CN105625796A - 一种电杆扶正装置 - Google Patents

一种电杆扶正装置 Download PDF

Info

Publication number
CN105625796A
CN105625796A CN201610198281.5A CN201610198281A CN105625796A CN 105625796 A CN105625796 A CN 105625796A CN 201610198281 A CN201610198281 A CN 201610198281A CN 105625796 A CN105625796 A CN 105625796A
Authority
CN
China
Prior art keywords
electric pole
base
guide deflection
deflection sheave
retaining clip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610198281.5A
Other languages
English (en)
Other versions
CN105625796B (zh
Inventor
杨瑞亮
尹少谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Haiheng Building-Materials Machinery Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610198281.5A priority Critical patent/CN105625796B/zh
Publication of CN105625796A publication Critical patent/CN105625796A/zh
Application granted granted Critical
Publication of CN105625796B publication Critical patent/CN105625796B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/345Arrangements for tilting up whole structures or sections thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Clamps And Clips (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种电杆扶正装置,其包括底座、牵引钢缆、第一固定夹和第二固定夹,底座左侧开设有卡置电杆的卡槽,卡槽之间设置有第一导向轮,底座的右侧设置有液压装置和通过定位套管滑动设置在底座上的滑行柱,滑行柱左端与液压装置接触,第一固定夹和第二固定夹上下分布固定在线杆上,第一固定夹和第二固定夹通过连接钢缆连接,牵引钢缆一端通过动滑轮与所述连接钢缆连接,另一端绕过所述第一导向轮与所述滑行柱右端连接。本发明对电杆施加拉力来进行扶正处理,通过拉力作用,其作用的稳定性和安全性更高,其效果明显好于推力,在拉力的作用下,固定架不会和电杆发生相对转动,因此其安全性更高,作用效果更好。

Description

一种电杆扶正装置
技术领域
本发明涉及电力工程施工工具,具体为一种电杆扶正装置。
背景技术
电力系统配电线路的高压杆、低压杆,由于基础不牢或土质疏松等原因造成的水泥电杆倾斜、杆歪现象,按照《配电管理标准》电杆倾斜达到5°为一般缺陷、10°为严重缺陷、15°为危急缺陷。严重威胁配电线路的正常运行,《配电管理标准》明确规定“危急缺陷必须尽快消除(一般不超过24小时)或采取必要的安全技术措施进行临时处理,严重缺陷应在短期(10天)内消除,消除前应加强监视”。这样就需要对歪斜的水泥电杆扶正。
如专利号为201420644528.8的中国发明专利中公开的一种电杆扶正器,其包括底座、液压升降装置、支杆和第一固定夹,其通过底座定位,然后利用液压升降装置的作用,通过支杆推动电杆将其扶正。其存在以下问题;1、由于电杆周围一般为土质地面,要将底座固定牢固,使用过程中不会松动或发生位移,困难较大;2、由于电杆为圆柱形,在推动的过程中,第一固定夹容易发生转动,导致支杆偏转,推动效果受影响;3、通过推力将电杆扶正本身具有较大的难度,对相关的设备要求也较高。
发明内容
本发明所要解决的技术问题是提供一种结构简单、操作性强的电杆扶正装置。
为解决上述问题,本发明所采取的技术方案是:
一种电杆扶正装置,其关键技术在于:其包括底座、牵引钢缆、第一固定夹和第二固定夹,所述底座左侧开设有卡置电杆的卡槽,所述卡槽之间设置有第一导向轮,所述底座的右侧设置有液压装置和通过定位套管滑动设置在底座上的滑行柱,所述滑行柱左端与液压装置接触,所述第一固定夹和第二固定夹上下分布固定在线杆上,所述第一固定夹和第二固定夹通过连接钢缆连接,所述牵引钢缆一端通过动滑轮与所述连接钢缆连接,另一端绕过所述第一导向轮与所述滑行柱右端连接。
作为本发明的进一步改进,所述底座的一侧还设置有第二导向轮和第三导向轮,所述牵引钢缆依次绕过第一导向轮、第二导向轮及第三导向轮后与所述滑行柱右端连接。
作为本发明的进一步改进,所述的第一导向轮倾斜设置。
采用上述技术方案所产生的有益效果在于:
本发明对电杆施加拉力来进行扶正处理,通过拉力作用,其作用的稳定性和安全性更高,其效果明显好于推力,在拉力的作用下,固定架不会和电杆发生相对转动,因此其安全性更高,作用效果更好。由于电杆为钢筋水泥材质,其能够承受较大的压力,但是对从其侧面施加的剪力的承受力较差,很容易破损断裂,本发明通过设置两个固定夹一上一下,在对电杆作用的时候,由于两点受力,能够减轻电杆单点受到的剪力,保证电杆不受损失,通过动滑轮使牵引钢缆和连接钢缆连接,使其着力点随着电杆的方位变化而变化,保证了两个固定夹的受力均匀,避免由于受力点不恰当导致仅有一个固定夹作用,而另一个失效的现象。
本发明通过导向轮的作用,一方面将液压装置的推力转化为对电杆的拉力,另一方面改变了液压装置的安装方位和对牵引钢缆的牵引力的施加方向,本发明中,牵引钢缆对电杆的水平分力向左,而液压装置对牵引钢缆的牵引力是向右的,而液压装置对底座的反作用力是向左的,液压装置安装在电杆的右侧,这样则能够利用电杆的作用,抵住底座的左侧,对底座施加向右的作用力,这样保证了底座不发生水平方向的位移,克服了软质的土地情况不方便固定底座的问题,并且同时保证了电杆根部的稳定,作为一个支点,与第一固定夹的施力点相互协调作用,有利于电杆的扶正。
本发明同时还具有体积小,方便运输和存储的优点。
附图说明
为了更清楚地说明本发明具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其它的附图。
图1是本发明的主视结构示意图。
图2是本发明的俯视结构示意图。
其中:1底座、2液压装置、3滑行柱、4定位套管、5第一导向轮、6第二导向轮、7第三导向轮、8支撑座、9牵引钢缆、10第一固定夹、11卡槽、12长钉、13第二固定夹、14动滑轮、15连接钢缆、100电杆。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,下面结合附图和具体实施例对发明进行清楚、完整的描述。
如图1和2所示的一种电杆扶正装置,其包括底座1、牵引钢缆9、第一固定夹10和第二固定夹13,所述底座1左侧开设有卡置电杆100的卡槽11,所述卡槽11之间设置有第一导向轮5,所述底座1的一侧还设置有第二导向轮6和第三导向轮7,所述底座1的右侧设置有液压装置2和通过定位套管4滑动设置在底座1上的滑行柱3,所述滑行柱3左端与液压装置2接触,所述第一固定夹10和第二固定夹13上下分布固定在线杆100上,所述第一固定夹10和第二固定夹13通过连接钢缆15连接,所述牵引钢缆9一端通过动滑轮14与所述连接钢缆15连接,所述牵引钢缆9的另一端依次绕过第一导向轮5、第二导向轮6及第三导向轮7后与所述滑行柱3右端连接。第二导向轮6和第三导向轮7的作用是使牵引钢缆9避开电杆100的干扰,减少摩擦阻力。
所述的第一导向轮5倾斜设置,其倾斜方向是向着第二导向轮6和第三导向轮7所在的一侧倾斜,作用是使第一导向轮5和第二导向轮6之间的牵引钢缆9与第一导向轮5的轴线尽可能的垂直作用,避免牵引钢缆9在作用的过程中脱离第一导向轮5,所述第一导向轮5采用凹形的辊。
如图1所示,本实施例中,电杆100向右侧倾斜,扶正过程中,需要通过牵引钢缆9施加向左的拉力。如图2所示,将底座1上的卡槽11卡在电杆100根部,使卡槽开口侧在左边,液压装置2在电杆的右侧,通过四个长钉12将底座1固定在地面上。在卡槽11的开口处安装上第一导向轮5,第一导向轮5通过支撑座8安装在底座1上,第一导向轮5和支撑座8整体拆装。然后将第一固定夹10和第二固定夹13分别固定在电杆100上,两个固定夹高度相差一米左右,每个固定夹的高度根据现场情况确定,牵引钢缆9的另一端通过连接机构和滑行柱3的右端固定连接,连接时使牵引钢缆9张紧,连接钢缆15嵌置在动滑轮14的绳槽中,启动液压装置2,其顶杆向右移动,推动滑行柱3向右移动,使牵引钢缆9向右产生拉力,同时液压装置2会对底座产生向左的作用力,由于电杆100位于卡槽11内,阻碍底座向左移动,因此保证了底座1的稳定性,由于牵引钢缆9从第一导向轮5的下侧穿过,会对第一导向轮5产生向上的作用力,因此长钉12可以固定底座1不会翘起,同时可以采用石头等中午压制在底座的左端,石头等在旷野是容易获得的。
所述第一固定夹10和第二固定夹13可以为抱箍,所述液压装置2可以为千斤顶等。所述第一固定夹10和第二固定夹13内侧设置防滑橡胶层,防止转动。

Claims (3)

1.一种电杆扶正装置,其特征在于:其包括底座(1)、牵引钢缆(9)、第一固定夹(10)和第二固定夹(13),所述底座(1)左侧开设有卡置电杆(100)的卡槽(11),所述卡槽(11)之间设置有第一导向轮(5),所述底座(1)的右侧设置有液压装置(2)和通过定位套管(4)滑动设置在底座(1)上的滑行柱(3),所述滑行柱(3)左端与液压装置(2)接触,所述第一固定夹(10)和第二固定夹(13)上下分布固定在线杆(100)上,所述第一固定夹(10)和第二固定夹(13)通过连接钢缆(15)连接,所述牵引钢缆(9)一端通过动滑轮(14)与所述连接钢缆(15)连接,另一端绕过所述第一导向轮(5)与所述滑行柱(3)右端连接。
2.根据权利要求1所述的一种电杆扶正装置,其特征在于:所述底座(1)的一侧还设置有第二导向轮(6)和第三导向轮(7),所述牵引钢缆(9)依次绕过第一导向轮(5)、第二导向轮(6)及第三导向轮(7)后与所述滑行柱(3)右端连接。
3.根据权利要求1或2所述的一种电杆扶正装置,其特征在于:所述的第一导向轮(5)倾斜设置。
CN201610198281.5A 2016-04-01 2016-04-01 一种电杆扶正装置 Expired - Fee Related CN105625796B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610198281.5A CN105625796B (zh) 2016-04-01 2016-04-01 一种电杆扶正装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610198281.5A CN105625796B (zh) 2016-04-01 2016-04-01 一种电杆扶正装置

Publications (2)

Publication Number Publication Date
CN105625796A true CN105625796A (zh) 2016-06-01
CN105625796B CN105625796B (zh) 2017-09-22

Family

ID=56041098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610198281.5A Expired - Fee Related CN105625796B (zh) 2016-04-01 2016-04-01 一种电杆扶正装置

Country Status (1)

Country Link
CN (1) CN105625796B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888361A (zh) * 2016-06-17 2016-08-24 国家电网公司 电杆扶正机
CN106884565A (zh) * 2017-04-14 2017-06-23 南京尚志电子科技有限公司 便携式快速升降装置
CN107869275A (zh) * 2017-12-20 2018-04-03 国网河北省电力有限公司饶阳供电分公司 一种电线杆调杆器
CN110029857A (zh) * 2019-03-13 2019-07-19 农军 一种景观通信塔
CN113445812A (zh) * 2021-05-24 2021-09-28 邵小东 一种农业物联网通信基站施工装置
CN113846899A (zh) * 2021-10-22 2021-12-28 河北汇智电力工程设计有限公司 一种输电线路铁塔加固调节装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2052056C1 (ru) * 1992-08-07 1996-01-10 Хухрин Виктор Владимирович Агрегат для установки длинномерных объектов в вертикальное положение
GB2495695A (en) * 2011-09-08 2013-04-24 Relgold Ltd A fast erecting pylon with offset arms and a landmark component
CN203213953U (zh) * 2013-04-22 2013-09-25 连云港黄海机械股份有限公司 一种液压动力头工程钻机
CN203977967U (zh) * 2014-08-05 2014-12-03 国家电网公司 电杆扶正装置
CN105442934A (zh) * 2015-11-18 2016-03-30 国网山东青州市供电公司 双向力矩水泥杆正杆器

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2052056C1 (ru) * 1992-08-07 1996-01-10 Хухрин Виктор Владимирович Агрегат для установки длинномерных объектов в вертикальное положение
GB2495695A (en) * 2011-09-08 2013-04-24 Relgold Ltd A fast erecting pylon with offset arms and a landmark component
CN203213953U (zh) * 2013-04-22 2013-09-25 连云港黄海机械股份有限公司 一种液压动力头工程钻机
CN203977967U (zh) * 2014-08-05 2014-12-03 国家电网公司 电杆扶正装置
CN105442934A (zh) * 2015-11-18 2016-03-30 国网山东青州市供电公司 双向力矩水泥杆正杆器

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888361A (zh) * 2016-06-17 2016-08-24 国家电网公司 电杆扶正机
CN106884565A (zh) * 2017-04-14 2017-06-23 南京尚志电子科技有限公司 便携式快速升降装置
CN107869275A (zh) * 2017-12-20 2018-04-03 国网河北省电力有限公司饶阳供电分公司 一种电线杆调杆器
CN107869275B (zh) * 2017-12-20 2023-11-21 国网河北省电力有限公司饶阳县供电分公司 一种电线杆调杆器
CN110029857A (zh) * 2019-03-13 2019-07-19 农军 一种景观通信塔
CN113445812A (zh) * 2021-05-24 2021-09-28 邵小东 一种农业物联网通信基站施工装置
CN113846899A (zh) * 2021-10-22 2021-12-28 河北汇智电力工程设计有限公司 一种输电线路铁塔加固调节装置

Also Published As

Publication number Publication date
CN105625796B (zh) 2017-09-22

Similar Documents

Publication Publication Date Title
CN105625796A (zh) 一种电杆扶正装置
CN207248634U (zh) 一种锚杆拉拔试验的装置
CN204982667U (zh) 一种预应力橡胶管穿管机
CN110965688B (zh) 一种轻型钢结构厂房建造型钢搭建处理方法
CN113373812B (zh) 一种可调节盖梁端头倒角模板标高的支撑装置及施工工艺
CN103628477A (zh) 一种用于玻璃纤维筋锚杆的预应力加载装置
CN112211382A (zh) 一种装配式建筑辅助施工设备
CN109914248A (zh) 悬索桥主索鞍预应力式顶推方法
CN205713410U (zh) 一种电杆扶正装置
CN206722533U (zh) 一种结构限位的电力设备护栏杆
CN105822133A (zh) 一种电杆扶正装置
CN204510624U (zh) 碳纤维板锚具张拉系统
CN115183062B (zh) 一种防滑脱混凝土预制楼面管道吊架结构
CN102587585A (zh) 平转调整预紧型定向夹持式锚具
CN216713350U (zh) 一种强度高安装便捷的钢结构
CN211315346U (zh) 一种拼接式管道支墩
CN210178392U (zh) 采掘支架调正防倒装置
CN207847691U (zh) 一种胶带输送机机尾固定装置
CN209497184U (zh) 迪尼玛绳高空收紧装置
CN102605961B (zh) 建筑施工中构件的提升方法及锚垫板
CN208362929U (zh) 一种钢管支架支撑结构
CN218562415U (zh) 基坑渗漏探测系统
CN206395355U (zh) 压力钢管洞内运输装置
CN219535553U (zh) 易于安装的轨道隧道线缆走线架
CN109713612A (zh) 迪尼玛绳高空收紧装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170727

Address after: 510640 Guangdong City, Tianhe District Province, No. five, road, public education building, unit 371-1, unit 2401

Applicant after: Guangdong Gaohang Intellectual Property Operation Co., Ltd.

Address before: 050301 Hebei Province, Shijiazhuang Mayor Zhao Tuolu Security No. 82 based Bi domain 2 Building 2 unit 403

Applicant before: Yang Ruiliang

TA01 Transfer of patent application right
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Yuwen

Inventor after: Chen Xin

Inventor after: Liu Lifeng

Inventor after: Zhao Chaoyang

Inventor after: Wang Yunfei

Inventor before: Yang Ruiliang

Inventor before: Yin Shaoqian

TA01 Transfer of patent application right

Effective date of registration: 20170815

Address after: Beijing Road Street Xingtai road 225300 in Jiangsu province Taizhou City Hailing District No. 18

Applicant after: Jiangsu Haiheng Building-Materials Machinery Co., Ltd.

Address before: 510640 Guangdong City, Tianhe District Province, No. five, road, public education building, unit 371-1, unit 2401

Applicant before: Guangdong Gaohang Intellectual Property Operation Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170922

Termination date: 20180401