CN105571768B - 一种基于位移监测结果的浅埋隧道土压力计算方法 - Google Patents
一种基于位移监测结果的浅埋隧道土压力计算方法 Download PDFInfo
- Publication number
- CN105571768B CN105571768B CN201610008963.5A CN201610008963A CN105571768B CN 105571768 B CN105571768 B CN 105571768B CN 201610008963 A CN201610008963 A CN 201610008963A CN 105571768 B CN105571768 B CN 105571768B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- earth pressure
- arch structure
- heavy
- soil body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L11/00—Measuring steady or quasi-steady pressure of a fluid or a fluent solid material by means not provided for in group G01L7/00 or G01L9/00
- G01L11/004—Measuring steady or quasi-steady pressure of a fluid or a fluent solid material by means not provided for in group G01L7/00 or G01L9/00 by the use of counterbalancing forces
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610008963.5A CN105571768B (zh) | 2016-01-04 | 2016-01-04 | 一种基于位移监测结果的浅埋隧道土压力计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610008963.5A CN105571768B (zh) | 2016-01-04 | 2016-01-04 | 一种基于位移监测结果的浅埋隧道土压力计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105571768A CN105571768A (zh) | 2016-05-11 |
CN105571768B true CN105571768B (zh) | 2018-08-03 |
Family
ID=55882157
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610008963.5A Active CN105571768B (zh) | 2016-01-04 | 2016-01-04 | 一种基于位移监测结果的浅埋隧道土压力计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105571768B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106529150B (zh) * | 2016-11-03 | 2018-12-11 | 上海隧道工程有限公司 | 复合地层盾构隧道拱顶荷载计算方法 |
CN107066795B (zh) * | 2016-12-29 | 2018-05-15 | 中国人民解放军63926部队 | 一种基于开挖面变形砂土地层隧道开挖松动预测方法 |
CN108489800B (zh) * | 2018-03-06 | 2020-06-09 | 安徽理工大学 | 一种施压组件及其用于测试岩石弹性后效的实验装置 |
CN109723052B (zh) * | 2018-12-03 | 2021-01-29 | 兰州交通大学 | 高填明洞土压力计算方法 |
CN116541928B (zh) * | 2023-04-25 | 2024-03-08 | 中铁十四局集团隧道工程有限公司 | 一种管幕或管棚承载松动土压力计算方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101215969A (zh) * | 2008-01-17 | 2008-07-09 | 上海交通大学 | 大直径盾构近距离下穿小直径地铁隧道的变形控制方法 |
CN104533434A (zh) * | 2014-12-28 | 2015-04-22 | 上海隧道工程股份有限公司 | 超浅覆土矩形隧道的构建方法 |
CN104951652A (zh) * | 2015-06-03 | 2015-09-30 | 北京工业大学 | 一种浅埋非对称小间距隧道土压力荷载计算方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002275875A (ja) * | 2001-03-13 | 2002-09-25 | Kankyo Kikaku 21:Kk | 地下構造体の地中埋設工法 |
-
2016
- 2016-01-04 CN CN201610008963.5A patent/CN105571768B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101215969A (zh) * | 2008-01-17 | 2008-07-09 | 上海交通大学 | 大直径盾构近距离下穿小直径地铁隧道的变形控制方法 |
CN104533434A (zh) * | 2014-12-28 | 2015-04-22 | 上海隧道工程股份有限公司 | 超浅覆土矩形隧道的构建方法 |
CN104951652A (zh) * | 2015-06-03 | 2015-09-30 | 北京工业大学 | 一种浅埋非对称小间距隧道土压力荷载计算方法 |
Non-Patent Citations (3)
Title |
---|
地铁隧道竖向土压力荷载的计算研究;宋玉香 等;《岩土力学》;20071031;第28卷(第10期);第2240-2244页 * |
盾构施工隧道开挖面上覆土压力的研究;郅彬 等;《施工技术》;20081228;第37卷;第246-248页 * |
矩形沟埋涵洞顶部垂直土压力试验和理论研究;李永刚 等;《岩土力学》;20080430;第29卷(第4期);第1081-1086页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105571768A (zh) | 2016-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105571768B (zh) | 一种基于位移监测结果的浅埋隧道土压力计算方法 | |
Randolph et al. | Limiting resistance of a spherical penetrometer in cohesive material | |
CN107489424B (zh) | 一种盾构地铁施工诱发地层变形及对古建筑影响的预估方法 | |
Liu et al. | Bearing behavior of wide-shallow bucket foundation for offshore wind turbines in drained silty sand | |
CN104480962B (zh) | 一种有限填土挡墙的土压力分布计算方法 | |
Hong et al. | Base stability of multi-propped excavations in soft clay subjected to hydraulic uplift | |
CN110362955A (zh) | 岩质高边坡稳定性分析三维地质力学模型试验方法及应用 | |
CN106529150B (zh) | 复合地层盾构隧道拱顶荷载计算方法 | |
Yang et al. | Performance of overlapped shield tunneling through an integrated physical model tests, numerical simulations and real-time field monitoring | |
CN105735375A (zh) | 一种黄土隧道隧底稳定性监测方法、系统及施工方法 | |
Ghanbari et al. | Improvement parameters in dynamic compaction adjacent to the slopes | |
Choudhary et al. | Three-dimensional analysis of uplift behaviour of square horizontal anchor plate in frictional soil | |
CN107577836B (zh) | 一种软土地层中隧道上方覆土压力的确定方法 | |
CN110750923B (zh) | 强夯置换处理的滨海淤泥软土地基单桩极限承载力计算方法 | |
Xia et al. | Complex rock slope deformation at Laxiwa Hydropower Station, China: background, characterization, and mechanism | |
CN105887791B (zh) | 一种考虑边载效应的公路刚性桩复合地基沉降计算方法 | |
CN101845815A (zh) | 一种软土地层含承压水基坑突涌塑性破坏计算处理方法 | |
Li et al. | Stability assessment of a slope under a transformer substation using numerical modelling | |
CN108121831A (zh) | 大直径宽浅式筒型基础筒盖承载模式的竖向承载力计算方法 | |
CN110442948A (zh) | 上软层厚度与倾角对隧道掌子面稳定性的确定方法 | |
Hisatake | A proposed methodology for analysis of ground settlements caused by tunneling, with particular reference to the “buoyancy” effect | |
Wu et al. | The 2015 Ms 6.5 Pishan earthquake, Northwest Tibetan Plateau: A folding event in the western Kunlun piedmont | |
Wang et al. | Twin tunnels-induced ground settlement in soft soils | |
CN109033662B (zh) | 基于变形的顺层边坡开挖稳定性分析方法 | |
Liu et al. | Elastic analysis of ground movements around a tunnel considering a buoyant lining moving upwards |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190411 Address after: 230000 B-1512, west of Ganquan Road, Shushan District, Hefei, Anhui. Patentee after: Anhui Eagle Dragon Industrial Design Co., Ltd. Address before: No. 168 Shun Geng Middle Road, Huainan, Anhui Province Patentee before: Anhui University Of Science And Technology |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190509 Address after: 410000 22nd Floor, Jiaxing International Hui Plaza Hotel, 247 Jinxing Middle Road, Yuelu District, Changsha City, Hunan Province Patentee after: Changsha Road and Bridge Construction Co., Ltd. Address before: 230000 B-1512, west of Ganquan Road, Shushan District, Hefei, Anhui. Patentee before: Anhui Eagle Dragon Industrial Design Co., Ltd. |