CN206290207U - A kind of modified bored pile construction rig - Google Patents

A kind of modified bored pile construction rig Download PDF

Info

Publication number
CN206290207U
CN206290207U CN201621426376.XU CN201621426376U CN206290207U CN 206290207 U CN206290207 U CN 206290207U CN 201621426376 U CN201621426376 U CN 201621426376U CN 206290207 U CN206290207 U CN 206290207U
Authority
CN
China
Prior art keywords
rig
modified
bored pile
pile construction
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621426376.XU
Other languages
Chinese (zh)
Inventor
郝雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Navigation Construction Co Ltd
Original Assignee
Beijing Navigation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Navigation Construction Co Ltd filed Critical Beijing Navigation Construction Co Ltd
Priority to CN201621426376.XU priority Critical patent/CN206290207U/en
Application granted granted Critical
Publication of CN206290207U publication Critical patent/CN206290207U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of modified bored pile construction rig, including chopping bit body and rig body, the chopping bit body bottom portion is provided with hanger, the chopping bit body is divided into impact cone and core drill bucket, steel wire rope is connected with the hanger, the rig bodies top is provided with support frame, and support frame as described above top is provided with drive, the wire rope gearing is connected to drive, and extends to rig body interior.A kind of modified bored pile construction rig of the utility model, structure is novel, easy to operate, and the chopping bit pile quality of use is good, and pile body integrality is good.Construction technology machinery is relatively small, site condition requirement is relatively low, has the soil nailing of former pattern foundation pit supporting structure and the poor strata of anchor cable to have fine applicability to underground, with practicality very high, a kind of use feature of modified bored pile construction rig is greatly improved, is adapted to be widely popularized.

Description

A kind of modified bored pile construction rig
Technical field
The utility model is related to drilling rig technique field, specially a kind of modified bored pile construction rig.
Background technology
Percussive drilling pile driving construction is using drill hole of drilling machine, retaining wall pore-forming(Ground is acted on without jam-packed)On the spot under priming petock A kind of construction technology of concrete technology pile.This technique be suitable for stratum for lam, sand, flour sand and containing a small amount of granule ground Layer, using slurry strengthened wall impact drill bradawl hole, the drilled pile of a diameter of 0.8-2.0m.Existing drill configuration is depending on the soil body is passed through Cross the hammering that adds water and be changed into mud, causing scene to be badly in need of a large amount of mud needs treatment, and its mud conditioning is costly, not only economical Cost is high and causes environmental pollution, while rate of penetration is too slow.
The content of the invention
The purpose of this utility model is to provide a kind of modified bored pile construction rig, to solve above-mentioned background The problem proposed in technology.
To achieve the above object, the utility model provides following technical scheme:A kind of modified bored pile construction is used Rig, including chopping bit body and rig body, the chopping bit body bottom portion are provided with hanger, and the impact drill is bored Head body is divided into impact cone and core drill bucket, and steel wire rope is connected with the hanger, and the rig bodies top is provided with support frame, Support frame as described above top is provided with drive, and the wire rope gearing is connected to drive, and extends to rig body interior.
Preferably, it is in circular arc that core drill bucket junction is located in the impact cone.
Preferably, the core drill bucket is grab jaw type.
Preferably, the impact cone and core drill bucket inside are equipped with cavity structure.
Preferably, the rig body bottom portion is provided with includes motor and driving wheel in roller, the rig body, and Motor and driving wheel are connected by belt, and steel wire rope is connected with driving wheel.
Compared with prior art, the beneficial effects of the utility model are:A kind of modified cast-in-situ bored pile of the utility model Construction rig, structure is novel, easy to operate, and the chopping bit pile quality of use is good, and pile body integrality is good.Construction Process machinery is relatively small, and site condition requirement is relatively low, has the soil nailing of former pattern foundation pit supporting structure and the poor strata of anchor cable to have to underground Fine applicability, with practicality very high, greatly improves a kind of use of modified bored pile construction rig Feature, it is ensured that its using effect and utilization benefit, is adapted to be widely popularized.
Brief description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model chopping bit body construction schematic diagram.
In figure:1 chopping bit body, 2 rig bodies, 3 hangers, 4 impact cones, 5 core drills bucket, 6 steel wire ropes, 7 transmissions Wheel, 8 support frames, 9 rollers.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of modified bored pile construction is bored Machine, including chopping bit body 1 and rig body 2, the bottom of chopping bit body 1 are provided with hanger 3, the impact drill 1 point of drill body is impact cone 4 and core drill bucket 5, and steel wire rope 6 is connected with the hanger 3, and the top of the rig body 2 sets There is support frame 8, the top of support frame as described above 8 is provided with drive 7, and the steel wire rope 6 is connected in drive 7, and extends to brill It is in circular arc that 5 junctions of core drill bucket are located inside machine body 2, in the impact cone 4, and the core drill bucket 5 is grab jaw type, institute State and be equipped with cavity structure inside impact cone 4 and core drill bucket 5, the bottom of rig body 2 is provided with roller 9, the rig sheet Include motor and driving wheel in body 2, and motor and driving wheel are connected by belt, and steel wire rope is connected with driving wheel 6。
Operation principle:A kind of modified bored pile construction rig of the utility model, when using, device is moved to Working region, steel wire rope 3 is driven downwards by the motor in rig body 2, drives chopping bit body 1 to undershoot Hit, core drill bucket 5 launches, core drill bucket 5 is tightened up and the soil body is caught the soil body extruding when above carrying, and will be impacted by rig body 2 The lifting of drill bit body 1 is removed, and the soil body is laid down, and mud off is used when running into water, and impact is directly used when running into barrier Cone 4 is used as impact main body.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out various changes in the case where principle of the present utility model and spirit is not departed from, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of modified bored pile construction rig, including chopping bit body(1)With rig body(2), it is special Levy and be:The chopping bit body(1)Bottom is provided with hanger(3), the chopping bit body(1)It is divided into impact cone (4)With core drill bucket(5), the hanger(3)On be connected with steel wire rope(6), the rig body(2)Top is provided with support frame (8), support frame as described above(8)Top is provided with drive(7), the steel wire rope(6)It is connected in drive(7), and extend to Rig body(2)It is internal.
2. a kind of modified bored pile construction rig according to claim 1, it is characterised in that:The impact cone (4)It is upper to be located at core drill bucket(5)Junction is in circular arc.
3. a kind of modified bored pile construction rig according to claim 1, it is characterised in that:The core drill Bucket(5)It is grab jaw type.
4. a kind of modified bored pile construction rig according to claim 1, it is characterised in that:The impact cone (4)With core drill bucket(5)Inside is equipped with cavity structure.
5. a kind of modified bored pile construction rig according to claim 1, it is characterised in that:The rig sheet Body(2)Bottom is provided with roller(9), the rig body(2)It is interior including motor and driving wheel, and motor and driving wheel Connected by belt, steel wire rope is connected with driving wheel(6).
CN201621426376.XU 2016-12-23 2016-12-23 A kind of modified bored pile construction rig Expired - Fee Related CN206290207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621426376.XU CN206290207U (en) 2016-12-23 2016-12-23 A kind of modified bored pile construction rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621426376.XU CN206290207U (en) 2016-12-23 2016-12-23 A kind of modified bored pile construction rig

Publications (1)

Publication Number Publication Date
CN206290207U true CN206290207U (en) 2017-06-30

Family

ID=59153453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621426376.XU Expired - Fee Related CN206290207U (en) 2016-12-23 2016-12-23 A kind of modified bored pile construction rig

Country Status (1)

Country Link
CN (1) CN206290207U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107246012A (en) * 2017-07-17 2017-10-13 昂徕博智能科技(昆山)有限公司 A kind of obstacle cleaning plant in the peg hole based on impact drill
CN107288132A (en) * 2017-07-17 2017-10-24 昂徕博智能科技(昆山)有限公司 A kind of peg apodization based on ultrasonic wave drill bit hinders cleaning plant
CN109826559A (en) * 2018-12-31 2019-05-31 宁波二十冶建设有限公司 A kind of simple drilling rig and construction method
CN111608578A (en) * 2020-06-01 2020-09-01 中铁隧道局集团有限公司 A percussion drill for drilling bored concrete pile construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107246012A (en) * 2017-07-17 2017-10-13 昂徕博智能科技(昆山)有限公司 A kind of obstacle cleaning plant in the peg hole based on impact drill
CN107288132A (en) * 2017-07-17 2017-10-24 昂徕博智能科技(昆山)有限公司 A kind of peg apodization based on ultrasonic wave drill bit hinders cleaning plant
CN109826559A (en) * 2018-12-31 2019-05-31 宁波二十冶建设有限公司 A kind of simple drilling rig and construction method
CN111608578A (en) * 2020-06-01 2020-09-01 中铁隧道局集团有限公司 A percussion drill for drilling bored concrete pile construction
CN111608578B (en) * 2020-06-01 2021-11-16 中铁隧道局集团有限公司 A percussion drill for drilling bored concrete pile construction

Similar Documents

Publication Publication Date Title
CN206290207U (en) A kind of modified bored pile construction rig
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN102852457B (en) Follow-up drilling machine for down-hole hammer casing pipe
CN106194030B (en) A kind of double power head long spire rotation drill machine with casing and the method using its bored pile
WO2009049470A1 (en) A bored pile drilling machine
CN205840770U (en) A kind of impact type rotary drilling rig device being applicable to heavy caliber construction
CN104594802B (en) A kind of Combined hydraulic impacts hammer
CN207436901U (en) A kind of rotary drilling rig
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN102330536A (en) Lifting type diving rotary drilling rig with turbine pump
CN100485156C (en) Multiple shaft drilling machine and its construction method
CN102373705A (en) Pile sinking device and method for outer digging pre-stressed centrifugal pipe pile and square pile
CN205840781U (en) A kind of super three axes agitating pile of pebble layer
CN203256735U (en) Multi-shaft mixing pile device capable of reducing soil-squeezing effect
CN2204847Y (en) Multifunctional underwater drill
CN106089084A (en) A kind of super three axes agitating pile of pebble layer and stirring means thereof
CN215595492U (en) A reaming device for collapsible loess foundation handles
CN202788610U (en) Down-hole hammer sleeve follow-up drilling machine
CN201746831U (en) Turbopump-lifting downhole and rotary drilling machine
CN102926654B (en) Pile Hole Ring Cutting System and Pile Hole Ring Cutting Method
CN105386723A (en) Long spiral mast rotatable drilling machine
CN113969581A (en) Construction method for rock-entering pile planting
CN108978649B (en) High-pressure jet grouting foundation construction process
CN216950237U (en) Drilling device for piling on soft foundation ground
CN203584300U (en) Roof bolter with hoisting equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

Termination date: 20181223

CF01 Termination of patent right due to non-payment of annual fee