bottom to top successively printing: the printing path according to the multiple described layering cross section obtained in step C, successively described region to be filled is printed from the bottom to top, make described region to be filled be filled with by multiple shape layers stacking from the bottom to top;The quantity of described shape layer is identical with the quantity being layered cross section described in step A, the installation position of multiple described shape layers is all identical with the installation position one_to_one corresponding in multiple described layering cross sections and its thickness respectively, distance between the thickness of described shape layer two described layering cross sections adjacent with step A is identical, the printing path of multiple described shape layers in the printing path in multiple described layering cross sections respectively described region to be filled in step C;In described region to be filled, the Method of printing of multiple described shape layers is all identical;When described region to be filled is printed, process is as follows:
Step D1, bottom print: described in move horizontally the controller 24 printing path according to current institute printing shaping layer acquired in step C, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto in described region to be filled by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of current institute printing shaping layer in described region to be filled;
In this step, current institute printing shaping layer is the shape layer being positioned at bottommost in described region to be filled in multiple described shape layers;
Step D2, last layer print, and comprise the following steps:
Step D21, print distance regulate: horizontal stamp pad 4 in the vertical direction is once moved down and moves down height identical with the thickness of described shape layer, or by print distance regulable control device 10 control described printing distance adjusting means drive described plasma generator in the vertical direction once move up and move up height identical with the thickness of described shape layer;
Step D22, printing and synchronize temperature control: described in move horizontally the controller 24 printing path according to current institute printing shaping layer acquired in step C, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto on the upper surface of the current printed described shape layer of the next one by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of current institute printing shaping layer;
In this step, in described plasma generator moving process in the horizontal plane synchronize with described wire feeder, carrying out detecting in real time and by detected temperature information synchronous driving to printing distance regulable control device 10 to the upper surface temperature of the described shape layer of the next one current printed in described region to be filled by temperature detecting unit 9, the distance simultaneously detected between the unit 8 outlet and horizontal stamp pad 4 to described shower nozzle by distance carries out detection in real time and by the range information synchronous driving detected to printing apart from regulable control device 10;Described print temperature information that distance regulable control device 10 detects according to temperature detecting unit 9 and be adjusted by controlling the distance between described printing distance adjusting means outlet and horizontal stamp pad 4 to described shower nozzle, making 0.6 times of the upper surface temperature of the currently printed described shape layer of the next one material fusing point not higher than described printed material;
In the moving process in the horizontal plane synchronize with described wire feeder of plasma generator described in step D1 and step D22, processed silk material 2 is sent by described wire feeder continuously, the melting end of processed silk material 2 is melted by the beam-plasma simultaneously produced by described plasma beam system of processing, and makes the molten melt drop that the fusing of described melting end is formed continuously and form liquid stream;Described liquid stream is distributed in described beam-plasma, the plasma beam of the melted liquid stream of band in being formed;
Step D3, repeatedly repetition step D2, until completing the print procedure of all shape layers in described region to be filled。
In the present embodiment, when the plasma beam of melted for interior band liquid stream is sprayed onto on mould 3 to be repaired by plasma beam system of processing continuously described in step D1, the melted liquid stream of interior band synchronizes to flow on mould 3 to be repaired。When the plasma beam of melted for interior band liquid stream is sprayed onto on the upper surface of the current printed described shape layer of the next one by plasma beam system of processing continuously described in step D22, the melted liquid stream of interior band synchronizes to flow on the upper surface of the current printed described shape layer of the next one。
In the present embodiment, before step D successively prints from the bottom to top, data handling equipment described in step A is first according to the material fusing point pre-build and printing range data storehouse, and combine the Material Name of described printed material pre-entered by parameter input unit, the basis of described printed material is printed distance and is determined;Described parameter input unit connects with described data handling equipment;
Carrying out in step D1 before bottom printing, the distance between outlet and the horizontal stamp pad 4 of described shower nozzle is adjusted to described basis printing distance by controlling described printing distance adjusting means by described printing distance regulable control device 10;In step D1 in bottom print procedure, the distance between outlet and the horizontal stamp pad 4 of described shower nozzle is that described basis prints distance;
Before carrying out in step D22 printing and synchronizing temperature control, the distance between the upper surface exporting the described shape layer of the next one current printed with described region to be filled of described shower nozzle is adjusted to described basis printing distance apart from regulable control device 10 by controlling described printing distance adjusting means by described printing;When distance between outlet and the horizontal stamp pad 4 of described shower nozzle is adjusted by step D22, also need by temperature-detecting device, the upper surface temperature of the described shape layer of the next one current printed in described region to be filled to be detected in real time, the distance exported between horizontal stamp pad 4 of described shower nozzle is adjusted by the described temperature information detected according to described temperature-detecting device apart from regulable control device 10 that prints, the upper surface temperature making the described shape layer of the next one current printed in described region to be filled controls between 0.1 times~0.6 times of the material fusing point at described printed material;Further, when the distance between outlet and the horizontal stamp pad 4 of described shower nozzle is adjusted, the amplitude of accommodation is 5mm~60mm, and the material fusing point of described printed material is more high, and the amplitude of accommodation is more little。
In the present embodiment, before step D successively prints from the bottom to top, data handling equipment described in step A is first according to the gas flow pre-build and wire feed rate data base, and in conjunction with the thickness of described shape layer set in advance, the base gas flow of air supply pipe 5 and the wire feed rate of described wire feeder are determined;
Described gas flow and wire feed rate databases contain the wire feed rate needed for the shape layer of multiple different thickness and base gas flow;Described base gas flow is 50ml/min~15000ml/min, and the wire feed rate of described wire feeder is more big, and described base gas flow is more big;
In the moving process in the horizontal plane synchronize with described wire feeder of plasma generator described in step D1 and step D22, the wire feed rate of described wire feeder is carried out detection in real time and detected synchronizing information is sent to wire feed rate controller 20 by described speed detection unit 18, described wire feed rate controller 20 is according to the wire feed rate of predetermined described wire feeder and in conjunction with 18 detection information of speed detection unit, wire feed driving mechanism 14 is controlled, and the wire feed rate making described wire feeder is all identical with predetermined wire feed rate;
Carrying out in step D1 before bottom printing, the gas flow of air supply pipe 5 is adjusted to described base gas flow according to 11 detection information of detection of gas flow rate unit and by controlling flow control valve 25 by described gas flow controller 12;In step D1 in bottom print procedure, the gas flow of described air supply pipe 5 is described base gas flow;
Step D22 carries out print and synchronize in temperature control process, described gas flow controller 12 is according to 11 detection information of detection of gas flow rate unit and combines distance detection 8 detecting distance information of unit, and by controlling flow control valve 25, the gas flow of air supply pipe 5 carries out increase and decrease adjustment;Further, the distance between outlet and the horizontal stamp pad 4 of described shower nozzle is more big, and the gas flow of described air supply pipe 5 is more big。
Embodiment 2
In the present embodiment, as it is shown in fig. 7, the mould plasma 3D rapid shaping adopted remanufactures equipment as different from Example 1: the angle between described spout 13-5 and gun body 13-1 central axis is 30 °~45 °。
So, after the direction of described beam-plasma being changed by spout 13-5, can effectively reduce the plasma jet antianode nozzle 13-2 thermic load produced and impact, improve anode ablation situation。
In the present embodiment, it is all identical with embodiment 1 that adopted mould plasma 3D rapid shaping remanufactures the remainder structure of equipment, annexation and operation principle。
In the present embodiment, the mould plasma 3D rapid shaping reproducing method adopted is identical with embodiment 1。
The above; it it is only presently preferred embodiments of the present invention; not the present invention is imposed any restrictions, every any simple modification, change and equivalent structure change above example made according to the technology of the present invention essence, all still fall within the protection domain of technical solution of the present invention。

Claims (10)

1. a mould plasma 3D rapid shaping remanufactures equipment, it is characterised in that: by monitoring system, plasma beam system of processing, treat machining set-up (27) that repairing mould (3) is machined out, the horizontal stamp pad (4) placed for mould to be repaired (3) and treat the temporary fixing piece that repairing mould (3) carries out fixing temporarily and form;Described machining set-up (27) is positioned at horizontal stamp pad (4) top;Described temporary fixing piece is laid on horizontal stamp pad (4);
Described plasma beam system of processing is by being provided with shower nozzle and for producing the plasma generator of beam-plasma, forming for the feeder (1) of described plasma generator offer working gas, the wire feeder being used for sending continuously processed silk material (2) and the print position adjusting apparatus that print position is adjusted, described plasma generator and described wire feeder are respectively positioned on horizontal stamp pad (4) top, and described wire feeder is positioned at described plasma generator side;Described feeder (1) is connected with the air inlet opened on described plasma generator by air supply pipe (5);The outer end of described processed silk material (2) is melting end, described melting end be positioned at described shower nozzle outlet lower section and its be positioned on the central axis of described beam-plasma;Described print position adjusting apparatus includes driving the described plasma generator horizontally moving device that in the horizontal plane move Tong Bu with described wire feeder and driving described plasma generator, described wire feeder and described horizontally moving device synchronizing moving and tackle the printing distance adjusting means that the distance between the outlet of described shower nozzle and horizontal stamp pad (4) is adjusted mutually, described plasma generator and described wire feeder are installed on described horizontally moving device, and described horizontally moving device is arranged in described printing distance adjusting means;
What described monitoring system included described horizontally moving device is controlled moves horizontally controller (24), described plasma beam system of processing Working position place temperature on mould to be repaired (3) is carried out the temperature detecting unit (9) of detection in real time, distance detection unit (8) that distance between outlet and the horizontal stamp pad (4) of described shower nozzle is carried out detection in real time and printing distance regulable control device (10) that described printing distance adjusting means is controlled, the described controller (24) that moves horizontally is connected with described horizontally moving device, described distance regulable control device (10) that prints is connected with described printing distance adjusting means, described temperature detecting unit (9) and distance detection unit (8) are all connected apart from regulable control device (10) with printing;Described temperature detecting unit (9) forms temperature control device with printing distance regulable control device (10)。
2. a kind of mould plasma 3D rapid shaping described in claim 1 remanufactures equipment, it is characterized in that: described mould to be repaired (3) is for exist local defect and/or the mould of surface abrasion defect, described local defect is there is damaged or cracking in the forming surface of mould to be repaired (3), and the forming surface that described surface abrasion defect is mould to be repaired (3) exists abrasion;Being provided above of described horizontal stamp pad (4) treats ultrasonic detection device (28) or the three-dimensional laser scanner that the upper defect existed of repairing mould (3) carries out detecting。
3. a kind of mould plasma 3D rapid shaping described in claim 1 or 2 remanufactures equipment, it is characterized in that: described plasma generator includes plasma gun (13), described shower nozzle is the anode nozzle (13-2) of plasma gun (13) front end;Described plasma gun (13) includes having the gun body (13-1) of described air inlet, being positioned at the anode nozzle (13-2) of gun body (13-1) dead ahead and be plugged in the negative electrode (13-3) of gun body (13-1), described anode nozzle (13-2) is positioned at negative electrode (13-3) front side, described arc chamber (13-4) is positioned at negative electrode (13-3) front side and it is positioned at the posterior medial of anode nozzle (13-2), and the front inner of described anode nozzle (13-2) is spout (13-5);Described anode nozzle (13-2), negative electrode (13-3) and arc chamber (13-4) are all laid in coaxial with gun body (13-1);Described air inlet is positioned at gun body (13-1) rear side, described spout (13-5) and gun body (13-1) in coaxial laying or and gun body (13-1) central axis between angle be 30 °~45 °;
Detection of gas flow rate unit (11) that plasma generator controller (7) that described monitoring system also includes described plasma generator is controlled, gas flow to air supply pipe (5) carry out detection in real time and the gas flow controller (12) that the upper flow control valve (25) installed of air supply pipe (5) is controlled, described plasma generator controller (7) is connected with described plasma generator, and described detection of gas flow rate unit (11) is connected with gas flow controller (12)。
4. a kind of mould plasma 3D rapid shaping described in claim 1 or 2 remanufactures equipment, it is characterized in that: described wire feeder includes top and is wound with the wire tray (6) of processed silk material (2), the wire feeder that processed silk material (2) is carried and the wire feed driving mechanism (14) that described wire feeder is driven, described wire feeder is positioned at wire tray (6) inner side and is connected with described wire feeder;Described wire tray (6) is coaxially mounted in rotating shaft and can rotate around described rotating shaft。
5. a kind of mould plasma 3D rapid shaping described in claim 4 remanufactures equipment, it is characterized in that: described wire feeder is wire pushing roller (19), described wire pushing roller (19) includes active roller group and return idler group, described active roller group includes two and is driven by wire feed driving mechanism (14) and active roller that rotation direction is contrary, it is contrary and lay respectively at the return idler of processed silk material (2) both sides that described return idler group includes two rotation directions, described active roller group is positioned at described return idler group side, two described active rollers lay respectively at processed silk material (2) both sides;
Described monitoring system also includes the speed detection unit (18) that the wire feed rate of processed silk material (2) carries out detection in real time and the wire feed rate controller (20) that wire feed driving mechanism (14) is controlled, and described speed detection unit (18) is connected with wire feed rate controller (20)。
6. a kind of mould plasma 3D rapid shaping described in claim 1 or 2 remanufactures equipment, it is characterised in that: the angle between central axis and the vertical plane of the beam-plasma that described plasma generator produces is not more than 45 °;Described printing distance adjusting means is the adjusting apparatus up and down (17) described shower nozzle adjusted up and down along the central axis of described beam-plasma, and described distance detection unit (8) be to the distance detection device carrying out from the distance exported between horizontal stamp pad (4) of described shower nozzle detecting in real time along the central axis of described beam-plasma;
Described horizontal stamp pad (4) is for be arranged on stamp pad position regulator and the mobile platform that can move up and down;
Described monitoring system also includes the position adjustment controller (15) that described stamp pad position regulator is controlled, and described position adjustment controller (15) is connected with described stamp pad position regulator。
7. one kind utilizes and remanufactures equipment as claimed in claim 1 mould carries out the method that plasma 3D rapid shaping remanufactures, it is characterised in that: the method comprises the following steps:
Step one, mold defect detect: be first positioned on horizontal stamp pad (4) by mould to be repaired (3), and make the forming surface of mould to be repaired (3) upward;Treat the upper defect existed of repairing mould (3) again to detect, and the position detecting each defect is recorded respectively;
The upper defect existed of described mould to be repaired (3) is local defect and/or surface abrasion defect, described local defect is there is damaged or cracking in the forming surface of mould to be repaired (3), and the forming surface that described surface abrasion defect is mould to be repaired (3) exists abrasion;
Step 2, mould repair: adopt described mould plasma 3D rapid shaping to remanufacture equipment, repair respectively to the upper defect existed of the mould to be repaired (3) detected in step one, and process is as follows:
Step 201, local defect reparation judge: according to the mold defect testing result in step one, judge whether to carry out local defect reparation: when step one detects there is described local defect in mould to be repaired (3) time, repairing mould (3) need to be treated and carry out local defect reparation, and enter step 202;Otherwise, step 203 is entered;
Step 202, local defect reparation: according to the mold defect testing result in step one, treat the upper each local defect existed of repairing mould (3) to repair respectively, until completing the repair process of the upper all local defects existed of mould to be repaired (3);
The restorative procedure of the upper all local defects of described mould to be repaired (3) is all identical;Treat repairing mould (3) upper any one described local defect existed when repairing, comprise the following steps:
Step 2021, rejected region are removed: adopt described machining set-up (27) to treat region residing for upper current the repaired local defect of repairing mould (3) and be removed, it is thus achieved that the to be filled region corresponding with current repaired local defect;
Step 2022, plasma 3D print: adopt described plasma beam system of processing, region to be filled described in step 2021 is carried out plasma 3D printing, complete the repair process of current repaired local defect;
Step 203, surface abrasion defect repair judge: according to the mold defect testing result in step one, judge whether to carry out surface abrasion defect repair: when step one detects there is surface abrasion defect in mould to be repaired (3) time, repairing mould (3) need to be treated and carry out surface abrasion defect repair, and enter step 204;Otherwise, what complete mould to be repaired (3) remanufactures process;
Step 204, surface abrasion defect repair: according to the mold defect testing result in step one, adopt described plasma beam system of processing, the eroded area treated in the forming surface of repairing mould (3) is repaired, and what complete mould to be repaired (3) remanufactures process。
8. described in claim 7, mould is carried out the method that plasma 3D rapid shaping remanufactures, it is characterized in that: when step one carries out mold defect detection, adopt ultrasonic detection device (28) that horizontal stamp pad (4) is provided above or three-dimensional laser scanner to treat the upper defect existed of repairing mould (3) and detect;
After step 2 completes mould repair, it is thus achieved that repair rear mold;Afterwards, adopt machining set-up (27) that described reparation rear mold is carried out polish。
9. described in claim 7 or 8, mould is carried out the method that plasma 3D rapid shaping remanufactures, it is characterised in that: when carrying out surface abrasion defect repair in step 204, process is as follows:
Step 2041, three-dimensional stereo model obtain and hierarchy slicing processes: adopt described data handling equipment and call the three-dimensional stereo model of eroded area in the forming surface of described image processing module acquisition mould to be repaired (3), recall the hierarchy slicing module three-dimensional stereo model to described eroded area and carry out hierarchy slicing, and obtain multiple layering cross-sectional image;
Multiple described layering cross-sectional images are the image obtaining multiple layering cross section after the three-dimensional stereo model to described eroded area carries out hierarchy slicing, and multiple described layering cross sections are uniformly laid from the inside to the outside;
Step 2042, scanning pattern are filled: adopt data handling equipment and call described image processing module, described layering cross-sectional images multiple in step 2041 are respectively processed, and complete the scanning pattern filling process in multiple described layering cross section, it is thus achieved that the scanning pattern in multiple described layering cross sections;
Step 2043, printing path obtain: the described data handling equipment scanning pattern according to the multiple described layering cross section obtained in step 2042, it is thus achieved that the printing path in multiple described layering cross sections;The printing path in each described layering cross section is all identical with the scanning pattern in this layering cross section;
Step 2044, from the bottom to top successively printing: the printing path according to the multiple described layering cross section obtained in step 2043, successively described eroded area is printed from the bottom to top, make described eroded area be filled with by multiple shape layers stacking from the bottom to top;The quantity of described shape layer is identical with the quantity being layered cross section described in step one, the installation position of multiple described shape layers is all identical with the installation position one_to_one corresponding in multiple described layering cross sections and its thickness respectively, distance between the thickness of described shape layer with adjacent two described layering cross sections is identical, the printing path of the printing path in multiple described layering cross sections respectively multiple described shape layers in step 3;When described eroded area is printed, process is as follows:
Step 401, bottom print: described in move horizontally the controller (24) printing path according to current institute printing shaping layer acquired in step 2043, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto on mould to be repaired (3) by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of current institute printing shaping layer;
In this step, current institute printing shaping layer is the shape layer being positioned at bottommost in multiple described shape layer;
Step 402, last layer print, and comprise the following steps:
Step 4021, print distance regulate: horizontal stamp pad (4) in the vertical direction is once moved down and moves down height identical with the thickness of described shape layer, or by print distance regulable control device (10) control described printing distance adjusting means drive described plasma generator in the vertical direction once move up and move up height identical with the thickness of described shape layer;
Step 4022, print and synchronize temperature control: described in move horizontally the controller (24) printing path according to current institute printing shaping layer acquired in step 3, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto on the upper surface of the current printed described shape layer of the next one by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of current institute printing shaping layer;
In this step, in described plasma generator moving process in the horizontal plane synchronize with described wire feeder, carry out detecting in real time and by detected temperature information synchronous driving to printing apart from regulable control device (10) to the upper surface temperature of the current printed described shape layer of the next one by temperature detecting unit (9), detect the distance between the unit (8) outlet and horizontal stamp pad (4) to described shower nozzle by distance simultaneously and carry out detection in real time the range information synchronous driving extremely printing distance regulable control device (10) that will detect;Described print temperature information that distance regulable control device (10) detects according to temperature detecting unit (9) and be adjusted by controlling the distance between described printing distance adjusting means outlet and horizontal stamp pad (4) to described shower nozzle, making 0.6 times of the upper surface temperature of the currently printed described shape layer of the next one material fusing point not higher than described printed material;
In the moving process in the horizontal plane synchronize with described wire feeder of plasma generator described in step 401 and step 4022, processed silk material (2) is sent by described wire feeder continuously, the melting end of processed silk material (2) is melted by the beam-plasma simultaneously produced by described plasma beam system of processing, and makes the molten melt drop that the fusing of described melting end is formed continuously and form liquid stream;Described liquid stream is distributed in described beam-plasma, the plasma beam of the melted liquid stream of band in being formed;
Step 403, repeatedly repetition step 402, until completing the print procedure of all shape layers of described eroded area。
10. described in claim 7 or 8, mould is carried out the method that plasma 3D rapid shaping remanufactures, it is characterized in that: step 2022 adopts described plasma beam system of processing, when region to be filled described in step 2021 carries out plasma 3D printing, process is as follows:
Step A, three-dimensional stereo model obtain and hierarchy slicing processes: the three-dimensional stereo model according to the mould finished product of mould to be repaired (3), adopt data handling equipment and call the three-dimensional stereo model in the described region to be filled of image processing module acquisition, recall the hierarchy slicing module three-dimensional stereo model to described region to be filled and carry out hierarchy slicing, and obtain multiple layering cross-sectional image;
In this step, multiple described layering cross-sectional images are the image obtaining multiple layering cross section after the three-dimensional stereo model to described region to be filled carries out hierarchy slicing, and multiple described layering cross sections are uniformly laid from the bottom to top;
Step B, scanning pattern are filled: adopt data handling equipment and call described image processing module, described layering cross-sectional images multiple in step A are respectively processed, and complete the scanning pattern filling process in multiple described layering cross section, it is thus achieved that the scanning pattern in multiple described layering cross sections;
Step C, printing path obtain: the described data handling equipment scanning pattern according to the multiple described layering cross section obtained in step B, it is thus achieved that the printing path in multiple described layering cross sections;The printing path in each described layering cross section is all identical with the scanning pattern in this layering cross section;
Step D, from the bottom to top successively printing: the printing path according to the multiple described layering cross section obtained in step C, successively described region to be filled is printed from the bottom to top, make described region to be filled be filled with by multiple shape layers stacking from the bottom to top;The quantity of described shape layer is identical with the quantity being layered cross section described in step A, the installation position of multiple described shape layers is all identical with the installation position one_to_one corresponding in multiple described layering cross sections and its thickness respectively, distance between the thickness of described shape layer two described layering cross sections adjacent with step A is identical, the printing path of multiple described shape layers in the printing path in multiple described layering cross sections respectively described region to be filled in step C;In described region to be filled, the Method of printing of multiple described shape layers is all identical;When described region to be filled is printed, process is as follows:
Step D1, bottom print: described in move horizontally the controller (24) printing path according to current institute printing shaping layer acquired in step C, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto in described region to be filled by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of current institute printing shaping layer in described region to be filled;
In this step, current institute printing shaping layer is the shape layer being positioned at bottommost in described region to be filled in multiple described shape layers;
Step D2, last layer print, and comprise the following steps:
Step D21, print distance regulate: horizontal stamp pad (4) in the vertical direction is once moved down and moves down height identical with the thickness of described shape layer, or by print distance regulable control device (10) control described printing distance adjusting means drive described plasma generator in the vertical direction once move up and move up height identical with the thickness of described shape layer;
Step D22, printing and synchronize temperature control: described in move horizontally the controller (24) printing path according to current institute printing shaping layer acquired in step C, described horizontally moving device is controlled and drives that described plasma generator is Tong Bu with described wire feeder to be moved in the horizontal plane;In described plasma generator moving process in the horizontal plane synchronize with described wire feeder, the interior plasma beam with molten melt drop is sprayed onto on the upper surface of the current printed described shape layer of the next one by described plasma beam system of processing continuously;After sprayed molten melt drop all solidifies, complete the print procedure of current institute printing shaping layer;
In this step, in described plasma generator moving process in the horizontal plane synchronize with described wire feeder, carry out detecting in real time and by detected temperature information synchronous driving to printing distance regulable control device (10) to the upper surface temperature of the described shape layer of the next one current printed in described region to be filled by temperature detecting unit (9), detect the distance between the unit (8) outlet and horizontal stamp pad (4) to described shower nozzle by distance simultaneously and carry out detection in real time the range information synchronous driving extremely printing distance regulable control device (10) that will detect;Described print temperature information that distance regulable control device (10) detects according to temperature detecting unit (9) and be adjusted by controlling the distance between described printing distance adjusting means outlet and horizontal stamp pad (4) to described shower nozzle, making 0.6 times of the upper surface temperature of the currently printed described shape layer of the next one material fusing point not higher than described printed material;
In the moving process in the horizontal plane synchronize with described wire feeder of plasma generator described in step D1 and step D22, processed silk material (2) is sent by described wire feeder continuously, the melting end of processed silk material (2) is melted by the beam-plasma simultaneously produced by described plasma beam system of processing, and makes the molten melt drop that the fusing of described melting end is formed continuously and form liquid stream;Described liquid stream is distributed in described beam-plasma, the plasma beam of the melted liquid stream of band in being formed;
Step D3, repeatedly repetition step D2, until completing the print procedure of all shape layers in described region to be filled。
CN201610121809.9A 2016-03-03 2016-03-03 Mold plasma 3D rapid prototyping remanufacturing device and method Pending CN105689715A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610121809.9A CN105689715A (en) 2016-03-03 2016-03-03 Mold plasma 3D rapid prototyping remanufacturing device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610121809.9A CN105689715A (en) 2016-03-03 2016-03-03 Mold plasma 3D rapid prototyping remanufacturing device and method

Publications (1)

Publication Number Publication Date
CN105689715A true CN105689715A (en) 2016-06-22

Family

ID=56222816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610121809.9A Pending CN105689715A (en) 2016-03-03 2016-03-03 Mold plasma 3D rapid prototyping remanufacturing device and method

Country Status (1)

Country Link
CN (1) CN105689715A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168518A (en) * 2016-08-05 2016-11-30 中北大学 Selective laser melting molded article residual stress real-time detection apparatus
CN107470624A (en) * 2017-08-11 2017-12-15 西安增材制造国家研究院有限公司 The increasing material manufacturing method and apparatus of more silk material function gradient structures
CN107825019A (en) * 2017-11-09 2018-03-23 无锡百禾工业机器人有限公司 Four axle welding manipulators
CN109402372A (en) * 2018-08-29 2019-03-01 中国人民解放军空军工程大学 A kind of quick coating unit of absorption protective layer and method based on 3D printing technique
CN110154383A (en) * 2019-05-17 2019-08-23 西安交通大学 A method of utilizing corona treatment reinforcement material extrusion molding interface cohesion
CN111182984A (en) * 2017-10-31 2020-05-19 株式会社Ihi Three-dimensional modeling apparatus and three-dimensional modeling method
CN114258437A (en) * 2019-06-13 2022-03-29 善洁科技有限公司 Accelerated production method of electroforming mold insert
CN115041915A (en) * 2022-06-27 2022-09-13 广东鸿图科技股份有限公司 Repairing method of metal 3D printing mold and server

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104552957A (en) * 2015-01-27 2015-04-29 潘祥生 3D printer for printing carbon fibers
CN204451216U (en) * 2014-12-26 2015-07-08 南昌航空大学 A kind of constant temperature desktop printer with functions/drying
CN104815985A (en) * 2015-04-22 2015-08-05 华南理工大学 Micro beam plasma 3D (three dimensional) printing device and method
JP2016501137A (en) * 2012-11-09 2016-01-18 エボニック インダストリーズ アクチエンゲゼルシャフトEvonik Industries AG Use and manufacture of coated filaments for 3D printing processes based on extrusion
CN105269822A (en) * 2015-12-03 2016-01-27 广东技术师范学院 Closed-loop control system of 3D printer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016501137A (en) * 2012-11-09 2016-01-18 エボニック インダストリーズ アクチエンゲゼルシャフトEvonik Industries AG Use and manufacture of coated filaments for 3D printing processes based on extrusion
CN204451216U (en) * 2014-12-26 2015-07-08 南昌航空大学 A kind of constant temperature desktop printer with functions/drying
CN104552957A (en) * 2015-01-27 2015-04-29 潘祥生 3D printer for printing carbon fibers
CN104815985A (en) * 2015-04-22 2015-08-05 华南理工大学 Micro beam plasma 3D (three dimensional) printing device and method
CN105269822A (en) * 2015-12-03 2016-01-27 广东技术师范学院 Closed-loop control system of 3D printer

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106168518A (en) * 2016-08-05 2016-11-30 中北大学 Selective laser melting molded article residual stress real-time detection apparatus
CN106168518B (en) * 2016-08-05 2018-11-23 中北大学 Selective laser melting molded article residual stress real-time detection apparatus
CN107470624A (en) * 2017-08-11 2017-12-15 西安增材制造国家研究院有限公司 The increasing material manufacturing method and apparatus of more silk material function gradient structures
CN111182984A (en) * 2017-10-31 2020-05-19 株式会社Ihi Three-dimensional modeling apparatus and three-dimensional modeling method
CN111182984B (en) * 2017-10-31 2022-03-08 株式会社Ihi Three-dimensional modeling apparatus and three-dimensional modeling method
US12005636B2 (en) 2017-10-31 2024-06-11 Ihi Corporation Additive manufacturing device and additive manufacturing method
CN107825019A (en) * 2017-11-09 2018-03-23 无锡百禾工业机器人有限公司 Four axle welding manipulators
CN109402372A (en) * 2018-08-29 2019-03-01 中国人民解放军空军工程大学 A kind of quick coating unit of absorption protective layer and method based on 3D printing technique
CN110154383A (en) * 2019-05-17 2019-08-23 西安交通大学 A method of utilizing corona treatment reinforcement material extrusion molding interface cohesion
CN114258437A (en) * 2019-06-13 2022-03-29 善洁科技有限公司 Accelerated production method of electroforming mold insert
CN115041915A (en) * 2022-06-27 2022-09-13 广东鸿图科技股份有限公司 Repairing method of metal 3D printing mold and server
CN115041915B (en) * 2022-06-27 2024-02-06 广东鸿图科技股份有限公司 Repairing method and server for metal 3D printing mold

Similar Documents

Publication Publication Date Title
CN105642895A (en) Plasma 3D printing remanufacturing equipment and method for mold
CN105689715A (en) Mold plasma 3D rapid prototyping remanufacturing device and method
CN105522155A (en) Plasma 3D fast forming and remanufacturing method and equipment of train wheels
CN105543768A (en) Plasma 3D printing remanufacturing equipment and method for roller
CN101817121B (en) Deposition forming composite manufacturing method of part and mould and auxiliary device thereof
CN105543769A (en) Plasma 3D quick-forming remanufacturing equipment and method for roller
JP7002142B2 (en) How to control the deformation and accuracy of parts in parallel during the additive manufacturing process
CN105710371A (en) Plasma 3D printing remanufacturing equipment and method for train wheel
CN105750542A (en) Mould plasma 3D printing equipment and mould plasma 3D printing method
CN110773837B (en) Titanium alloy high-precision electric arc additive manufacturing process
CN110076566A (en) A kind of the metal parts manufacture system and method for micro- casting forging milling In-situ reaction
CN103962560B (en) The compound metal of a kind of molten forging increases material manufacturing installation
CN105522154A (en) Plasma 3D (three-dimensional) fast forming equipment and method for rollers
CN102179517A (en) Laser-induction hybrid melting direct forming method and device
CN101885063A (en) The laser cladding forming method of laser cladding forming equipment and a kind of metal parts
CN109590743B (en) Composite manufacturing method for electric arc additive forming and generating electrolytic machining
CN105922571B (en) A kind of plasma 3D rapid forming equipments and forming method
CN105665702A (en) Mold plasma 3D printing device and 3D printing method
CN105922574B (en) A kind of plasma cladding manufacture 3D printing device and method
CN105618753A (en) Roll plasma 3D printing remanufacturing device and method
CN109175367B (en) Additive and equal-material composite metal 3D laser forming device and method thereof
CN105922572B (en) A kind of plasma 3D printing device and method
CN101147971A (en) Selective resistance welding melting powder rapid forming method
CN105710367A (en) Roller plasma 3D printing equipment and method
CN110814350A (en) Aluminum alloy ultrasonic-assisted 3D printing device and printing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 073000 Hongye Avenue, Dingzhou Economic Development Zone, Dingzhou, Hebei, 19

Applicant after: SINOADDITIVE MANUFACTURING EQUIPMENT CO., LTD.

Address before: 050035 Tianshan science and Technology Park, 319 Xiangjiang Road, Shijiazhuang high tech Zone, Hebei, 025-108

Applicant before: SINOADDITIVE MANUFACTURING EQUIPMENT CO., LTD.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160622