CN105649207A - Construction method and structure of spliced type standard temporary houses - Google Patents

Construction method and structure of spliced type standard temporary houses Download PDF

Info

Publication number
CN105649207A
CN105649207A CN201510113456.3A CN201510113456A CN105649207A CN 105649207 A CN105649207 A CN 105649207A CN 201510113456 A CN201510113456 A CN 201510113456A CN 105649207 A CN105649207 A CN 105649207A
Authority
CN
China
Prior art keywords
assembly
connector assembly
framework
standard relocation
relocation housing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510113456.3A
Other languages
Chinese (zh)
Other versions
CN105649207B (en
Inventor
龙敏健
陈静
彭振峰
黄韬
杨超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201510113456.3A priority Critical patent/CN105649207B/en
Publication of CN105649207A publication Critical patent/CN105649207A/en
Application granted granted Critical
Publication of CN105649207B publication Critical patent/CN105649207B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a construction method and structure of spliced type standard temporary houses. The construction method adopts a standard manufacturing mode, in the splicing process, only a framework adopts bolts for connection, other parts are all connected in a clamping or plugging mode, and the whole splicing process does not need welding. The framework is formed by bending and forming Q235 galvanized steel plates 3 mm thick overall, is high in strength and is not prone to rusting, thereby improving the circulation rate. All components are high in size accuracy and good in interchangeability, only galvanized bolts are adopted for connection in the splicing process, assembling and disassembling are simple, convenient and rapid, and the construction period is short. Combination is flexible, and office rooms, temporary meeting rooms, dormitories, dining rooms, bathrooms, toilets, standard rooms, power distribution rooms, water pump rooms and the like with different areas and different purposes can be obtained in a freely spliced mode. All wires are pre-buried in wall boards at a time when processed in a factory and do not need to be arranged on site. The construction method and structure of the spliced type standard temporary houses further have the characteristics of firmness, durability, dampproofness, wind resistance, fireproofness, corrosion resistance, heat insulation, sound insulation and heat preservation.

Description

The construction method of a kind of piecing assembly standard relocation housing and structure
Technical field
The present invention relates to the construction method of a kind of piecing assembly standard relocation housing and structure, belong to construction work and produce life temporary facilities technical field.
Background technology
The most outstanding feature of building enterprise is exactly that mobility is big, after a project completes, again accepts new projects' global transfer to another building site. In order to convenient transfer, the production at building scene, enterprise building site, office and living facilities are temporary structure mostly.
Traditional way is working-yard new everywhere, waste and scrap first can be utilized to set up some interim offices and lightly constructed and simply equipped building as office and life place, just abandon and process as building waste after need not or removing when finally withdrawing. Traditional way not only can cause the waste of material, also can leave a lot of building waste. Not meeting the theory of energy-conserving and environment-protective, country has promulgated " construction work civilized construction standard " for this reason, civilization and safety in production is had higher requirement, and therefore traditional way cannot meet requirement.
In order to adapt to the needs of civilized construction, some assembled type moveable plank houses are engendered in building trade. The appearance of these movable plank houses, serves certain promoter action, but there are some problems civilized construction. Standardization level such as movable plank house is low, interchangeability and use very flexible, assembled cumbersome. During structure, terrace is required high, it is necessary to lay 10cm rubble as basic unit, basic unit also to be laid 5cm pea gravel concreten surface layer. The existing movable plank house strength of materials is poor, and repeating utilization factor is low. The performances such as some material fire retardant anticorrosion, sound-insulating are not good, and working-yard office and dormitory condition are poor. After removing, building waste is many, is unfavorable for environment protection.
Summary of the invention
It is an object of the invention to, construction method and the structure of a kind of piecing assembly standard relocation housing are provided, by Virtual production mode, improve the standardization of components of prefabricated house, simplify assembled operation and improve assembled speed, substantially there is no building waste after dismounting, to improve the level of carrying out production strictly in line with rules and regulations of building operation, thus overcome the deficiencies in the prior art.
The technical scheme of the present invention is achieved in that
The construction method of a kind of piecing assembly standard relocation housing of the present invention is that the method is constructed according to the following steps:
Step one, the drawing designed all is transferred to professional factory process by stdn requirement;
Step 2, construct standard relocation housing basis in working-yard according to design paper;
Component needed for step 3, all standard relocation housings professional factory processed is transported to working-yard;
Step 4, with weight handling equipment, two root length beams are placed on standard relocation housing basis, then two short beams are inserted on the horizontal connector assembly of long beam-ends head, and with zinc coated bolt, short beam and connector assembly are fixed, form bottom framework;
Step 5, terrestrial components is installed on bottom framework;
Step 6, four root posts are inserted in long beam-ends head erect on connector assembly, and with zinc coated bolt, column and connector assembly are fixed;
Step 7, wall assemblies is arranged between two columns;
Step 8, on ground, two short beams are inserted on the horizontal connector assembly of long beam-ends head, and with zinc coated bolt, short beam and connector assembly are fixed, form top frame;
Step 9, the assembling completing roof assembly and top frame on ground;
Step 10, with weight handling equipment, by being provided with, four bottom the top frame of roof assembly erect to connector assembly and four root post top grafting, and top frame and column are fixed with zinc coated bolt; Complete standard relocation housing assembled.
In aforementioned method, described standard relocation housing basis is the rectangle frame corresponding with bottom framework size of the prefabricated reinforced concrete bar formation being embedded in smooth ground, and the end face of rectangle frame is concordant with ground and is in horizontality.
In aforementioned method, described long beam, short beam, column and connector assembly are all be converted into, with Q235 hot-dip galvanizing sheet steel, the steel post that cross section is L-type two end band flange; Wherein the cross section of connector assembly is dimensioned slightly smaller than the cross section size of short beam and column, to insert short beam and column.
A kind of piecing assembly standard relocation housing structure of the present invention formed as stated above is that described standard relocation housing is case structure, comprises the rectangular parallelepiped framework assembled by long beam, short beam and column; Each drift angle of rectangular parallelepiped framework is equipped with stiffening plate, for bundling the erection opening of wireline when stiffening plate is provided with lifting; Chang Liang two ends are welded with horizontal connector assembly respectively and erect to connector assembly; Horizontal connector assembly and short beam grafting also form bottom framework and top frame through zinc coated bolt is fixing; Erect to connector assembly and column grafting and through zinc coated bolt fixing formation rectangular parallelepiped framework; The bottom surface of rectangular parallelepiped framework is provided with terrestrial components, and the end face of rectangular parallelepiped framework is provided with roof assembly; Rectangular parallelepiped framework surrounding is provided with wall assemblies.
In aforementioned structure, described wall assemblies comprises the side wall being arranged on rectangular parallelepiped framework two sides and the headwall being arranged on rectangular parallelepiped framework both ends of the surface; Headwall is provided with door assembly and/or window assembly, and wall assemblies is provided with supply socket, power switch and/or switch box; The junction of terrestrial components and wall assemblies is provided with baseboard; Roof assembly. Ornamental strip it is provided with everywhere with the corner of the junction of wall assemblies and wall assemblies.
In aforementioned structure, described side wall and headwall are formed by one group of wallboard, and wallboard is chromatic steel sandwich plate, is filled with rock wool in chromatic steel sandwich plate; One side of wallboard is provided with tenon, and another side of wallboard is provided with groove; Wallboard is assembled into side wall or headwall through tongue-and-groove.
In aforementioned structure, in described chromatic steel sandwich plate, side is provided with supply socket, trip switch and/or switch box, is provided with PVC spool in chromatic steel sandwich plate, is provided with supply lead in PVC spool, and supply lead two ends are provided with web member.
In aforementioned structure, described terrestrial components comprises cement pressure plate, and cement pressure plate is equipped with anti-skidding PVC floor.
In aforementioned structure, described roof assembly comprises ceiling board, is equipped with rock wool fireproof heat-insulation plate above ceiling board, and ceiling board bottom surface is provided with LED energy-saving lamp.
In aforementioned structure, described terrestrial components is stuck between the L-type two ends flange of bottom framework in the card groove formed; Roof assembly is stuck between the L-type two ends flange of top frame in the card groove formed; Roof assembly end face is provided with waterproof layer.
Owing to have employed technique scheme, the present invention is compared with prior art, the topmost feature of the present invention is that all components of standard relocation housing are by professional factory standardized production, substantially increase the dimensional precision height of each component, time assembled, interchangeability is good, and assembled process all adopts zinc coated bolt to connect without the need to welding. Mounting or dismounting are easy, quick, short construction period. The present invention combines flexibly, assembling combination can go out different area, the office of different purposes, temporary meeting room, dormitory, dining room, bathroom, toilet, mark foster room, distribution room, water plant etc. as required. Electric installation and electric wire in the present invention are all in place when factory process, and respective wire only connects during assembling trouble by number that can eliminate field wiring. It is low that the present invention also has cost of manufacture, the feature of sturdy and durable, moistureproof, windproof, fire prevention, anticorrosion, heat insulation, sound insulation, insulation.
Two floor, 10 dormitory under 5 on assembled one 5, the settling time in traditional activity room needs 5 days, and the present invention only needs 3 days, shortens 2 days durations. Standard relocation housing can also be assembled by the present invention in factory, after transporting to building site, directly can use after lifting. Only need two days according to integral hoisting the present invention, 3 days durations can be shortened. The present invention, when shifting building site, can remove the office accommodations in standard relocation housing and equipment, and Integral lifting entrucking is transported. Reaching 15 years working life of the present invention, can repeat turnover and use 6 times, lose little in turnover process, the building waste of generation is almost negligible.
The following is the present invention and the comparative analysis of traditional activity room making use cost. Working-yard is in Shanghai, and source mill is in Suzhou. Specify according to relevant current specifications, traditional color steel sandwich board prefabricated house duration of service summation must not more than 5 years, turnover number of times must not more than 3 times.
The unit price in existing traditional activity room is 310 yuan/m 2 (comprising mounting cost), 66 yuan/m is considered in transport, mounting cost Shanghai to Suzhou 2 , temporary electricity mounting cost considers 25 yuan/m 2 , traditional activity room terrace needs construction separately, it is to construct for 10cm crushed rock base course adds 5cm pea gravel concreten surface layer, unit price considers 21.75 yuan/m 2 Considering the anti-wind scarce capacity in traditional activity room in addition, typhoon season need to increase safeguard procedures expense by every square meter 7.5 yuan consideration, and traditional activity room uses turnover number of times to consider 3 times, installation, the expense of setting up consider 2 times, and between every, traditional activity board house is of a size of 6000 �� 3640=21.84m 2 , between every, prefabricated house considers burglary-resisting window materials cost and mounting cost 70 yuan/door frame, and 2 door frames between every, every square meter expense is 70 �� 2 �� 21.84=6.41 unit/m 2 , then the every square meter in traditional activity room once the expense of amortizing be: (310+66 �� 2+25 �� 3+21.75 �� 3+7.5 �� 3+6.41 �� 3) �� 3=207.99 unit/m 2 . Prefabricated house is installed and removed loss every time and is considered 25%, then traditional activity room is once amortized actual cost and is: 207.99+207.99 �� 25%=259.99 unit/m 2 ��
The standard relocation housing area of the present invention is 6158 �� 3000, then the area of a standard room is 18.474m 2 .Unit price is 16800 yuan, and transport mounting cost considers that Shanghai to Suzhou is 63 yuan/m 2 , temporary electricity mounting cost considers 8 yuan/m 2 , turnover number of times considers 6 times. Then every square meter assembled prefabricated house unit price is: 16800 �� 18.474=909.38 unit/m 2 , turnover uses 6 times, then expense of once amortizing is: (909+63 �� 6+8 �� 6) �� 6=222.50 unit/m 2 . Fabricated construction temporary facilities mounting or dismounting loss by 5% consideration, then reality once the expense of amortizing be: 22.50+222.50 �� 5%=233.63 unit/m 2 , therefore adopt fabricated construction temporary facilities every square meter compared with traditional prefabricated house to reduce expenses: 259.99-233.63=26.36(unit).
On assembling 15, the expense of 5 times totally 10 relocation housings of the present invention is: 18.474 �� 233.63 �� 10=43160.81(unit).
On assembling 15, the expense in 5 times totally 10 traditional activity rooms is: 21.84 �� 259.99 �� 10=56781.82(unit).
Then assemble on 155 times totally 10 relocation housings of the present invention with set up on 155 times totally 10 traditional activity rooms compare can save 56781.82-43160.81=13621.01(unit). Not only one, building site, at least need several even more, its economic benefit is considerable.
Accompanying drawing explanation
Fig. 1 is the assembling flow path schematic diagram of standard relocation housing;
Fig. 2 is the structural representation one of standard relocation housing;
Fig. 3 is the structural representation two of standard relocation housing;
Fig. 4 is the connection structural representation of long beam and short beam and column;
Fig. 5 is the connection diagram of terrestrial components and bottom framework;
Fig. 6 is the connection diagram of roof assembly and top frame;
Fig. 7 is the connection diagram of wall assemblies and column.
The long beam of being labeled as in accompanying drawing: 1-, the short beam of 2-, 3-column, 4-stiffening plate, 5-erection opening, the horizontal connector assembly of 6-, 7-erects to connector assembly, 8-zinc coated bolt, 9-terrestrial components, 10-roof assembly, 11-side wall, 12-headwall, 13-supply socket, 14-power switch, 15-door assembly, 16-window assembly, 17-baseboard, 18-cement pressure plate, the anti-skidding PVC floor of 19-, 20-ceiling board, 21-rock wool fireproof heat-insulation plate, 22-LED energy-saving lamp, 23-waterproof layer, 24-switch box, 25-ornamental strip, 26-chromatic steel sandwich plate, 27-rock wool, 28-tenon, 29-groove, 30-standard relocation housing basis.
Embodiment
Below in conjunction with drawings and Examples, the present invention is described in further detail, but not as any limitation of the invention.
The construction method of a kind of piecing assembly standard relocation housing of the present invention, shown in Fig. 1, the method is constructed according to the following steps:
Step one, the drawing designed all is transferred to professional factory process by stdn requirement;
Step 2, construct standard relocation housing basis in working-yard according to design paper; Standard relocation housing basis 30 as in Fig. 1 1. shown in, be on smooth ground, bury prefabricated reinforced concrete bar underground, prefabricated reinforced concrete bar form the rectangle frame corresponding with bottom framework size, the end face of rectangle frame is concordant with ground and is in horizontality.
Component needed for step 3, all standard relocation housings professional factory processed is transported to working-yard;
Step 4, as in Fig. 1 2. shown in, with weight handling equipment, two root length beams 1 are placed on installation foundation 30, for another example in Fig. 1 3. shown in, two short beams 2 are inserted on the horizontal connector assembly 6 of long beam 1 termination, and with zinc coated bolt 8, short beam 2 is fixed with horizontal connector assembly 6, form bottom framework;
Step 5, as in Fig. 1 4. shown in, bottom framework is installed terrestrial components 9;
Step 6, as in Fig. 1 5. shown in, what four root posts 3 were inserted in long beam 1 termination erects on connector assembly 7, and is fixed to connector assembly 7 with erecting by column 3 with zinc coated bolt 8;
Step 7, as in Fig. 1 6. shown in, wall assemblies is arranged between two columns 3;
Step 8, as in Fig. 1 7. shown in, on ground, two short beams 2 are inserted on the horizontal connector assembly 6 of long beam 1 termination, and with zinc coated bolt 8, short beam 2 and horizontal connector assembly 6 are fixed, form top frame;
Step 9, the assembling completing roof assembly 10 and top frame on ground, can also fill LED energy-saving lamp 22 simultaneously in the lump;
Step 10, as in Fig. 1 8. shown in, with weight handling equipment, by being provided with, four bottom the top frame of roof assembly 10 erect to connector assembly 7 and four root post 3 top grafting, and top frame and column 3 are fixed with zinc coated bolt 8; Complete standard relocation housing assembled.
Described long beam 1, short beam 2, column 3 and connector assembly are all be converted into, with Q235 hot-dip galvanizing sheet steel, the steel post that cross section is L-type two end band flange as shown in Figure 4; Wherein the cross-sectional shape of connector assembly (comprise horizontal connector assembly 6 and erect to connector assembly 7) is identical, but is dimensioned slightly smaller than the cross section size of short beam 2 and column 3, to insert short beam 2 and column 3.
The piecing assembly standard relocation housing structure formed as stated above, as shown in Figures 2 and 3, described standard relocation housing is case structure, comprise the rectangular parallelepiped framework assembled by long beam 1, short beam 2 and column 3, each drift angle of rectangular parallelepiped framework is equipped with stiffening plate 4, for bundling the erection opening 5 of wireline when stiffening plate 4 is provided with lifting. The connection structure of long beam 1 and short beam 2 and column 3 is as shown in Figure 4, long beam 1 two ends are welded with horizontal connector assembly 6 respectively and erect to connector assembly 7, and horizontal connector assembly 6 is pressed direction grafting shown in horizontal arrow in Fig. 4 with short beam 2 and fixed through zinc coated bolt 8 and form bottom framework and top frame; Erect and form rectangular parallelepiped framework to connector assembly 7 and column 3 by Fig. 4 erecting fix to the grafting of direction shown in arrow and through zinc coated bolt 8; The bottom surface of rectangular parallelepiped framework is provided with terrestrial components 9, and the end face of rectangular parallelepiped framework is provided with roof assembly 10; Rectangular parallelepiped framework surrounding is provided with wall assemblies. As shown in Figures 2 and 3, wall assemblies comprises the side wall 11 being arranged on rectangular parallelepiped framework two sides and the headwall 12 being arranged on rectangular parallelepiped framework both ends of the surface; Headwall 12 is provided with door assembly 15 and/or window assembly 16, and wall assemblies is provided with supply socket 13, power switch 14 and/or switch box 24; Terrestrial components 9 is provided with baseboard 17 with the junction of wall assemblies; Roof assembly 10. Ornamental strip 25 it is provided with everywhere with the corner of the junction of wall assemblies and wall assemblies. Side wall 11 and headwall 12 are formed by one group of wallboard, and wallboard is illustrated in figure 7 chromatic steel sandwich plate 26, is filled with rock wool 27 in chromatic steel sandwich plate; One side of wallboard is provided with tenon 28, and another side of wallboard is provided with groove 29; Wallboard is assembled into side wall 11 or headwall 12 through tongue-and-groove. As shown in Figures 2 and 3, in chromatic steel sandwich plate, side is provided with supply socket 23, trip switch 24 and/or switch box 25. Being provided with PVC spool (not shown in FIG.) in chromatic steel sandwich plate, be provided with supply lead in PVC spool, supply lead two ends are provided with web member. Terrestrial components 9 as shown in Figure 5, comprises cement pressure plate 18, and cement pressure plate 18 is equipped with anti-skidding PVC floor 19.Roof assembly 10 comprises ceiling board 20 as shown in Figure 6, is equipped with rock wool fireproof heat-insulation plate 21 above ceiling board 20, and ceiling board 20 bottom surface is provided with LED energy-saving lamp 22(and sees Fig. 3). If when standard relocation housing is used for the top layer of one layer of one-storey house or building, it is also possible to lay waterproof layer 23 at rock wool fireproof heat-insulation plate 21 end face. When preventing rainy, rainwater infiltrates. All as shown in Figure 5 and Figure 6, terrestrial components 9 is stuck between the L-type two ends flange of bottom framework in the card groove formed for terrestrial components 9 and roof assembly 10; Roof assembly 10 is stuck between the L-type two ends flange of top frame in the card groove formed, it is not necessary to welding or bolt are fixed; Roof assembly 9 end face is provided with waterproof layer 3.
Embodiment
The at present office of just flourish in just honor of Jiujiang Wanda, Suzhou, Han Bi building, Nanjing, Nanjing, 9 projects such as Taizhou silver is safe, melt letter platinum gulf, symphysis international square, Zhujiang River International trade center/hotel, Hongqiao are just flourish of the standard relocation housing of the present invention, life and production temporary facilities are applied, can fully meet on-the-spot needs, achieve good effect.
Standard relocation housing length, width and height of the present invention are of a size of 6158 �� 3000 �� 2700mm; Its width dimensions 640mm less of traditional activity room width 3640mm, one is the maximum width considering not exceed when transporting transport by road requirement; Two is owing to width dimensions reduces, and terrestrial components span is reduced, and intensity is higher. Standard relocation housing of the present invention by rock cotton board wallboard/containing door and window amount to 18 pieces, 4, zinc-plated column, roof assembly 1 overlaps, terrestrial components 1 is overlapped, electrically the accessory such as circuit, controlling box, light fixture form, 1 twenty-feet equivalent unit gross weight about 1.9 tons, deadweight is light, is convenient to lifting and transport. The all components of prefabricated house of the present invention all adopt zinc coated bolt to connect, and skeleton, wallboard all adopt zinc-plating material, erosion resistance height. The connection of the present invention's each component when designing fully considers accessibility and the agility of assembling, can carry out assembly and disassembly fast. The thick Q235 hot-dip galvanizing sheet steel of the good 3mm of intensity is adopted to be converted into into the steel post that cross section is L-type two end band flange in the design of framework; Long beam 1 two ends of framework are welded with identical with column shape with short beam, the connector assembly of undersized, and when assembly rectangular parallelepiped framework, the mode adopting grafting and bolt to fix, assembles very convenient. Intensity also meets the requirement repeatedly having enough to meet the need use. And can stock and repeatedly have enough to meet the need use. Standard relocation housing of the present invention all adopts zinc coated bolt to connect, and flexibly, installation and removal are quick in assembling, and can according to on-the-spot actual needs assembling different area, the office of different purposes, production, life temporary facilities. Prefabricated house of the present invention basis adopts builds a circle concrete continuous footing in whole casing surrounding; Terrestrial components adopts 18mm solid cement pressure plate, and the anti-skidding PVC floor of upper berth 1.8mm, can repeatedly have enough to meet the need use; Subject type Steel Skeleton adopts the thick Q235 hot-dip galvanizing sheet steel of 3mm to fold and is welded into web member, all adopts zinc coated bolt to connect into rectangular parallelepiped skeleton construction; All electric wires are buried in advance in wallboard by standard relocation housing of the present invention while factory manufactures, and can directly install switch and socket, do not need again to lay house wire when being transported to site assembly; When standard relocation housing of the present invention designs, aluminium alloy window has considered anti-theft guardrail, disposable installation time assembled; The all components of standard relocation housing of the present invention are all prefabricated in advance in factory, are transported to site assembly, and construction speed is fast, cheap, repeating utilization factor height.
The standard relocation housing subject type Steel Skeleton of the present invention adopts the thick Q235 hot-dip galvanizing sheet steel of 3mm to fold and is welded into web member, mutually with bolts;Wallboard is the two-sided 0.5mm chromatic steel sandwich plate of 60mm rock wool. Between bathroom, toilet, dining room, steamed rice, mark and support the room employing color steel of the fire-retardant outer one side of 60mm and interior single-side stainless steel sandwich board; Roofing top board adopt thickness be the color fire-retardant sandwich board of steel of the two-sided 0.5mm of 50mm as ceiling board, ceiling board is laid 50mm rock wool fireproof thermal-insulation layer; Base plate adopts 18mm solid cement pressure plate, and lays the thick anti-skidding PVC floor of 1.8mm; Door and window adopts aluminum alloy doors and windows, and window uses transparent toughened glass, and adds aluminum alloy anti-burglary railing; Illuminating line adopts 1.5mm 2 Electric wire, air-conditioning system adopt 2.5mm 2 Electric wire, electricity case adopt PVC electricity case, day stream PVC spool be DN25 spool, office illumination adopt 18WLED energy-saving daylight lamp, dormitory adopt 9W LED energy-saving daylight lamp; Require to meet Zhong Jian main office CI in appearance: rectangular parallelepiped framework and doorframe build blueness in painting, and wall assemblies and door paint lime look, and material of paint all adopts KCC priming paint+polyurethane finish.

Claims (10)

1. the construction method of a piecing assembly standard relocation housing, it is characterised in that: the method is constructed according to the following steps:
Step one, the drawing designed all is transferred to professional factory process by stdn requirement;
Step 2, construct standard relocation housing basis in working-yard according to design paper;
Component needed for step 3, all standard relocation housings professional factory processed is transported to working-yard;
Step 4, with weight handling equipment, two root length beams are placed on standard relocation housing basis, then two short beams are inserted on the horizontal connector assembly of long beam-ends head, and with zinc coated bolt, short beam and connector assembly are fixed, form bottom framework;
Step 5, terrestrial components is installed on bottom framework;
Step 6, four root posts are inserted in long beam-ends head erect on connector assembly, and with zinc coated bolt, column and connector assembly are fixed;
Step 7, wall assemblies is arranged between two columns;
Step 8, on ground, two short beams are inserted on the horizontal connector assembly of long beam-ends head, and with zinc coated bolt, short beam and connector assembly are fixed, form top frame;
Step 9, the assembling completing roof assembly and top frame on ground;
Step 10, with weight handling equipment, by being provided with, four bottom the top frame of roof assembly erect to connector assembly and four root post top grafting, and top frame and column are fixed with zinc coated bolt; Complete standard relocation housing assembled.
2. the construction method of piecing assembly standard relocation housing according to claim 1, it is characterized in that: described standard relocation housing basis is the rectangle frame corresponding with bottom framework size of the prefabricated reinforced concrete bar formation being embedded in smooth ground, and the end face of rectangle frame is concordant with ground and is in horizontality.
3. the construction method of piecing assembly standard relocation housing according to claim 1, it is characterised in that: described long beam, short beam, column and connector assembly are all be converted into, with Q235 hot-dip galvanizing sheet steel, the steel post that cross section is L-type two end band flange; Wherein the cross section of connector assembly is dimensioned slightly smaller than the cross section size of short beam and column, to insert short beam and column.
4. the piecing assembly standard relocation housing structure formed by either method described in claims 1 to 3, it is characterised in that: described standard relocation housing is case structure, comprises the rectangular parallelepiped framework assembled by long beam (1), short beam (2) and column (3); Each drift angle of rectangular parallelepiped framework is equipped with stiffening plate (4), for bundling the erection opening (5) of wireline when stiffening plate (4) is provided with lifting;Long beam (1) two ends are welded with horizontal connector assembly (6) respectively and erect to connector assembly (7); Horizontal connector assembly (6) is with (2) grafting of short beam and through zinc coated bolt (8) fixing formation bottom framework and top frame; Erect to connector assembly (7) with column (3) grafting and through zinc coated bolt (8) fixing formation rectangular parallelepiped framework; The bottom surface of rectangular parallelepiped framework is provided with terrestrial components (9), and the end face of rectangular parallelepiped framework is provided with roof assembly (10); Rectangular parallelepiped framework surrounding is provided with wall assemblies.
5. piecing assembly standard relocation housing structure according to claim 4, it is characterised in that: described wall assemblies comprises the side wall (11) being arranged on rectangular parallelepiped framework two sides and the headwall (12) being arranged on rectangular parallelepiped framework both ends of the surface; Headwall (12) is provided with door assembly (15) and/or window assembly (16), and wall assemblies is provided with supply socket (13), power switch (14) and/or switch box (24); Terrestrial components (9) is provided with baseboard (17) with the junction of wall assemblies; Roof assembly (10),
Ornamental strip (25) it is provided with everywhere with the corner of the junction of wall assemblies and wall assemblies.
6. piecing assembly standard relocation housing structure according to claim 5, it is characterised in that: described side wall (11) and headwall (12) are formed by one group of wallboard, and wallboard is chromatic steel sandwich plate (26), are filled with rock wool (27) in chromatic steel sandwich plate; One side of wallboard is provided with tenon (28), and another side of wallboard is provided with groove (29); Wallboard is assembled into side wall (11) or headwall (12) through tongue-and-groove.
7. piecing assembly standard relocation housing structure according to claim 6, it is characterized in that: in described chromatic steel sandwich plate, side is provided with supply socket (23), trip switch (24) and/or switch box (25), PVC spool it is provided with in chromatic steel sandwich plate, being provided with supply lead in PVC spool, supply lead two ends are provided with web member.
8. piecing assembly standard relocation housing structure according to claim 4, it is characterised in that: described terrestrial components (9) comprises cement pressure plate (18), and cement pressure plate (18) is equipped with anti-skidding PVC floor (19).
9. piecing assembly standard relocation housing structure according to claim 4, it is characterized in that: described roof assembly (10) comprises ceiling board (20), ceiling board (20) top is equipped with rock wool fireproof heat-insulation plate (21), and ceiling board (20) bottom surface is provided with LED energy-saving lamp (22).
10. piecing assembly standard relocation housing structure according to claim 4, it is characterised in that: described terrestrial components (9) is stuck between the L-type two ends flange of bottom framework in the card groove formed; Roof assembly (10) is stuck between the L-type two ends flange of top frame in the card groove formed; Roof assembly (9) end face is provided with waterproof layer (23).
CN201510113456.3A 2015-03-16 2015-03-16 A kind of construction method and structure of pin-connected panel standard relocation housing Active CN105649207B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510113456.3A CN105649207B (en) 2015-03-16 2015-03-16 A kind of construction method and structure of pin-connected panel standard relocation housing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510113456.3A CN105649207B (en) 2015-03-16 2015-03-16 A kind of construction method and structure of pin-connected panel standard relocation housing

Publications (2)

Publication Number Publication Date
CN105649207A true CN105649207A (en) 2016-06-08
CN105649207B CN105649207B (en) 2018-10-30

Family

ID=56481558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510113456.3A Active CN105649207B (en) 2015-03-16 2015-03-16 A kind of construction method and structure of pin-connected panel standard relocation housing

Country Status (1)

Country Link
CN (1) CN105649207B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368311A (en) * 2016-10-26 2017-02-01 南宁众创空间科技有限公司 Simplified house
CN107012950A (en) * 2017-05-20 2017-08-04 邓雪云 Green energy conservation assembled architecture and construction method
CN107060379A (en) * 2017-01-17 2017-08-18 优居优住家居装饰(北京)有限公司 A kind of bathroom construction method
CN107130684A (en) * 2017-05-26 2017-09-05 北京北玻硅巢技术有限公司 A kind of fabricated structure and its construction method
CN107299685A (en) * 2017-07-04 2017-10-27 陈贵 It is a kind of can the quickly assembled and disassembled removable room of packing and transporting
CN107327162A (en) * 2017-06-05 2017-11-07 湖北源盛钢构有限公司 A kind of novel fabricated building
CN107355095A (en) * 2017-07-26 2017-11-17 长沙天鹏泵业制造有限公司 Novel all-in-one assembled pump house and its assemble method
CN107451327A (en) * 2017-06-26 2017-12-08 福建省建筑设计研究院 The BIM Component Modelings system and modeling method for assigning component tax plus layer are divided with working region
CN107476616A (en) * 2017-09-27 2017-12-15 广东电网有限责任公司茂名供电局 A kind of prefabricated assembled low-voltage power distribution room and manufacture method
CN108166568A (en) * 2018-02-11 2018-06-15 成都市阳光电器工业有限公司 A kind of assembled, which integrates, irrigates by lifting water to a higher level with a water pump, etc. pump house
CN108301653A (en) * 2018-03-28 2018-07-20 广东海悟科技有限公司 A kind of quick-assembling small-sized antitheft armor computer room
CN109138523A (en) * 2018-10-25 2019-01-04 中冶天工(天津)装备制造有限公司 The removable assembling type steel structure of corner post builds single open-door toilette modules
CN109267644A (en) * 2018-10-23 2019-01-25 中国冶集团有限公司 One kind assembling dismountable mobile structure board house entirely
CN109663862A (en) * 2019-01-30 2019-04-23 河北玉发压瓦机设备有限公司 Four side covering cap seaming machine of box-type room roof
CN109853743A (en) * 2018-12-27 2019-06-07 安徽企服工程技术有限公司 A kind of modular assembly formula steel structure technique and its assembly method
CN110080564A (en) * 2019-04-25 2019-08-02 中国电建集团江西省电力设计院有限公司 A kind of main body module and preparation method thereof of transforming plant assembly type guardroom
CN110528701A (en) * 2019-08-23 2019-12-03 中建科技(福州)有限公司 A kind of the Bar Anchorage connection structure and connection method of prefabricated assembled concrete component
CN113250344A (en) * 2021-05-25 2021-08-13 江苏省苏中建设集团股份有限公司 Assembled dampproofing building wall
CN113914664A (en) * 2021-11-01 2022-01-11 中国人民解放军32181部队 Quick-inserting combined movable house with door pocket
CN114771723A (en) * 2022-03-17 2022-07-22 江西朝阳机械有限公司 Cabin unit for boats and ships of convenient combination
CN114809725A (en) * 2022-07-01 2022-07-29 北京凯隆分析仪器有限公司 Assembled movable house
CN115126156A (en) * 2022-06-13 2022-09-30 珠海采筑电子商务有限公司 Bearing column of assembled movable house and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201151950Y (en) * 2007-07-16 2008-11-19 金胜财 Dismounting type integral hoisting movable dwellings
WO2009108986A1 (en) * 2008-03-07 2009-09-11 Francesco Antonio Martino A transportable building including a roof structure for stacking of multiple buildings
CN102913002A (en) * 2012-11-22 2013-02-06 北京城乡建设集团有限责任公司 Integrated steel structure movable room and mounting method thereof
CN203821595U (en) * 2014-04-16 2014-09-10 广东一百集成房屋有限公司 Container type movable house
CN104074267A (en) * 2014-07-04 2014-10-01 中国石油集团长城钻探工程有限公司工程服务公司 Dismountable skid-mounted steel structure camping house
CN203924359U (en) * 2014-05-14 2014-11-05 湖南绿广景观新材料有限公司 A kind of stand column and beam connector
CN104389349A (en) * 2014-11-29 2015-03-04 山东双得利建设科技有限公司 Novel house capable of being fast disassembled and assembled and assembling method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201151950Y (en) * 2007-07-16 2008-11-19 金胜财 Dismounting type integral hoisting movable dwellings
WO2009108986A1 (en) * 2008-03-07 2009-09-11 Francesco Antonio Martino A transportable building including a roof structure for stacking of multiple buildings
CN102913002A (en) * 2012-11-22 2013-02-06 北京城乡建设集团有限责任公司 Integrated steel structure movable room and mounting method thereof
CN203821595U (en) * 2014-04-16 2014-09-10 广东一百集成房屋有限公司 Container type movable house
CN203924359U (en) * 2014-05-14 2014-11-05 湖南绿广景观新材料有限公司 A kind of stand column and beam connector
CN104074267A (en) * 2014-07-04 2014-10-01 中国石油集团长城钻探工程有限公司工程服务公司 Dismountable skid-mounted steel structure camping house
CN104389349A (en) * 2014-11-29 2015-03-04 山东双得利建设科技有限公司 Novel house capable of being fast disassembled and assembled and assembling method thereof

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368311A (en) * 2016-10-26 2017-02-01 南宁众创空间科技有限公司 Simplified house
CN107060379A (en) * 2017-01-17 2017-08-18 优居优住家居装饰(北京)有限公司 A kind of bathroom construction method
CN107012950A (en) * 2017-05-20 2017-08-04 邓雪云 Green energy conservation assembled architecture and construction method
CN107012950B (en) * 2017-05-20 2019-08-02 湖北广盛建筑产业化科技有限公司 Green energy conservation assembled architecture and construction method
CN107130684A (en) * 2017-05-26 2017-09-05 北京北玻硅巢技术有限公司 A kind of fabricated structure and its construction method
CN107327162A (en) * 2017-06-05 2017-11-07 湖北源盛钢构有限公司 A kind of novel fabricated building
CN107451327A (en) * 2017-06-26 2017-12-08 福建省建筑设计研究院 The BIM Component Modelings system and modeling method for assigning component tax plus layer are divided with working region
CN107299685A (en) * 2017-07-04 2017-10-27 陈贵 It is a kind of can the quickly assembled and disassembled removable room of packing and transporting
CN107355095A (en) * 2017-07-26 2017-11-17 长沙天鹏泵业制造有限公司 Novel all-in-one assembled pump house and its assemble method
CN107476616A (en) * 2017-09-27 2017-12-15 广东电网有限责任公司茂名供电局 A kind of prefabricated assembled low-voltage power distribution room and manufacture method
CN108166568A (en) * 2018-02-11 2018-06-15 成都市阳光电器工业有限公司 A kind of assembled, which integrates, irrigates by lifting water to a higher level with a water pump, etc. pump house
CN108301653A (en) * 2018-03-28 2018-07-20 广东海悟科技有限公司 A kind of quick-assembling small-sized antitheft armor computer room
CN109267644A (en) * 2018-10-23 2019-01-25 中国冶集团有限公司 One kind assembling dismountable mobile structure board house entirely
CN109267644B (en) * 2018-10-23 2021-01-19 中国一冶集团有限公司 Complete-assembly detachable movable building board house
CN109138523A (en) * 2018-10-25 2019-01-04 中冶天工(天津)装备制造有限公司 The removable assembling type steel structure of corner post builds single open-door toilette modules
CN109853743A (en) * 2018-12-27 2019-06-07 安徽企服工程技术有限公司 A kind of modular assembly formula steel structure technique and its assembly method
CN109853743B (en) * 2018-12-27 2021-01-29 安徽企服工程技术有限公司 Modular assembly type steel structure building system and assembly method thereof
CN109663862A (en) * 2019-01-30 2019-04-23 河北玉发压瓦机设备有限公司 Four side covering cap seaming machine of box-type room roof
CN109663862B (en) * 2019-01-30 2024-04-02 河北玉发压瓦机设备有限公司 Box-type house roof four-edge skin serging machine
CN110080564A (en) * 2019-04-25 2019-08-02 中国电建集团江西省电力设计院有限公司 A kind of main body module and preparation method thereof of transforming plant assembly type guardroom
CN110528701A (en) * 2019-08-23 2019-12-03 中建科技(福州)有限公司 A kind of the Bar Anchorage connection structure and connection method of prefabricated assembled concrete component
CN110528701B (en) * 2019-08-23 2020-12-08 中建科技(福州)有限公司 Steel bar anchoring connection structure and connection method of prefabricated concrete member
CN113250344A (en) * 2021-05-25 2021-08-13 江苏省苏中建设集团股份有限公司 Assembled dampproofing building wall
CN113914664A (en) * 2021-11-01 2022-01-11 中国人民解放军32181部队 Quick-inserting combined movable house with door pocket
CN114771723A (en) * 2022-03-17 2022-07-22 江西朝阳机械有限公司 Cabin unit for boats and ships of convenient combination
CN114771723B (en) * 2022-03-17 2023-04-18 江西朝阳机械有限公司 Cabin unit for boats and ships of convenient combination
CN115126156A (en) * 2022-06-13 2022-09-30 珠海采筑电子商务有限公司 Bearing column of assembled movable house and construction method
CN114809725A (en) * 2022-07-01 2022-07-29 北京凯隆分析仪器有限公司 Assembled movable house

Also Published As

Publication number Publication date
CN105649207B (en) 2018-10-30

Similar Documents

Publication Publication Date Title
CN105649207A (en) Construction method and structure of spliced type standard temporary houses
CN204781329U (en) Pin -connected panel standard turnover room
CN205012458U (en) Simple and easy basic timber structure local -style dwelling houses
CN103821229B (en) Rapid assembly type integrated house and installation method
US20130305629A1 (en) Modular Building System
CN204782075U (en) Have enough to meet need bathroom that room constitutes by standard
CN105421818B (en) Built-in steel Standard house
CN204627053U (en) A kind of multiple field steel work ITS
CN204753823U (en) Have enough to meet need double -decker that room constitutes by standard
MX2011000809A (en) Transportable, modular, self contained shipping container building.
CN105178629A (en) Jointed wood structure house
CN105649208B (en) A kind of method and structure being combined into big room by standard relocation housing
CN110145033A (en) Assembled assembled house structure
CN205296893U (en) Embedded steel construction assembly house
CN204826205U (en) Have enough to meet need structure that room made up into big room by standard
CN109162359A (en) For the assembling type steel structure module faced and built of constructing
CN204627052U (en) Steel work machine room under a kind of Integral tower
CN217079091U (en) Bamboo assembled building room
CN209145011U (en) For the assembling type steel structure module faced and built of constructing
WO2004106669A1 (en) Ready-to-use containerised house
CN110397158A (en) A kind of boxboard steel construction assembled architecture system
CN211818281U (en) Net frame sandwich module passive room
CN203613646U (en) Prefabricated house convenient for wiring
CN204663036U (en) A kind of cabinet be made up of standard relocation housing
CN204782104U (en) Have enough to meet need staff canteen that room made up by standard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant