CN105680276B - Earthing pole impactor and squeeze into method - Google Patents

Earthing pole impactor and squeeze into method Download PDF

Info

Publication number
CN105680276B
CN105680276B CN201610205464.5A CN201610205464A CN105680276B CN 105680276 B CN105680276 B CN 105680276B CN 201610205464 A CN201610205464 A CN 201610205464A CN 105680276 B CN105680276 B CN 105680276B
Authority
CN
China
Prior art keywords
support member
earthing pole
component
hitting part
location hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610205464.5A
Other languages
Chinese (zh)
Other versions
CN105680276A (en
Inventor
王鑫
刘栋
李成斌
唐晓
张茂元
周海滨
商艳凤
贾庆荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaocheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Liaocheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaocheng Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Liaocheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201610205464.5A priority Critical patent/CN105680276B/en
Publication of CN105680276A publication Critical patent/CN105680276A/en
Application granted granted Critical
Publication of CN105680276B publication Critical patent/CN105680276B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R43/00Apparatus or processes specially adapted for manufacturing, assembling, maintaining, or repairing of line connectors or current collectors or for joining electric conductors

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of earthing pole impactor and method is squeezed into, earthing pole impactor includes support member(1), hitting part(2), help component(3)And connecting component(4);The method of squeezing into of the earthing pole impactor includes:By hitting part(2)With support component(3)It is adjusted to be suitable for operation height, earthing pole is inserted in support component(3)In, make support member(1)Move up and down, strike earthing pole top.After squeezing into a part, hitting part is adjusted downwards(2)With support component(3)Continue to hit, to below ground, remove support component(3), by hitting part(2)Bottom is adjusted to, continues strike until reaching requirement depth.For the present invention by probation, hitting dynamics is big, and accurate positioning, operation is comfortable, safe, the shortcomings that overcoming traditional construction mode completely, and an earthing pole of often constructing, time saving more than 10 minutes, constructor generally reflected that the amount of labour considerably reduces.

Description

Earthing pole impactor and squeeze into method
Technical field
The present invention relates to a kind of electric construction tool and construction method.
Background technology
In power construction engineering, squeezing into for steel pipe type earthing pole is the project under construction frequently encountered, small to arrive separate unit distribution Transformer, the greatly installation to large-scale substation, transmission line of electricity, or even industry are constructed with civil buildings earthed system, will Carry out steel pipe type earthing pole and squeeze into construction.
It is made, applies as shown in Figure 1, steel pipe type earthing pole is generally fined away using the coating steel pipe front end of 2.5-3 meters of Φ 50 To be squeezed into work in the extremely pre-buried pit slot of horizontal grounding of below ground 80cm.Construction now is general by the way of iron hammer is squeezed into, Difficulty of construction is larger, has the following disadvantages.
Initial position striking point raises hammer height 1.7-2.2 meters of position, more than construction personnel, it is necessary to is stepped on using auxiliary High instrument is constructed.
As shown in Fig. 2, into after pit slot, tup is not easily accessible, bad construction.
One holds hammer hitting dynamics deficiency, meets the extremely difficult construction of harder soil property.
There must be personnel to help during hammering and easily cause support personnel injury.
It is time-consuming and due to that cannot tend not to meet with soil close contact ground resistance by the way of drilling It is required that.
The content of the invention
In order to solve the above technical problems, the present invention provides a kind of earthing pole impactor and squeezing into method, it, which is improved, applies Work efficiency rate and security.
To achieve these goals, the present invention adopts the following technical scheme that.
Earthing pole squeezes into method, includes the following steps:
Step 1, hitting part and support component are fixed on the supporting member, wherein, help component compared with hitting part more Close to earthing pole.
Step 2, component will be helped to be sleeved on earthing pole.
Step 3, outer active force is acted in support member, moves back and forth support member, so as to drive hitting part Contact or separate with earthing pole.
Step 4, component and support member are helped in separation.
Step 5, hitting part is departed from support member, hitting part is moved to the position closer to earthing pole, then Hitting part and support member are fixed.
Step 6, outer active force is acted in support member, moves back and forth support member, so as to drive hitting part Contact or separate with earthing pole.
Further included between the step 2 and step 3:Step 2-1, two cross bar, elbow are installed in support member In parallel bar.
Also include successively between the step 3 and 4:
Step 3-1, makes hitting part and helps component to depart from support member, by hitting part and helps component to be moved to Closer to the position of earthing pole, then by hitting part and component is helped to be fixed with support member.
Step 3-2, outer active force is acted in support member, moves back and forth support member, so as to drive beating part Part is contacted or separated with earthing pole.
Further included after step 6:Step 7, hitting part and support member are separated.
Further included after step 6:Step 8, cross bar, elbow are separated from two parallel bars in support member.
Wherein, the order of step 1 and step 2 can overturn.
When the reversed order of step 1 and step 2, first component will be helped to be sleeved on earthing pole, then by hitting part and help Hold component to fix on the supporting member, such sequence arrangement is suitable for the longer situation of earthing pole.When earthing pole is longer, such as Fruit first will help component to be fixed in support member, then can cause difficulty to helping component to be sleeved on earthing pole.
Step 7 and step 8 can and be deposited, and the order of step 7 and step 8 can overturn.
As a further improvement on the present invention, in the step 1, hitting part and support component pass through connecting component respectively It is fixed that when fixed, the first location hole in connecting component is overlapped with the second location hole in support member on the supporting member, Positioning element is recycled to pass through the first location hole and the second location hole.
In the step 5, hitting part is fixed by connecting component and support member, when fixed, by connecting component The first location hole overlapped with the second location hole in support member, recycle positioning element to pass through the first location hole and second fixed Position hole.
In the step 3-1, hitting part and support component are fixed on the supporting member by connecting component respectively, fixed When, the first location hole in connecting component is overlapped with the second location hole in support member, recycles positioning element to pass through the A positioning hole and the second location hole.
Present invention also offers a kind of earthing pole impactor, including support member, hitting part, support component and connecting portion Part;
The support member, is used to support hitting part and helps component;Support member can be bar, the quantity of bar Preferably two, two bars are arranged in parallel.The top of two bars is also removably connected by elbow with cross bar, forms U Font.
The hitting part, for hitting earthing pole;The hitting part can be block, and hitting part and earthing pole connect Contacting surface is plane.
The support component, for keeping the position of earthing pole, easy to which earthing pole is squeezed into according to predetermined direction of squeezing into. It can be ring-type to help component, help component to be sleeved on earthing pole.
The connecting component, for hitting part to be removably fastened on to several positions of support member, And component will be helped removably to be fastened on several positions in support member.For example, hitting part can lead to Cross top, middle part or lower part that connecting component is fixed on support member;Component is helped to be fixed on branch by connecting component The middle part or lower part of support part part.
The hitting part is fixed on the supporting member by two connecting components.
As a further improvement on the present invention, the earthing pole impactor further includes positioning element, close in connecting component One end of support member is equipped with the first location hole, is provided with some second location holes in support member, positioning element passes through first Location hole and the second location hole.
The positioning element can be set screw, positioning pin etc..
The support member of the present invention can be by 32 coating steel pipe machine-shapings of Φ, and open location hole on it;Hitting part According to purposes, the weight of 10-25kg may be designed as;Help the steel annulus that component can be a diameter of 80mm.
The invention has the advantages that the present invention, by probation, hitting dynamics is big, and accurate positioning, operation is comfortable, peace Quan Xinggao, the shortcomings that overcoming traditional construction mode completely, an earthing pole of often constructing, time saving more than 10 minutes, constructor was general Considerably reduced all over the reflection amount of labour.
Certainly, implement any of the products of the present invention and do not necessarily require achieving all the advantages described above at the same time.
Brief description of the drawings
Fig. 1 is the schematic diagram of reaching the last that existing iron hammer squeezes into mode.
Fig. 2 be existing iron hammer squeeze into mode squeeze into rear schematic diagram.
Fig. 3 is the structure diagram of earthing pole impactor of the present invention.
Fig. 4 is the schematic diagram of reaching the last that earthing pole of the present invention squeezes into method.
Fig. 5 be earthing pole of the present invention squeeze into method squeeze into middle schematic diagram.
Fig. 6 be earthing pole of the present invention squeeze into method squeeze into rear schematic diagram.
Wherein, 1, support member;2nd, hitting part;3rd, component is helped;4th, connecting component;5th, positioning element.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
As shown in figure 3, the earthing pole impactor of the product embodiments of the present invention, including support member 1, hitting part 2, help Hold component 3, connecting component 4 and positioning element 5.
The support member 1, is used to support hitting part 2 and helps component 3;1 main body of support member is two and parallel sets The bar put, the top of two bars are also removably connected by elbow with cross bar, form U-shaped.
The hitting part 2, for hitting earthing pole;The hitting part 2 is block, and hitting part 2 connects with earthing pole Contacting surface is plane.
The support component 3, for keeping the position of earthing pole, easy to which earthing pole is beaten according to predetermined direction of squeezing into Enter.Support component 3 is ring-type, helps component 3 to be sleeved on earthing pole.
The connecting component 4, for hitting part 2 to be removably fastened on to several positions of support member 1 On, and component 3 will be helped removably to be fastened on several positions in support member 1.
The hitting part 2 is fixed in support member 1 by two connecting components 4.
The first location hole is equipped with close to one end of support member 1 in connecting component 4, some the are provided with support member 1 Two location holes, positioning element 5 pass through the first location hole and the second location hole, and the positioning element 5 is set screw.
The earthing pole impactor of the present embodiment provides two kinds and squeezes into embodiment of the method.
Embodiment of the method 1.
As shown in Figure 4.
Step a, by hitting part 2 and helps component 3 to be fixed on by connecting component 4 in support member 1, wherein, help Component 3 is closer to earthing pole compared with hitting part 2.
Hitting part 2 and support component 3 are fixed in support member 1 by connecting component 4 respectively, when fixed, will be connected The first location hole on component 4 is overlapped with the second location hole in support member 1, recycles positioning element 5 to pass through the first positioning Hole and the second location hole.
Step b, will help component 3 to be sleeved on earthing pole.
Step c, cross bar, elbow are installed in two parallel bars in support member 1.
Step d, outer active force is acted in support member 1, moves back and forth support member 1, so as to drive beating part Part 2 is contacted or separated with earthing pole.
As shown in Figure 5.
Step e, makes hitting part 2 and helps component 3 to depart from support member 1, by hitting part 2 and helps component 3 to move Move to the position closer to earthing pole, then by hitting part 2 and help component 3 to be fixed with support member 1.
Hitting part 2 and support component 3 are fixed in support member 1 by connecting component 4 respectively, when fixed, will be connected The first location hole on component 4 is overlapped with the second location hole in support member 1, recycles positioning element 5 to pass through the first positioning Hole and the second location hole.
Step f, outer active force is acted in support member 1, moves back and forth support member 1, so as to drive beating part Part 2 is contacted or separated with earthing pole.
As shown in Figure 6.
Component 3 and support member 1 are helped in step g, separation.
Step h, makes hitting part 2 depart from support member 1, and hitting part 2 is moved to the position closer to earthing pole, Hitting part 2 and support member 1 are fixed again.
Hitting part 2 is fixed by connecting component 4 and support member 1, when fixed, first in connecting component 4 is determined Position hole is overlapped with the second location hole in support member 1, recycles positioning element 5 to pass through the first location hole and the second location hole.
Step i, outer active force is acted in support member 1, moves back and forth support member 1, so as to drive beating part Part 2 is contacted or separated with earthing pole.
Step j, separates hitting part 2 and support member 1.
Step k, cross bar, elbow are separated from two parallel bars in support member 1.
Embodiment of the method 2.
Unlike embodiment of the method 1, the order of step a and step b are exchanged.
Although above-mentioned be described the embodiment of the present invention with reference to attached drawing, model not is protected to the present invention The limitation enclosed, those skilled in the art should understand that, on the basis of technical scheme, those skilled in the art are not Need to make the creative labor the various modifications that can be made or deformation still within protection scope of the present invention.

Claims (10)

1. earthing pole squeezes into method, it is characterized in that, include the following steps:
Step 1, by hitting part(2)With support component(3)It is fixed on support member(1)On, wherein, help component(3)Relatively beat Hit component(2)It is closer to earthing pole;
Step 2, component will be helped(3)It is sleeved on earthing pole;
Step 3, outer active force is acted on into support member(1)On, make support member(1)Move back and forth, so as to drive beating part Part(2)Contact or separate with earthing pole;
Step 4, component is helped in separation(3)And support member(1);
Step 5, hitting part is made(2)With support member(1)Depart from, by hitting part(2)It is moved to the position closer to earthing pole Put, then by hitting part(2)With support member(1)It is fixed;
Step 6, outer active force is acted on into support member(1)On, make support member(1)Move back and forth, so as to drive beating part Part(2)Contact or separate with earthing pole.
2. earthing pole as claimed in claim 1 squeezes into method, it is characterized in that, further included between the step 2 and step 3:Step Rapid 2-1, support member is installed on by cross bar, elbow(1)In two parallel bars on.
3. earthing pole as claimed in claim 1 squeezes into method, it is characterized in that, also include successively between the step 3 and 4:
Step 3-1, makes hitting part(2)With support component(3)With support member(1)Depart from, by hitting part(2)With support portion Part(3)It is moved to the position closer to earthing pole, then by hitting part(2)With support component(3)With support member(1)It is fixed;
Step 3-2, support member is acted on by outer active force(1)On, make support member(1)Move back and forth, so as to drive strike Component(2)Contact or separate with earthing pole.
4. earthing pole as claimed in claim 1 squeezes into method, it is characterized in that, further included after step 6:Step 7, separation strike Component(2)And support member(1).
5. earthing pole as claimed in claim 2 squeezes into method, it is characterized in that, further included after step 6:Step 8, by cross bar, Elbow is from support member(1)In two parallel bars on separate.
6. earthing pole as claimed in claim 1 squeezes into method, it is characterized in that, in the step 1, hitting part(2)And support Component(3)Pass through connecting component respectively(4)It is fixed on support member(1)On, when fixed, by connecting component(4)On it is first fixed Position hole and support member(1)On the second location hole overlap, recycle positioning element(5)Pass through the first location hole and the second positioning Hole.
7. earthing pole as claimed in claim 1 squeezes into method, it is characterized in that, in the step 5, by hitting part(2)Pass through Connecting component(4)With support member(1)It is fixed, when fixed, by connecting component(4)On the first location hole and support member(1) On the second location hole overlap, recycle positioning element(5)Pass through the first location hole and the second location hole.
8. earthing pole as claimed in claim 3 squeezes into method, it is characterized in that, in the step 3-1, hitting part(2)With help Hold component(3)Pass through connecting component respectively(4)It is fixed on support member(1)On, when fixed, by connecting component(4)On first Location hole and support member(1)On the second location hole overlap, recycle positioning element(5)The first location hole and second is passed through to determine Position hole.
9. a kind of earthing pole impactor, it is characterized in that, including support member(1), hitting part(2), help component(3)And connection Component(4);
The support member(1), it is used to support hitting part(2)With support component(3);Support member(1)It is two parallel to set The bar put;The top of two bars is also removably connected by elbow with cross bar, forms U-shaped;
The hitting part(2), for hitting earthing pole;Hitting part(2)It is block, hitting part(2)With connecing for earthing pole Contacting surface is plane;
The support component(3), for keeping the position of earthing pole, easy to which earthing pole is squeezed into according to predetermined direction of squeezing into; Help component(3)For ring-type, component is helped(3)It is sleeved on earthing pole;
The connecting component(4), for by hitting part(2)Removably it is fastened on support member(1)Several positions Put, and component will be helped(3)Removably it is fastened on support member(1)On several positions on;
The hitting part(2)Pass through two connecting components(4)It is fixed on support member(1)On.
10. earthing pole impactor as claimed in claim 9, it is characterized in that, the earthing pole impactor further includes positioning element (5), connecting component(4)Upper close support member(1)One end be equipped with the first location hole, support member(1)On be provided with it is some Second location hole, positioning element(5)Pass through the first location hole and the second location hole;The positioning element(5)It is set screw.
CN201610205464.5A 2016-04-05 2016-04-05 Earthing pole impactor and squeeze into method Active CN105680276B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610205464.5A CN105680276B (en) 2016-04-05 2016-04-05 Earthing pole impactor and squeeze into method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610205464.5A CN105680276B (en) 2016-04-05 2016-04-05 Earthing pole impactor and squeeze into method

Publications (2)

Publication Number Publication Date
CN105680276A CN105680276A (en) 2016-06-15
CN105680276B true CN105680276B (en) 2018-04-20

Family

ID=56225219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610205464.5A Active CN105680276B (en) 2016-04-05 2016-04-05 Earthing pole impactor and squeeze into method

Country Status (1)

Country Link
CN (1) CN105680276B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106207514B (en) * 2016-08-31 2018-11-23 国网河南省电力公司漯河供电公司 A kind of electric power grounding device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203406493U (en) * 2013-07-04 2014-01-22 天津二十冶建设有限公司 Earth electrode automatic hammer-in device
CN204012118U (en) * 2014-07-29 2014-12-10 国家电网公司 A kind of earth rod with vertically-guided function is installed power set
CN204361459U (en) * 2015-02-07 2015-05-27 吴晓媛 Earth electrode erecting device
CN204577625U (en) * 2015-05-13 2015-08-19 东营市雷封防雷科技有限公司 A kind of outdoor quick installing grounding pole and locking device thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203406493U (en) * 2013-07-04 2014-01-22 天津二十冶建设有限公司 Earth electrode automatic hammer-in device
CN204012118U (en) * 2014-07-29 2014-12-10 国家电网公司 A kind of earth rod with vertically-guided function is installed power set
CN204361459U (en) * 2015-02-07 2015-05-27 吴晓媛 Earth electrode erecting device
CN204577625U (en) * 2015-05-13 2015-08-19 东营市雷封防雷科技有限公司 A kind of outdoor quick installing grounding pole and locking device thereof

Also Published As

Publication number Publication date
CN105680276A (en) 2016-06-15

Similar Documents

Publication Publication Date Title
CN204151692U (en) A kind of modular assembly formula connection system for guide rail
CN105680276B (en) Earthing pole impactor and squeeze into method
CN103938663A (en) Correction device of inclined power transmission tower made of signal-splicing steel angle principal material
CN107246012A (en) A kind of obstacle cleaning plant in the peg hole based on impact drill
CN205452760U (en) Ware is squeezed into to earthing pole
CN107401223A (en) A kind of attachment structure for steel structural upright column and crossbeam
CN202117057U (en) Full-hydraulic static pipe drawing machine
CN103956675B (en) Tool and method for inserting ground wire into soil and pulling ground wire out of soil
CN201420310Y (en) Pre-buried crimping rack for mounting overhanging steel beam
CN203007920U (en) Gravity penetration sounding heavy punch lifting device
CN207891905U (en) A kind of new steel structure holder multi-column pier foundation
CN206053320U (en) Sizing can be had enough to meet the need to exempt to pick chisel embedded board muscle protector
CN206887960U (en) A kind of obstacle cleaning plant in the peg hole based on impact drill
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN214384043U (en) Scaffold frame of encorbelmenting of building engineering construction usefulness
CN206034476U (en) Big board of transmission line basis construction equipment
CN211395652U (en) Steel-pipe pile foundation reinforced structure
CN203795824U (en) Suspension type fastener scaffold erecting device
CN206588904U (en) A kind of multifunctional hammer installed and removed for aluminum alloy mould plate
CN206702863U (en) A kind of abrasive blasting rust-cleaning machine material supporting rack
CN206369005U (en) A kind of novel multiple section boom malposition calibration equipment
CN209071640U (en) Cable run construction Special grounding tool
CN206503377U (en) A kind of movable railing of steel trestle
CN205429189U (en) Power equipment's earthing device
CN206457199U (en) Pumping unit correcting and positioning device and pumping unit correcting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant