一种降低全断面隧道掘进机施工振动的方法 Download PDFInfo
- Publication number
- CN105550415A CN105550415A CN201510897722.6A CN201510897722A CN105550415A CN 105550415 A CN105550415 A CN 105550415A CN 201510897722 A CN201510897722 A CN 201510897722A CN 105550415 A CN105550415 A CN 105550415A
- Authority
- CN
- China
- Prior art keywords
- gamma
- cutterhead
- boring machine
- tunnel boring
- vibration frequency
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000005452 bending Methods 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/17—Mechanical parametric or variational design
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/003—Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
- E21D9/11—Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Computational Mathematics (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了属于隧道施工技术领域的一种降低全断面隧道掘进机施工振动的方法。首先计算刀盘的固有振动频率,根据全断面隧道掘进机刀盘上刀具布置基本对称,则全断面隧道掘进机刀盘的振型函数,通过理论建模和求解,得到刀盘的固有振动频率,通过加大推力或(和)扭矩快速通过刀盘的固有振动频率,或通过降低推力或(和)扭矩远离此固有振动频率的数值,全断面隧道掘进机避开在这些振动频率附近作业。本发明提出了全断面隧道掘进机刀盘固有振动频率的确定方法,为降低全断面隧道掘进机施工振动、为避免造成事故隐患的发生提供了可靠依据。
Description
技术领域
本发明属于隧道施工技术领域,特别涉及一种降低全断面隧道掘进机施工振动的方法。
背景技术
目前,全断面隧道掘进机施工中,设备振动已成为严重影响施工进度、工程成本甚至威胁设备安全的实际难题。全断面隧道掘进机在施工的隧道工程中的刀盘断裂、大轴承过渡点蚀等关键部件失效时有发生;据某工程实际统计,盘形滚刀的非正常磨损消耗已达刀具消耗量的40%。这些现象的发生,与隧道掘进机施工中刀盘振动密切相关。为此,我们通过实际工程测量和理论研究分析发现,一般全断面隧道掘进机施工中,刀盘振动频率与其固有振动频率较接近,这是造成上述现象的主要原因。为此,我们提出了全断面隧道掘进机刀盘固有振动频率的确定方法,进而提出了降低全断面隧道掘进机施工振动的方法,为避免上述现象的发生提供了可靠依据。
发明内容
本发明的目的是提出一种降低全断面隧道掘进机施工振动的方法,其特征在于,包括:
(1)将加速度传感器固结到刀盘支承壳体上,通过电缆连接到驾驶室中的电荷放大器、数据采集测试仪,最后连接到PC上显示刀盘的固有振动频率;
(2)计算刀盘的固有振动频率,根据全断面隧道掘进机刀盘上刀具布置基本对称,则全断面隧道掘进机刀盘的振型函数取为:
W=F(r)cosnθ
式中:n为刀盘上径向节线数;n=0,1,2,……。n=0,刀盘振形是轴对称的。n=1及n=2,刀盘的环向围线将分别有一个及两个波,即:刀盘中面分别有一根和两根径向节线,其余类推;
通过理论建模和求解,得到刀盘的固有振动频率为:
式中,r-振动点距刀盘中心的距离;γ-常数,且:n为刀盘上径向节线数;ω-刀盘固有振动圆频率;-刀盘单位面积的质量;D-刀盘弯曲刚度;N为大于等于零的整数。
(3)驾驶员从PC上看到振动频率接近上述振动频率时,通过加大推力或(和)扭矩快速通过刀盘的固有振动频率,或通过降低推力或(和)扭矩远离此固有振动频率的数值,全断面隧道掘进机避开在这些振动频率附近作业。
所述步骤(2)计算刀盘的固有振动频率,具体过程为:
根据全断面隧道掘进机刀盘上刀具布置基本对称,则全断面隧道掘进机刀盘的振型函数取为:
W=F(r)cosnθ
式中:n为刀盘上径向节线数;n=0,1,2,……。n=0,刀盘振形是轴对称的。n=1及n=2,刀盘的环向围线将分别有一个及两个波;
通过理论建模和求解,其振型的常微分方程为:
式中:r-振动点距刀盘中心的距离;γ-常数,且:
ω-刀盘固有振动圆频率;-刀盘单位面积的质量;D-刀盘弯曲刚度,
且:其中,E-刀盘材料弹性模量;t-刀盘厚度;μ-刀盘材料泊松比;
设x=γr,则上述方程可化为:
当r=r0时,r0是刀盘的支撑半径,所以有
因常数C1、C2不能全为0,所以有
求解,得
N为大于等于零的整数。
由:得刀盘的固有振动频率为:
本发明有益效果是提出了全断面隧道掘进机刀盘固有振动频率的确定方法,为降低全断面隧道掘进机施工振动,为避免造成事故隐患的发生提供了可靠依据。
附图说明
图1为检测全断面隧道掘进机刀盘固有振动频率示意图。
具体实施方式
本发明提出一种降低全断面隧道掘进机施工振动的方法,包括:
(1)将加速度传感器固结到刀盘支承壳体上,通过电缆连接到驾驶室中的电荷放大器、数据采集测试仪,最后连接到PC上显示刀盘的固有振动频率(如图1所示);
(2)计算刀盘的固有振动频率,根据全断面隧道掘进机刀盘上刀具布置基本对称,则全断面隧道掘进机刀盘的振型函数取为:
W=F(r)cosnθ
式中:n为刀盘上径向节线数;n=0,1,2,……。n=0,刀盘振形是轴对称的。n=1及n=2,刀盘的环向围线将分别有一个及两个波,即:刀盘中面分别有一根和两根径向节线,其余类推;
通过理论建模和求解,得到刀盘的固有振动频率为:
式中,r-振动点距刀盘中心的距离;γ-常数,且:n为刀盘上径向节线数;ω-刀盘固有振动圆频率;-刀盘单位面积的质量;D-刀盘弯曲刚度;N为大于等于零的整数。
(3)驾驶员从PC上看到振动频率接近上述振动频率时,通过加大推力或(和)扭矩快速通过刀盘的固有振动频率,或通过降低推力或(和)扭矩远离此固有振动频率的数值,全断面隧道掘进机避开在这些振动频率附近作业。
实施例
以直径为5.75m、厚度t=0.25m的刀盘为例,重量2.3吨,则:D=2.877×108Nm,m=88.57kg/m2,r0=0.4×5.75/2=1.15m代入上式得该刀盘的自然频率:ωNn=13450×(N+n/2)2ω01=3362Hz、ω10=13450Hz、ω11=30262Hz、……这里给出了该刀盘三个低频率,即:全断面隧道掘进机只要避开在这些振动频率附近作业,其振动就会大幅减小,且能避免关键零部件的非正常失效。
实际实施中,将加速度传感器固结到刀盘支承壳体上,通过电缆连接到驾驶室中的电荷放大器、数据采集测试仪,最后连接到PC上(见附图所示),驾驶员从PC上看到振动频率接近上述振动频率时,可通过加大推力或(和)扭矩快速通过此数值,或通过降低推力或(和)扭矩远离此数值。
Claims (2)
1.一种降低全断面隧道掘进机施工振动的方法,其特征在于,包括:
(1)将加速度传感器固结到刀盘支承壳体上,通过电缆连接到驾驶室中的电荷放大器、数据采集测试仪,最后连接到PC上显示刀盘的固有振动频率;
(2)计算刀盘的固有振动频率,根据全断面隧道掘进机刀盘上刀具布置基本对称,则全断面隧道掘进机刀盘的振型函数取为:
W=F(r)cosnθ
式中:n为刀盘上径向节线数;n=0,1,2,……;n=0,刀盘振形是轴对称的,n=1及n=2,刀盘的环向围线将分别有一个及两个波,即:刀盘中面分别有一根和两根径向节线,其余类推;
通过理论建模和求解,得到刀盘的固有振动频率为:
式中,r-振动点距刀盘中心的距离;γ-常数,且:n为刀盘上径向节线数;ω-刀盘固有振动圆频率;-刀盘单位面积的质量;D-刀盘弯曲刚度;N为大于等于零的整数;
(3)驾驶员从PC上看到振动频率接近上述振动频率时,通过加大推力或/和扭矩快速通过刀盘的固有振动频率,或通过降低推力或/和扭矩远离此固有振动频率的数值,全断面隧道掘进机避开在这些振动频率附近作业。
2.根据权利要求1所述一种降低全断面隧道掘进机施工振动的方法,其特征在于,所述步骤(2)计算刀盘的固有振动频率,具体过程为:
根据全断面隧道掘进机刀盘上刀具布置基本对称,则全断面隧道掘进机刀盘的振型函数取为:
W=F(r)cosnθ
式中:n为刀盘上径向节线数;n=0,1,2,……;n=0,刀盘振形是轴对称的,n=1及n=2,刀盘的环向围线将分别有一个及两个波;
通过理论建模和求解,其振型的常微分方程为:
式中:r-振动点距刀盘中心的距离;γ-常数,且:
ω-刀盘固有振动圆频率;-刀盘单位面积的质量;D-刀盘弯曲刚度,
且:其中,E-刀盘材料弹性模量;t-刀盘厚度;μ-刀盘材料泊松比;
设x=γr,则上述方程可化为:
当r=r0时,r0是刀盘的支撑半径,所以有
因常数C1、C2不能全为0,所以有
求解,得
N为大于等于零的整数;
由:得刀盘的固有振动频率为:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510897722.6A CN105550415A (zh) | 2015-12-08 | 2015-12-08 | 一种降低全断面隧道掘进机施工振动的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510897722.6A CN105550415A (zh) | 2015-12-08 | 2015-12-08 | 一种降低全断面隧道掘进机施工振动的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105550415A true CN105550415A (zh) | 2016-05-04 |
Family
ID=55829604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510897722.6A Pending CN105550415A (zh) | 2015-12-08 | 2015-12-08 | 一种降低全断面隧道掘进机施工振动的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105550415A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106354916A (zh) * | 2016-08-25 | 2017-01-25 | 华北电力大学 | 全断面岩石掘进机刀盘支撑半径及刀具数量的确定方法 |
CN107762525A (zh) * | 2017-11-20 | 2018-03-06 | 华北电力大学 | 改变刀盘面板厚度降低tbm施工振动的方法及其刀盘 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101418692A (zh) * | 2008-12-02 | 2009-04-29 | 华北电力大学 | 全断面隧道掘进机盘形滚刀管理方法 |
CN103233744A (zh) * | 2013-04-07 | 2013-08-07 | 大连理工大学 | 全断面岩石掘进机刀盘溜碴板支撑筋设计方法 |
KR20150071886A (ko) * | 2013-12-19 | 2015-06-29 | 한국철도기술연구원 | 링 tbm 및 수평천공장치를 이용한 터널 시공 방법 |
-
2015
- 2015-12-08 CN CN201510897722.6A patent/CN105550415A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101418692A (zh) * | 2008-12-02 | 2009-04-29 | 华北电力大学 | 全断面隧道掘进机盘形滚刀管理方法 |
CN103233744A (zh) * | 2013-04-07 | 2013-08-07 | 大连理工大学 | 全断面岩石掘进机刀盘溜碴板支撑筋设计方法 |
KR20150071886A (ko) * | 2013-12-19 | 2015-06-29 | 한국철도기술연구원 | 링 tbm 및 수평천공장치를 이용한 터널 시공 방법 |
Non-Patent Citations (5)
Title |
---|
ZHANG ZHAOHUANG等: "Design Theory of Full Face Rock Tunnel Boring Machine Transition CutterEdge Angle and Its Application", 《CHINESE JOURNAL OF MECHANICAL ENGINEERING》 * |
凌静秀等: "TBM刀盘系统多自由度耦合固有特性及敏感度", 《东北大学学报(自然科学版)》 * |
张照煌等: "《全断面隧道掘进机施工技术》", 31 January 2006 * |
李传信等: "普通圆锯片固有频率的理论探讨", 《吉林林学院学报》 * |
王超: "TBM刀盘受力分析及盘形滚刀破岩机理研究", 《中国优秀硕士学位论文全文数据库(工程科技I辑)》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106354916A (zh) * | 2016-08-25 | 2017-01-25 | 华北电力大学 | 全断面岩石掘进机刀盘支撑半径及刀具数量的确定方法 |
CN106354916B (zh) * | 2016-08-25 | 2019-09-20 | 华北电力大学 | 全断面岩石掘进机刀盘支撑半径及刀具数量的确定方法 |
CN107762525A (zh) * | 2017-11-20 | 2018-03-06 | 华北电力大学 | 改变刀盘面板厚度降低tbm施工振动的方法及其刀盘 |
CN107762525B (zh) * | 2017-11-20 | 2019-09-03 | 华北电力大学 | 改变刀盘面板厚度降低tbm施工振动的方法及其刀盘 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Jain et al. | High-frequency torsional dynamics of drilling systems: an analysis of the bit-system interaction | |
JP6713627B2 (ja) | トンネル切羽前方の地山評価方法及びシステム | |
Özşahin et al. | Analysis and compensation of mass loading effect of accelerometers on tool point FRF measurements for chatter stability predictions | |
CN104653193B (zh) | 基于能量原理的tbm盘形滚刀受力预测方法 | |
JP6251128B2 (ja) | シールド掘進機による土質分布の判定方法 | |
CN109975119A (zh) | 一种岩石双轴压缩爆破设计方法 | |
CN105068504B (zh) | 一种考虑结合部特性的电主轴系统建模方法 | |
CN105332715A (zh) | 通过改变刀盘厚度和支撑半径降低tbm施工振动的方法 | |
CN105550415A (zh) | 一种降低全断面隧道掘进机施工振动的方法 | |
CN103792155A (zh) | 基于惯性测量参数的钻头磨损预测方法 | |
Cooley et al. | Limitations of an inextensible model for the vibration of high-speed rotating elastic rings with attached space-fixed discrete stiffnesses | |
Chen et al. | Experimental and numerical investigation on overbreak control considering the influence of initial support in tunnels | |
CN103983754A (zh) | 钻进岩石模拟的试验装置及确定试验杆压力和扭矩的方法 | |
Medolago et al. | A flexible multi-body model of a surface miner for analyzing the interaction between rock-cutting forces and chassis vibrations | |
JP5940303B2 (ja) | トンネル切羽前方探査方法 | |
JP6342723B2 (ja) | シールド掘進機による切羽土質分布の判別システム | |
Zhang et al. | Study on the crack propagation behaviour of eccentric uncoupled blasting in a deep-level rock mass | |
Jia et al. | Study of the influencing factors of the liquid CO2 phase change fracturing effect in coal seams | |
JP2014013222A (ja) | シールド機による切羽調査方法 | |
Heydari et al. | The influences of stagger and pretwist angles of blades on coupling vibration in shaft-disk-blade systems | |
JP5319981B2 (ja) | 弾性波探査システム | |
Buckley | Monitoring the vibration response of a tunnel boring machine: application to real time boulder detection | |
JP2010059670A (ja) | 一軸圧縮強度推定工法 | |
Yang et al. | In situ stress effects on smooth blasting: model test and analysis | |
Fang et al. | Effects of Driving Parameters on TBM Dynamic Response and Cracking of the Disc Cutter Ring: A Case Study |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160504 |