CN105508732B - Pipe frame - Google Patents
Pipe frame Download PDFInfo
- Publication number
- CN105508732B CN105508732B CN201510996677.XA CN201510996677A CN105508732B CN 105508732 B CN105508732 B CN 105508732B CN 201510996677 A CN201510996677 A CN 201510996677A CN 105508732 B CN105508732 B CN 105508732B
- Authority
- CN
- China
- Prior art keywords
- upright bar
- bar
- upright
- pipe frame
- vertical pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The present invention discloses a kind of Pipe frame, second upright bar of the first upright bar and two parallel intervals including two parallel intervals, first upright bar is set with the second upright bar parallel interval, vertical pole is both provided with the top of the top of two first upright bars, two second upright bars, the first cross bar for being used to support pipeline is provided between first upright bar and the second upright bar, the second cross bar of support pipeline is provided between two vertical poles, wherein, two the first upright bars are each formed with the passage that pedestrian passes through with vertical pole, two the second upright bars with vertical pole.The passage passed through by upright bar and vertical pole formation pedestrian, passes through the supporting surface that support pipeline is formed in the first cross bar and the second cross bar so that whole Pipe frame can also both be separated pipeline and walkway with aerial pipeline, reduce security risk.
Description
Technical field
The present invention relates to a kind of pipeline support frock, more particularly to a kind of Pipe frame.
Background technology
There are various pipelines during shipbuilding, all pipelines are required to aerial management, to ensure shipbuilding process
In safe operation, but in outfield operation, for unspecial extension null device, it usually needs set up scaffold etc. other
Gadget is maked somebody a mere figurehead for pipeline, and pipe joint often often leads to sectional area across walkway, pipeline across people's row
Road, personnel's walking are very inconvenient.
The content of the invention
It is an object of the invention to provide a kind of Pipe frame, pipeline can be maked somebody a mere figurehead setting and by pipeline and people's row by it
Passage separates, and passes through easy to personnel, reduces security risk.
In order to achieve the above object, the present invention uses following technical scheme:
A kind of Pipe frame, including the first upright bar of two parallel intervals and the second upright bar of two parallel intervals be provided, described
One upright bar is set with the second upright bar parallel interval, and the top of two first upright bars, the top of two second upright bars are equal
Vertical pole is provided with, is provided with the first cross bar for being used to support the pipeline between first upright bar and second upright bar, two
The second cross bar for supporting the pipeline is provided between the vertical pole, wherein, two first upright bars and the vertical pole, two
Second upright bar is each formed with the passage that pedestrian passes through with the vertical pole.
Preferably, be arranged in parallel two second cross bars between two vertical poles, first upright bar and described second
Both length directions of edge are parallel between upright bar and are arranged at intervals four first cross bars, the first cross bar of two of which difference position
In the both ends of first upright bar, second upright bar.
As a kind of preferred solution of Pipe frame, the spacing of two first upright bars and the spacing phase of two second upright bars
Deng.
By the way that the spacing of two first upright bars to be set to people equal with the spacing of two second upright bars, can be formed Pipe frame
Row of channels even width, ensures that pedestrian can normally pass through.
As a kind of preferred solution of Pipe frame, upwardly extended at the top of first upright bar and be provided with the first limiting section,
Upwardly extended at the top of second upright bar and be provided with the second limiting section, first limiting section and second limiting section are convex
For second cross bar and the vertical pole.
By setting limiting section, it can prevent pipeline from dropping.
As a kind of preferred solution of Pipe frame, the side of first upright bar away from the passage along its length between
Every setting multiple hooks, the side of second upright bar away from the passage is also arranged at intervals multiple hooks along its length.
Linked up with by setting, can be wound into hanging on hook after pipeline is finished.
As a kind of preferred solution of Pipe frame, the hook includes vertical with first upright bar or second upright bar
Supporting part, upwardly extended in the end of the supporting part and be provided with stop part, the stop part perpendicular to the supporting part, and
It is arranged at intervals with first upright bar or second upright bar.
As a kind of preferred solution of Pipe frame, also set up in first upright bar and second upright bar for strengthening institute
The reinforcing plate of supporting part is stated, the reinforcing plate is in triangle tabular, and a wherein right-angle side and the supporting part of the reinforcing plate are consolidated
Fixed connection, another right-angle side are fixedly connected with first upright bar or second upright bar.
By setting reinforcing plate, the intensity of hook can be increased, hook is hung more pipelines, increase Pipe frame
Storage ability.
As a kind of preferred solution of Pipe frame, the bottom of two first upright bars sets the first pedal, described in two
The bottom of second upright bar sets the second pedal.
By setting pedal, whole Pipe frame can be made to form a closing entirety, strengthen the intensity of whole Pipe frame,
Prevent Pipe frame from deforming, while easy to the movement of Pipe frame.
As a kind of preferred solution of Pipe frame, the first bracing piece and the second bracing piece, first bracing piece are further included
One end be connected with the vertical pole at the top of first upright bar, the other end is connected with first upright bar, described first
Bracing piece is set with first upright bar and the vertical pole in angle respectively, one end of second bracing piece with positioned at described the
Vertical pole connection at the top of two upright bars, the other end is connected with second upright bar, and second bracing piece is respectively with described the
Two upright bars and the vertical pole are set in angle.
Preferably, two first bracing pieces are set in distance with one end that the vertical pole is connected, two described second
Bracing piece is set in distance with one end that the vertical pole is connected.
As a kind of preferred solution of Pipe frame, sealing plate is provided with the top of first upright bar, second upright bar
Top is also equipped with sealing plate.
As a kind of preferred solution of Pipe frame, first upright bar, second upright bar, the vertical pole, described first
Cross bar, second cross bar are made of steel pipe.
Preferably, upper antirust paint is sprayed after the Pipe frame surface polishes smooth, the thickness of the antirust paint is not less than
0.6mm。
Beneficial effects of the present invention:The passage that Pipe frame provided by the invention is passed through by upright bar and vertical pole formation pedestrian,
Pass through the supporting surface that support pipeline is formed in the first cross bar and the second cross bar so that whole Pipe frame both can with aerial pipeline,
Pipeline and walkway can be separated, reduce security risk.
Brief description of the drawings
Fig. 1 is the schematic front view of the Pipe frame of the embodiment of the present invention.
Fig. 2 is the A-A schematic cross-sectional views of Fig. 1.
Fig. 3 is the schematic side view of the Pipe frame of the embodiment of the present invention.
In Fig. 1 to 3:
1st, the first upright bar;101st, the first limiting section;2nd, the second upright bar;201st, the second limiting section;3rd, vertical pole;4th, first is horizontal
Bar;5th, the second cross bar;6th, passage;7th, link up with;71st, supporting part;72nd, stop part;8th, reinforcing plate;9th, the first pedal;10th, second step on
Plate;11st, the first bracing piece;12nd, sealing plate.
Embodiment
Further illustrate technical scheme below with reference to the accompanying drawings and specific embodiments.
As shown in Figures 1 to 3, in an embodiment of the present invention, first upright bar 1 and two of the Pipe frame including two parallel intervals is flat
Second upright bar 2 of between-line spacing, the first upright bar 1 and 2 parallel interval of the second upright bar are set, and the top of two first upright bars 1, two second stand
The top of bar 2 is both provided with vertical pole 3, and the first cross bar 4 for being used to support pipeline is provided between the first upright bar 1 and the second upright bar 2,
The second cross bar 5 of support pipeline is provided between two vertical poles 3, wherein, two the first upright bars 1 and 3, two the second upright bars 2 of vertical pole
The passage 6 that pedestrian passes through is each formed with vertical pole 3.The passage 6 passed through by upright bar and the formation pedestrian of vertical pole 3, by first
4 and second cross bar 5 of cross bar forms the supporting surface of support pipeline so that whole Pipe frame both can be with aerial pipeline, can also be by pipe
Line is separated with walkway, reduces security risk.
In the present embodiment, be arranged in parallel two the second cross bars 5 between two vertical poles 3, the first upright bar 1 and the second upright bar 2 it
Between it is parallel and be arranged at intervals four the first cross bars 4 along both length directions, the first cross bar of two of which 4 is vertical positioned at first respectively
Bar 1, the both ends of the second upright bar 2.The spacing of two first upright bars 1 is equal with the spacing of two second upright bars 2.By by two first upright bars
1 spacing sets walkway even width equal with the spacing of two second upright bars 2, can be formed Pipe frame, ensures row
People can normally pass through.
The top of first upright bar 1, which upwardly extends, is provided with the first limiting section 101, and the top of the second upright bar 2, which upwardly extends, to be set
The second limiting section 201 is equipped with, the first limiting section 101 and the second limiting section 201 protrude from the second cross bar 4 and vertical pole 3.By setting
Limiting section is put, can prevent pipeline from dropping.
First side of the upright bar 1 away from passage 6 is arranged at intervals multiple hooks 7 along its length, and the second upright bar 2 is away from logical
6 side of road is also arranged at intervals multiple hooks 7 along its length.By setting hook 7, can be wound into after pipeline is finished
Hang on hook 7.Hook 7 includes the supporting part 71 vertical with the first upright bar 1 or the second upright bar 2, the end of supporting part 71 to
Upper be extended has stop part 72, and stop part 72 is arranged at intervals perpendicular to supporting part 71, and with the first upright bar 1 or the second upright bar 2.
The reinforcing plate 8 for strengthening supporting part 71 is also set up in first upright bar 1 and the second upright bar 2, reinforcing plate 8 is in straight triangle tabular, is added
A wherein right-angle side for strong plate 8 is fixedly connected with supporting part 71, and another right-angle side and the first upright bar 1 or the second upright bar 2, which are fixed, to be connected
Connect.By setting reinforcing plate 8, the intensity of hook 7 can be increased, hook 7 is hung more pipelines, increase Pipe frame
Storage ability.
The bottom of two the first upright bars 1 sets the first pedal 9, and the bottom of two the second upright bars 2 sets the second pedal 10.It is logical
Setting pedal is crossed, whole Pipe frame can be made to form a closing entirety, the intensity of whole Pipe frame is strengthened, prevent Pipe frame
Deformation, while easy to the movement of Pipe frame.
Pipe frame further includes the first bracing piece 11 and the second bracing piece (not shown), one end of the first bracing piece 11 with
Vertical pole 3 positioned at the top of the first upright bar 1 connects, and the other end is connected with the first upright bar 1, the first bracing piece 11 respectively with the first upright bar
1 and vertical pole 3 set in angle, one end of the second bracing piece is connected with the vertical pole 3 at the top of the second upright bar 2, the other end and the
Two upright bars 2 connect, and the second bracing piece is set with the second upright bar 2 and vertical pole 3 in angle respectively.Two the first bracing pieces 11 and vertical pole
One end of 3 connections is set in distance, and two the second bracing pieces are set in distance with one end that vertical pole 3 is connected.
The top of first upright bar 1 is provided with sealing plate 12, and the top of the second upright bar 2 is also equipped with sealing plate 12.
First upright bar 1, the second upright bar 2, vertical pole 3, the first cross bar 4, the second cross bar 5 are made of steel pipe.
Pipe frame surface sprays upper antirust paint after polishing smooth, the thickness of antirust paint is not less than 0.6mm.
It is to be understood that above-mentioned embodiment is only that presently preferred embodiments of the present invention and institute's application technology are former
Reason, in technical scope disclosed in this invention, change that any one skilled in the art is readily apparent that or
Replace, should all cover within the scope of the present invention.
Claims (7)
1. a kind of Pipe frame, it is characterised in that the second upright bar of the first upright bar and two parallel intervals including two parallel intervals, institute
State the first upright bar to set with the second upright bar parallel interval, the top of two first upright bars, the top of two second upright bars
Portion is both provided with vertical pole, and the first horizontal stroke for being used to support the pipeline is provided between first upright bar and second upright bar
Bar, is provided with the second cross bar for supporting the pipeline between two vertical poles, wherein, two first upright bars with it is described vertical
Bar, two second upright bars are each formed with the passage that pedestrian passes through with the vertical pole;
Upwardly extended at the top of first upright bar and be provided with the first limiting section, setting is upwardly extended at the top of second upright bar
There is the second limiting section, first limiting section and second limiting section protrude from second cross bar and the vertical pole;
The side of first upright bar away from the passage is arranged at intervals multiple hooks along its length, and second upright bar is remote
Side from the passage is also arranged at intervals multiple hooks along its length;
The hook includes the supporting part vertical with first upright bar or second upright bar, the end of the supporting part to
Upper be extended has stop part, the stop part perpendicular to the supporting part, and with first upright bar or second upright bar
It is arranged at intervals.
2. Pipe frame according to claim 1, it is characterised in that the spacing of two first upright bars is vertical with two described second
The spacing of bar is equal.
3. Pipe frame according to claim 1, it is characterised in that also set up in first upright bar and second upright bar
For strengthening the reinforcing plate of the supporting part, the reinforcing plate is in straight triangle tabular, a wherein right-angle side for the reinforcing plate with
The supporting part is fixedly connected, and another right-angle side is fixedly connected with first upright bar or second upright bar.
4. Pipe frame according to any one of claims 1 to 3, it is characterised in that the bottom of two first upright bars is set
The first pedal is put, the bottom of two second upright bars sets the second pedal.
5. Pipe frame according to any one of claims 1 to 3, it is characterised in that further include the first bracing piece and second and add
Strong bar, one end of first bracing piece be connecteds with the vertical pole at the top of first upright bar, the other end and described the
One upright bar connects, and first bracing piece is set with first upright bar and the vertical pole in angle respectively, and described second strengthens
One end of bar is connected with the vertical pole at the top of second upright bar, and the other end is connected with second upright bar, and described the
Two bracing pieces are set with second upright bar and the vertical pole in angle respectively.
6. Pipe frame according to any one of claims 1 to 3, it is characterised in that be provided with the top of first upright bar
Sealing plate, is also equipped with sealing plate at the top of second upright bar.
7. Pipe frame according to any one of claims 1 to 3, it is characterised in that first upright bar, described second stand
Bar, the vertical pole, first cross bar, second cross bar are made of steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510996677.XA CN105508732B (en) | 2015-12-24 | 2015-12-24 | Pipe frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510996677.XA CN105508732B (en) | 2015-12-24 | 2015-12-24 | Pipe frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105508732A CN105508732A (en) | 2016-04-20 |
CN105508732B true CN105508732B (en) | 2018-05-11 |
Family
ID=55716926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510996677.XA Active CN105508732B (en) | 2015-12-24 | 2015-12-24 | Pipe frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105508732B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106764066B (en) * | 2017-01-23 | 2018-12-04 | 北京亚欧震达科技发展有限公司 | A kind of aerial piping lane |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202402792U (en) * | 2011-12-31 | 2012-08-29 | 中建工业设备安装有限公司 | Convenient-to-disassemble multifunctional portal frame for mounting large-aperture pipeline |
CN203248122U (en) * | 2013-03-13 | 2013-10-23 | 中国石油天然气集团公司 | Concealed folding hydraulic pipeline support |
CN204057508U (en) * | 2014-08-29 | 2014-12-31 | 广东新船重工有限公司 | Retractable frame maked somebody a mere figurehead by a kind of pipeline |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11141740A (en) * | 1997-11-07 | 1999-05-28 | Kumagai Gumi Co Ltd | Method for transferring existing piping in cut and cover tunnel making work |
KR20130136894A (en) * | 2012-06-05 | 2013-12-13 | 김지성 | A laundry drier have a hot wind drier |
-
2015
- 2015-12-24 CN CN201510996677.XA patent/CN105508732B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202402792U (en) * | 2011-12-31 | 2012-08-29 | 中建工业设备安装有限公司 | Convenient-to-disassemble multifunctional portal frame for mounting large-aperture pipeline |
CN203248122U (en) * | 2013-03-13 | 2013-10-23 | 中国石油天然气集团公司 | Concealed folding hydraulic pipeline support |
CN204057508U (en) * | 2014-08-29 | 2014-12-31 | 广东新船重工有限公司 | Retractable frame maked somebody a mere figurehead by a kind of pipeline |
Also Published As
Publication number | Publication date |
---|---|
CN105508732A (en) | 2016-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105508732B (en) | Pipe frame | |
CN202015677U (en) | Multifunctional lifting tool for use in power spray production line | |
CN204040515U (en) | Cat ladder | |
CN102718124A (en) | Anti-slipping lifting appliance | |
CN204059924U (en) | A kind of scaffolding structure for building | |
CN203531345U (en) | Movable cantilever frame | |
CN205894636U (en) | A cage device for steel structure high altitude welding jobs | |
CN207749810U (en) | A kind of Novel moveable scaffold | |
CN205550663U (en) | Vehicle vent -pipe decorates and covers frock of spraying paint | |
CN203141641U (en) | Pipe drawing device of mold enabling multiple building blocks to be formed at one time | |
CN205777629U (en) | A kind of Fabricated railing | |
CN205144131U (en) | Two -sided clothing frame | |
CN204571255U (en) | Simple and easy hanging basket | |
CN206405203U (en) | Smoothing roll hoisting structure | |
CN206957253U (en) | A kind of alloy safety net | |
CN204754238U (en) | Movable type hangs handling frame | |
CN205568480U (en) | Show shelf is separated to clothing | |
CN205056944U (en) | Antiskid stoving support | |
CN205222438U (en) | Prefabricated component gallows and truss superimposed sheet system of lifting by crane | |
CN205603675U (en) | Novel car door sprays bridging frame of line | |
CN205531260U (en) | Novel scaffold frame for fitment | |
CN209423991U (en) | A kind of rebar cylinder mould erecting by overhang | |
CN208858134U (en) | The security platform of high-altitude installation exercise | |
CN209099198U (en) | Pier stud curing means | |
CN206923915U (en) | The wooden frame rope made of hemp weaves wine frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |