CN1055146C CN 97115254 CN97115254A CN1055146C CN 1055146 C CN1055146 C CN 1055146C CN 97115254 CN97115254 CN 97115254 CN 97115254 A CN97115254 A CN 97115254A CN 1055146 C CN1055146 C CN 1055146C
Authority
CN
China
Prior art keywords
concrete
dam
hydraulic compensation
engineering
continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 97115254
Other languages
English (en)
Other versions
CN1172190A (zh
Inventor
吴来峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wu Jin
Wu Laifeng
Zhang Jinsheng
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97115254 priority Critical patent/CN1055146C/zh
Publication of CN1172190A publication Critical patent/CN1172190A/zh
Application granted granted Critical
Publication of CN1055146C publication Critical patent/CN1055146C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

本发明属于一种水工补偿收缩混凝土连续筑坝方法。其主要步骤包括:整理坝基,架设模板;分层连续浇筑坝体混凝土;表层处理和养护拆模;其中的水工补偿收缩混凝土采用水工补偿收缩水泥。其主要优点是:解决了大体积混凝土工程大仓面连续浇筑施工中的关键问题,缩短了工程建设周期60%以上,使工程提前投入运行,从而获得巨大的经济效益,并可节约模板、灌浆、温控、导流等工程费用,提高工程质量及耐久性。

Description

水工补偿收缩混凝土连续筑坝方法
本发明属于一种连续筑坝方法,特别涉及于一种水工补偿收缩混凝土连续快速筑坝方法。
现有大体积混凝土工程均采用分段分层间歇浇筑的设计施工方法,它将混凝土坝分成多条纵、横缝,采用预冷骨料加冰拌和混凝土以减低浇筑温度,坝体内埋设冷却水钢管,通冷却水至稳定温度后,再进行灌浆,使坝体形成整体。如美国近代德沃克坝的大仓面用间歇分层浇筑,预冷技术要求浇筑温度为4.7~6.3℃,不仅建坝速度慢,而且成本高,裂缝多。
本发明的目的针对现有技术中存在速度慢,成本高,裂缝多的缺点,研制出一种水工补偿收缩混凝土连续筑坝方法。
本发明的连续筑坝方法,其主要步骤包括:
1)整理坝基,架设全坝(坝段)大型翻转式或滑动模板。
2)水工补偿收缩水泥的制备,其组分及其重量百分比(%)为:熟料
  15~22,石膏8~14,高炉水淬矿渣68~76,糖蜜0.05~0.5%。
3)制备水工补偿收缩混凝土,其组分及其重量比例为:
  水工补偿收缩水泥∶沙∶石子=1∶2.4∶6.14
4)连续浇筑坝体混凝土,并连续通水冷却坝体混凝土。
5)混凝土直接与侧壁岩石面接触,即侧壁岩石面与混凝土之间不必另
  行埋设灌浆系统和进行灌浆。
6)表面层处理。
7)养护(>15天)。
所述坝体分层的高度为≥6m。
在所述连续浇筑坝体混凝土时预埋入水管,然后连续通水冷却坝体混凝土。
本发明的连续筑坝方法的主要优点是解决了大体积混凝土工程无纵缝大仓面连续浇筑设计施工中的关键问题,缩短了工程建设周期60%以上,使工程提前投入运行,从而获得巨大的经济效益,并可节约模板、灌浆、温控、导流等工程费用,提高工程质量及耐久性,如某导流洞封堵工程全部利用该发明创效益1008万元。另某工程三个坝段采用该发明创效益1845.82万元。本方法也适用于其它大体积混凝土结构,如海港、码头、桥梁、电站等工程。
水工补偿收缩混凝土是利用特制的低热微膨胀水泥或水工补偿收缩水泥拌制的混凝土适时产生适量的自生体积膨胀,补偿大体积混凝土结构因温降产生的体积收缩,实现结构大仓面连续浇筑温度应力不增加,免去纵缝灌浆,并可实现侧壁不灌浆。
实施例:
1)基础及侧壁岩石面整理并支模;
2)水工补偿收缩水泥的备制,其组分及其重量百分比分别为:
  熟料19,石膏12,高炉水淬矿渣69;结构高17m,分五层
  用泵送砼连续浇筑,其五层厚度分别为:1.5m,3.0m,5,5m,6,0m
  和1.0m。
3)配制水工补偿收缩混凝土并实施6m高的连续浇筑,其混凝土的配
  合比为:水工补偿收缩水泥∶沙∶石子=1∶2.04∶6.23水灰比(W/C)
  =0.65,并加入总重量0.15%的木钙,0.0006%的松香皂。
4)结构侧壁岩石面直接与混凝土连接,不埋设灌浆系统。
5)15天以上的养护。
本实施例中的混凝土的7天和28天的膨胀量分别为296×10-6和310×10-6,7天和28天的绝热温升分别为21.30℃和22.41℃;
本发明所用水工补偿收缩混凝土的性能特点有:
1.早期强度高:其3天、7天早期抗压、抗拉强度分别为28天和
  40%和60%以上:
2.绝热温升特别低:比矿渣水泥混凝土低7℃,如水泥用量160kg/m3
  的水工补偿收缩混凝土为16℃,比美国上净水坝混凝土的绝热温
  升18℃还低2℃:
3.耐硫酸盐侵蚀性能好:比最好的抗硫酸盐水泥(可抗100mg/L)
  还提高一倍(可抗2000mg/L);
4.抗渗透性强:其渗透系数为1.43×10-10cm/s,比普通混凝土10-7
  -10-8小100倍以上;
5.优良的施工性能:和易性好,不粘罐,下料速度提高10倍。
6.可实现连续浇筑的优异性能和较好的补偿收缩性能。

Claims (3)

1.一种水工补偿收缩混凝土连续浇筑筑坝方法,其主要步骤包括:
(1)整理坝基,架设全坝或坝段大型翻转式模板或滑动模板;
(2)水工补偿收缩水泥的制备,其组分及其重量百分比(%)为:
   熟料15~22,石膏8~14,高炉水淬矿渣68~76,糖蜜0.05~
   0.5%;
(3)制备水工补偿收缩混凝土,其组分及其重量比例为:
   水工补偿收缩水泥∶沙∶石子=1∶2.4∶6.14
(4)连续浇筑坝体混凝土并连续通水冷却坝体混凝土;
(5)混凝土直接与侧壁岩石面接触,即侧壁岩石面与混凝土之间不必另
   行埋设灌浆系统和进行灌浆;
(6)表面层处理;
(7)养护>15天。
2.如权利要求所述的筑坝方法,其特征在于所述坝体分层的高度为≥6m。
3.如权利要求1所述的筑坝方法,其特征在于在所述连续浇筑坝体混凝土时预埋入水管,然后连续通水冷却坝体混凝土。
CN 97115254 1997-08-27 1997-08-27 水工补偿收缩混凝土连续筑坝方法 Expired - Fee Related CN1055146C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97115254 CN1055146C (zh) 1997-08-27 1997-08-27 水工补偿收缩混凝土连续筑坝方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97115254 CN1055146C (zh) 1997-08-27 1997-08-27 水工补偿收缩混凝土连续筑坝方法

Publications (2)

Publication Number Publication Date
CN1172190A CN1172190A (zh) 1998-02-04
CN1055146C true CN1055146C (zh) 2000-08-02

Family

ID=5173244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97115254 Expired - Fee Related CN1055146C (zh) 1997-08-27 1997-08-27 水工补偿收缩混凝土连续筑坝方法

Country Status (1)

Country Link
CN (1) CN1055146C (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101514870B (zh) * 2008-02-22 2012-02-22 中冶天工建设有限公司 利用木模板及型钢制作环形加热炉工作层的施工方法
CN102587381A (zh) * 2012-04-09 2012-07-18 浙江大学 一种利用双膨胀水泥浇筑大坝的方法
CN102888845B (zh) * 2012-11-06 2014-10-22 中国第二重型机械集团(德阳)万信工程设备有限责任公司 超大体积灌浆体的施工方法
CN104196031A (zh) * 2014-08-25 2014-12-10 四川金锋建设有限公司 一种大体积灌浆体的施工方法

Also Published As

Publication number Publication date
CN1172190A (zh) 1998-02-04

Similar Documents

Publication Publication Date Title
US20170009469A1 (en) Composite insulated plywood, insulated plywood concrete form and method of curing concrete using same
CN103979901B (zh) 一种掺有磷渣粉的水泥基无收缩灌浆材料及使用方法
CN106007550B (zh) 一种大流态无收缩抗裂混凝土灌浆料
CN103306501B (zh) 现浇工业石膏承重墙节能住宅建筑及其制作方法
CN107313463A (zh) 城市轨道交通地下车站主体结构侧墙砼裂缝控制方法
CN102797358A (zh) 严寒地区铁路施工用超低温高性能混凝土的施工工艺
CN113718777A (zh) 一种大体积混凝土防裂缝施工方法
CN102001852A (zh) 一种具有高抗渗性能的半柔性快速堵漏砂浆
CN103938767B (zh) 外包钢丝网砂浆板发泡混凝土槽形节能承重墙体及作法
CN1238609C (zh) 堆石混凝土大坝施工方法
CN1055146C (zh) 水工补偿收缩混凝土连续筑坝方法
CN201495627U (zh) 一种石膏-混凝土混合结构节能住宅建筑结构
KR100610556B1 (ko) 충진형 pc판넬 터널 라이닝 시스템 및 그 시공법
Yuan et al. Experimental study on influencing factors associated with a new tunnel waterproofing for improved impermeability
CN113565143A (zh) 地下室顶板沉降后浇带施工方法
CN105672203B (zh) 一种堤坝钢筋混凝土涵管的封堵施工方法
CN111908853A (zh) 自密实土及其制备方法和回填市政空腔的施工方法
CN105016770A (zh) 一种桥梁减跨的方法及专用桥梁减跨回填材料
CN105064411A (zh) 一种地下构筑物墙板后浇膨胀加强带的构筑方法
CN1247480C (zh) 水泥砂浆浆液
CN201485994U (zh) 一种新型节能复合承重墙体
CN1049414C (zh) 烟囱用轻质砌块
CN109372031B (zh) 一种用于钢管桩围堰锁扣的止水材料
CN105503100A (zh) 一种路桥工程加固用高性能灌浆料及其制备方法
CN111946365A (zh) 一种高含石盐岩地层隧道多重结构防水系统及工艺

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHANG JINSHENG WU JIN

Effective date: 20050304

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20050304

Address after: 100044 3, gate 401, west 2, Institute of water and electricity, No. 22 West Zhuang Road, Beijing, Haidian District

Co-patentee after: Zhang Jinsheng

Patentee after: Wu Laifeng

Co-patentee after: Wu Jin

Address before: 100044 3, gate 401, west 2, Institute of water and electricity, No. 22 West Zhuang Road, Beijing, Haidian District

Patentee before: Wu Laifeng

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Wu Laifeng

Document name: payment instructions

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Wu Laifeng

Document name: Notification of Termination of Patent Right

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee