CN103956675B - Tool and method for inserting ground wire into soil and pulling ground wire out of soil - Google Patents
Tool and method for inserting ground wire into soil and pulling ground wire out of soil Download PDFInfo
- Publication number
- CN103956675B CN103956675B CN201410207634.4A CN201410207634A CN103956675B CN 103956675 B CN103956675 B CN 103956675B CN 201410207634 A CN201410207634 A CN 201410207634A CN 103956675 B CN103956675 B CN 103956675B
- Authority
- CN
- China
- Prior art keywords
- ground wire
- hammer
- soil
- sledgehammer
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Manufacturing Of Electrical Connectors (AREA)
Abstract
The invention belongs to the technical field of tools for inserting ground wires into soil and pulling the ground wires out of soil and discloses a tool and method for inserting a ground wire into soil and pulling the ground wire out of soil. The tool for inserting the ground wire into soil and pulling the ground wire out of soil is mainly characterized in that the tool comprises a sledge hammer, a base and a connecting sleeve, an insertion rod is arranged above the connecting sleeve, a pressure-bearing semicircular pipe which is open upwards is arranged at the top end of the insertion rod, the insertion rod and the connecting sleeve are connected through a height adjustment mechanism, a hammer handle fixing clip is arranged on the side face of the connecting sleeve, a hammer handle of the sledge hammer is fixed into the hammer handle fixing clip, a fixing bolt is arranged at the tail end of the hammer handle of the sledge hammer, and ground wire pulling hanging rings are arranged on the fixing bolt. During construction, the ground wire is hammered into soil with the sledge hammer; after construction, the ground wire pulling hanging rings are hung on a cross rod of the ground wire, the hammer handle is pressed onto the pressure-bearing semicircular pipe, and then the ground wire can be pulled out of soil according to the lever principle; the construction efficiency is improved, the labor intensity is relieved, the ground wire is prevented from being damaged or bent, the service life of the ground wire is prolonged, and the tool is more convenient to carry.
Description
Technical field
The invention belongs to electricity earthing cable plug-pull tool technical field, in particular relate to ground wire plug-pull tool and plug
The method of ground wire.
Background technology
In line maintenance, line upkeep, need for power circuit to pass through ground connection, to avoid danger of getting an electric shock
Danger.The ground wire end using at present is that " fourth " font inserts ground metallic rod, and during use, slotting ground metallic rod is inserted soil by needs
Interior, after the completion of construction, slotting ground metallic rod is extracted.Because soil property is different different with degree of drought, cause to be grounded OIR difficulty,
Especially in the harder soil of soil property.When pulling up ground wire, need to vibrate ground wire metallic rod with hammer, or manually rock
Or bend metallic rod in front and back, manually ground wire metallic rod is extracted, not only increase labour intensity, reduce efficiency, and
During vibrating or bending ground wire metallic rod, cause ground wire metal rod bending or fracture, shorten the use of ground wire
Life-span, metallic rod after bending upper once insert soil when more difficult.
Content of the invention
The present invention solve first technical problem be exactly provide a kind of property easy to use, safe good, extend ground wire make
Do not allow ground wire plug-pull tool flexible, that high working efficiency, labour intensity are little with life-span, ground wire.
For solving above-mentioned technical problem, technical scheme proposed by the present invention is:Including sledgehammer, base and accept sleeve pipe,
It is provided with insertion rod above described undertaking sleeve pipe, be provided with the pressure-bearing semi-circular tube of opening upwards on the top of this insertion rod, described
Insertion rod and described undertaking sleeve pipe are connected by height adjustment mechanism, are provided with hammer fixing card in described bearing sleeve tube side face,
The hammer of described sledgehammer, being fixed on described hammer in fixing card, is provided with fixing bolt in the hammer of described sledgehammer end,
It is provided with ground wire on this fixing bolt and rises and pull out suspension ring.
Its additional technical feature is:
Described height adjustment mechanism include described accept outer adjustment hole vertically on sleeve pipe, in described insertion rod
The interior adjustment hole mating with this outer adjustment hole of upper setting and insertion bolt composition, the described outer regulation of described insertion bolt insertion
Hole and interior regulation in the hole.
Second technical problem that the present invention solves is exactly to provide one kind to be plugged using above-mentioned ground wire plug-pull tool
The method of ground wire.
For solving above-mentioned technical problem, technical scheme proposed by the present invention is:
The method comprises the following steps:
The first step:Take out sledgehammer
The hammer handle of sledgehammer is taken out in hammer is fixing card;
Second step:Insertion ground wire
Ground wire lower end is placed in relevant position, a people hand steered ground wire vertical rod, another people is horizontal with sledgehammer impact ground wire
Bar, ground wire is inserted in ground;
3rd step:Extract ground wire
After the completion of construction, base is placed in the side of ground wire, ground wire is risen and pulls out suspension ring and hang on the cross bar of ground wire, and
By hammer being pressed on pressure-bearing semi-circular tube, adjust height adjustment mechanism as needed so that hammer is lower slightly end, then firmly hammer
First side, ground wire is partly pulled up, and then passes through to adjust height adjustment mechanism, pressure-bearing semi-circular tube is raised, continue with defeating
Tup side, until ground wire is pulled up;
4th step:Sledgehammer is packed up, and will hammer into shape insertion hammer in fixing card.
Ground wire plug-pull tool and the method for plug ground wire that the present invention provides, compared with the existing technology relatively have following
Advantage:First, due to including sledgehammer, base and accepting sleeve pipe, being provided with insertion rod above described undertaking sleeve pipe, in this insertion
The top of bar is provided with the pressure-bearing semi-circular tube of opening upwards, and described insertion rod and described undertaking sleeve pipe are by height adjustment mechanism even
Connect, be provided with hammer fixing card in described bearing sleeve tube side face, the hammer of described sledgehammer being fixed on described hammer in fixing card,
In the hammer of described sledgehammer, end is provided with fixing bolt, this fixing bolt is provided with ground wire rises and pull out suspension ring, when construction,
Take out sledgehammer, ground wire sledgehammer is hammered in ground, after the completion of construction, base is placed in the side of ground wire, ground wire is risen and pulls out
Suspension ring hang on the cross bar of ground wire, and by hammer being pressed on pressure-bearing semi-circular tube, adjust height adjustment mechanism as needed so that
Hammer is lower slightly end, then the firmly first side of hammer, and ground wire is partly pulled up, and then passes through to adjust height adjustment mechanism, general
Pressure-bearing semi-circular tube raises, and continues the first side of hammer of exerting oneself, until ground wire is pulled up, sledgehammer is packed up, when extracting ground wire,
Beat ground wire without sledgehammer, without bending and rocking ground wire, not only increase efficiency of construction, reduce labour intensity,
Do not result in ground wire to damage and bend, extend the service life of ground wire so that ground wire insertion next time ground wire is easier;
And all instruments is placed together, it is to avoid instrument disappearance, carry convenient;Second, due to described height adjustment mechanism
Including outer adjustment hole vertically on described undertaking sleeve pipe, in described insertion rod, setting is mated with this outer adjustment hole
Interior adjustment hole and insertion bolt composition, the described outer adjustment hole of described insertion bolt insertion and interior regulation in the hole, adjust more
Convenient.
Brief description
Fig. 1 is the structural representation of ground wire plug-pull tool of the present invention;
Fig. 2 has been the use state figure pulling out ground wire.
Specific embodiment
To ground wire plug-pull tool proposed by the invention and plug ground wire with specific embodiment below in conjunction with the accompanying drawings
Method is described further.
As depicted in figs. 1 and 2, the structural representation of the ground wire plug-pull tool providing for the present invention, this ground connection OIR
Instrument includes sledgehammer 2, base 1 and accepts sleeve pipe 3, is provided with insertion rod 4 accepting, on the top of this insertion rod 4 above sleeve pipe 3
End is provided with the pressure-bearing semi-circular tube 5 of opening upwards, and insertion rod 4 and undertaking sleeve pipe 3 are connected by height adjustment mechanism 6, are accepting
The side of sleeve pipe 3 is provided with hammer fixing card 7, and the hammer of sledgehammer 1 is fixed on 21 to be hammered into shape in fixing card 7, sledgehammer 2 hammer 21
End is provided with fixing bolt 8, is provided with ground wire and rises and pull out suspension ring 9 on this fixing bolt 8.When construction, take out sledgehammer 2, will
Ground wire 10 sledgehammer hammers in ground, after the completion of construction, base 1 is placed in the side of ground wire 10, ground wire is risen and pulls out suspension ring 9 and hang
On the cross bar 11 of ground wire 10, and hammer is pressed on pressure-bearing semi-circular tube 5 21, adjusts height adjustment mechanism 6 as needed, make
An end must be hammered into shape lower slightly, then the firmly first side of hammer, ground wire 10 is partly pulled up, then pass through to adjust height adjustment mechanism
6, pressure-bearing semi-circular tube 5 is raised, continues the first side of hammer of exerting oneself, until ground wire is pulled up, sledgehammer is packed up, is extracting ground connection
During line, beat ground wire without sledgehammer, without bending and rocking ground wire, not only increase efficiency of construction, reduce work
Intensity, does not result in ground wire and damages and bend, and extends the service life of ground wire so that ground wire inserts ground wire more next time
Easily;And all instruments is placed together, it is to avoid instrument disappearance, carry convenient.
Height adjustment mechanism 6 includes outer adjustment hole 61 vertically, setting in insertion rod 4 on accepting sleeve pipe 3
The interior adjustment hole 62 mating with this outer adjustment hole 61 and insertion bolt 63 form, insertion bolt 63 inserts outer adjustment hole 61 and interior
In adjustment hole 62, adjust convenient.
The method plugging ground wire using ground wire plug-pull tool, the method comprises the following steps:
The first step:Take out sledgehammer 2
The hammer of sledgehammer 2 is taken out in hammer is fixing card 7 21;
Second step:Insertion ground wire
Ground wire 10 lower end is placed in relevant position, a people hand steered ground wire vertical rod, another people impacts ground wire with sledgehammer
Cross bar 11, ground wire is inserted in ground;
3rd step:Extract ground wire
After the completion of construction, base 1 is placed in the side of ground wire 10, ground wire is risen and pulls out the cross bar that suspension ring 9 hang over ground wire
On 11, and hammer is pressed on pressure-bearing semi-circular tube 5 21, adjusts height adjustment mechanism 6 as needed so that hammer is lower slightly end,
Then exert oneself the first side of hammer, ground wire 10 partly pulled up, and then passes through to adjust height adjustment mechanism 6, by pressure-bearing semi-circular tube 5
Raise, continue the first side of hammer of exerting oneself, until ground wire is pulled up;
4th step:Sledgehammer 2 is packed up, and will hammer into shape 21 insertion hammers in fixing card 7.
Protection scope of the present invention is not limited solely to above-described embodiment, as long as structure and ground wire plug-pull tool of the present invention
Structure is identical, just falls in the scope of protection of the invention.
Claims (2)
1. ground wire plug-pull tool it is characterised in that:Including sledgehammer, base and undertaking sleeve pipe, set above described undertaking sleeve pipe
It is equipped with insertion rod, be provided with the pressure-bearing semi-circular tube of opening upwards, described insertion rod and described bearing sleeve on the top of this insertion rod
Pipe is connected by height adjustment mechanism, is provided with hammer fixing card in described bearing sleeve tube side face, the hammer of described sledgehammer is fixing
In described hammer in fixing card, in the hammer of described sledgehammer, end is provided with fixing bolt, this fixing bolt is provided with
Ground wire rises and pulls out suspension ring;Described height adjustment mechanism include described accept outer adjustment hole vertically on sleeve pipe, described
The interior adjustment hole mating with this outer adjustment hole of setting and insertion bolt composition in insertion rod, described insertion bolt inserts described
Outer adjustment hole and interior regulation in the hole.
2. usage right require 1 described in ground wire plug-pull tool carry out plug ground wire method it is characterised in that:The method
Comprise the following steps:
The first step:Take out sledgehammer
The hammer handle of sledgehammer is taken out in hammer is fixing card;
Second step:Insertion ground wire
Ground wire lower end is placed in relevant position, a people hand steered ground wire vertical rod, another people impacts ground wire cross bar with sledgehammer, will
In ground wire insertion ground;
3rd step:Extract ground wire
After the completion of construction, base is placed in the side of ground wire, ground wire is risen and pulls out suspension ring and hang on the cross bar of ground wire, and will hammer into shape
Being pressed on pressure-bearing semi-circular tube, adjust height adjustment mechanism as needed so that hammer is lower slightly end, then firmly hammer is first
Side, ground wire is partly pulled up, and then passes through to adjust height adjustment mechanism, pressure-bearing semi-circular tube is raised, continue hammer head of exerting oneself
Side, until ground wire is pulled up;
4th step:Sledgehammer is packed up, and will hammer into shape insertion hammer in fixing card.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410207634.4A CN103956675B (en) | 2014-05-16 | 2014-05-16 | Tool and method for inserting ground wire into soil and pulling ground wire out of soil |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410207634.4A CN103956675B (en) | 2014-05-16 | 2014-05-16 | Tool and method for inserting ground wire into soil and pulling ground wire out of soil |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103956675A CN103956675A (en) | 2014-07-30 |
CN103956675B true CN103956675B (en) | 2017-02-15 |
Family
ID=51333923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410207634.4A Active CN103956675B (en) | 2014-05-16 | 2014-05-16 | Tool and method for inserting ground wire into soil and pulling ground wire out of soil |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103956675B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106099446B (en) * | 2016-08-04 | 2018-06-15 | 广西大学 | A kind of high-voltage grounding wire clamp takes off bar self-locking device |
CN110467134A (en) * | 2018-05-10 | 2019-11-19 | 中石化石油工程技术服务有限公司 | One kind carving atural object pull-up |
CN110474223B (en) * | 2019-07-31 | 2020-12-01 | 国家电网有限公司 | Ground wire operating device |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE504946C2 (en) * | 1995-09-27 | 1997-06-02 | Bill Olsson | Method and apparatus for driving down an earth line including a telescopic support unit |
CN203289001U (en) * | 2013-04-24 | 2013-11-13 | 国家电网公司 | Wiring pile extractor |
CN103618235A (en) * | 2013-11-17 | 2014-03-05 | 国家电网公司 | Quick puller for temporary ground bar |
CN203813311U (en) * | 2014-05-16 | 2014-09-03 | 国网河北省电力公司衡水供电分公司 | Ground wire plugging tool |
-
2014
- 2014-05-16 CN CN201410207634.4A patent/CN103956675B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103956675A (en) | 2014-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103956675B (en) | Tool and method for inserting ground wire into soil and pulling ground wire out of soil | |
CN203300821U (en) | Grounding hammer drill | |
CN103259213B (en) | A kind of wiring pile extractor | |
CN203813311U (en) | Ground wire plugging tool | |
CN103618235A (en) | Quick puller for temporary ground bar | |
CN107246012A (en) | A kind of obstacle cleaning plant in the peg hole based on impact drill | |
CN204289737U (en) | Cable inspection earthing pricker | |
CN204282364U (en) | A kind of for beating short-circuit device | |
JP2005317300A (en) | Grounding device and its construction method | |
CN204326075U (en) | A kind of drill steel extracting apparatus | |
CN102832564B (en) | A kind of extracting apparatus of rod power ground | |
CN206332191U (en) | A kind of ground connection pole device | |
CN203289001U (en) | Wiring pile extractor | |
KR20160002583U (en) | Digging equipment for grounding construction | |
CN205122965U (en) | Ground rod pull -out device | |
CN104201598B (en) | Device for mounting and demounting grounding drill rod | |
CN204068023U (en) | Ground connection pricker assembling and disassembling device | |
CN203430416U (en) | Rope ladder ground fixer with oblique needle | |
CN103259153B (en) | A kind of electricity earthing cable grounding pin dismantling device | |
CN203248124U (en) | Well site ground wire inserted rod pull-out device | |
CN208767588U (en) | A kind of mounting device for right angle setting flexible ground body | |
CN208961926U (en) | A kind of wind turbine detaching device for coupling | |
CN105667106B (en) | Bogie is carved and beats grade of steel steel seal clamping tooling | |
CN203895728U (en) | Installing tool for grounding pin | |
CN105680276B (en) | Earthing pole impactor and squeeze into method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |