CN105625743B - 带次梁的混凝土主梁加固结构 - Google Patents

带次梁的混凝土主梁加固结构 Download PDF

Info

Publication number
CN105625743B
CN105625743B CN201610127847.5A CN201610127847A CN105625743B CN 105625743 B CN105625743 B CN 105625743B CN 201610127847 A CN201610127847 A CN 201610127847A CN 105625743 B CN105625743 B CN 105625743B
Authority
CN
China
Prior art keywords
girder
stirrup
steel
bar
secondary beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610127847.5A
Other languages
English (en)
Other versions
CN105625743A (zh
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Power Construction Group Jiangxi Hydropower Engineering Bureau Co., Ltd.
Original Assignee
朱奎
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 朱奎 filed Critical 朱奎
Priority to CN201610127847.5A priority Critical patent/CN105625743B/zh
Priority to CN201710540171.7A priority patent/CN107269018B/zh
Priority to CN201710537646.7A priority patent/CN107060368B/zh
Publication of CN105625743A publication Critical patent/CN105625743A/zh
Application granted granted Critical
Publication of CN105625743B publication Critical patent/CN105625743B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0244Increasing or restoring the load-bearing capacity of building construction elements of beams at places of holes, e.g. drilled in them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Abstract

本发明公开了一种带次梁的混凝土主梁加固结构,其特征是在搁置次梁部位凿出墙洞,将工字钢伸入墙洞,工字钢和墙洞空隙部位采用混凝土封闭,墙体次梁下部保护层凿除,露出主筋,工字钢顶标高与主筋底标高相同,将主筋和工字钢进行焊接,工字钢底部焊接张拉机具,预应力钢筋为折线型,预应力钢筋伸入砖墙预留孔,砖墙预留孔孔隙部位填塞环氧树脂砂浆,环氧树脂砂浆使预应力钢筋和砖墙联成整体,预应力钢筋张拉完毕后用锚具固定。主梁保护层凿除,露出主梁箍筋,将加固箍筋做成开口U型,加固箍筋开口双肢与主梁箍筋焊接,将主梁和次梁之间长度作为跨度单元,在离次梁端部1/3跨度范围内进行采用加强箍进行加强,加强箍直径与主梁箍筋直径相同,加强箍采用封闭箍筋,加强箍与主梁主筋焊接连接,主梁下部采用膨胀混凝土进行封闭。

Description

带次梁的混凝土主梁加固结构
技术领域
本发明涉及一种加固结构,特别涉及一种带次梁的混凝土主梁加固结构。
背景技术
带次梁的混凝土主梁一旦出现承载力不够或者裂缝的情况下必须进行加固,对于带次梁的混凝土主梁加固结构,传统的加固方法加大截面加固法,粘钢加固法、粘碳纤维加固法,这些加固方法的缺点是存在着应力滞后,由于加固结构属于二次受力结构,加固前原结构已经受力,截面上的应力、应变已经存在,在受力情况下,只有当原结构受力达到一定情况下加固结构才参与承载,容易出现原结构达到极限状态而加固结构承载较小的情况,所以传统方法对带次梁的混凝土主梁的加固效果不明显。
发明内容
本发明是提供一种带次梁的混凝土主梁加固结构,解决加固结构和砖墙原因结构不能协同受力的问题。
本发明中在搁置次梁部位凿出墙洞,将工字钢伸入墙洞,工字钢和墙洞空隙部位采用混凝土封闭,墙体次梁下部保护层凿除,露出主筋,工字钢顶标高与主筋底标高相同,将主筋和工字钢进行焊接,工字钢底部焊接张拉机具,预应力钢筋为折线型,预应力钢筋直径为18~22mm,预应力钢筋伸入砖墙预留孔,砖墙预留孔直径为25~28mm,砖墙预留孔孔隙部位填塞环氧树脂砂浆,环氧树脂砂浆使预应力钢筋和砖墙联成整体,预应力钢筋张拉完毕后用锚具固定。主梁保护层凿除,露出主梁箍筋,将加固箍筋做成开口U型,加固箍筋开口双肢与主梁箍筋焊接,加固箍筋直径与主梁箍筋直径相同,焊接长度为10倍箍筋直径,将主梁和次梁之间长度作为跨度单元,在离次梁端部1/3跨度范围内进行采用加强箍进行加强,加强箍直径与主梁箍筋直径相同,加强箍采用封闭箍筋,加强箍与主梁主筋焊接连接,加强箍间距为75~100mm,主梁下部采用膨胀混凝土进行封闭。
张拉机具包括钢垫板、有丝螺帽、无丝螺帽、螺杆、钢垫块。钢垫板厚度为10~12mm,钢垫板长度和宽度均为100~150mm,钢垫板侧边安装百分表,用于测量下移数据,张拉机具下部设置有丝螺帽,有丝螺帽与钢垫板焊接固定,有丝螺帽内圈设有丝扣,螺杆直径为28~32mm,螺杆下部设置丝牙,螺杆的丝牙长度比有丝螺帽的丝扣长度要大20~25mm,螺杆丝牙与有丝螺帽丝扣咬合连接,在螺杆上部焊接无丝螺帽,下部钢垫块下表面焊接钢垫块,钢垫块为倒三角形锲块,钢垫块最底部要做成圆弧形,以便钢垫块与预应力钢筋接触时不致产生应力集中。操作时用扳手转动无丝螺帽,带动螺杆转动,由于螺杆丝牙和有丝螺帽丝扣的作用会带动钢垫板移动,移动幅度由安装在钢垫板侧边的百分表来进行反映。
施工步骤包括:
(1)安装工字钢
在搁置次梁部位凿出墙洞,将工字钢伸入墙洞,工字钢和墙洞空隙部位采用混凝土封闭,用于封闭的混凝土强度为C30,墙体次梁下部保护层凿除,露出主筋,将主筋和工字钢进行焊接;
(2)安装张拉机具
工字钢底部焊接张拉机具;
(3)钻设砖墙预留孔
(4)凿除主梁保护层
(5)安装预应力钢筋
预应力钢筋穿过砖墙预留孔,在张拉机具的钢垫块部位进行弯折;
(6)张拉预应力钢筋
由于在预应力钢筋张拉会涉及钢筋松弛的应力损失,砖墙预留孔孔隙部位填塞环氧树脂砂浆的应力损失,故预应力钢筋预应力采用超张拉,根据大量试验结果,采用控制应力超张拉5%。预应力钢筋张拉完毕后用锚具固定。
(7)封闭砖墙预留孔
在砖墙预留孔孔隙部位填塞环氧树脂砂浆;
(8)将加固箍筋与主梁箍筋焊接
(9)将加强箍与主梁主筋焊接
(10)主梁下部采用膨胀混凝土进行封闭,膨胀混凝土强度为C30。
本发明通过转动张拉机具的无丝螺帽,使钢垫板下移强迫预应力钢筋就位,迫使钢筋延伸变形而获得预应力。钢筋会对工字钢产生向上的反作用力,从而可以直接卸掉次梁的荷载,故本发明加固的力学性能好。另外,本发明所采用张拉机具可以在施工现场自行制作,操作方便成本较低。
附图说明
图1为带次梁的混凝土主梁加固结构示意图,图2为张拉机具示意图,图3为加固箍筋与原有箍筋连接示意图。
各附图中:1、工字钢,2、张拉机具,3、预应力钢筋,4、膨胀混凝土,5、锚具,6、环氧树脂砂浆,7、主梁,8、次梁,9、钢垫板,10、有丝螺帽,11、无丝螺帽,12、螺杆,13、钢垫块,14、百分表,15、主梁箍筋,16、加固箍筋。
具体实施方式
图1为带次梁的混凝土主梁加固结构示意图,图2为张拉机具示意图,图3为加固箍筋与原有箍筋连接示意图。
实施例中在搁置次梁部位凿出墙洞,将工字钢1伸入墙洞,工字钢1和墙洞空隙部位采用混凝土封闭,墙体次梁下部保护层凿除,露出主筋,工字钢1顶标高与主筋底标高相同,将主筋和工字钢1进行焊接,工字钢1底部焊接张拉机具2,预应力钢筋3为折线型,预应力钢筋3直径为22mm,预应力钢筋3伸入砖墙预留孔,砖墙预留孔直径为28mm,砖墙预留孔孔隙部位填塞环氧树脂砂浆6,环氧树脂砂浆6使预应力钢筋3和砖墙联成整体,预应力钢筋3张拉完毕后用锚具5固定。主梁7保护层凿除,露出主梁箍筋15,将加固箍筋16做成开口U型,加固箍筋16开口双肢与主梁箍筋15焊接,加固箍筋16直径与主梁箍筋15直径相同,焊接长度为10倍箍筋直径,将主梁7和次梁之间长度作为跨度单元,在离次梁端部1/3跨度范围内进行采用加强箍进行加强,加强箍直径与主梁箍筋15直径相同,加强箍采用封闭箍筋,加强箍与主梁主筋焊接连接,加强箍间距为75mm,主梁7下部采用膨胀混凝土4进行封闭。
张拉机具2包括钢垫板9、有丝螺帽10、有丝螺帽11、螺杆12、钢垫块13。钢垫板9厚度为12mm,钢垫板9长度和宽度均为120mm,钢垫板9侧边安装百分表14,用于测量下移数据,张拉机具2下部设置有丝螺帽10,有丝螺帽10与钢垫板9焊接固定,有丝螺帽10内圈设有丝扣,螺杆12直径为30mm,螺杆12下部设置丝牙,螺杆12的丝牙长度比有丝螺帽10的丝扣长度要大22mm,螺杆12丝牙与有丝螺帽10丝扣咬合连接,在螺杆12上部焊接有丝螺帽11,下部钢垫块13下表面焊接钢垫块13,钢垫块13为倒三角形锲块,钢垫块13最底部要做成圆弧形。操作时用扳手转动有丝螺帽11,带动螺杆12转动,由于螺杆12丝牙和有丝螺帽10丝扣的作用会带动钢垫板9移动,移动幅度由安装在钢垫板9侧边的百分表14来进行反映。
施工步骤包括:
(1)安装工字钢1
在搁置次梁部位凿出墙洞,将工字钢1伸入墙洞,工字钢1和墙洞空隙部位采用混凝土封闭,用于封闭的混凝土强度为C30,墙体次梁下部保护层凿除,露出主筋,将主筋和工字钢1进行焊接;
(2)安装张拉机具2
工字钢1底部焊接张拉机具2;
(3)钻设砖墙预留孔
(4)凿除主梁7保护层
(5)安装预应力钢筋3
预应力钢筋3穿过砖墙预留孔,在张拉机具2的钢垫块13部位进行弯折;
(6)张拉预应力钢筋3
采用控制应力超张拉5%。预应力钢筋3张拉完毕后用锚具5固定。
(7)封闭砖墙预留孔
在砖墙预留孔孔隙部位填塞环氧树脂砂浆6;
(8)将加固箍筋16与主梁箍筋15焊接
(9)将加强箍与主梁7主筋焊接
(10)主梁7下部采用膨胀混凝土4进行封闭,膨胀混凝土4强度为C30。

Claims (1)

1.一种带次梁的混凝土主梁加固结构,其特征是在搁置次梁部位凿出墙洞,将工字钢伸入墙洞,工字钢和墙洞空隙部位采用混凝土封闭,墙体次梁下部保护层凿除,露出主筋,工字钢顶标高与主筋底标高相同,将主筋和工字钢进行焊接,工字钢底部焊接张拉机具,预应力钢筋为折线型,预应力钢筋伸入砖墙预留孔,砖墙预留孔孔隙部位填塞环氧树脂砂浆,环氧树脂砂浆使预应力钢筋和砖墙联成整体,预应力钢筋张拉完毕后用锚具固定;主梁保护层凿除,露出主梁箍筋,将加固箍筋做成开口U型,加固箍筋开口双肢与主梁箍筋焊接,将主梁和次梁之间长度作为跨度单元,在离次梁端部1/3跨度范围内进行采用加强箍进行加强,加强箍直径与主梁箍筋直径相同,加强箍采用封闭箍筋,加强箍与主梁主筋焊接连接,主梁下部采用膨胀混凝土进行封闭。
CN201610127847.5A 2016-02-24 2016-02-24 带次梁的混凝土主梁加固结构 Active CN105625743B (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201610127847.5A CN105625743B (zh) 2016-02-24 2016-02-24 带次梁的混凝土主梁加固结构
CN201710540171.7A CN107269018B (zh) 2016-02-24 2016-02-24 带次梁的混凝土主梁加固施工方法
CN201710537646.7A CN107060368B (zh) 2016-02-24 2016-02-24 混凝土主梁加固结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610127847.5A CN105625743B (zh) 2016-02-24 2016-02-24 带次梁的混凝土主梁加固结构

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201710537646.7A Division CN107060368B (zh) 2016-02-24 2016-02-24 混凝土主梁加固结构
CN201710540171.7A Division CN107269018B (zh) 2016-02-24 2016-02-24 带次梁的混凝土主梁加固施工方法

Publications (2)

Publication Number Publication Date
CN105625743A CN105625743A (zh) 2016-06-01
CN105625743B true CN105625743B (zh) 2017-11-14

Family

ID=56041048

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610127847.5A Active CN105625743B (zh) 2016-02-24 2016-02-24 带次梁的混凝土主梁加固结构
CN201710537646.7A Active CN107060368B (zh) 2016-02-24 2016-02-24 混凝土主梁加固结构
CN201710540171.7A Active CN107269018B (zh) 2016-02-24 2016-02-24 带次梁的混凝土主梁加固施工方法

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201710537646.7A Active CN107060368B (zh) 2016-02-24 2016-02-24 混凝土主梁加固结构
CN201710540171.7A Active CN107269018B (zh) 2016-02-24 2016-02-24 带次梁的混凝土主梁加固施工方法

Country Status (1)

Country Link
CN (3) CN105625743B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805304A (zh) * 2017-09-12 2020-02-18 叶长青 混凝土梁的加固构造施工方法
CN110821204A (zh) * 2017-10-16 2020-02-21 叶长青 一种混凝土屋面梁的加固施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09273318A (ja) * 1996-04-04 1997-10-21 Fujita Corp 既存の鉄筋コンクリート、もしくは鉄骨鉄筋コンクリート構造物における柱・梁接合部の耐震補強構造
CN201334780Y (zh) * 2008-12-09 2009-10-28 贵阳铝镁设计研究院 一种钢筋混凝土次梁的加固结构
CN101660327A (zh) * 2008-08-29 2010-03-03 万科企业股份有限公司 预制混凝土次梁与主梁的连接结构、施工方法及建筑
CN202202577U (zh) * 2011-08-18 2012-04-25 正益集团有限责任公司 预应力托梁拆柱结构

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2818676B1 (fr) * 2000-12-27 2003-03-07 Freyssinet Int Stup Procede de demontage d'un cable de precontrainte et dispositif pour la mise en oeuvre
KR100560725B1 (ko) * 2005-10-17 2006-03-14 주식회사 세진에스씨엠 건축물의 보 보강 구조
CN103388408B (zh) * 2013-07-28 2016-01-13 桂林理工大学 一种建筑结构体外预应力筋加固转向块
CN204152236U (zh) * 2014-08-27 2015-02-11 唐昌辉 一种体外预应力加固装置
CN104929381A (zh) * 2015-06-02 2015-09-23 项剑锋 钢支托无粘结钢绞线下撑式预应力加固楼板的方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09273318A (ja) * 1996-04-04 1997-10-21 Fujita Corp 既存の鉄筋コンクリート、もしくは鉄骨鉄筋コンクリート構造物における柱・梁接合部の耐震補強構造
CN101660327A (zh) * 2008-08-29 2010-03-03 万科企业股份有限公司 预制混凝土次梁与主梁的连接结构、施工方法及建筑
CN201334780Y (zh) * 2008-12-09 2009-10-28 贵阳铝镁设计研究院 一种钢筋混凝土次梁的加固结构
CN202202577U (zh) * 2011-08-18 2012-04-25 正益集团有限责任公司 预应力托梁拆柱结构

Also Published As

Publication number Publication date
CN107060368B (zh) 2019-06-07
CN107060368A (zh) 2017-08-18
CN107269018A (zh) 2017-10-20
CN105625743A (zh) 2016-06-01
CN107269018B (zh) 2019-03-08

Similar Documents

Publication Publication Date Title
CN104612037B (zh) 一种附加耗能钢筋的法兰连接混凝土填充双壁钢管预制拼装桥墩
CN102383418A (zh) 抗震型预制混凝土实心方桩及其生产方法
CN109183607A (zh) 预制拼接uhpc管-混凝土超高桥墩及施工方法
CN101220593A (zh) 一种预应力管桩施工后处理该管桩断裂的加固方法
CN108252424A (zh) 一种预制装配型钢混凝土柱间连接结构与方法
CN105625743B (zh) 带次梁的混凝土主梁加固结构
CN104532740A (zh) 一种附加耗能钢筋的无粘结后张预应力混凝土填充双壁钢管预制拼装桥墩
CN204589789U (zh) 一种附加阻尼器的无粘结后张预应力混凝土填充双壁钢管预制拼装桥墩
CN100458102C (zh) 钢板-混凝土组合衬砌
CN108708273A (zh) 一种分块式桥面板湿接缝连接形式
KR20100035787A (ko) 리브강관을 사용한 중공 cft 제작공법
CN201474095U (zh) 逆施混凝土梁钢筋与正施型钢柱组合连接装置
CN103924676B (zh) 预应力连接混凝土梁圆钢管混凝土柱节点
CN103306495B (zh) 木结构截柱加固施工方法
CN104652430A (zh) 复合配筋部分预应力混凝土实心方桩及其制作方法
CN204475149U (zh) 一种附加耗能钢筋的无粘结后张预应力混凝土填充双壁钢管预制拼装桥墩
CN106968244A (zh) 一种frp管与半预制半现浇再生混凝土预应力叠合桩基础及制备方法
CN202509790U (zh) 构筑物水池的加固结构
CN109208463A (zh) 底部节段采用构件组合形式的预制节段拼装桥墩
CN102505668B (zh) 一种重力坝坝头水平裂缝钢筋加固施工方法
CN203939023U (zh) 抗震型预制混凝土三角形实心桩
CN209941715U (zh) 一种预应力管桩与承台连接用的节点
CN207193949U (zh) 一种方便施工的预应力管桩
CN208563359U (zh) 一种预制phc管桩及其与承台法兰的连接结构
JP2021188354A (ja) プレキャスト・プレストレストコンクリート基礎構造物及びその施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180824

Address after: 330001 No. 138, Nan Lian Road, Qingyun District, Nanchang, Jiangxi

Patentee after: China Electric Power Construction Group Jiangxi Hydropower Engineering Bureau Co., Ltd.

Address before: 325000 No. 39 Rong Xin Road, Ouhai District, Wenzhou, Zhejiang.

Patentee before: Zhu Kui