CN105546813A - Rubbish combustion gas instant water boiler device and application method - Google Patents

Rubbish combustion gas instant water boiler device and application method Download PDF

Info

Publication number
CN105546813A
CN105546813A CN201610070061.4A CN201610070061A CN105546813A CN 105546813 A CN105546813 A CN 105546813A CN 201610070061 A CN201610070061 A CN 201610070061A CN 105546813 A CN105546813 A CN 105546813A
Authority
CN
China
Prior art keywords
water
water leg
boiler device
leg
heating type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610070061.4A
Other languages
Chinese (zh)
Inventor
李观德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610070061.4A priority Critical patent/CN105546813A/en
Publication of CN105546813A publication Critical patent/CN105546813A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/22Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating
    • F24H1/44Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with combinations of two or more of the types covered by groups F24H1/24 - F24H1/40 , e.g. boilers having a combination of features covered by F24H1/24 - F24H1/40
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/02Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment
    • F23G5/027Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment pyrolising or gasifying stage
    • F23G5/0276Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment pyrolising or gasifying stage using direct heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/44Details; Accessories
    • F23G5/442Waste feed arrangements
    • F23G5/444Waste feed arrangements for solid waste
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/006Layout of treatment plant
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/46Water heaters having plural combustion chambers

Abstract

The invention discloses a rubbish combustion gas instant water boiler device. The rubbish combustion gas instant water boiler device comprises a boiler body. An ash falling cavity, a primary combusting cavity and a secondary combusting cavity are sequentially arranged in the boiler body from bottom to top. A water-pipe boiler grate is arranged between the ash falling cavity and the primary combusting cavity. A water-pipe partition module provided with through holes is arranged between the primary combusting cavity and the secondary combusting cavity. An ash blocking cover mechanism arranged above the through holes in a clasped mode is arranged on the water-pipe partition module. A reflection heat-storage cover is arranged outside the ash blocking cover mechanism. A plurality of vent holes are formed in the side walls of the lower portion of the reflection heat-storage cover. An ash outlet is formed in the ash falling cavity. The primary combusting cavity is connected with a feeding mechanism. A water jacket mechanism installed outside the reflection heat-storage cover is arranged in the secondary combusting cavity. According to the rubbish combustion gas instant water boiler device, rubbish can be combusted more sufficiently and cold water can be heated rapidly after the rubbish is incinerated; in addition, heating of water pipes can be conducted, and hot water resources are provided, so that environmental pollution and energy waste are greatly reduced.

Description

The Instant heating type hot-water boiler device of garbage gas and using method
Technical field
the present invention relates to a kind of rubbish heating field, particularly the Instant heating type hot-water boiler device of a kind of garbage gas and using method.
Background technology
along with the raising of people's living standard, the generation of rubbish is also increasing, and burning is the usual manner of disposal of refuse.Conventional refuse burner is similar to the combustion furnace structure of traditional use conventional fuel, is all single combustion chamber, during burning, rubbish is directly poured into combustion furnace and burn, be directly discharged in air after burning by simple purified treatment by waste gas.Because single combustion chamber heat is inadequate, rubbish cannot Thorough combustion, the inorganic matter that cannot burn in a large number is included in mixture after burning, the toxic gas produced after simultaneously also including a large amount of burning and the lower solid granulates of combustion rate, and these mixtures are with very high heat energy, like this waste gas is directly discharged into the waste not only causing energy in air, also waste pollution and the thermal pollution of environment can be caused, and due to burning after hot air temperature not high, when supply boiler uses, heating is slow, and utilization rate is not high.
Summary of the invention
the object of the invention is to, the Instant heating type hot-water boiler device of a kind of garbage gas and using method are provided.The present invention not only can make rubbish burn more fully, can carry out Fast Heating after burning to cold water, and can carry out the heating of water pipe, provides thermal water resource, thus significantly reduces environmental pollution and energy dissipation.
technical scheme of the present invention: the Instant heating type hot-water boiler device of garbage gas, comprise body of heater, be provided with grey chamber successively from bottom to top in body of heater, single-stage combustion chamber and secondary firing chamber, describedly fall to being provided with water pipe furnace grate between grey chamber and single-stage combustion chamber, be provided with the water pipe with through hole between single-stage combustion chamber and secondary firing chamber and cut off module, water pipe cuts off module and is provided with the ash retaining cover mechanism be buckled in above through hole, reflection heat storage hood is provided with outside ash retaining cover mechanism, the lower sides of reflection heat storage hood is provided with multiple passage, described fall grey chamber be provided with ash hole, described single-stage combustion chamber is connected with feeding mechanism, the water leg mechanism be arranged on outside reflection heat storage hood is provided with in described secondary firing chamber.
in the Instant heating type hot-water boiler device of aforesaid garbage gas, described feeding mechanism comprises horizontally disposed short auger, and short auger one end is connected with the long auger be obliquely installed, and the short auger other end is connected to single-stage combustion chamber.
in the Instant heating type hot-water boiler device of aforesaid garbage gas, described water leg mechanism is made up of one or more layers water leg.
in the Instant heating type hot-water boiler device of aforesaid garbage gas, described water leg mechanism comprises and setting gradually from the inside to the outside and the first water leg be interconnected, the second water leg, the 3rd water leg and the 4th water leg, first water leg, the second water leg, be provided with S shape heat tunnel between the 3rd water leg and the 4th water leg, S shape heat tunnel is connected with blast pipe; Described first water leg, the second water leg, connected by water pipe between the 3rd water leg and the 4th water leg, described 4th water leg bottom is provided with water inlet, and the first water leg top is provided with delivery port.
in the Instant heating type hot-water boiler device of aforesaid garbage gas, described in fall to being provided with in grey chamber and be connected to outside blast pipe.
in the Instant heating type hot-water boiler device of aforesaid garbage gas, described water pipe furnace grate comprises fire grate, and fire grate is provided with the many water pipe A be set up in parallel.
in the Instant heating type hot-water boiler device of aforesaid garbage gas, described water pipe cuts off module and comprises partition wall, partition wall arranges through hole, is provided with the many water pipe B be set up in parallel in partition wall.
in the Instant heating type hot-water boiler device of aforesaid garbage gas, described ash retaining cover mechanism comprises taper inner cover, one or more layers taper upper cover is provided with above taper inner cover, taper inner cover is provided with through hole A, taper upper cover is provided with through hole B, described taper inner cover is fixed on water pipe and cuts off in module, and described taper upper cover is fixed on reflection heat storage hood, and junction is positioned at below passage.
according to the using method of the Instant heating type hot-water boiler device of aforesaid garbage gas, by feeding mechanism rubbish is delivered in single-stage combustion chamber and burns, cut off module to water pipe furnace grate and water pipe during burning to heat, the hot gas simultaneously produced by after through hole successively through ash retaining cover mechanism, reflection heat storage hood, at ash retaining cover, combustion ash is blocked by mechanism, carry out hot-fluid at the inner top of reflection heat storage hood liquidate thus improve hot air temperature, and out the in-house water of water leg is heated from the passage of reflection heat storage hood.
in the using method of the Instant heating type hot-water boiler device of aforesaid garbage gas, the described passage hot gas out from reflection heat storage hood is heated the first water leg, the second water leg, the 3rd water leg and the 4th water leg successively by S shape heat tunnel.
compared with prior art, the present invention is by feeding mechanism transport of refuse, force to enter in single-stage combustion chamber after rubbish can being carried out preliminary pulverizing and burn, water in water pipe A and water pipe B can be heated in combustion process, effectively utilize, reduce thermal loss, and the hot gas (burning gases) produced directly is sprayed into reflection heat storage hood inner top through ash retaining cover mechanism, form hot gas with the hot gas of top reflective to liquidate, accelerated warming, make the impurity in hot gas burned fall, finally go out from passage, for the water leg mechanism in single-stage combustion chamber, wherein combustion ash can all be blocked by ash retaining cover mechanism, reduce the impact on environment, the burning of applicable stalk, also unburned particle can be blocked and burn away, improve efficiency of combustion, in use, because cold water is carried from outside to inside, heat transmits from inside to outside, the lower hot gas in outside can carry out preheating for surrounding water jacket, then direct high-temperature heating is carried out by the high temperature hot gas of inboard, thus the object of instant heating can be realized, the present invention not only can make rubbish burn more fully, Fast Heating can be carried out to cold water after burning, and the heating of water pipe can be carried out, thermal water resource is provided, thus significantly reduce environmental pollution and energy dissipation.Heat supply is carried out in the application of the invention, can reduce operating cost more than 50% than the mode of routine, and the smokeless harmless odorless of the gas simultaneously discharged, can reach the object of environmental protection.The present invention can significantly improve the temperature of burning gases by simple mode, reaches as high as 1600 DEG C, thus obviously can accelerate the efficiency of heating surface.
Accompanying drawing explanation
fig. 1 is structural representation of the present invention;
the structural representation of Tu2Shi ash retaining cover mechanism.
being labeled as in accompanying drawing: 1-secondary firing chamber, 2-single-stage combustion chamber, 3-ash retaining cover mechanism, 4-taper inner cover, 5-taper upper cover, the long auger of 6-, the short auger of 7-, 8-falls grey chamber, 9-ash hole, 10-blast pipe, 11-water pipe A, 12-fire grate, 13-through hole, 14-water pipe B, 15-partition wall, 16-delivery port, 17-passage, 18-reflects heat storage hood, 19-body of heater, 20-water inlet, 21-the 4th water leg, 22-the 3rd water leg, 23-second water leg, 24-first water leg, 25-S shape heat tunnel, 26-blast pipe, 27-through hole B, 28-through hole A.
Detailed description of the invention
below in conjunction with drawings and Examples, the present invention is further illustrated, but not as the foundation limited the present invention.
embodiment.The Instant heating type hot-water boiler device of garbage gas, form as illustrated in fig. 1 and 2, comprise body of heater 19, be provided with grey chamber 8 from bottom to top successively in body of heater 19, single-stage combustion chamber 2 and secondary firing chamber 1, describedly fall to being provided with water pipe furnace grate between grey chamber 8 and single-stage combustion chamber 2, be provided with the water pipe with through hole 13 between single-stage combustion chamber 2 and secondary firing chamber 1 and cut off module, water pipe cuts off module and is provided with the ash retaining cover mechanism 3 be buckled in above through hole 13, reflection heat storage hood 18 is provided with outside ash retaining cover mechanism 3, the lower sides of reflection heat storage hood 18 is provided with multiple passage 17, described fall grey chamber 8 be provided with ash hole 9, described single-stage combustion chamber 2 is connected with feeding mechanism, the water leg mechanism be arranged on outside reflection heat storage hood 18 is provided with in described secondary firing chamber 1.
described feeding mechanism comprises horizontally disposed short auger 7, and short auger 7 one end is connected with the long auger 6 be obliquely installed, and short auger 7 other end is connected to single-stage combustion chamber 2.Described long auger feed end is provided with hopper.
described water leg mechanism is made up of one or more layers water leg.
described water leg mechanism comprises and setting gradually from the inside to the outside and the first water leg 24, second water leg 23, the 3rd water leg 22 and the 4th water leg 21 that are interconnected, first water leg 24, second water leg 23, be provided with S shape heat tunnel 25, S shape heat tunnel 25 between the 3rd water leg 22 and the 4th water leg 21 and be connected with blast pipe 26.Described first water leg 24, second water leg 23, connected by water pipe between the 3rd water leg 22 and the 4th water leg 21, described 4th water leg 21 bottom is provided with water inlet 20, and the first water leg 24 top is provided with delivery port 16.Described blast pipe 26 is arranged on upper lateral part.
described fall to being provided with in grey chamber 8 be connected to outside blast pipe 10.
described water pipe furnace grate comprises fire grate 12, and fire grate 12 is provided with the many water pipe A11 be set up in parallel.
described water pipe cuts off module and comprises partition wall 15, partition wall 15 is arranged through hole 13, is provided with the many water pipe B14 be set up in parallel in partition wall 15.
described ash retaining cover mechanism 3 comprises taper inner cover 4, one or more layers taper upper cover 5 is provided with above taper inner cover 13, taper inner cover 4 is provided with through hole A28, taper upper cover 5 is provided with through hole B27, described taper inner cover 4 is fixed on water pipe and cuts off in module, described taper upper cover 5 is fixed on reflection heat storage hood 18, and junction is positioned at below passage 17.
the top and bottom in described single-stage combustion chamber 2 can be provided with many hot-water lines, and fixed by high temperature castable.
described fire grate 12 and water pipe A11 can be cast iron hole fire grates, namely casting furnace grate offer hole, can carry out water transmission in hole.Cast iron hole fire grate is provided with air intake and falls hawk.
realize the using method of the Instant heating type hot-water boiler device of aforesaid garbage gas, by feeding mechanism rubbish is delivered in single-stage combustion chamber and burns, cut off module to water pipe furnace grate and water pipe during burning to heat, the hot gas simultaneously produced by after through hole successively through ash retaining cover mechanism, reflection heat storage hood, at ash retaining cover, combustion ash is blocked by mechanism, carry out hot-fluid at the inner top of reflection heat storage hood liquidate thus improve hot air temperature, and out the in-house water of water leg is heated from the passage of reflection heat storage hood.The described passage hot gas out from reflection heat storage hood is heated the first water leg, the second water leg, the 3rd water leg and the 4th water leg successively by S shape heat tunnel.
the present invention is by feeding mechanism transport of refuse, force to enter in single-stage combustion chamber after rubbish can being carried out preliminary pulverizing and burn, water in water pipe A and water pipe B can be heated in combustion process, effectively utilize, reduce thermal loss, and the hot gas (burning gases) produced directly is sprayed into reflection heat storage hood inner top through ash retaining cover mechanism, form hot gas with the hot gas of top reflective to liquidate, accelerated warming, make the impurity in hot gas burned fall, finally go out from passage, for the water leg mechanism in single-stage combustion chamber, wherein combustion ash can all be blocked by ash retaining cover mechanism, reduce the impact on environment, the burning of applicable stalk, also unburned particle can be blocked and burn away, improve efficiency of combustion, in use, because cold water is carried from outside to inside, heat transmits from inside to outside, the lower hot gas in outside can carry out preheating for surrounding water jacket, then direct high-temperature heating is carried out by the high temperature hot gas of inboard, thus the object of instant heating can be realized, the present invention not only can make rubbish burn more fully, Fast Heating can be carried out to cold water after burning, and the heating of water pipe can be carried out, thermal water resource is provided, thus significantly reduce environmental pollution and energy dissipation.Heat supply is carried out in the application of the invention, can reduce operating cost more than 50% than the mode of routine, and the smokeless harmless odorless of the gas simultaneously discharged, can reach the object of environmental protection.The present invention can significantly improve the temperature of burning gases by simple mode, reaches as high as 1600 DEG C, thus obviously can accelerate the efficiency of heating surface.The present invention not only can make rubbish burn more fully, can carry out Fast Heating after burning to cold water, and can carry out the heating of water pipe, provides thermal water resource, thus significantly reduces environmental pollution and energy dissipation.

Claims (10)

1. the Instant heating type hot-water boiler device of garbage gas, it is characterized in that: comprise body of heater (19), be provided with grey chamber (8) from bottom to top successively in body of heater (19), single-stage combustion chamber (2) and secondary firing chamber (1), describedly fall to being provided with water pipe furnace grate between grey chamber (8) and single-stage combustion chamber (2), be provided with the water pipe with through hole (13) between single-stage combustion chamber (2) and secondary firing chamber (1) and cut off module, water pipe cuts off module and is provided with the ash retaining cover mechanism (3) being buckled in through hole (13) top, reflection heat storage hood (18) is provided with outside ash retaining cover mechanism (3), the lower sides of reflection heat storage hood (18) is provided with multiple passage (17), described fall grey chamber (8) be provided with ash hole (9), described single-stage combustion chamber (2) is connected with feeding mechanism, be provided with in described secondary firing chamber (1) and be arranged on reflection heat storage hood (18) water leg mechanism outward.
2. the Instant heating type hot-water boiler device of garbage gas according to claim 1, it is characterized in that: described feeding mechanism comprises horizontally disposed short auger (7), short auger (7) one end is connected with the long auger (6) be obliquely installed, and short auger (7) other end is connected to single-stage combustion chamber (2).
3. the Instant heating type hot-water boiler device of garbage gas according to claim 1, is characterized in that: described water leg mechanism is made up of one or more layers water leg.
4. the Instant heating type hot-water boiler device of garbage gas according to claim 3, it is characterized in that: described water leg mechanism comprises and setting gradually from the inside to the outside and the first water leg (24) be interconnected, the second water leg (23), the 3rd water leg (22) and the 4th water leg (21), first water leg (24), the second water leg (23), be provided with S shape heat tunnel (25) between the 3rd water leg (22) and the 4th water leg (21), S shape heat tunnel (25) is connected with blast pipe (26); Described first water leg (24), the second water leg (23), to be connected by water pipe between the 3rd water leg (22) and the 4th water leg (21), described 4th water leg (21) bottom is provided with water inlet (20), and the first water leg (24) top is provided with delivery port (16).
5. the Instant heating type hot-water boiler device of garbage gas according to claim 1, is characterized in that: described in fall to being provided with in grey chamber (8) and be connected to outside blast pipe (10).
6. the Instant heating type hot-water boiler device of garbage gas according to claim 1, is characterized in that: described water pipe furnace grate comprises fire grate (12), and fire grate (12) is provided with the many water pipe A(11 be set up in parallel).
7. the Instant heating type hot-water boiler device of garbage gas according to claim 1, it is characterized in that: described water pipe cuts off module and comprises partition wall (15), partition wall (15) is arranged through hole (13), in partition wall (15), be provided with the many water pipe B(14 be set up in parallel).
8. the Instant heating type hot-water boiler device of garbage gas according to claim 1, it is characterized in that: described ash retaining cover mechanism (3) comprises taper inner cover (4), taper inner cover (13) top is provided with one or more layers taper upper cover (5), taper inner cover (4) is provided with through hole A(28), taper upper cover (5) is provided with through hole B(27), described taper inner cover (4) is fixed on water pipe and cuts off in module, described taper upper cover (5) is fixed in reflection heat storage hood (18), and junction is positioned at passage (17) below.
9. the using method of the Instant heating type hot-water boiler device of the garbage gas according to any one of claim 1-8, it is characterized in that: by feeding mechanism rubbish is delivered in single-stage combustion chamber and burns, cut off module to water pipe furnace grate and water pipe during burning to heat, the hot gas simultaneously produced by after through hole successively through ash retaining cover mechanism, reflection heat storage hood, at ash retaining cover, combustion ash is blocked by mechanism, carry out hot-fluid at the inner top of reflection heat storage hood liquidate thus improve hot air temperature accumulation of heat, and out the in-house water of water leg is heated from the passage of reflection heat storage hood.
10. the using method of the Instant heating type hot-water boiler device of garbage gas according to claim 9, is characterized in that: the described passage hot gas out from reflection heat storage hood is heated the first water leg, the second water leg, the 3rd water leg and the 4th water leg successively by S shape heat tunnel.
CN201610070061.4A 2016-02-02 2016-02-02 Rubbish combustion gas instant water boiler device and application method Pending CN105546813A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610070061.4A CN105546813A (en) 2016-02-02 2016-02-02 Rubbish combustion gas instant water boiler device and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610070061.4A CN105546813A (en) 2016-02-02 2016-02-02 Rubbish combustion gas instant water boiler device and application method

Publications (1)

Publication Number Publication Date
CN105546813A true CN105546813A (en) 2016-05-04

Family

ID=55826192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610070061.4A Pending CN105546813A (en) 2016-02-02 2016-02-02 Rubbish combustion gas instant water boiler device and application method

Country Status (1)

Country Link
CN (1) CN105546813A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000310346A (en) * 1999-04-23 2000-11-07 Masayuki Takahashi Temperature limited safety relief valve for hot water supply device
CN2416427Y (en) * 1999-12-24 2001-01-24 俞建荣 Environment protection vertical boiler
CN101718467A (en) * 2010-01-20 2010-06-02 王世俊 Bidirectional environment-friendly energy saving boiler with three return strokes
CN102367989A (en) * 2011-11-18 2012-03-07 张守法 Smokeless environment-friendly boiler
CN102384479A (en) * 2010-08-30 2012-03-21 陈晓花 Chimney for kitchen range
KR20130084913A (en) * 2012-01-18 2013-07-26 고광필 Heating water boiler with multiple combustion chamber
CN103653256A (en) * 2013-11-28 2014-03-26 湖州盛基金属制品有限公司 On-board ashtray and automobile with same
CN204757359U (en) * 2015-06-25 2015-11-11 长沙天大锅炉制造有限公司 Fire boiler of rubbish
CN205373010U (en) * 2016-02-02 2016-07-06 李观德 Instant heating type boiler device of rubbish gas

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000310346A (en) * 1999-04-23 2000-11-07 Masayuki Takahashi Temperature limited safety relief valve for hot water supply device
CN2416427Y (en) * 1999-12-24 2001-01-24 俞建荣 Environment protection vertical boiler
CN101718467A (en) * 2010-01-20 2010-06-02 王世俊 Bidirectional environment-friendly energy saving boiler with three return strokes
CN102384479A (en) * 2010-08-30 2012-03-21 陈晓花 Chimney for kitchen range
CN102367989A (en) * 2011-11-18 2012-03-07 张守法 Smokeless environment-friendly boiler
KR20130084913A (en) * 2012-01-18 2013-07-26 고광필 Heating water boiler with multiple combustion chamber
CN103653256A (en) * 2013-11-28 2014-03-26 湖州盛基金属制品有限公司 On-board ashtray and automobile with same
CN204757359U (en) * 2015-06-25 2015-11-11 长沙天大锅炉制造有限公司 Fire boiler of rubbish
CN205373010U (en) * 2016-02-02 2016-07-06 李观德 Instant heating type boiler device of rubbish gas

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李朝绪: "《实用节能技术》", 31 August 1988 *

Similar Documents

Publication Publication Date Title
CN206244626U (en) Pyrolyzing sludge device
EP2884200B1 (en) Central heating boiler
CN100432532C (en) Combined incineration treatment method for refuse and special vertical oxygen-enriched continuous incinerator
CN201149374Y (en) Hot-blast stove through burning waste gas
CN205373010U (en) Instant heating type boiler device of rubbish gas
CN203517761U (en) Biomass three-time-air-distribution half-gasifying combustor
CN203478305U (en) Biomass fuel steam generator
CN205316334U (en) Waste gasification heat accumulation burner
CN105546813A (en) Rubbish combustion gas instant water boiler device and application method
CN201944886U (en) Biomass back-burning furnace
CN205316297U (en) Biomass combustion device
RU2445550C1 (en) Heating device
CN106594747B (en) Improved innoxious waste incinerator
CN207298912U (en) A kind of energy-efficient chimney arch of biomass chain-grate boiler
CN206430142U (en) A kind of refuse burning system with gas buffer region
CN205137544U (en) Cooking heating stove with water pipe heat exchanger
KR20150000221A (en) Nonmotorized Heater using Solid refuse fuel
CN202938363U (en) Combined type coal-to-gas combustion heating furnace
CN205535756U (en) Environment -friendly biomass combustion device
CN103225802A (en) Steam, heat and charcoal triple co-generation biomass combustion device
CN219607103U (en) Integrated smoke-free environment-friendly boiler for waste incineration continuous kiln
CN201662208U (en) Straw particle fired boiler
RU79328U1 (en) GAS-GENERATING-PYROLYSIS BOILER
CN213395382U (en) Efficient anti-slagging low-emission biomass boiler
CN203837253U (en) Square counter-heating energy-saving water heating coal-fired furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160504

RJ01 Rejection of invention patent application after publication