CN105627929A - 移动梁受力后位移及变形量测量系统 - Google Patents
移动梁受力后位移及变形量测量系统 Download PDFInfo
- Publication number
- CN105627929A CN105627929A CN201410619939.6A CN201410619939A CN105627929A CN 105627929 A CN105627929 A CN 105627929A CN 201410619939 A CN201410619939 A CN 201410619939A CN 105627929 A CN105627929 A CN 105627929A
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- fixed
- transverse shifting
- grating scale
- scale displacement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000006073 displacement reaction Methods 0.000 title claims abstract description 49
- 230000003287 optical effect Effects 0.000 claims description 6
- 230000008901 benefit Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract 1
- 238000007493 shaping process Methods 0.000 description 4
- 238000005259 measurement Methods 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000002301 combined effect Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Length Measuring Devices By Optical Means (AREA)
Abstract
本发明创造提供移动梁受力后位移及变形量测量系统,该系统设置在针对CRTSⅢ型无砟道轨道板生产所用的张拉池中,包括横向移动横梁、纵向移动横梁、光栅尺位移传感器、千斤顶和固定架,所述横向移动横梁、纵向移动横梁分别固定在张拉池两内壁上,且每个内壁上各设有两个横梁,每个横梁上分别设有三个光栅尺位移传感器,连接两个千斤顶,每个横梁上方设有一个固定架。本发明创造具有的优点和积极效果是:精确控制横向移动横梁与纵向移动横梁的变形量,保证张拉精度,自动化程度高,提高生产效率,为我国高铁事业所用的CRTSⅢ型无砟道轨道板的产品质量提供有力保证。
Description
技术领域
本发明创造涉及一种移动梁受力后位移及变形量测量系统。
背景技术
光栅尺位移传感器,是利用光栅的光学原理工作的测量反馈装置,其测量输出的信号为数字脉冲,具有检测范围大,检测精度高,相应速度快的特点。
光栅位移传感器的工作原理,是由一对光栅副中的主光栅(又称标尺光栅)和副光栅(即指示光栅)进行相对位移时,在光的干涉与衍射共同作用下产生黑白相间(或明暗相间)的规则条纹图形,称之为莫尔条纹。进过光电器件转换使黑白(或明暗)相同的条纹转换成正弦波变化的电信号,再经过放大器放大,整形电路整形后,得到两路相差为90°的正弦波或者方波,送入光栅数显表计数显示。
发明内容
本发明创造要解决的问题是提供一种针对CRTSⅢ型无砟道轨道板生产所用张拉池中使用的移动梁受力后位移及变形量测量系统。
为解决上述技术问题,本发明创造采用的技术方案是:移动梁受力后位移及变形量测量系统,该系统设置在针对CRTSⅢ型无砟道轨道板生产所用的张拉池中,包括横向移动横梁、纵向移动横梁、光栅尺位移传感器、千斤顶和固定架;
所述光栅尺位移传感器为一对光栅副,包括主光栅和副光栅;
所述横向移动横梁固定在张拉池内一个池壁上,且该池壁上固定有两个横向移动横梁,每个所述横向移动横梁端部位置的梁体上分别连接一个千斤顶,每个所述横向移动横梁上方连接一个固定架,每个所述横向移动横梁上设有三个光栅尺位移传感器,所述光栅尺位移传感器分别设置在每个横向移动横梁上与千斤顶相连的位置和每个横向移动横梁的中心位置,每个所述光栅尺位移传感器中的主光栅固定在固定架上,每个所述光栅尺位移传感器中的副光栅固定在每个横向移动横梁上;
所述纵向移动横梁固定在张拉池内一个池壁上,且该池壁上固定有两个纵向移动横梁,每个所述纵向移动横梁端部位置的梁体上分别连接一个千斤顶,每个所述纵向移动横梁上方连接一个固定架,每个所述纵向移动横梁上设有三个光栅尺位移传感器,所述光栅尺位移传感器分别设置在每个纵向移动横梁上与千斤顶相连的位置和每个纵向移动横梁的中心位置,每个所述光栅尺位移传感器中的主光栅固定在固定架上,每个所述光栅尺位移传感器中的副光栅固定在每个纵向移动横梁上;
所述横向移动横梁和纵向移动横梁在张拉池中所固定的池壁相邻。
本发明创造具有的优点和积极效果是:精确控制横向移动横梁与纵向移动横梁的变形量,保证张拉精度,自动化程度高,提高生产效率,为我国高铁事业所用的CRTSⅢ型无砟道轨道板的产品质量提供有力保证。
附图说明
图1是本发明创造在轨道板生产所用的张拉池中的布局示意图;
图中:1-横向移动横梁,2-纵向移动横梁,3-光栅尺位移传感器,4-千斤顶,5-张拉池。
具体实施方式
下面结合附图对本发明创造的具体实施例做详细说明。
移动梁受力后位移及变形量测量系统,该系统设置在针对CRTSⅢ型无砟道轨道板生产所用的张拉池5中,其特征在于,包括横向移动横梁1、纵向移动横梁2、光栅尺位移传感器3、千斤顶4和固定架;
所述光栅尺位移传感器为一对光栅副,包括主光栅和副光栅;
所述横向移动横梁1固定在张拉池5内一个池壁上,且该池壁上固定有两个横向移动横梁1,每个所述横向移动横梁1端部位置的梁体上分别连接一个千斤顶4,每个所述横向移动横梁1上方连接一个固定架,每个所述横向移动横梁1上设有三个光栅尺位移传感器3,所述光栅尺位移传感器3分别设置在每个横向移动横梁1上与千斤顶4相连的位置和每个横向移动横梁1的中心位置,每个所述光栅尺位移传感器3中的主光栅固定在固定架上,每个所述光栅尺位移传感器3中的副光栅固定在每个横向移动横梁1上;
所述纵向移动横梁2固定在张拉池5内一个池壁上,且该池壁上固定有两个纵向移动横梁2,每个所述纵向移动横梁2端部位置的梁体上分别连接一个千斤顶4,每个所述纵向移动横梁2上方连接一个固定架,每个所述纵向移动横梁2上设有三个光栅尺位移传感器3,所述光栅尺位移传感器3分别设置在每个纵向移动横梁2上与千斤顶4相连的位置和每个纵向移动横梁2的中心位置,每个所述光栅尺位移传感器3中的主光栅固定在固定架上,每个所述光栅尺位移传感器3中的副光栅固定在每个纵向移动横梁2上;
所述横向移动横梁1和纵向移动横梁2在张拉池中所固定的池壁相邻。
上述移动梁受力后位移及变形量测量系统的测试方法如下:第一步,张拉过程开始时,对光栅尺位移传感器3进行清零;第二步,记录张拉完成后横向移动横梁1和纵向移动横梁2的位移值;第三步,根据张拉梁变形公式δ=0.5*(a+b)-c,分别将第二步测量的横向移动横梁1和纵向移动横梁2位移值代入公式,计算出横向移动横梁1和纵向移动横梁2的变形量。
以上技术方案用到的光栅尺位移传感器的工作原理为,光栅尺位移传感器3为一对光栅副,包括主光栅和副光栅,当主光栅和副光栅进行相对位移时,在光的干涉和衍射共同作用下产生黑白相间的规则条纹图形,该图形称之为莫尔条纹。经过光电器件转换使黑白相间的条纹转换为正弦波变化的电信号,再经过放大器放大,整形电路整形后,得到两路相差为90°的正弦波或方波,送入光栅数显表计数显示。
以上对本发明创造的一个实施例进行了详细说明,但所述内容仅为本发明创造的较佳实施例,不能被认为用于限定本发明创造的实施范围。凡依本发明创造申请范围所作的均等变化与改进等,均应仍归属于本发明创造的专利涵盖范围之内。
Claims (1)
1.移动梁受力后位移及变形量测量系统,该系统设置在针对CRTSⅢ型无砟道轨道板生产所用的张拉池中,其特征在于,包括横向移动横梁、纵向移动横梁、光栅尺位移传感器、千斤顶和固定架;
所述光栅尺位移传感器为一对光栅副,包括主光栅和副光栅;
所述横向移动横梁固定在张拉池内一个池壁上,且该池壁上固定有两个横向移动横梁,每个所述横向移动横梁端部位置的梁体上分别连接一个千斤顶,每个所述横向移动横梁上方连接一个固定架,每个所述横向移动横梁上设有三个光栅尺位移传感器,所述光栅尺位移传感器分别设置在每个横向移动横梁上与千斤顶相连的位置和每个横向移动横梁的中心位置,每个所述光栅尺位移传感器中的主光栅固定在固定架上,每个所述光栅尺位移传感器中的副光栅固定在每个横向移动横梁上;
所述纵向移动横梁固定在张拉池内一个池壁上,且该池壁上固定有两个纵向移动横梁,每个所述纵向移动横梁端部位置的梁体上分别连接一个千斤顶,每个所述纵向移动横梁上方连接一个固定架,每个所述纵向移动横梁上设有三个光栅尺位移传感器,所述光栅尺位移传感器分别设置在每个纵向移动横梁上与千斤顶相连的位置和每个纵向移动横梁的中心位置,每个所述光栅尺位移传感器中的主光栅固定在固定架上,每个所述光栅尺位移传感器中的副光栅固定在每个纵向移动横梁上;
所述横向移动横梁和纵向移动横梁在张拉池中所固定的池壁相邻。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410619939.6A CN105627929A (zh) | 2014-11-05 | 2014-11-05 | 移动梁受力后位移及变形量测量系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410619939.6A CN105627929A (zh) | 2014-11-05 | 2014-11-05 | 移动梁受力后位移及变形量测量系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105627929A true CN105627929A (zh) | 2016-06-01 |
Family
ID=56043083
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410619939.6A Pending CN105627929A (zh) | 2014-11-05 | 2014-11-05 | 移动梁受力后位移及变形量测量系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105627929A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108458667A (zh) * | 2018-04-10 | 2018-08-28 | 中铁十九局集团有限公司 | 轨道板变形快速检测装置及检测方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19505982A1 (de) * | 1995-02-21 | 1996-08-22 | Siemens Nixdorf Inf Syst | Berührungslos arbeitender Positionssensor mit Nonius |
CN101380777A (zh) * | 2007-08-09 | 2009-03-11 | 欧阳炎 | 一种双向先张轨道板长面台座生产线 |
CN101387114A (zh) * | 2008-09-19 | 2009-03-18 | 天津市市政工程设计研究院 | 超静定墩柱或桩基主动托换结构及其施工方法 |
CN101885210A (zh) * | 2010-06-29 | 2010-11-17 | 中铁三局集团有限公司 | 高速铁路crtsⅱ型轨道板预应力张拉台座框架式压柱 |
CN102877492A (zh) * | 2012-10-31 | 2013-01-16 | 东南大学 | 一种负摩阻力桩土位移测量装置 |
CN203592572U (zh) * | 2013-11-01 | 2014-05-14 | 天津中金博奥重工机械有限责任公司 | 一种钢结构张拉基座 |
-
2014
- 2014-11-05 CN CN201410619939.6A patent/CN105627929A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19505982A1 (de) * | 1995-02-21 | 1996-08-22 | Siemens Nixdorf Inf Syst | Berührungslos arbeitender Positionssensor mit Nonius |
CN101380777A (zh) * | 2007-08-09 | 2009-03-11 | 欧阳炎 | 一种双向先张轨道板长面台座生产线 |
CN101387114A (zh) * | 2008-09-19 | 2009-03-18 | 天津市市政工程设计研究院 | 超静定墩柱或桩基主动托换结构及其施工方法 |
CN101885210A (zh) * | 2010-06-29 | 2010-11-17 | 中铁三局集团有限公司 | 高速铁路crtsⅱ型轨道板预应力张拉台座框架式压柱 |
CN102877492A (zh) * | 2012-10-31 | 2013-01-16 | 东南大学 | 一种负摩阻力桩土位移测量装置 |
CN203592572U (zh) * | 2013-11-01 | 2014-05-14 | 天津中金博奥重工机械有限责任公司 | 一种钢结构张拉基座 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108458667A (zh) * | 2018-04-10 | 2018-08-28 | 中铁十九局集团有限公司 | 轨道板变形快速检测装置及检测方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103335603B (zh) | 一种分布式光纤应变系数标定装置及标定方法 | |
CN207180606U (zh) | 离线式多功能手机壳检测设备 | |
CN105067206A (zh) | 一种桥梁结构挠度线形测量装置和方法 | |
CN101000252A (zh) | 一种双光栅位移传感器 | |
CN201104239Y (zh) | 杠杆式微位移光学测定装置 | |
CN105333834B (zh) | 一种光纤应变系数自动标定系统及方法 | |
CN102489547A (zh) | 钢管自动测量、喷标装置 | |
CN202216637U (zh) | 圆弧段半径快速测量工具 | |
CN201828221U (zh) | 气缸套长度及止口高检具 | |
CN103344192B (zh) | 一种长距离大范围光纤应变产生装置及产生方法 | |
CN203881356U (zh) | 正余弦编码器 | |
CN105627929A (zh) | 移动梁受力后位移及变形量测量系统 | |
CN103411584A (zh) | 一种连铸机扇形段底座检修测量方法及装置 | |
CN102095378A (zh) | 一种光栅线位移传感器 | |
CN204165519U (zh) | 移动梁受力后位移及变形量测量系统 | |
CN212623084U (zh) | 钢管测长称重系统 | |
CN103884458B (zh) | 一种细杆双向内力测量传感器及标定方法 | |
CN105180887A (zh) | 一种大跨度梁挠曲变形测量方法 | |
CN202171440U (zh) | 差分电容式长度传感器 | |
CN205175534U (zh) | 基于轴线车的原位称重装置 | |
CN202748004U (zh) | 光纤光栅位移传感器 | |
CN203132528U (zh) | 一种收敛计检定装置 | |
CN200986441Y (zh) | 一种双光栅位移传感器 | |
CN106949839A (zh) | 轮对压装机高精度控制测量控制系统 | |
CN104089602A (zh) | 一种利用光纤光栅压差计测量动态挠度的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160601 |