CN105625481A - 一种地下工程用泄水孔施工方法 - Google Patents

一种地下工程用泄水孔施工方法 Download PDF

Info

Publication number
CN105625481A
CN105625481A CN201610160324.0A CN201610160324A CN105625481A CN 105625481 A CN105625481 A CN 105625481A CN 201610160324 A CN201610160324 A CN 201610160324A CN 105625481 A CN105625481 A CN 105625481A
Authority
CN
China
Prior art keywords
sleeve pipe
groove
weep hole
sole plate
constructional method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610160324.0A
Other languages
English (en)
Other versions
CN105625481B (zh
Inventor
顾国荣
郭星宇
王恺敏
王克文
杨砚宗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Changkai Geotechnical Engineering Co Ltd
Original Assignee
Shanghai Changkai Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Changkai Geotechnical Engineering Co Ltd filed Critical Shanghai Changkai Geotechnical Engineering Co Ltd
Priority to CN201610160324.0A priority Critical patent/CN105625481B/zh
Publication of CN105625481A publication Critical patent/CN105625481A/zh
Application granted granted Critical
Publication of CN105625481B publication Critical patent/CN105625481B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure

Abstract

本发明公开了一种地下工程用泄水孔施工方法,其特征在于所述施工方法包括如下步骤:在地下室基础底板上开设一凹槽,在所述凹槽中固定安装一具有开关阀门的套管;开启所述开关阀门,在所述套管中利用钻杆将所述基础底板钻穿直至下方土体中形成泄水孔;之后将所述钻杆提离所述套管,并关闭所述套管中的开关阀门。本发明的优点是,施工方法简单易操作,通过在具有开关阀门的套管内进行分步钻孔,以实现在泄水孔成孔后,有效防止地下水的喷涌,并防止泥沙流失。

Description

一种地下工程用泄水孔施工方法
技术领域
本发明属于地下工程技术领域,具体涉及一种地下工程用泄水孔施工方法。
背景技术
目前随施工工程逐渐向地下延伸,地下室越来越深,在基础底板标高低于所在区域水位标高时,基础底板将会受到地下水的浮力。
结构施工过程中,往往会在基础底板上设置承压泄水井或泄水孔,防止所施工结构自重不足以抵抗地下水浮力时造成结构整体上浮。然而在地下室基础底板上开设泄水井或泄水孔时,由于需要钻穿基础底板将会造成大量地下水喷涌,这种情况下,大多采用砂包堆压,施工不得不在涌水的情况下进行,给施工造成了极大的不便和困难。
发明内容
本发明的目的是根据上述现有技术的不足之处,提供一种地下工程用泄水孔施工方法,该施工方法通过在基础底板分步钻孔,并安装具有开关阀门的套管,以有效防止泄水孔成孔后的地下水喷涌。
本发明目的实现由以下技术方案完成:
一种地下工程用泄水孔施工方法,其特征在于所述施工方法包括如下步骤:在地下室基础底板上开设一凹槽,在所述凹槽中固定安装一具有开关阀门的套管;开启所述开关阀门,在所述套管中利用钻杆将所述基础底板钻穿直至下方土体中形成泄水孔;之后将所述钻杆提离所述套管,并关闭所述套管中的开关阀门。
待将所述钻杆提离所述套管后,在所述套管的上端口连接一具有过滤装置的滤管。
所述凹槽深度小于所述基础底板的厚度。
所述套管固定安装于所述凹槽中是指:所述套管底端经角铁与所述凹槽底面固定连接,并于所述套管与所述凹槽之间的空隙中灌注水泥砂浆。
本发明的优点是,施工方法简单易操作,通过在具有开关阀门的套管内进行分步钻孔,以实现在泄水孔成孔后,有效防止地下水的喷涌,并防止泥沙流失。
附图说明
图1为本发明中泄水孔施工的原理示意图;
图2为本发明中在套管上安装有滤管的示意图。
具体实施方式
以下结合附图通过实施例对本发明的特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1-2,图中标记1-11分别为:基础底板1、凹槽2、套管3、开关阀门4、角铁5、螺丝6、水泥砂浆7、钻杆8、钻孔9、土层10、滤管11。
实施例:
如图1、2所示,为了克服现有地下室内泄水孔开孔过程中,由于钻穿基础底板造成大量地下水喷涌的不足,本实施例提供了一种地下工程泄水孔施工方法,该施工方法包括如下步骤:
(1)首先,在地下室内的基础底板1上开设一凹槽2,该凹槽2由大变小呈两段式阶梯状,需要说明的是,凹槽2并不钻穿基础底板1,在基础底板1上预留有一定厚度的底板,以防下部土层10内水喷涌而出,凹槽2的开设深度占基础底板1厚度的1/2—3/4;
(2)之后,选取一具有开关阀门4的套管3,将套管3的下端口插入凹槽2内底部,但不穿过基础底板1;待插入完毕后,利用角铁5将套管3同凹槽2之间固定连接,即角铁5的一侧板与套管3侧壁焊接固定,另一侧板则与凹槽2的上段底板通过螺丝6螺纹固定连接;套管3上部高出于基础底板1的表面,开关阀门4应设置于套管3上部以便于工作人员对其进行启闭操作;
(3)为了进一步对套管3进行固定限位,在套管3外壁与凹槽2之间的空隙内灌注水泥砂浆7;
(4)待前述灌注的水泥砂浆7凝固并达到一定强度后,开启套管3内的开关阀门4,然后将一钻杆8深入至套管3内底部,并利用该钻杆8开设钻孔9,钻穿基础底板1直至其下方的土层10中,形成泄水孔;
(5)待泄水孔施工完毕后,土层10内的地下水将会产生突涌现象,因此迅速上提钻杆8脱离套管3,并立即关闭开关阀门4;
(6)在套管3的上端口套接一具有过滤功能的滤管11,滤管11再外接泄水管路,其中,该滤管11可对地下水中的泥砂进行反滤,防止泥砂流失。
利用本实施例中的泄水孔进行泄水减压工作时,开启套管3中的开关阀门4,基础底板1下方土层10中的地下水经套管3向外排出,排出的地下水在经过滤管11时,可将地下水中所夹带的泥砂进行反滤,以防止土层10中泥砂的流失,避免造成地质危害。
本实施例中泄水孔施工方法的有益效果在于:通过在基础底板上分步开孔并设置具有开关阀门的套管,以在开孔后能够迅速关闭开关阀门,即可达到既能顺利开孔又能防止地下水喷涌的目的。

Claims (4)

1.一种地下工程用泄水孔施工方法,其特征在于所述施工方法包括如下步骤:在地下室基础底板上开设一凹槽,在所述凹槽中固定安装一具有开关阀门的套管;开启所述开关阀门,在所述套管中利用钻杆将所述基础底板钻穿直至下方土体中形成泄水孔;之后将所述钻杆提离所述套管,并关闭所述套管中的开关阀门。
2.根据权利要求1所述的一种地下工程用泄水孔施工方法,其特征在于待将所述钻杆提离所述套管后,在所述套管的上端口连接一具有过滤装置的滤管。
3.根据权利要求1所述的一种地下工程用泄水孔施工方法,其特征在于所述凹槽深度小于所述基础底板的厚度。
4.根据权利要求1所述的一种地下工程用泄水孔施工方法,其特征在于所述套管固定安装于所述凹槽中是指:所述套管底端经角铁与所述凹槽底面固定连接,并于所述套管与所述凹槽之间的空隙中灌注水泥砂浆。
CN201610160324.0A 2016-03-21 2016-03-21 一种地下工程用泄水孔施工方法 Active CN105625481B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610160324.0A CN105625481B (zh) 2016-03-21 2016-03-21 一种地下工程用泄水孔施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610160324.0A CN105625481B (zh) 2016-03-21 2016-03-21 一种地下工程用泄水孔施工方法

Publications (2)

Publication Number Publication Date
CN105625481A true CN105625481A (zh) 2016-06-01
CN105625481B CN105625481B (zh) 2018-11-27

Family

ID=56040791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610160324.0A Active CN105625481B (zh) 2016-03-21 2016-03-21 一种地下工程用泄水孔施工方法

Country Status (1)

Country Link
CN (1) CN105625481B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277829A (zh) * 2018-03-23 2018-07-13 中铁大桥勘测设计院集团有限公司 一种带泄水孔的底板结构及其施工方法
CN109958119A (zh) * 2019-04-02 2019-07-02 中铁二十三局集团第四工程有限公司 一种地下工程水位观测井施工方法
CN113202148A (zh) * 2021-05-10 2021-08-03 四川省建筑科学研究院有限公司 一种地下室导流限压结构

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04102633A (ja) * 1990-08-17 1992-04-03 Takenaka Komuten Co Ltd 建物の浮上り防止工法及び装置
JPH06185080A (ja) * 1992-12-17 1994-07-05 San East:Kk 地下構築物用床パネル
CN204080879U (zh) * 2014-08-29 2015-01-07 上海建工七建集团有限公司 地下室底板抗浮泄水装置
CN204343342U (zh) * 2014-12-10 2015-05-20 奥意建筑工程设计有限公司 一种带有泄水孔的地下室底板结构
CN104711994A (zh) * 2015-01-27 2015-06-17 江苏省华建建设股份有限公司 基坑深井降水及封堵施工方法
CN105525631A (zh) * 2015-11-20 2016-04-27 中国建筑第四工程局有限公司 一种用于处理底板涌水孔的堵漏方法及结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04102633A (ja) * 1990-08-17 1992-04-03 Takenaka Komuten Co Ltd 建物の浮上り防止工法及び装置
JPH06185080A (ja) * 1992-12-17 1994-07-05 San East:Kk 地下構築物用床パネル
CN204080879U (zh) * 2014-08-29 2015-01-07 上海建工七建集团有限公司 地下室底板抗浮泄水装置
CN204343342U (zh) * 2014-12-10 2015-05-20 奥意建筑工程设计有限公司 一种带有泄水孔的地下室底板结构
CN104711994A (zh) * 2015-01-27 2015-06-17 江苏省华建建设股份有限公司 基坑深井降水及封堵施工方法
CN105525631A (zh) * 2015-11-20 2016-04-27 中国建筑第四工程局有限公司 一种用于处理底板涌水孔的堵漏方法及结构

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277829A (zh) * 2018-03-23 2018-07-13 中铁大桥勘测设计院集团有限公司 一种带泄水孔的底板结构及其施工方法
CN109958119A (zh) * 2019-04-02 2019-07-02 中铁二十三局集团第四工程有限公司 一种地下工程水位观测井施工方法
CN113202148A (zh) * 2021-05-10 2021-08-03 四川省建筑科学研究院有限公司 一种地下室导流限压结构
CN113202148B (zh) * 2021-05-10 2023-01-17 四川省建筑科学研究院有限公司 一种地下室导流限压结构

Also Published As

Publication number Publication date
CN105625481B (zh) 2018-11-27

Similar Documents

Publication Publication Date Title
CN202047416U (zh) 电梯井坑处减压降水井封井装置
CN205387712U (zh) 一种基坑管涌快速处置装置
CN201610552U (zh) 强力真空疏干降水管井
CN105625481A (zh) 一种地下工程用泄水孔施工方法
CN107816051B (zh) 承压性潜水含水层深基坑组合井降水施工方法
CN104762981B (zh) 一种降水井的成孔方法
CN105350555B (zh) 一种降水井的快速施工方法
CN107794954B (zh) 一种抗浮泄水泄压结构
CN103031847A (zh) 变径搭接组合式孔口管灌浆法
CN107354951A (zh) 一种可用于水力冲孔的轻型井点集水管及其使用方法
CN102425156A (zh) 变截面地下连续墙及其施工方法
CN105804690B (zh) 地浸工艺钻孔逆向注水泥浆装置
CN105625482A (zh) 地下工程基础底板上的布孔方式及其应用
CN205713982U (zh) 一种适用于岩溶地区的桩基施工钻孔装置
CN113846995A (zh) 一种地浸采铀钻孔活塞加注清水联动洗井装置及洗井方法
CN105735331B (zh) 一种地下工程用注浆加固施工方法
CN110644483B (zh) 桥梁水下桩基施工装置
CN205116158U (zh) 可防钢筋笼上浮的咬合砼钻孔灌注桩
CN205530387U (zh) 一种地下工程泄水孔用泄水装置
CN207526475U (zh) 一种可单向排水的隔水装置
CN203891911U (zh) 一种竹筋注浆锚杆
CN207177816U (zh) 回接插入注水泥总成
CN107780420B (zh) 铸造机下液压活塞井的施工方法
CN206667276U (zh) 一种降水井钢套管装置
CN217206388U (zh) 孔或井口防喷密封装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction method for drainage holes used in underground engineering

Effective date of registration: 20231115

Granted publication date: 20181127

Pledgee: Bank of Shanghai Limited by Share Ltd North Branch

Pledgor: SHANGHAI CHANGKAI GEOTECHNICAL ENGINEERING Co.,Ltd.

Registration number: Y2023310000742

PE01 Entry into force of the registration of the contract for pledge of patent right