CN105569087A - 检查井施工方法 - Google Patents

检查井施工方法 Download PDF

Info

Publication number
CN105569087A
CN105569087A CN201610022197.8A CN201610022197A CN105569087A CN 105569087 A CN105569087 A CN 105569087A CN 201610022197 A CN201610022197 A CN 201610022197A CN 105569087 A CN105569087 A CN 105569087A
Authority
CN
China
Prior art keywords
manhole
walling crib
reinforcing bar
anchoring pile
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610022197.8A
Other languages
English (en)
Inventor
冯兴
孟祥龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp Chengdu Construction Co ltd
China 19th Metallurgical Group Co ltd
Original Assignee
China 19th Metallurgical Corp Chengdu Construction Co ltd
China 19th Metallurgical Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp Chengdu Construction Co ltd, China 19th Metallurgical Group Co ltd filed Critical China 19th Metallurgical Corp Chengdu Construction Co ltd
Priority to CN201610022197.8A priority Critical patent/CN105569087A/zh
Publication of CN105569087A publication Critical patent/CN105569087A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明涉及一种检查井施工方法。本发明的检查井施工完成后检查井、持力层、钢筋混凝土井圈通过锚桩形成整体结构,能有效抵抗自身不均匀沉降和外部荷载下产生的下沉,提高检查井的结构强度和稳定性,极大地降低返修率,节省返修费用,降低后期维护成本。

Description

检查井施工方法
技术领域
本发明涉及一种检查井施工方法,属于城市道路施工技术领域。
背景技术
现有的城市道路路面检查井,多采用砖混结构与钢筋混凝土垫圈组成井身部分,井身周围回填土碾压与道路路面结构连接。
该做法有如下不足:
1)受施工方法及作业面限制,不能保证井身周围回填土的压实度,自身易产生不均匀沉降;
2)采用的检查井垫圈厚度不够、尺寸偏小,不能有效传递并扩散上部所受荷载;
3)检查井结构与路面结构缺乏有效连接,各成系统,不能共同受力;
4)检查井结构的破坏会使路面结构更易受水侵蚀,也影响路面结构的耐久性;
5)返修率过高会加大成本的投入;
6)检查井处的下沉影响道路的舒适性和美观性。
发明内容
本发明所要解决的技术问题是:提供一种检查井施工方法,可使得检查井的结构强度和稳定性更好。
为解决上述技术问题本发明所采用的技术方案是:检查井的施工步骤为:
A、平整场地,形成施工前检查井放线和基坑土方开挖平台;
B、基坑开挖及检查井和管道安装;
C、检查井周边进行基坑土方分层回填,并夯实形成持力层;
D、在持力层沿检查井圆周方向设置若干个锚桩孔,安装锚桩钢筋并埋入导管注浆,锚桩钢筋上端伸出持力层作为预留钢筋;
E、在持力层上表面设置现浇钢筋混凝土结构的井圈,并使得锚桩钢筋伸入井圈结构内,井圈同时设于检查井上表面,井圈的内壁与检查井的内壁平齐设置;
F、进行路面施工,并安装井盖。
进一步地是:步骤C中持力层的压实系数≥93%。
进一步地是:步骤D中的锚桩钢筋的顶端弯折设置。
进一步地是:步骤E中的井圈施工时,井圈钢筋和锚桩钢筋绑固。
进一步地是:步骤E中的井圈施工时,锚桩钢筋顶部还设置有加强钢筋,加强钢筋同时绑固于井圈钢筋。
进一步地是:步骤F中的进行路面施工时,方法为在井圈上安装检查井定位井筒,安装前定位井筒外表面涂刷机油,然后在井圈的外表面喷洒粘层沥青,与路面同步摊铺沥青混合料,碾压完成后,取出定位井筒,最后把井盖安装就位,摊铺道路面层沥青并碾压。
本发明的有益效果是:检查井施工完成后,检查井、持力层、钢筋混凝土井圈为整体结构,能有效抵抗自身不均匀沉降和外部荷载下产生的下沉,提高检查井的结构强度和稳定性,极大地降低返修率,节省返修费用,降低后期维护成本。
附图说明
图1是本发明的结构示意图;
图中零部件、部位及编号:1-检查井、2-锚桩孔、3-持力层、4-锚桩钢筋、5-井圈、6-井圈钢筋、7-加强钢筋、8-井盖、9-路面结构层。
具体实施方式
下面结合附图及优选实施例对本发明作进一步说明。
检查井的结构如图1所示,其施工步骤为:
A、平整场地,形成施工前检查井1放线和基坑土方开挖平台;
B、基坑开挖及检查井1和管道安装;
C、检查井1周边进行基坑土方分层回填,并夯实形成持力层3,持力层3的压实系数≥93%,使得持力层3具有足够的强度;持力层3的上表面通常与检查井1的上表面齐平设置;
D、在持力层3沿检查井1圆周方向设置若干个锚桩孔2,安装锚桩钢筋4并埋入导管注浆,锚桩钢筋4上端伸出持力层;本实施例中的锚桩钢筋4下端伸入持力层3的长度为600mm,上端伸出持力层3的长度为300mm,作为预留钢筋;锚桩孔2应均匀布置,本实例中锚桩孔2的数量设置为8个,锚桩钢筋4为以3根Φ25钢筋为主筋绑扎成的钢筋笼,导管可采用PUC导管;锚桩钢筋4的顶端弯折设置,优选弯折为L型,可提高施工完成后的结构强度;
E、在持力层3上表面设置现浇钢筋混凝土结构的井圈5,并使得锚桩钢筋4伸入井圈5结构内,井圈5同时设于检查井1上表面,井圈5的内壁与检查井1的内壁平齐设置,井圈5的上表面距路面8厘米~13厘米;井圈钢筋6采用Φ14钢筋为主筋,双层双向布置,另外,锚桩钢筋4顶部还可设置加强钢筋7,加强钢筋7采用Φ20钢筋,为保证结构强度,加强钢筋7、井圈钢筋6、锚桩钢筋4三者之间应绑固成一整体;井圈5为C30现浇混凝土,井圈5厚度为15厘米~20厘米,井圈5直径与检查井1规格相适配,以内径0.8米的检查井1为例,井圈5内径与检查井1内径相同,井圈5外径为3.5米;
F、城市道路通常采用沥青路面,其路面施工方法为,在井圈5上安装检查井定位井筒,安装前定位井筒外表面涂刷机油,然后在井圈5的外表面喷洒粘层沥青,与路面同步摊铺沥青混合料,碾压完成后,取出定位井筒,最后把井盖8安装就位,摊铺道路面层沥青并碾压,保证了路面美观的同时,也具有很好的强度。

Claims (6)

1.检查井施工方法,其特征在于,步骤为:
A、平整场地,形成施工前检查井放线和基坑土方开挖平台;
B、基坑开挖及检查井和管道安装;
C、检查井周边进行基坑土方分层回填,并夯实形成持力层;
D、在持力层沿检查井圆周方向设置若干个锚桩孔,安装锚桩钢筋并埋入导管注浆,锚桩钢筋上端伸出持力层作为预留钢筋;
E、在持力层上表面设置现浇钢筋混凝土结构的井圈,并使得锚桩钢筋伸入井圈结构内,井圈5同时设于检查井1上表面,井圈内壁与检查井内壁平齐设置;
F、进行路面施工,并安装井盖。
2.如权利要求1所述的检查井施工方法,其特征在于:步骤C中持力层的压实系数≥93%。
3.如权利要求1所述的检查井施工方法,其特征在于:步骤D中的锚桩钢筋的顶端弯折设置。
4.如权利要求1所述的检查井施工方法,其特征在于:步骤E中的井圈施工时,井圈钢筋和锚桩钢筋绑固。
5.如权利要求4所述的检查井施工方法,其特征在于:步骤E中的井圈施工时,锚桩钢筋顶部还设置有加强钢筋,加强钢筋同时绑固于井圈钢筋。
6.如权利要求1~5中任一项所述的检查井施工方法,其特征在于:步骤F中的进行路面施工时,方法为在井圈上安装检查井定位井筒,安装前定位井筒外表面涂刷机油,然后在井圈的外表面喷洒粘层沥青,与路面同步摊铺沥青混合料,碾压完成后,取出定位井筒,最后把井盖安装就位,摊铺道路面层沥青并碾压。
CN201610022197.8A 2016-01-13 2016-01-13 检查井施工方法 Pending CN105569087A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610022197.8A CN105569087A (zh) 2016-01-13 2016-01-13 检查井施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610022197.8A CN105569087A (zh) 2016-01-13 2016-01-13 检查井施工方法

Publications (1)

Publication Number Publication Date
CN105569087A true CN105569087A (zh) 2016-05-11

Family

ID=55879674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610022197.8A Pending CN105569087A (zh) 2016-01-13 2016-01-13 检查井施工方法

Country Status (1)

Country Link
CN (1) CN105569087A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567410A (zh) * 2016-11-07 2017-04-19 温州市兴业市政建设有限公司 市政道路检查井的新建施工方法
CN106638696A (zh) * 2016-11-01 2017-05-10 济南汇通联合市政工程有限责任公司 防沉降检查井盖的安装施工方法
CN110295628A (zh) * 2019-07-02 2019-10-01 广东源基建设工程有限公司 一种带有检查井的路面施工方法
CN112814033A (zh) * 2021-01-04 2021-05-18 江苏港通路桥集团有限公司 一种检查井升降施工结构
CN114809238A (zh) * 2022-04-27 2022-07-29 扬州市建筑设计研究院有限公司 一种市政道路检查井及其施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1020568A1 (de) * 1999-01-12 2000-07-19 Paul-Gerd Stellmach Vorrichtung zum provisorischen Abdecken eines Kontrollschachtes
CN102322055A (zh) * 2011-06-29 2012-01-18 刘建华 防止检查井周围路面沉降的构造及施工方法
CN102644295A (zh) * 2012-04-28 2012-08-22 江苏阳湖建设项目管理有限公司 防止路面检查井周边和局部沉降的施工方法
CN103806470A (zh) * 2014-03-14 2014-05-21 江苏华光双顺机械制造有限公司 钢筋混凝土检查井生产安装方法
CN104060630A (zh) * 2014-06-25 2014-09-24 新疆维泰开发建设(集团)股份有限公司 防位移检查井施工工艺

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1020568A1 (de) * 1999-01-12 2000-07-19 Paul-Gerd Stellmach Vorrichtung zum provisorischen Abdecken eines Kontrollschachtes
CN102322055A (zh) * 2011-06-29 2012-01-18 刘建华 防止检查井周围路面沉降的构造及施工方法
CN102644295A (zh) * 2012-04-28 2012-08-22 江苏阳湖建设项目管理有限公司 防止路面检查井周边和局部沉降的施工方法
CN103806470A (zh) * 2014-03-14 2014-05-21 江苏华光双顺机械制造有限公司 钢筋混凝土检查井生产安装方法
CN104060630A (zh) * 2014-06-25 2014-09-24 新疆维泰开发建设(集团)股份有限公司 防位移检查井施工工艺

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638696A (zh) * 2016-11-01 2017-05-10 济南汇通联合市政工程有限责任公司 防沉降检查井盖的安装施工方法
CN106638696B (zh) * 2016-11-01 2018-09-11 山东汇通建设集团有限公司 防沉降检查井盖的安装施工方法
CN106567410A (zh) * 2016-11-07 2017-04-19 温州市兴业市政建设有限公司 市政道路检查井的新建施工方法
CN110295628A (zh) * 2019-07-02 2019-10-01 广东源基建设工程有限公司 一种带有检查井的路面施工方法
CN112814033A (zh) * 2021-01-04 2021-05-18 江苏港通路桥集团有限公司 一种检查井升降施工结构
CN112814033B (zh) * 2021-01-04 2022-04-22 江苏港通路桥集团有限公司 一种检查井升降施工结构
CN114809238A (zh) * 2022-04-27 2022-07-29 扬州市建筑设计研究院有限公司 一种市政道路检查井及其施工方法

Similar Documents

Publication Publication Date Title
CN104452795B (zh) 一种老旧住宅外加电梯基础结构及其施工方法
US6796098B2 (en) Building block, system and method
CN105569087A (zh) 检查井施工方法
CN106854873A (zh) 一种预制拼接的沉井式停车库的工程方法及停车库
CN108560542B (zh) 一种废旧轮胎包覆建渣的双向增强体及其施工方法
CN105274922B (zh) 一种修复塌方路基的抗滑键‑钢管桩复合结构及方法
CN101509261B (zh) 一种用于软弱地基上超高压输电线铁塔的桩板基础的施工方法
CN110700291A (zh) 一种联合支挡结构及其施工方法
CN108035376B (zh) 一种适用于采空区场地风电机组的抗变形可纠偏基础及其施工方法
CN103669374A (zh) 一种用于在粉沙土质边坡中的钢板桩组合支护施工方法
CN110374111B (zh) 一种放坡与钢管桩锚协同支护体系
CN101858082A (zh) 一种软土地基新建工程后压桩工艺及其施工方法
CN106013171A (zh) 一种深基坑侧壁的半刚性半柔性支护结构和方法
CN107100179B (zh) 轻型组合支挡结构及治理大范围高填方边坡工程的方法
CN114263211A (zh) 一种挡土墙及其构建方法
CN110295628A (zh) 一种带有检查井的路面施工方法
CN109208545B (zh) 一种具有消能效果的人工景观溢流坝施工方法
CN107558477A (zh) 一种基坑与边坡相结合的支护结构与施工方法
CN107090848A (zh) 一种波纹钢拱挡土墙
CN104727237A (zh) 散拼大直径钢波纹管施工方法
CN105155575B (zh) 一种钢管内嵌非开挖悬臂式挡土墙及其施工方法
CN104196036B (zh) 基于老旧地下室外墙结构的基坑支护结构及支护方法
CN110144784A (zh) 基于预应力混凝土板桩构筑的市政道路及其施工方法
CN206844132U (zh) 超高轻型支挡结构
CN105569067A (zh) 适用于预应力岩石锚杆风机基础的地基结构及施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160511