CN105571768B - 一种基于位移监测结果的浅埋隧道土压力计算方法 - Google Patents

一种基于位移监测结果的浅埋隧道土压力计算方法 Download PDF

Info

Publication number
CN105571768B
CN105571768B CN201610008963.5A CN201610008963A CN105571768B CN 105571768 B CN105571768 B CN 105571768B CN 201610008963 A CN201610008963 A CN 201610008963A CN 105571768 B CN105571768 B CN 105571768B
Authority
CN
China
Prior art keywords
tunnel
earth pressure
arch structure
heavy
soil body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610008963.5A
Other languages
English (en)
Other versions
CN105571768A (zh
Inventor
娄培杰
梁书玲
李成杰
徐颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Road and Bridge Construction Co., Ltd.
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201610008963.5A priority Critical patent/CN105571768B/zh
Publication of CN105571768A publication Critical patent/CN105571768A/zh
Application granted granted Critical
Publication of CN105571768B publication Critical patent/CN105571768B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L11/00Measuring steady or quasi-steady pressure of a fluid or a fluent solid material by means not provided for in group G01L7/00 or G01L9/00
    • G01L11/004Measuring steady or quasi-steady pressure of a fluid or a fluent solid material by means not provided for in group G01L7/00 or G01L9/00 by the use of counterbalancing forces

Abstract

本发明涉及一种基于位移监测结果的浅埋隧道土压力计算方法,该方法实施步骤包括两大步,首先通过隧道顶部位移判断土拱结构形状,然后按照土拱结构形状来选择不同的松动土压力计算公式计算松动土压力。本发明给出的浅埋隧道土压力计算方法可以更好的预测隧道土压力,对于工程施工和设计具有重要意义。

Description

一种基于位移监测结果的浅埋隧道土压力计算方法
技术领域
本发明专利涉及公路或铁路隧道土压力计算方法,具体地涉及一种基于浅埋隧道位移监测的土压力计算方法。
背景技术
隧道变形监测是隧道施工中常见的一道施工工序,通过监测数据来复核设计松动土压力具有较大的实际工程价值。土拱效应是自然界中非常普遍的一种现象,在挡土墙、管道工程、浅埋隧道工程、桩基工程中对于土压力均有较大的影响。土力学奠基人Terzaghi对土拱效应的定义是土体应力从屈服区域转移到非屈服区域,即土体产生不均匀沉降必然会伴随着土拱效应的发生。在公路或铁路浅埋隧道施工中,由于在隧道顶部进行支护以及同步注浆等因素,隧道顶部位移收到约束,隧道上部土体不均匀沉降。因而,在浅埋隧道松动土压力计算中有必要考虑土拱效应的影响。
对于浅埋隧道松动土压力计算方法,已有文献进行报道:
文献[1]、科技期刊:岩土工程学报,名称:盾构隧道施工松动土压力计算方法研究,上述文献认为土拱结构为下凹曲线,给出了一种考虑土拱效应的浅埋隧道松动土压力计算方法。
文献[2]、科技期刊:岩土工程学报,名称:对“盾构隧道施工松动土压力计算方法研究”的讨论,该文献将文献[1]的方法推广到了黏性土领域。
根据Terzaghi的活动门试验可知,土拱结构的发展如附图1所示:随着土体位移的逐渐增大,土拱结构大致经历了4种形状;1)当活动门开始移动时,土体中会形成类似与拱桥一样的上凹拱结构;2)当活动门向下移动时,上凹拱结构会演化为三角拱结构;3)随着活动门的继续下移,土体逐渐形成下凹曲线(即下凹拱结构);4)随着活动门的继续下移,土体会形成矩形拱结构。对于浅埋隧道而言,由于土体位移较大,土拱结构往往以下凹拱或者矩形拱为主。因此,文献[1]和文献[2]均未考虑土拱结构对于土体松动土压力的影响,并且上述文献均是针对单层均质土为研究对象,实际工程中往往以成层土为主,因而上述两个方法还不能直接用于工程实际。
发明内容
本发明的目的在于提供一种可以考虑土拱结构影响的浅埋隧道松动土压力计算方法。
本发明的技术方案是:
一种基于位移监测结果的浅埋隧道土压力计算方法,其特征在于:计算步骤包括:
(1)根据地层沉降监测结果判断土拱结构形状:
a.隧道施工监测获得隧道中部位移δ和两边部沉降较大值δ1
b.计算隧道边部位移下凹拱理论值δ′1,计算公式如下:
其中,b1等于表示隧道开挖高度内的土体加权平均内摩擦角,b为矩形隧道宽度,h为矩形隧道高度;
c.判断:当δ1>δ′1时,为矩形拱;当δ1≤δ′1时,为下凹拱;
(2)根据土拱结构形状计算松动土压力;
a.当土拱结构为矩形拱时,采用下式求解松动土压力:
式中,γ1表示等沉面到隧道顶部土体加权平均重度,γ2表示地面到等沉面土体加权平均重度,σ0为粘结应力,大小等于c表示等沉面距隧道顶部高度土体加权平均粘聚力,表示等沉面距隧道顶部高度土体加权平均内摩擦角;q表示地面超载,h1表示地面距等沉面高度,h2表示等沉面距隧道顶部高度,
b.当土拱结构判断为下凹拱结构时,采用下式求解松动土压力:
式中,Ka表示朗肯土压力系数,A表示参数,θ表示大主应力与水平面夹角。
进一步的,等沉面的确定方法是:当隧道顶部覆土>1.5b1时,h1=1.5b1;当隧道顶部覆土≦1.5b1时,h1=0,且γ2取值为0。
附图说明:
图1:活动门试验土拱结构与地层沉降关系;
图2:圆弧形下凹拱结构图;
图3:土拱结构判断图;
图4:盾构隧道松动土压力理论分析图;
图5:隧道松动土压力分析图;
图6:滑动面处应力摩尔圆;
具体实施方式
为使本发明实施的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行更加详细的描述。
本发明所提供的一种基于位移监测结果的浅埋隧道土压力计算方法,其步骤如下:
基于地层沉降判断土拱结构形状;
监测隧道中部位移δ,隧道边部位移较大值δ1;矩形隧道宽度为b,隧道高度为h;c表示等沉面距隧道顶部高度加权平均粘聚力,表示等沉面距隧道顶部高度加权平均内摩擦角;
假定土拱结构正好为圆弧下凹拱结构,松动土体宽度为b1,其大小等于 表示隧道高度内的土体加权平均内摩擦角,根据附图2所示的几何形状可得:
上式中,R为假定圆弧拱半径,θ为主应力与水平面夹角;
由式(1)可求得假定圆弧拱半径R;
而隧道边部位移下凹拱理论值δ′1为:
判断:当δ1>δ′1时,为矩形拱;当δ1≤δ′1时,为下凹拱;
如附图4所示,为隧道松动土压力理论分析图。滑动面自隧道两脚部沿着与水平方向呈的角度向上延伸,到达隧道顶部后,沿着竖直方向向上延伸,直到到达等沉面。在等沉面上方,土体的沉降相同,即土颗粒的相对位置不变,因而不会发生土拱现象,土体竖向应力为σv=γz。在等沉降面下方到松动土压力计算面区间内,土体会产生不均匀沉降,因而土拱效应会发生。
如附图5所示:取距离等沉面z的任一薄层单元来进行分析,微分单元体宽度为b1,高度为dz,上表面压力为σvb1,下表面压力为(σv+dσv)b1,自重为dw=γ2b1dz,γ1表示等沉面到隧道顶部土体加权平均重度,滑动面正压力为σwdz,滑动面剪力为τdz。根据竖向力平衡,可得下式:
σvb1+dw=(σv+dσv)b1+2τdz (5)
对于下凹拱结构而言,如附图6所示,剪切应力τ大小即为ux长度,其大小为:
式中,σ0为粘结应力,大小等于c表示等沉面距隧道顶部高度土体加权平均粘聚力,表示等沉面距隧道顶部高度土体加权平均内摩擦角;
对于下凹拱结构,根据几何形状,大主应力与水平面夹角θ采用下式:
对于矩形拱结构而言,土拱效应发挥到最大化,剪切应力τ大小为:
将式(6)和式(8)代入式(5),以及边界条件:z=0,σv=γ2h1+q,其中,z表示等沉面下任意高度,γ2表示地面到等沉面土体加权平均重度,q表示地面超载,可求得等沉面下z高度下的松动土压力:
矩形拱结构:
将z=h2代入式(9)(10),可得隧道顶部的松动土压力:
矩形拱结构:
进一步的,等沉面的判断方法是:土拱效应的范围为土拱跨度的1.5倍,即判断方法为:
当隧道顶部覆土>1.5b1时,h1=1.5b1
当隧道顶部覆土≦1.5b1时,h1=0,且γ2取值为0。
以某隧道工程为例,宽度和高度均为6m,上覆土厚度为12m,选取K1+100断面进行分析,该断面土层分布为:第1层,素填土,厚度为0.7m;第2层,由冲积、洪积作用形成的粉质黏土,可塑状,厚度为9.3m;第3层,残积层粉土,硬塑或中密,厚度为18.8m;第4层,粗砂岩全风化带,厚度为19.9m;第5层,粗砂岩强风化带,厚度为6.5m层;土工测试结果处理后求得:c=2.7Kpa,由此可求得土拱跨度b1=12.928m,隧道顶部覆土12m<1.5b1,可知等沉面高度为0,土工测试结果处理后求得:γ1=15.6KN/m3
在施工过程中,量测隧道顶部位移,并且在隧道衬砌上部埋深土压力盒以便读取土压力,表1对比了实测结果与几种方法计算结果对比,随着施工时间的前行,隧道顶部位移也是不断增大,土拱结构由下凹拱发展为矩形拱(最后一组按照本发明方法确定为矩形拱),并且稳定在矩形拱结构上。从计算结果对比可知,本发明法较其他文献的方法可以更好地预测和计算隧道松动土压力。
表1几种方法结果对比

Claims (2)

1.一种基于位移监测结果的浅埋隧道土压力计算方法,其特征在于:计算步骤包括:
(1)根据地层沉降监测结果判断土拱结构形状:
a.隧道施工监测获得隧道中部位移δ和两边部沉降较大值δ1
b.计算隧道边部位移下凹拱理论值δ′1,计算公式如下:
其中,b1等于 表示隧道开挖高度内的土体加权平均内摩擦角,b为矩形隧道宽度,h为矩形隧道高度;
c.判断:当δ1>δ′1时,为矩形拱;当δ1≤δ′1时,为下凹拱;
(2)根据土拱结构形状计算松动土压力;
a.当土拱结构为矩形拱时,采用下式求解松动土压力:
式中,γ1表示等沉面到隧道顶部土体加权平均重度,γ2表示地面到等沉面土体加权平均重度,σ0为粘结应力,大小等于c表示等沉面距隧道顶部高度土体加权平均粘聚力,表示等沉面距隧道顶部高度土体加权平均内摩擦角;q表示地面超载,h1表示地面距等沉面高度,h2表示等沉面距隧道顶部高度,
b.当土拱结构判断为下凹拱结构时,采用下式求解松动土压力:
式中,Ka表示朗肯土压力系数,A表示参数,θ表示大主应力与水平面夹角。
2.根据权利要求1所述的一种基于位移监测结果的浅埋隧道土压力计算方法,其特征在于:等沉面的确定方法是:当隧道顶部覆土厚度>1.5b1时,h1=1.5b1;当隧道顶部覆土厚度≦1.5b1时,h1=0,且γ2取值为0。
CN201610008963.5A 2016-01-04 2016-01-04 一种基于位移监测结果的浅埋隧道土压力计算方法 Active CN105571768B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610008963.5A CN105571768B (zh) 2016-01-04 2016-01-04 一种基于位移监测结果的浅埋隧道土压力计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610008963.5A CN105571768B (zh) 2016-01-04 2016-01-04 一种基于位移监测结果的浅埋隧道土压力计算方法

Publications (2)

Publication Number Publication Date
CN105571768A CN105571768A (zh) 2016-05-11
CN105571768B true CN105571768B (zh) 2018-08-03

Family

ID=55882157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610008963.5A Active CN105571768B (zh) 2016-01-04 2016-01-04 一种基于位移监测结果的浅埋隧道土压力计算方法

Country Status (1)

Country Link
CN (1) CN105571768B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106529150B (zh) * 2016-11-03 2018-12-11 上海隧道工程有限公司 复合地层盾构隧道拱顶荷载计算方法
CN107066795B (zh) * 2016-12-29 2018-05-15 中国人民解放军63926部队 一种基于开挖面变形砂土地层隧道开挖松动预测方法
CN108489800B (zh) * 2018-03-06 2020-06-09 安徽理工大学 一种施压组件及其用于测试岩石弹性后效的实验装置
CN109723052B (zh) * 2018-12-03 2021-01-29 兰州交通大学 高填明洞土压力计算方法
CN116541928B (zh) * 2023-04-25 2024-03-08 中铁十四局集团隧道工程有限公司 一种管幕或管棚承载松动土压力计算方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101215969A (zh) * 2008-01-17 2008-07-09 上海交通大学 大直径盾构近距离下穿小直径地铁隧道的变形控制方法
CN104533434A (zh) * 2014-12-28 2015-04-22 上海隧道工程股份有限公司 超浅覆土矩形隧道的构建方法
CN104951652A (zh) * 2015-06-03 2015-09-30 北京工业大学 一种浅埋非对称小间距隧道土压力荷载计算方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002275875A (ja) * 2001-03-13 2002-09-25 Kankyo Kikaku 21:Kk 地下構造体の地中埋設工法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101215969A (zh) * 2008-01-17 2008-07-09 上海交通大学 大直径盾构近距离下穿小直径地铁隧道的变形控制方法
CN104533434A (zh) * 2014-12-28 2015-04-22 上海隧道工程股份有限公司 超浅覆土矩形隧道的构建方法
CN104951652A (zh) * 2015-06-03 2015-09-30 北京工业大学 一种浅埋非对称小间距隧道土压力荷载计算方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
地铁隧道竖向土压力荷载的计算研究;宋玉香 等;《岩土力学》;20071031;第28卷(第10期);第2240-2244页 *
盾构施工隧道开挖面上覆土压力的研究;郅彬 等;《施工技术》;20081228;第37卷;第246-248页 *
矩形沟埋涵洞顶部垂直土压力试验和理论研究;李永刚 等;《岩土力学》;20080430;第29卷(第4期);第1081-1086页 *

Also Published As

Publication number Publication date
CN105571768A (zh) 2016-05-11

Similar Documents

Publication Publication Date Title
CN105571768B (zh) 一种基于位移监测结果的浅埋隧道土压力计算方法
Randolph et al. Limiting resistance of a spherical penetrometer in cohesive material
CN107489424B (zh) 一种盾构地铁施工诱发地层变形及对古建筑影响的预估方法
Liu et al. Bearing behavior of wide-shallow bucket foundation for offshore wind turbines in drained silty sand
CN104480962B (zh) 一种有限填土挡墙的土压力分布计算方法
Hong et al. Base stability of multi-propped excavations in soft clay subjected to hydraulic uplift
CN110362955A (zh) 岩质高边坡稳定性分析三维地质力学模型试验方法及应用
CN106529150B (zh) 复合地层盾构隧道拱顶荷载计算方法
Yang et al. Performance of overlapped shield tunneling through an integrated physical model tests, numerical simulations and real-time field monitoring
CN105735375A (zh) 一种黄土隧道隧底稳定性监测方法、系统及施工方法
Ghanbari et al. Improvement parameters in dynamic compaction adjacent to the slopes
Choudhary et al. Three-dimensional analysis of uplift behaviour of square horizontal anchor plate in frictional soil
CN107577836B (zh) 一种软土地层中隧道上方覆土压力的确定方法
CN110750923B (zh) 强夯置换处理的滨海淤泥软土地基单桩极限承载力计算方法
Xia et al. Complex rock slope deformation at Laxiwa Hydropower Station, China: background, characterization, and mechanism
CN105887791B (zh) 一种考虑边载效应的公路刚性桩复合地基沉降计算方法
CN101845815A (zh) 一种软土地层含承压水基坑突涌塑性破坏计算处理方法
Li et al. Stability assessment of a slope under a transformer substation using numerical modelling
CN108121831A (zh) 大直径宽浅式筒型基础筒盖承载模式的竖向承载力计算方法
CN110442948A (zh) 上软层厚度与倾角对隧道掌子面稳定性的确定方法
Hisatake A proposed methodology for analysis of ground settlements caused by tunneling, with particular reference to the “buoyancy” effect
Wu et al. The 2015 Ms 6.5 Pishan earthquake, Northwest Tibetan Plateau: A folding event in the western Kunlun piedmont
Wang et al. Twin tunnels-induced ground settlement in soft soils
CN109033662B (zh) 基于变形的顺层边坡开挖稳定性分析方法
Liu et al. Elastic analysis of ground movements around a tunnel considering a buoyant lining moving upwards

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190411

Address after: 230000 B-1512, west of Ganquan Road, Shushan District, Hefei, Anhui.

Patentee after: Anhui Eagle Dragon Industrial Design Co., Ltd.

Address before: No. 168 Shun Geng Middle Road, Huainan, Anhui Province

Patentee before: Anhui University Of Science And Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190509

Address after: 410000 22nd Floor, Jiaxing International Hui Plaza Hotel, 247 Jinxing Middle Road, Yuelu District, Changsha City, Hunan Province

Patentee after: Changsha Road and Bridge Construction Co., Ltd.

Address before: 230000 B-1512, west of Ganquan Road, Shushan District, Hefei, Anhui.

Patentee before: Anhui Eagle Dragon Industrial Design Co., Ltd.