- CN105626096A CN105626096A CN201511034197.1A CN201511034197A CN105626096A CN 105626096 A CN105626096 A CN 105626096A CN 201511034197 A CN201511034197 A CN 201511034197A CN 105626096 A CN105626096 A CN 105626096A
- Authority
- CN
- China
- Prior art keywords
- hydraulic reclamation
- bean gravel
- jurisdiction
- section
- bean
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000010276 construction Methods 0.000 title abstract description 12
- 239000011435 rock Substances 0.000 claims abstract description 25
- 238000005507 spraying Methods 0.000 claims abstract description 13
- 235000010627 Phaseolus vulgaris Nutrition 0.000 claims description 95
- 244000046052 Phaseolus vulgaris Species 0.000 claims description 95
- 239000008267 milk Substances 0.000 claims description 5
- 210000004080 milk Anatomy 0.000 claims description 5
- 235000013336 milk Nutrition 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 8
- 230000000087 stabilizing effect Effects 0.000 abstract description 3
- 230000005641 tunneling Effects 0.000 abstract description 3
- 230000003631 expected effect Effects 0.000 abstract 1
- 238000005429 filling process Methods 0.000 abstract 1
- 239000011178 precast concrete Substances 0.000 abstract 1
- 238000011161 development Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000007569 slipcasting Methods 0.000 description 4
- 238000007664 blowing Methods 0.000 description 3
- 230000007423 decrease Effects 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 125000006850 spacer group Chemical group 0.000 description 3
- 230000003190 augmentative effect Effects 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000011440 grout Substances 0.000 description 2
- 235000003642 hunger Nutrition 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 241000233633 Phytophthora drechsleri Species 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000002301 combined effect Effects 0.000 description 1
- 238000009833 condensation Methods 0.000 description 1
- 230000005494 condensation Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511034197.1A CN105626096A (en) | 2015-12-31 | 2015-12-31 | Pea gravel hydraulic filling construction process for TBM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511034197.1A CN105626096A (en) | 2015-12-31 | 2015-12-31 | Pea gravel hydraulic filling construction process for TBM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105626096A true CN105626096A (en) | 2016-06-01 |
Family
ID=56041387
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511034197.1A Pending CN105626096A (en) | 2015-12-31 | 2015-12-31 | Pea gravel hydraulic filling construction process for TBM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105626096A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121677A (en) * | 2016-07-25 | 2016-11-16 | 中国科学院武汉岩土力学研究所 | TBM construction controls the structural shape of tunnel duct piece faulting of slab ends |
CN107165655A (en) * | 2017-06-29 | 2017-09-15 | 山东科技大学 | A kind of backfilling grouting method in the driving for complete-section tunnel boring machine |
CN107939420A (en) * | 2017-08-21 | 2018-04-20 | 中铁六局集团有限公司 | The construction method filled after two backing of bored tunnel assembled |
CN108198505A (en) * | 2018-03-01 | 2018-06-22 | 西南交通大学 | A kind of shield formula TBM tunnels beans gravel construction simulation device |
CN108708752A (en) * | 2018-07-27 | 2018-10-26 | 西南交通大学 | The method that the tunnels TBM apply the supporting apparatus and beans gravel rockfill grouting of section of jurisdiction |
CN109356613A (en) * | 2018-12-12 | 2019-02-19 | 青海大学 | A kind of TBM construction diversion tunnel segment deformation permanent reinforcement method |
CN109441470A (en) * | 2018-12-25 | 2019-03-08 | 中国电建集团成都勘测设计研究院有限公司 | Double-shielded TBM tunnels tunnel surrounding rebound value test method |
CN109736830A (en) * | 2019-01-10 | 2019-05-10 | 中铁建南方建设投资有限公司 | The implementation method of lateral sealing in a kind of TBM tunnel construction |
CN109798128A (en) * | 2018-12-28 | 2019-05-24 | 中国水利水电第四工程局有限公司 | A kind of diversion tunnel pole weak surrounding rock section constructing method |
CN110005432A (en) * | 2019-04-18 | 2019-07-12 | 西南交通大学 | Double-shielded TBM development machine passes through the synchronous grouting construction method of fractured weak zone |
CN111456758A (en) * | 2020-06-03 | 2020-07-28 | 中国水利水电第十工程局有限公司 | Double-shield TBM pipe back supporting method for dealing with rock burst |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006022503A (en) * | 2004-07-06 | 2006-01-26 | Kumagai Gumi Co Ltd | Construction method for connecting bifurcated section of shield tunnel, and shield tunnel structure using the construction method |
CN102562146A (en) * | 2012-03-07 | 2012-07-11 | 深圳市市政工程总公司 | Construction gap filling method and device for shield through air pushing section |
CN103993895A (en) * | 2014-06-10 | 2014-08-20 | 中铁二院工程集团有限责任公司 | Hoisting, hydraulic reclamation and grouting embedded assembly for segmental lining prefabricated according to TMB construction method |
CN204532364U (en) * | 2015-01-27 | 2015-08-05 | 中铁二院工程集团有限责任公司 | Tunneling boring rock tunnel development machine engineering method subway tunnel pressure release type liner structure |
-
2015
- 2015-12-31 CN CN201511034197.1A patent/CN105626096A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006022503A (en) * | 2004-07-06 | 2006-01-26 | Kumagai Gumi Co Ltd | Construction method for connecting bifurcated section of shield tunnel, and shield tunnel structure using the construction method |
CN102562146A (en) * | 2012-03-07 | 2012-07-11 | 深圳市市政工程总公司 | Construction gap filling method and device for shield through air pushing section |
CN103993895A (en) * | 2014-06-10 | 2014-08-20 | 中铁二院工程集团有限责任公司 | Hoisting, hydraulic reclamation and grouting embedded assembly for segmental lining prefabricated according to TMB construction method |
CN204532364U (en) * | 2015-01-27 | 2015-08-05 | 中铁二院工程集团有限责任公司 | Tunneling boring rock tunnel development machine engineering method subway tunnel pressure release type liner structure |
Non-Patent Citations (1)
Title |
---|
徐涛等: "地铁过江区间组合法施工隧道关键技术研究", 《南阳理工学院学报》 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121677A (en) * | 2016-07-25 | 2016-11-16 | 中国科学院武汉岩土力学研究所 | TBM construction controls the structural shape of tunnel duct piece faulting of slab ends |
CN107165655A (en) * | 2017-06-29 | 2017-09-15 | 山东科技大学 | A kind of backfilling grouting method in the driving for complete-section tunnel boring machine |
CN107939420A (en) * | 2017-08-21 | 2018-04-20 | 中铁六局集团有限公司 | The construction method filled after two backing of bored tunnel assembled |
CN108198505B (en) * | 2018-03-01 | 2023-10-03 | 西南交通大学 | Shield type TBM tunnel bean gravel construction simulation device |
CN108198505A (en) * | 2018-03-01 | 2018-06-22 | 西南交通大学 | A kind of shield formula TBM tunnels beans gravel construction simulation device |
CN108708752A (en) * | 2018-07-27 | 2018-10-26 | 西南交通大学 | The method that the tunnels TBM apply the supporting apparatus and beans gravel rockfill grouting of section of jurisdiction |
CN108708752B (en) * | 2018-07-27 | 2023-11-24 | 西南交通大学 | Temporary supporting device for TBM tunnel construction segment and bean gravel backfill grouting method |
CN109356613A (en) * | 2018-12-12 | 2019-02-19 | 青海大学 | A kind of TBM construction diversion tunnel segment deformation permanent reinforcement method |
CN109441470A (en) * | 2018-12-25 | 2019-03-08 | 中国电建集团成都勘测设计研究院有限公司 | Double-shielded TBM tunnels tunnel surrounding rebound value test method |
CN109798128A (en) * | 2018-12-28 | 2019-05-24 | 中国水利水电第四工程局有限公司 | A kind of diversion tunnel pole weak surrounding rock section constructing method |
CN109736830A (en) * | 2019-01-10 | 2019-05-10 | 中铁建南方建设投资有限公司 | The implementation method of lateral sealing in a kind of TBM tunnel construction |
CN110005432A (en) * | 2019-04-18 | 2019-07-12 | 西南交通大学 | Double-shielded TBM development machine passes through the synchronous grouting construction method of fractured weak zone |
CN111456758A (en) * | 2020-06-03 | 2020-07-28 | 中国水利水电第十工程局有限公司 | Double-shield TBM pipe back supporting method for dealing with rock burst |
CN111456758B (en) * | 2020-06-03 | 2021-05-14 | 中国水利水电第十工程局有限公司 | Double-shield TBM pipe back supporting method for dealing with rock burst |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105626096A (en) | Pea gravel hydraulic filling construction process for TBM | |
CN103334770B (en) | One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method | |
CN104453913B (en) | A kind of Shaft Stopes front pre-grouting method | |
CN108842840A (en) | Perforating causes the weak intercalated layer slip-casting lifting method of building settlement under a kind of compensation subway tunnel | |
CN106320354B (en) | The Seepage method on solution cavity development stratum under coating | |
CN104612179B (en) | Through the construction method of the diaphram wall of super thick silty sand ground | |
CN110924383A (en) | Construction method of pressurized cast-in-place pile based on reinforced fibers and metakaolin | |
CN105863648B (en) | A kind of tunneling is shallow to cover large-section tunnel construction method | |
CN107975375A (en) | A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel | |
CN104612134A (en) | Cast-in place pile post-grouting construction method for pouring construction | |
CN109026010B (en) | A kind of mine seepage well slip casting type sinking shaft construction method | |
CN106121722A (en) | A kind of method quickly constructing fire dam | |
CN110130936B (en) | Construction method for sudden encountering untreated karst cave or crack in shield tunneling process | |
CN108166989A (en) | The asymmetric twin-arch tunnel interval wall construction method of water rich strata " OC " shape | |
CN105442532A (en) | Construction method for pile-head-expanded bored pile | |
CN106640096A (en) | Construction method for penetrating through tunnel of backfilling soil section and transition section | |
CN110485444B (en) | Construction method for seepage prevention and reinforcement of deepwater cofferdam | |
CN103603335A (en) | Winged shelter steel-pipe pile capable of reducing influence of soil surface loading to adjacent pile foundations | |
CN107059904B (en) | A kind of underground pipe gallery ponding well excavation method | |
CN104790982B (en) | Casing material for ultra-deep hole grouting of underground excavated tunnel | |
CN107178077A (en) | Overburden layer grouting and reinforcing structure and its design method on a kind of karst area solution cavity | |
CN106089245B (en) | One kind postpones grouting method after being used for single shield TBM walls | |
CN207406345U (en) | Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction | |
CN106050239A (en) | Construction method for retaining structure of deep and large vertical shaft in water-abundant upper-soft lower-hard stratum | |
CN105605335A (en) | Large-caliber prestressed steel cylinder concrete pipe for jacking construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Qiangzong Inventor after: Zhang Bo Inventor after: Sun Heming Inventor after: Feng Shengwu Inventor after: Fan Weishan Inventor after: Zhang Zhiwei Inventor after: Wu Wei Inventor before: Zhang Bo Inventor before: Sun Heming Inventor before: Feng Shengwu Inventor before: Fan Weishan Inventor before: Zhang Zhiwei Inventor before: Wu Wei Inventor before: Wang Qiangzong |
|
COR | Change of bibliographic data | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |