CN107246012A - A kind of obstacle cleaning plant in the peg hole based on impact drill - Google Patents
A kind of obstacle cleaning plant in the peg hole based on impact drill Download PDFInfo
- Publication number
- CN107246012A CN107246012A CN201710580908.8A CN201710580908A CN107246012A CN 107246012 A CN107246012 A CN 107246012A CN 201710580908 A CN201710580908 A CN 201710580908A CN 107246012 A CN107246012 A CN 107246012A
- Authority
- CN
- China
- Prior art keywords
- impact drill
- peg hole
- cleaning plant
- fixing device
- drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004140 cleaning Methods 0.000 title claims abstract description 27
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 6
- 230000004888 barrier function Effects 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 4
- 230000003014 reinforcing effect Effects 0.000 abstract description 3
- 238000005259 measurement Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/08—Removing obstacles
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Cleaning In General (AREA)
Abstract
The invention discloses a kind of obstacle cleaning plant in the peg hole based on impact drill, including connecting line, balancing weight, pipeline fixing device and impact drill, the pipeline fixing device is located between the balancing weight and the impact drill, the front end of the impact drill is provided with drill bit, and the connecting line is electrically connected with the impact drill;The connecting line, balancing weight, pipeline fixing device and the impact drill are all located in peg hole.The present invention provides a kind of obstacle cleaning plant in the peg hole based on impact drill, this cleaning equipment is set to go deep into inside peg hole, barrier inside peg hole is cleared up, improve the method dredged originally using reinforcing bar, when solving construction caused by bored concrete pile peg hole plug detecting devices can not normal operation problem, so as to improve operating efficiency, make measurement data more accurate.
Description
Technical field
The present invention relates to a kind of obstacle cleaning plant in the peg hole based on impact drill, especially for bored concrete pile peg hole
The small-sized cleaning plant of obstacle cleaning.
Background technology
Without friction, without squeezing soil, noise is small during due to construction, be suitable for used in City Building City Regions etc. it is excellent
Point, bored concrete pile obtains relatively broad application in construction.According to the difference of pore-forming technique, bored concrete pile can be divided into dry operation into
Bored concrete pile of the bored concrete pile in hole, the bored concrete pile of mud off pore-forming and manually digging hole etc..Aperture caliber metal tubes are provided with bored concrete pile
Road, quality problems are whether there is for measuring when bored concrete pile is poured.
But it is due to nature and human factor, the peg hole for often having bored concrete pile is blocked, bored concrete pile has several meters to arrive
Tens meters, peg hole length and bored concrete pile are close.And in the market, when being blocked in the peg hole of bored concrete pile, do not have
There is special equipment effectively to be cleared up it, the data that causing peg hole can not use or measure have deviation,
Great potential safety hazard is brought to construction.The design can effectively solve above mentioned problem.
The content of the invention
Present invention aims at a kind of obstacle cleaning plant in the peg hole based on impact drill is provided, make this cleaning equipment can
Go deep into inside peg hole, the barrier inside peg hole is cleared up, improve the method dredged originally using reinforcing bar, solve
During construction caused by bored concrete pile peg hole plug detecting devices can not normal operation problem, so as to improve operating efficiency, make survey
Measure data more accurate.
In order to solve the above technical problems, one aspect of the present invention is:A kind of peg hole based on impact drill
Obstacle cleaning plant, including connecting line, balancing weight, pipeline fixing device and impact drill, the pipeline fixing device is located at institute
State between balancing weight and the impact drill, the front end of the impact drill is provided with drill bit, and the connecting line is electrically connected with the impact drill
Connect;
The connecting line, the balancing weight, the pipeline fixing device and the impact drill are all located at peg
In hole.
Further say, the pipeline fixing device is air bag.
Further say, the air bag is cylindrical air bag.
Further say, the pipeline fixing device is hydraulic telescopic device.
Further say, the connecting line includes power line and steel wire.
Further say, the drill bit is tip bite, needle-like drill bit or cylinder drill bit.
Beneficial effects of the present invention at least have it is following some:
First, the present invention includes connecting line, balancing weight, pipeline fixing device and impact drill, and the front end of impact drill is provided with drill bit,
Impact drill is electrically connected with connecting line, and impact drill starts drill bit and quickly rotated, and drill bit uses tip bite, makes this cleaning equipment deep
Enter inside peg hole, the barrier inside peg hole is cleared up, improve the method dredged originally using reinforcing bar, solve construction
When bored concrete pile peg hole plug caused by detecting devices can not normal operation problem, so as to improve operating efficiency, make measurement number
According to more accurate;
2nd, the pipeline fixing device in the present invention can be hydraulic telescopic device, when hydraulic telescopic device is by vertical direction power
When horizontal direction deploy, device is fixed on inner-walls of duct;Pipeline fixing device can be air bag, when pressure of the air bag by counterweight
When produce deformation, diameter becomes big, is close to peg hole inner-walls of duct to prevent impact drill peg hole horizontal direction from rotating, two kinds of sides
Formula can all reach the effect that cleaning plant is fixed in the duct, and smart structural design, fixed effect is good.
Above description of the invention is only the general introduction of technical solution of the present invention, in order to better understand the skill of the present invention
Art means, and being practiced according to the content of specification, with presently preferred embodiments of the present invention and coordinate accompanying drawing specifically below
It is bright as after.
Brief description of the drawings
Fig. 1 is the structural representation of present invention application hydraulic telescopic device;
Fig. 2 is the structural representation of present invention application air bag;
Each several part mark is as follows in accompanying drawing:
Peg hole 1, balancing weight 2, hydraulic telescopic device 3, impact drill 4, drill bit 5, connecting line 7 and air bag 8.
Embodiment
Presently preferred embodiments of the present invention is described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy
It is easier to be readily appreciated by one skilled in the art, apparent is clearly defined so as to be made to protection scope of the present invention.
Embodiment 1:A kind of obstacle cleaning plant in the peg hole based on impact drill, as shown in figure 1, including connecting line 7, matching somebody with somebody
Pouring weight 2, pipeline fixing device and impact drill 4, the pipeline fixing device are located between the balancing weight and the impact drill, institute
The front end for stating impact drill is provided with drill bit 5, and the connecting line 7 is electrically connected with the impact drill 4;
The connecting line 7, the balancing weight 2, the pipeline fixing device and the impact drill 4 are all located in peg hole 1.
The pipeline fixing device is air bag 8.
The air bag is cylindrical air bag.
The connecting line 7 includes power line and steel wire.
The drill bit 5 is tip bite, needle-like drill bit or cylinder drill bit.
Embodiment 2:A kind of obstacle cleaning plant in the peg hole based on impact drill, as shown in Fig. 2 structure and embodiment 1
Essentially identical, difference is, the pipeline fixing device is hydraulic telescopic device 3.
The operation principle or the course of work of the present invention is as follows:
Cleaning plant is slowly put into pipeline, and the barrier in pipeline is run into when drill bit, and balancing weight is produced due to gravity
Raw power vertically downward, when hydraulic telescopic device is by vertical direction power, horizontal direction is deployed, and cleaning plant is fixed on into pipeline
Inwall produces deformation when pressure of the air bag by balancing weight, and diameter becomes big, is close to prevent with peg hole inner-walls of duct
Impact drill peg hole horizontal direction is rotated up to the purpose of fixed cleaning plant, and impact drill starts drill bit and quickly rotated, hindered
Hinder cleaning, power after barrier, which is cleared up, to be terminated suffered by drill bit vertically upward disappears, and the power of balancing weight vertically downward also disappears therewith
Lose, recovering deformation when horizontal direction retraction or air bag vertical direction do not stress when hydraulic telescopic device vertical direction does not stress returns to
Original shape, cleaning plant continues to sink, and reaches bottom end-of-job, takes out cleaning plant.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair
The equivalent structure transformation that bright specification and accompanying drawing content are made, or other related technical fields are directly or indirectly used in,
Similarly it is included within the scope of the present invention.
Claims (6)
1. a kind of obstacle cleaning plant in the peg hole based on impact drill, it is characterised in that:Including connecting line, balancing weight, pipeline
Fixing device and impact drill, the pipeline fixing device are located between the balancing weight and the impact drill, the impact drill
Front end is provided with drill bit, and the connecting line is electrically connected with the impact drill;
The connecting line, the balancing weight, the pipeline fixing device and the impact drill are all located in peg hole.
2. a kind of obstacle cleaning plant in peg hole based on impact drill according to claim 1, it is characterised in that:It is described
Pipeline fixing device is air bag.
3. a kind of obstacle cleaning plant in peg hole based on impact drill according to claim 2, it is characterised in that:It is described
Air bag is cylindrical air bag.
4. a kind of obstacle cleaning plant in peg hole based on impact drill according to claim 1, it is characterised in that:It is described
Pipeline fixing device is hydraulic telescopic device.
5. a kind of obstacle cleaning plant in peg hole based on impact drill according to claim 1, it is characterised in that:It is described
Connecting line includes power line and steel wire.
6. a kind of obstacle cleaning plant in peg hole based on impact drill according to claim 1, it is characterised in that:It is described
Drill bit is tip bite, needle-like drill bit or cylinder drill bit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710580908.8A CN107246012A (en) | 2017-07-17 | 2017-07-17 | A kind of obstacle cleaning plant in the peg hole based on impact drill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710580908.8A CN107246012A (en) | 2017-07-17 | 2017-07-17 | A kind of obstacle cleaning plant in the peg hole based on impact drill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107246012A true CN107246012A (en) | 2017-10-13 |
Family
ID=60015456
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710580908.8A Pending CN107246012A (en) | 2017-07-17 | 2017-07-17 | A kind of obstacle cleaning plant in the peg hole based on impact drill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107246012A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110270563A (en) * | 2019-06-28 | 2019-09-24 | 中国二十冶集团有限公司 | Bored concrete pile sound detecting pipe plugging method for cleaning |
CN111255391A (en) * | 2020-02-27 | 2020-06-09 | 廉作勇 | Hydrology monitoring well hole clearance ware |
CN113202101A (en) * | 2021-03-28 | 2021-08-03 | 翟玉兰 | Fill out native device of clearance precast tubular pile stake core fast |
CN113399383A (en) * | 2021-06-04 | 2021-09-17 | 内蒙古大学公路工程试验检测中心 | Sounding pipe dredging device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2226520Y (en) * | 1995-07-05 | 1996-05-08 | 江世贵 | Impact drill bit |
CN2698846Y (en) * | 2004-05-28 | 2005-05-11 | 刘润郊 | Device for supporting and enlarging pile hole |
CN103510518A (en) * | 2012-06-27 | 2014-01-15 | 北京中岩大地工程技术有限公司 | Pile hole obstacle breaking device |
CN104695867A (en) * | 2013-12-05 | 2015-06-10 | 朱妍 | Drill bit for forming bottom expanding cast-in-place pile and construction step |
CN205189796U (en) * | 2015-11-11 | 2016-04-27 | 中国矿业大学(北京) | Carrier fixer of driling in pit |
CN206290207U (en) * | 2016-12-23 | 2017-06-30 | 北京航勘建设有限公司 | A kind of modified bored pile construction rig |
CN206887960U (en) * | 2017-07-17 | 2018-01-16 | 昂徕博智能科技(昆山)有限公司 | A kind of obstacle cleaning plant in the peg hole based on impact drill |
-
2017
- 2017-07-17 CN CN201710580908.8A patent/CN107246012A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2226520Y (en) * | 1995-07-05 | 1996-05-08 | 江世贵 | Impact drill bit |
CN2698846Y (en) * | 2004-05-28 | 2005-05-11 | 刘润郊 | Device for supporting and enlarging pile hole |
CN103510518A (en) * | 2012-06-27 | 2014-01-15 | 北京中岩大地工程技术有限公司 | Pile hole obstacle breaking device |
CN104695867A (en) * | 2013-12-05 | 2015-06-10 | 朱妍 | Drill bit for forming bottom expanding cast-in-place pile and construction step |
CN205189796U (en) * | 2015-11-11 | 2016-04-27 | 中国矿业大学(北京) | Carrier fixer of driling in pit |
CN206290207U (en) * | 2016-12-23 | 2017-06-30 | 北京航勘建设有限公司 | A kind of modified bored pile construction rig |
CN206887960U (en) * | 2017-07-17 | 2018-01-16 | 昂徕博智能科技(昆山)有限公司 | A kind of obstacle cleaning plant in the peg hole based on impact drill |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110270563A (en) * | 2019-06-28 | 2019-09-24 | 中国二十冶集团有限公司 | Bored concrete pile sound detecting pipe plugging method for cleaning |
CN111255391A (en) * | 2020-02-27 | 2020-06-09 | 廉作勇 | Hydrology monitoring well hole clearance ware |
CN113202101A (en) * | 2021-03-28 | 2021-08-03 | 翟玉兰 | Fill out native device of clearance precast tubular pile stake core fast |
CN113399383A (en) * | 2021-06-04 | 2021-09-17 | 内蒙古大学公路工程试验检测中心 | Sounding pipe dredging device |
CN113399383B (en) * | 2021-06-04 | 2022-09-16 | 内蒙古大学公路工程试验检测中心 | Sounding pipe dredging device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107246012A (en) | A kind of obstacle cleaning plant in the peg hole based on impact drill | |
CN207033388U (en) | A kind of clinometer probe fishing device | |
CN206681671U (en) | A kind of jackstone stratigraphical drilling device | |
CN205206779U (en) | Fracture drilling rod fishing device | |
CN207472247U (en) | A kind of excavation slope slope measuring control device | |
CN204112378U (en) | A kind of two casing device of pile measurement with emulation buffer action | |
CN203821461U (en) | Sampling device for deep underground concrete | |
CN206887960U (en) | A kind of obstacle cleaning plant in the peg hole based on impact drill | |
CN203256733U (en) | Device for detecting pile top concrete elevation of cast-in-place pile | |
CN107288132A (en) | A kind of peg apodization based on ultrasonic wave drill bit hinders cleaning plant | |
CN105971031A (en) | Magnetic-induction-based pile length detection device for tubular pile construction and detection method | |
CN209277837U (en) | A kind of flexible cable inclinometer detector fishing device based on low-resistance | |
CN205421243U (en) | Building building pile | |
CN106013096A (en) | Construction method of building foundation | |
CN217027119U (en) | Seepage-proofing underground supporting structure for foundation pit | |
CN206815303U (en) | Observation of groundwater levels bores into well | |
CN210507443U (en) | Pile pulling device | |
CN207167010U (en) | A kind of high slope trees digging apparatus | |
CN209761331U (en) | Eccentric casing drilling construction structure for anchoring engineering | |
CN103274329B (en) | A kind of top draws jack for the construction method of pile-anchor retaining | |
CN206496755U (en) | Foundation pile static loading test Displacement & Settlement device | |
CN109372460A (en) | Flexible cable inclinometer detector fishing device and its Refloatation method based on low-resistance | |
CN205712231U (en) | A kind of tube pile construction stake based on magnetic induction long detection device | |
CN107190720A (en) | Observation of groundwater levels is bored into well | |
CN206245357U (en) | A kind of prefabricated pile of embedded concrete strain gauge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171013 |
|
WD01 | Invention patent application deemed withdrawn after publication |