CN109356613A - A kind of TBM construction diversion tunnel segment deformation permanent reinforcement method - Google Patents

A kind of TBM construction diversion tunnel segment deformation permanent reinforcement method Download PDF

Info

Publication number
CN109356613A
CN109356613A CN201811517698.9A CN201811517698A CN109356613A CN 109356613 A CN109356613 A CN 109356613A CN 201811517698 A CN201811517698 A CN 201811517698A CN 109356613 A CN109356613 A CN 109356613A
Authority
CN
China
Prior art keywords
hole
section
jurisdiction
anchor pole
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811517698.9A
Other languages
Chinese (zh)
Inventor
孙新建
王海平
周隆基
李海宁
蒲军竹
马福印
晁永莲
张伟峰
杜喜龙
管吕军
张海鸿
占其兵
何殷鹏
刁目爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Province Yinda Jihuang Engineering Construction Administration
Qinghai University
Original Assignee
Qinghai Province Yinda Jihuang Engineering Construction Administration
Qinghai University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Province Yinda Jihuang Engineering Construction Administration, Qinghai University filed Critical Qinghai Province Yinda Jihuang Engineering Construction Administration
Priority to CN201811517698.9A priority Critical patent/CN109356613A/en
Publication of CN109356613A publication Critical patent/CN109356613A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of TBM construction diversion tunnel segment deformation permanent reinforcement methods, comprising the following steps: step 1 is installed longitudinal joint twice 12# channel steel and fixed with anchor pole;Step 2, the permanent horizontal support of installation;Step 3 reinforce in circumferential direction 15#H fashioned iron;Step 4, backfill beans gravel and grouting;Step 5, tunneling boring consolidation grouting reinforce country rock;Step 6 removes circumferential bracing members and horizontal temporary support;Step 7, using plus nano, crude fibre gunite concrete or form concrete lining cutting and supporting outside C30 thickness 20cm.The present invention makes full use of anchor pole and consolidation grouting to reinforce country rock;Determine that section of jurisdiction is horizontal temporary support that is stable, can removing circumferential fashioned iron and implement by monitoring.If the outer water of country rock influences further to deteriorate, drainage hole is set when necessary, realizes diversion tunnel segment deformation permanent reinforcement.The present invention has the characteristics that easy to operate, work efficiency is high, consolidation effect is good, is suitble to promote and apply.

Description

A kind of TBM construction diversion tunnel segment deformation permanent reinforcement method
Technical field
The invention belongs to hydraulic engineering technical fields, are related to a kind of TBM construction diversion tunnel segment deformation permanent reinforcement side Method.
Background technique
Pipe-plate lining is the main mounting structure of TBM diversion tunnel, and section of jurisdiction form is to determine liner structure safety and TBM The key factor of tunnel fltting speed.Double Shield TBM drivings almost carry out simultaneously with pipe-plate lining, with rapid construction Feature, but can pipe-plate lining bear the high internal water pressure effect of diversion tunnel at waterpower station, be to determine that can diversion tunnel use section of jurisdiction Lining cutting and
One of the key of TBM construction.Once diversion tunnel section of jurisdiction deforms, it is necessary to use relevant reinforcement means. Currently, in the prior art, being badly in need of a kind of TBM construction diversion tunnel segment deformation permanent reinforcement method.
Summary of the invention
The purpose of the present invention is to provide a kind of TBM construction diversion tunnel segment deformation permanent reinforcement methods.
Itself the specific technical proposal is:
A kind of TBM construction diversion tunnel segment deformation permanent reinforcement method, comprising the following steps:
Step 1 is installed longitudinal joint twice 12# channel steel and is fixed with anchor pole;
Step 2, the permanent horizontal support of installation;
Step 3 reinforce in circumferential direction 15#H fashioned iron;
Step 4, backfill beans gravel and grouting;
Step 5, tunneling boring consolidation grouting reinforce country rock;
Step 6 removes circumferential bracing members and horizontal temporary support;
Step 7, using plus nano, crude fibre gunite concrete or form concrete lining cutting and supporting outside C30 thickness 20cm.
Further, it is greater than the hole 7cm section in segment deformation, using reinforcing in 15#H fashioned iron, closes bottom arch, the row of reinforcing when necessary Away from about 40cm, circumferential bracing members not cover section of jurisdiction installation hole location when installing, and side bottom longitudinal direction joist H steel uses expansion bolt and anchor Bar is fixed on section of jurisdiction inner edge, and welds with circumferential direction support;Longitudinal joint uses limit steel plate and twice 12# channel steel, and and Ф on section of jurisdiction 32 hollow grouting anchor end firm weldings, boring aperture Ф 50, horizontal space 80cm, upper longitudinal joint processing, the long 7.28m of anchor pole; Side crown consolidation grouting, the long 6.28m of anchor pole;The side long 5.28m of lower arch anchor pole;Encircle the long 3.28m of anchor pole in bottom;Tunneling boring consolidation grouting point Two sequences carry out, and 1 sequence hole carries out slip casting, hollow bolt array pitch 3.2m, aperture using section of jurisdiction mounting hole and 32 hollow grouting anchor of Ф 50, the 2 sequence hole Ф is arranged between 1 sequence hole, the same sequence hole of the parameters such as bolthole hole diameter, material, hole depth, 2 sequence hole consolidation groutings In 1 sequence hole, grouting carries out after completing 10 days.2cm thickness billet and firm welding is arranged in anchor pole end, using CK mortar mushroom head Safeguard procedures, and be smoothly smoothly connected with section of jurisdiction.
Further, in the 3cm≤deformation≤hole 7cm section, using reinforcing in 15#H fashioned iron, bottom arch, the row of reinforcing are closed when necessary Away from about 80cm, side bottom longitudinal direction joist H steel is fixed on section of jurisdiction inner edge using expansion bolt and anchor pole, and welds with circumferential direction support;Pipe On piece longitudinal joint using limit steel plate and twice 12# channel steel, and with 32 hollow grouting anchor end firm welding of Ф, boring aperture Ф 50, horizontal space 80cm, side crown rock-bolt length 5.28m;Encircle the long 2.28m of anchor pole in bottom;Tunneling boring system consolidation grouting is divided to two sequences It carries out, hole location, Ф 32 hollow bolt array pitch 3.2m, aperture Ф 50, the side long 5.28m of crown anchor pole, 2 are installed using section of jurisdiction in 1 sequence hole Sequence hole is arranged between 1 sequence hole, and the same sequence hole of the parameters such as bolthole hole diameter, material, hole depth, 2 sequence hole consolidation groutings are in 1 sequence hole Grouting carries out after completing 10 days.It is arranged using 2cm thickness billet and firm welding using the protection of CK mortar mushroom head anchor pole end It applies, and is smoothly smoothly connected with section of jurisdiction.In detail
Further, it is less than the hole 3cm section in segment deformation, upstream face uses CK mortar slope ratio for 1:6, and downstream is that 1:3 is smooth It is smoothly connected;IV, it after V class surrounding rock hole section answers retention level temporary support, is backfilled and is consolidated by related design requirement and attached drawing Knot grouting.
Further, whole deformation section is all made of the permanent horizontal support in section of jurisdiction and reinforces, i.e., uses two side pipe piece angle positions 65 × 4.0 coating steel pipe of Ф carries out permanent horizontal support;Segment deformation is greater than the hole 7cm section, and permanent horizontal support spacing is 80cm;Deformation The hole 3~7cm section, permanent horizontal support spacing are 1.6m.
Further, larger position is deformed to limit steel plate or upper longitudinal joint, should be carried out at surface using linked network and CK mortar It manages and is smoothly smoothly connected in section of jurisdiction;The net protective layer of steel plate and anchor pole end and upper longitudinal joint 12# channel steel CK mortar is not less than 4cm。
Further, in step 7, if the outer water of country rock influences further to deteriorate, drainage hole is set when necessary.
Compared with prior art, beneficial effects of the present invention:
Technical solution of the present invention makes full use of anchor pole and consolidation grouting to reinforce country rock;Determine that section of jurisdiction is stable by monitoring , the horizontal temporary support that circumferential fashioned iron can be removed and implemented.If the outer water of country rock influences further to deteriorate, set when necessary Drainage hole, to realize diversion tunnel segment deformation permanent reinforcement.The present invention is with easy to operate, work efficiency is high, reinforces effect The good feature of fruit is suitble to promote and apply.
Specific embodiment
Technical solution of the present invention is described in more detail below with reference to embodiment.
Diversion tunnel (pile No. K12+459~K12+607) segment deformation (faulting of slab ends) permanent reinforcement solution technique is required such as Under:
1, segment deformation section Scheme of Strengthening and technical requirements
(1) Scheme of Strengthening is suitable for drawing big Ji the Huangshui River water transfer general main canal water diversion engineering tunnel segment deformation section (pile No. K12+459 ~K12+607), the program point second phase carries out.
One phase: anchor pole and consolidation grouting is made full use of to reinforce country rock;By monitor determine section of jurisdiction be it is stable, can remove Circumferential fashioned iron and the horizontal temporary support implemented.
Second phase: if the outer water of country rock influences further to deteriorate, drainage hole is set when necessary.
(2) one phase processing schemes.
1) it is greater than the hole 7cm section in section of jurisdiction faulting of slab ends, using being reinforced in 15#H fashioned iron, closes bottom arch when necessary, reinforce array pitch about 40cm, circumferential bracing members not cover section of jurisdiction installation hole location when installing, side bottom longitudinal direction joist H steel is solid using expansion bolt and anchor pole It is scheduled on section of jurisdiction inner edge, and is welded with circumferential direction support;Longitudinal joint is using limit steel plate and twice 12# channel steel on section of jurisdiction, and in Ф 32 Empty grouted anchor bar end firm welding (boring aperture Ф 50, horizontal space 80cm, upper longitudinal joint processing, the long 7.28m of anchor pole;Side top Encircle consolidation grouting, the long 6.28m of anchor pole;The side long 5.28m of lower arch anchor pole;Encircle the long 3.28m of anchor pole in bottom);Tunneling boring consolidation grouting is divided to two Sequence carries out, and 1 sequence hole carries out slip casting, hollow bolt array pitch 3.2m, aperture Ф using section of jurisdiction mounting hole and 32 hollow grouting anchor of Ф 50,2 sequence holes are arranged between 1 sequence hole, and the same sequence hole of the parameters such as bolthole hole diameter, material, hole depth, 2 sequence hole consolidation groutings are 1 The grouting of sequence hole carries out after completing 10 days.2cm thickness billet and firm welding is arranged in anchor pole end, is protected using CK mortar mushroom head Measure, and be smoothly smoothly connected with section of jurisdiction.
2) in the 3cm≤faulting of slab ends≤hole 7cm section, using being reinforced in 15#H fashioned iron, bottom arch is closed when necessary, reinforces array pitch about 80cm, side bottom longitudinal direction joist H steel is fixed on section of jurisdiction inner edge using expansion bolt and anchor pole, and welds with circumferential direction support;On section of jurisdiction Longitudinal joint using limit steel plate and twice 12# channel steel, and with 32 hollow grouting anchor end firm welding of Ф (boring aperture Ф 50, Horizontal space 80cm, side crown rock-bolt length 5.28m;Encircle the long 2.28m of anchor pole in bottom);Tunneling boring system consolidation grouting be divided to two sequences into Hole location, Ф 32 hollow bolt array pitch 3.2m, aperture Ф 50, the side long 5.28m of crown anchor pole, 2 sequences are installed using section of jurisdiction in row, 1 sequence hole Hole is arranged between 1 sequence hole, and the same sequence hole of the parameters such as bolthole hole diameter, material, hole depth, 2 sequence hole consolidation groutings fill in 1 sequence hole Slurry carries out after completing 10 days.Anchor pole end is using 2cm thickness billet and firm welding, using CK mortar mushroom head safeguard procedures, And it is smoothly smoothly connected with section of jurisdiction.
3) it is less than the hole 3cm section in section of jurisdiction faulting of slab ends, upstream face uses CK mortar slope ratio for 1:6, and downstream is 1:3 smoothly smooth company It connects;IV, after V class surrounding rock hole section answers retention level temporary support, filling is backfilled and consolidated by related design requirement and attached drawing Slurry.
4) whole deformation section is all made of the permanent horizontal support in section of jurisdiction and reinforces, i.e., two side pipe piece angle positions using Ф 65 × 4.0 coating steel pipes carry out permanent horizontal support;Section of jurisdiction faulting of slab ends is greater than the hole 7cm section, and permanent horizontal support spacing is 80cm;3~7cm of faulting of slab ends Hole section, permanent horizontal support spacing are 1.6m.
5) to the limit steel plate or larger position of upper longitudinal joint dislocation, should be carried out using linked network and CK mortar surface treatment and in Section of jurisdiction is smoothly smoothly connected;The net protective layer of steel plate and anchor pole end and upper longitudinal joint 12# channel steel CK mortar is not less than 4cm.
(3) the second stage of processing scheme
Second phase is using the outer plus nano of C30 thickness 20cm, crude fibre gunite concrete or form concrete lining cutting and supporting scheme.
2, a phase section of jurisdiction Scheme of Strengthening implementation steps
(1) it installs longitudinal joint twice 12# channel steel and is fixed with anchor pole;
(2) permanent horizontal support is installed;
(3) it carries out reinforcing in circumferential direction 15#H fashioned iron;
(4) beans gravel and grouting are backfilled;
(5) tunneling boring consolidation grouting reinforces country rock;
(6) circumferential bracing members and horizontal temporary support are removed.
3, it checks and checks and accepts
It is executed by country and the related clause of industry current standard.
4, other
(1) position to generator tube piece crack and the hole larger position of section faulting of slab ends, should reinforce safety monitoring work.
(2) faulting of slab ends larger position in longitudinal joint part on section of jurisdiction, should carry out specially treated;If circumferential bracing members are at this faulting of slab ends position It is then welded with the support of interim steel plate, it is ensured that circumferential H profile steel forms continuous support.
(3) project amount is by actually occurring meter amount.
The foregoing is only a preferred embodiment of the present invention, the scope of protection of the present invention is not limited to this, it is any ripe Know those skilled in the art within the technical scope of the present disclosure, the letter for the technical solution that can be become apparent to Altered or equivalence replacement are fallen within the protection scope of the present invention.

Claims (7)

  1. A kind of diversion tunnel segment deformation permanent reinforcement method 1. TBM constructs, which comprises the following steps:
    Step 1 is installed longitudinal joint twice 12# channel steel and is fixed with anchor pole;
    Step 2, the permanent horizontal support of installation;
    Step 3 reinforce in circumferential direction 15#H fashioned iron;
    Step 4, backfill beans gravel and grouting;
    Step 5, tunneling boring consolidation grouting reinforce country rock;
    Step 6 removes circumferential bracing members and horizontal temporary support;
    Step 7, using plus nano, crude fibre gunite concrete or form concrete lining cutting and supporting outside C30 thickness 20cm.
  2. The diversion tunnel segment deformation permanent reinforcement method 2. TBM according to claim 1 constructs, which is characterized in that in pipe Piece deformation is greater than the hole 7cm section, using reinforcing in 15#H fashioned iron, closes bottom arch when necessary, reinforcing array pitch is 40cm, circumferential bracing members Installation hole location in section of jurisdiction is not covered when installation, side bottom longitudinal direction joist H steel is fixed on section of jurisdiction inner edge using expansion bolt and anchor pole, and It is welded with circumferential direction support;Longitudinal joint is welded using limit steel plate and twice 12# channel steel, and with the 32 hollow grouting anchor end Ф on section of jurisdiction It connects securely, boring aperture Ф 50, horizontal space 80cm, upper longitudinal joint processing, the long 7.28m of anchor pole;Side crown consolidation grouting, anchor pole are long 6.28m;The side long 5.28m of lower arch anchor pole;Encircle the long 3.28m of anchor pole in bottom;Tunneling boring consolidation grouting is divided to two sequences to carry out, and 1 sequence hole utilizes pipe Piece mounting hole and 32 hollow grouting anchor of Ф carry out slip casting, and 50, the 2 sequence hole hollow bolt array pitch 3.2m, aperture Ф is arranged in 1 sequence hole Between, the same sequence hole of bolthole hole diameter, material, hole depth, 2 sequence hole consolidation groutings carry out after the grouting of 1 sequence hole is completed 10 days;Anchor 2cm thickness billet and firm welding is arranged in boom end, using CK mortar mushroom head safeguard procedures, and with the smooth smooth company in section of jurisdiction It connects.
  3. The diversion tunnel segment deformation permanent reinforcement method 3. TBM according to claim 1 constructs, which is characterized in that in 3cm ≤ deformation≤the hole 7cm section closes bottom arch using reinforcing in 15#H fashioned iron when necessary, and reinforcing array pitch is 80cm, side bottom longitudinal direction joist H steel is fixed on section of jurisdiction inner edge using expansion bolt and anchor pole, and welds with circumferential direction support;On section of jurisdiction longitudinal joint using limit steel plate and Twice 12# channel steel, and with 32 hollow grouting anchor end firm welding of Ф, boring aperture Ф 50, horizontal space 80cm, side crown Rock-bolt length 5.28m;Encircle the long 2.28m of anchor pole in bottom;Tunneling boring system consolidation grouting is divided to two sequences to carry out, and 1 sequence hole is installed using section of jurisdiction Hole location, Ф 32 hollow bolt array pitch 3.2m, aperture Ф 50, the side long 5.28m of crown anchor pole, 2 sequence holes are arranged between 1 sequence hole, anchor The same sequence hole of rod aperture hole diameter, material, hole depth, 2 sequence hole consolidation groutings carry out after the grouting of 1 sequence hole is completed 10 days;Anchor pole end Using 2cm thickness billet and firm welding, using CK mortar mushroom head safeguard procedures, and smoothly it is smoothly connected with section of jurisdiction.
  4. The diversion tunnel segment deformation permanent reinforcement method 4. TBM according to claim 1 constructs, which is characterized in that in pipe Piece deforms less than the hole 3cm section, and upstream face uses CK mortar slope ratio for 1:6, and downstream is that 1:3 is smoothly smoothly connected;IV, V class surrounding rock After hole section answers retention level temporary support, backfill and consolidation grouting are carried out by related design requirement and attached drawing.
  5. The diversion tunnel segment deformation permanent reinforcement method 5. TBM according to claim 1 constructs, which is characterized in that entire Deformation section is all made of the permanent horizontal support in section of jurisdiction and reinforces, i.e., two side pipe piece angle positions using 65 × 4.0 coating steel pipe of Ф into The permanent horizontal support of row;Segment deformation is greater than the hole 7cm section, and permanent horizontal support spacing is 80cm;Deform the hole 3~7cm section, permanent horizontal branch Tie distance is 1.6m.
  6. The diversion tunnel segment deformation permanent reinforcement method 6. TBM according to claim 1 constructs, which is characterized in that limit Position steel plate or upper longitudinal joint deform larger position, surface treatment should be carried out using linked network and CK mortar and in the smooth smooth company in section of jurisdiction It connects;The net protective layer of steel plate and anchor pole end and upper longitudinal joint 12# channel steel CK mortar is not less than 4cm.
  7. The diversion tunnel segment deformation permanent reinforcement method 7. TBM according to claim 1 constructs, which is characterized in that step 7 In, if the outer water of country rock influences further to deteriorate, drainage hole is set when necessary.
CN201811517698.9A 2018-12-12 2018-12-12 A kind of TBM construction diversion tunnel segment deformation permanent reinforcement method Pending CN109356613A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811517698.9A CN109356613A (en) 2018-12-12 2018-12-12 A kind of TBM construction diversion tunnel segment deformation permanent reinforcement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811517698.9A CN109356613A (en) 2018-12-12 2018-12-12 A kind of TBM construction diversion tunnel segment deformation permanent reinforcement method

Publications (1)

Publication Number Publication Date
CN109356613A true CN109356613A (en) 2019-02-19

Family

ID=65330641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811517698.9A Pending CN109356613A (en) 2018-12-12 2018-12-12 A kind of TBM construction diversion tunnel segment deformation permanent reinforcement method

Country Status (1)

Country Link
CN (1) CN109356613A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016037793A (en) * 2014-08-08 2016-03-22 株式会社大林組 Repair and reinforcement method for existing tunnel
CN105626096A (en) * 2015-12-31 2016-06-01 中交一公局第三工程有限公司 Pea gravel hydraulic filling construction process for TBM
CN105649650A (en) * 2014-12-03 2016-06-08 中铁十八局集团有限公司 Back pea gravel blow filling grouting construction method for single-shield hard rock roadheader after installing TBM pipe piece
PL412915A1 (en) * 2015-06-29 2017-01-02 Główny Instytut Górnictwa Lining, reinforcing the crossing supports of the mining headings

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016037793A (en) * 2014-08-08 2016-03-22 株式会社大林組 Repair and reinforcement method for existing tunnel
CN105649650A (en) * 2014-12-03 2016-06-08 中铁十八局集团有限公司 Back pea gravel blow filling grouting construction method for single-shield hard rock roadheader after installing TBM pipe piece
PL412915A1 (en) * 2015-06-29 2017-01-02 Główny Instytut Górnictwa Lining, reinforcing the crossing supports of the mining headings
CN105626096A (en) * 2015-12-31 2016-06-01 中交一公局第三工程有限公司 Pea gravel hydraulic filling construction process for TBM

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘卫丰 等: "《隧道工程》", 31 October 2012, 北京交通大学出版社 *
陈卫忠 等: "TBM 挤压大变形隧洞管片错台及加固机理研究", 《山东大学学报(工学版)》 *

Similar Documents

Publication Publication Date Title
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN106907159B (en) Shallow-buried underground excavation subway station separated open type structure and construction method thereof
CN101644160B (en) High ground stress soft rock stress-relief construction method
CN106498950B (en) Anchor head is placed in the implementation method of the Pile-Anchor Supporting for Deep Excavation system of pile body
CN111733828A (en) Large-section deep foundation pit fender pile and prestressed anchor cable supporting construction technology
CN106050266A (en) Construction method for undermining connected channel between shield sections in water-rich sand cobble stratum tunnel
CN110005439B (en) Construction method for shield near-distance over-advanced tunnel
CN108457656A (en) A kind of unearthed method for tunnel construction
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN106522242A (en) Foundation pit supporting system for subsurface structure close to soft ground stratum and construction method of foundation pit supporting system
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN105862930A (en) Protection structure on existing tunnel below new underground engineering
CN109372520A (en) One kind passing through Debris Flow Deposition area tunnel support structure and its construction method
CN108150187A (en) A kind of huge loose talus shield encircles the method into hole
CN107965325B (en) A kind of small interval shallow tunnel just branch arch replacement construction method
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN102235007B (en) Method for supporting deep foundation with upper nail-lower pile combination
CN104141500A (en) Hardened sand gravel stratum cavern construction method
CN108343035A (en) River construction method is worn under shallow tunnel
CN112922635B (en) Hydraulic tunnel excavation supporting structure and construction method
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN207033463U (en) Mine shield handing-over tunnel folded type joint design in the middle part of marine site
CN109763852B (en) Advanced support structure suitable for unconsolidated formation and construction method thereof
CN206385549U (en) For soft stratum close to underground structure foundation pit supporting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190219