CN106764066B - A kind of aerial piping lane - Google Patents
A kind of aerial piping lane Download PDFInfo
- Publication number
- CN106764066B CN106764066B CN201710049734.2A CN201710049734A CN106764066B CN 106764066 B CN106764066 B CN 106764066B CN 201710049734 A CN201710049734 A CN 201710049734A CN 106764066 B CN106764066 B CN 106764066B
- Authority
- CN
- China
- Prior art keywords
- vertical bar
- piping lane
- room
- lower beam
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/04—Protective tubing or conduits, e.g. cable ladders or cable troughs
- H02G3/0437—Channels
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to pipelines to hang technical field, more particularly to a kind of aerial piping lane, it includes at least two upper beams and lower beam being parallel to each other, upper beam and the setting of lower beam Parallel Symmetric, the both ends of upper beam and lower beam are connect with Shang Wuliang and lower room beam respectively, and two column vertical bars are equipped between upper beam and lower beam on the outermost side;Vertical bar is equipped with the more supporting beams extended horizontally outward, and walkway is formed between two column vertical bars, and lower beam is equipped with pedestrian.The present invention provides a kind of aerial piping lane, while playing the role of hanger, for staff in upper walking, i.e., when later maintenance is repaired, without ascending a height equipment in additional use, not only saves space shared by entirety, and operation is time saving and energy saving, working efficiency is higher;Meanwhile the aerial piping lane also has simple and stable structure, simple installation is quick, the advantages that without welding.
Description
Technical field
The present invention relates to pipeline hanging technical field more particularly to a kind of aerial piping lanes.
Background technique
In some factory floors, such as subway is with library, maintenance library, industrial premises, including various pipelines, cable bridge
Equal routes, quantity is more, repairs in order to facilitate the dismounting and later maintenance of the routes such as pipeline, cable bridge, currently, generally all
It is that these routes are carried out by common placement by hanger, wherein layering installation can be carried out on hanger, and carry out corresponding anti-shake
Processing.Using such mode, route is facilitated to be managed collectively, more securely and reliably.
But currently, its structure of common hanger includes the frame of a strip, various routes are placed in the frame, frame
Inside frame according to actual needs, it can be layered setting, layering fixation is carried out to each route by tube bank or gantry etc..Though such structure
Unified processing has so been carried out to route, still, since hanger is generally both mounted at roof portion, in later maintenance maintenance, has been needed
Maintenance and repair operation is carried out by the equipment of ascending a height of auxiliary, not only the space occupied is larger, and time-consuming and laborious when operation.
Summary of the invention
It is an object of the invention to propose a kind of aerial piping lane, it is unfavorable for the later period to solve hanger existing in the prior art
The technical issues of maintenance and repair.
To achieve this purpose, the present invention adopts the following technical scheme:
A kind of aerial piping lane, the upper beam and lower beam being parallel to each other including at least two, the upper beam and it is described under
The both ends of the setting of crossbeam Parallel Symmetric, the upper beam and the lower beam are connect with Shang Wuliang and lower room beam respectively, are located at most
Two column vertical bars are equipped between the upper beam and the lower beam in outside;
The vertical bar is equipped with the more supporting beams extended horizontally outward, forms walkway between the two column vertical bars,
The lower beam is equipped with pedestrian.
Further, the both ends of the upper beam and the lower beam top with the upper room beam and the lower room beam respectively
Portion is fixedly connected, and the vertical bar includes short vertical bar, and the short vertical bar is located at the end of the upper beam and the lower beam, described
One end of short vertical bar is connect with the lower beam, and the other end is connect with the bottom of the upper room beam.
Further, the vertical bar further includes long vertical bar, and the long vertical bar is located at the upper beam and the lower beam
Middle part, the two long vertical bars arranged in the vertical bars are symmetrical arranged, are respectively equipped on the upper beam and on the lower beam
Rack beams and lower bracket beam, the part upper bracket beam and the lower bracket beam are oppositely arranged with the long vertical bar.
Further, the long vertical bar and between the upper room beam of the same side pass through brace connect, the same side
It is connected between the adjacent long vertical bar by drag link.
Further, lead to respectively between the upper beam and the upper room beam, between the lower beam and the lower room beam
Lintel folder is fixedly connected, the part that is connected by a hinge respectively between the short vertical bar and the upper room beam and lower room beam connection.
Further, the supporting beam is equipped with connector, and the connector is at least one restrained, in gantry or lock
Kind, the supporting beam is U-lag steel.
Further, the pedestrian is steel grating, is connected between the steel grating and the lower beam by the way that U-shaped hook is fixed
It connects.
Further, between the upper beam and the long vertical bar and the upper bracket beam, the lower beam and the length
It is connected respectively by four-way connector between vertical bar and the lower bracket beam;
Pass through threeway respectively between the upper beam and the upper bracket beam, between the lower beam and the lower bracket beam
Connector connection;
It is connected respectively by two-way between the long vertical bar and the supporting beam, between the short vertical bar and the supporting beam
Part connection.
Further, the horizontal distance between two adjacent supporting beams of the same side is no more than 3 meters.
Further, the material of the upper beam, the lower beam, the vertical bar, the supporting beam and the pedestrian
For stainless steel.
The present invention provides a kind of aerial piping lane, in use, being installed on the Shang Wuliang and lower room beam in house, Duo Gezhi
It supports beam and forms support platform, fixed corresponding route, pipeline are placed in supporting beam, wherein for the people that works at walkway
Member walks.
The aerial piping lane, while playing the role of hanger, for staff in upper walking, i.e. later maintenance is repaired
When, without ascending a height equipment in additional use, space shared by entirety is not only saved, and operation is time saving and energy saving, working efficiency is more
It is high;Meanwhile the aerial piping lane also has simple and stable structure, simple installation is quick, the advantages that without welding.
Detailed description of the invention
Fig. 1 is the main view of aerial piping lane provided by the invention;
Fig. 2 is the bottom view of aerial piping lane provided by the invention;
Fig. 3 is A-A cross-sectional view in Fig. 1;
Fig. 4 is B-B cross-sectional view in Fig. 1;
Fig. 5 is the partial enlarged view in Fig. 1 at C.
In figure:
1, upper beam;2, lower beam;3, Shang Wuliang;4, Xia Wuliang;5, supporting beam;6, pedestrian;7, short vertical bar;8, long perpendicular
Bar;9, upper bracket beam;10, lower bracket beam;11, brace;12, drag link;13, Liang Jia;14, hinge connector;15, U-shaped hook;
16, four-way connector;17, three-way connector;18, two-way connector.
Specific embodiment
To further illustrate the technical scheme of the present invention below with reference to the accompanying drawings and specific embodiments.
As shown in Figs. 1-5, a kind of aerial piping lane, the upper beam 1 and lower beam 2 being parallel to each other including at least two, upper cross
The both ends of beam 1 and the setting of 2 Parallel Symmetric of lower beam, upper beam 1 and lower beam 2 are connect with upper room beam 3 and lower room beam 4 respectively, position
Two column vertical bars are equipped between outermost upper beam 1 and lower beam 2;
Vertical bar is equipped with the more supporting beams 5 extended horizontally outward, forms walkway, lower beam 2 between two column vertical bars
It is equipped with pedestrian 6.
The aerial piping lane is in " non-" character form structure, i.e., more horizontal supporting beams 5 is arranged in two sides, supporting beam 5 is for branch
Corresponding pipeline, route are supportted, walkway, the either dismounting of pipeline early period, route be set between supporting beam 5, or after
The maintenance and repair that phase carries out, staff can walk about in walkway walks the corresponding work of completion, no longer needs to by it
His ancillary equipment without reserved corresponding operation space, and then reduces aerial piping lane entirety the space occupied, and when operation
It is time saving and energy saving, the efficiency of dismounting and maintenance and repair can be improved.
The both ends of upper beam 1 and lower beam 2 are fixedly connected with the top of upper room beam 3 and lower room beam 4 respectively, and vertical bar includes short
Vertical bar 7, short vertical bar 7 are located at the end of upper beam 1 and lower beam 2, and one end of short vertical bar 7 is connect with lower beam 2, the other end with it is upper
The bottom of room beam 3 connects.
Vertical bar further includes long vertical bar 8, and long vertical bar 8 is located at the middle part of upper beam 1 and lower beam 2, and the length in two column vertical bars is perpendicular
Bar 8 is symmetrical arranged, and upper bracket beam 9 and lower bracket beam 10,9 He of part upper bracket beam are respectively equipped on the upper and lower crossbeam 2 of upper beam 1
Lower bracket beam 10 is oppositely arranged with long vertical bar 8.
Pass through vertical bar between upper beam 1 and lower beam 2 to connect, wherein positioned at upper beam 1 and 2 end of lower beam be short
Vertical bar 7, between upper room beam 3 (bracket) and lower beam 2, it is preferred that divide between short vertical bar 7 and upper room beam 3 and lower room beam 4
The part 14 that is not connected by a hinge connection, when the overall length of upper beam 1 and lower beam 2 is longer, in upper beam 1 and lower beam 2
Medium position corresponding long vertical bar 8 is set, the both ends of long vertical bar 8 are respectively arranged at upper beam 1 and lower beam 2.Wherein, long vertical bar
Difference in height between 8 and short vertical bar 7 is the height of upper room beam 3.
Long vertical bar 8 and short vertical bar 7 are uniformly distributed on upper beam 1 and lower beam 2, each section uniform force is formed in the air
The frame of gallery entirety.
It long vertical bar 8 and is connected between the upper room beam 3 of the same side by brace 11, the adjacent long vertical bar 8 in the same side
Between connected by drag link 12.To imitate between vertical bar with certain traction by setting brace 11 and drag link 12
Fruit, increases the globality of aerial piping lane, and when use is more safe and reliable.
It is fixedly connected respectively by beam folder 13 between upper beam 1 and upper room beam 3, between lower beam 2 and lower room beam 4, it is short perpendicular
The part 14 that is connected by a hinge respectively between bar 7 and upper room beam 3 and lower room beam 4 connection.It is fixedly connected by beam folder 13, it can be real
Now stable connection structure has certain anti seismic efficiency, the safety of aerial piping lane can be improved.
Supporting beam 5 is equipped with connector, and connector is at least one of tube bank, gantry or lock, and supporting beam 5 is U-shaped
Channel steel.
Corresponding connector is set in U-lag steel, is such as restrained, tube bank is fixed in U-lag steel, and supporting beam 5
When stay tube road, pipeline is fixed in tube bank, is further fixed by connector, using such mode, more conducively pipeline, line
Management is reasonably arranged on road.
Pedestrian 6 is steel grating, is fixedly connected between steel grating and lower beam 2 by U-shaped hook 15.Steel grating intensity compared with
Height, and setting hollow hole can reduce whole weight in the case where guaranteeing pedestrains safety, be easy to dismount, and save material.
Distinguish between upper beam 1 and long vertical bar 8 and upper bracket beam 9, between lower beam 2 and long vertical bar 8 and lower bracket beam 10
It is connected by four-way connector 16;
It is connected respectively by three-way connector 17 between upper beam 1 and upper bracket beam 9, between lower beam 2 and lower bracket beam;
It is connected respectively by two-way connector 18 between long vertical bar 8 and supporting beam 5, between short vertical bar 7 and supporting beam 5.
Corresponding component is fixed by two-way connector 18, three-way connector 17 and four-way connector 16, so that
The more fastening connected between each component, the globality of aerial piping lane is more preferable, and safety is higher.
Horizontal distance between two adjacent supporting beams 5 of the same side is no more than 3 meters.The supporting beam 5 of same level height
It is used to support same pipeline or route, when support, a supporting beam 5 is a supporting point, in order to ensure the stabilization of support
Property, the horizontal distance between two adjacent supporting beams 5 is no more than 3 meters.
Upper beam 1, lower beam 2, vertical bar, supporting beam 5 and pedestrian 6 material be stainless steel.Using stainless steel material, tool
There is higher intensity, moreover, stainless steel material is not easy to be corroded, is not susceptible to aging, the service life is longer.
When specifically used, by the upper room beam 3 and lower room beam 4 in the upper beam 1 of aerial piping lane and lower beam 2 and building construction
Connection, aerial piping lane are fixed on the top in house, the quantity of supporting beam 5 can be arranged, and in supporting beam according to actual needs
The connector used needed for being arranged on 5 e.g. installs tube bank in supporting beam 5, pipeline, route is mounted on supporting beam 5 accordingly
It is upper.
Wherein, when installing operation, staff can carry out operation in walkway, the maintenance and repair in later period, together
Sample can the operation in walkway, without using auxiliary equipment, both saved operating time and cost input, meanwhile, section
Aerial piping lane the space occupied is saved.
The technical principle of the invention is described above in combination with a specific embodiment.These descriptions are intended merely to explain of the invention
Principle, and shall not be construed in any way as a limitation of the scope of protection of the invention.Based on the explanation herein, the technology of this field
Personnel can associate with other specific embodiments of the invention without creative labor, these modes are fallen within
Within protection scope of the present invention.
Claims (8)
1. a kind of aerial piping lane, which is characterized in that the upper beam (1) and lower beam (2) being parallel to each other including at least two, it is described
Upper beam (1) and the setting of the lower beam (2) Parallel Symmetric, the both ends of the upper beam (1) and the lower beam (2) respectively with
Upper room beam (3) and lower room beam (4) connection, are equipped with two column between the upper beam (1) on the outermost side and the lower beam (2)
Vertical bar;
The vertical bar is equipped with the more supporting beams (5) extended horizontally outward, forms walkway between the two column vertical bars, institute
Lower beam (2) are stated equipped with pedestrian (6);
The both ends of the upper beam (1) and the lower beam (2) top with the upper room beam (3) and the lower room beam (4) respectively
Portion is fixedly connected, and the vertical bar includes short vertical bar (7), and the short vertical bar (7) is located at the upper beam (1) and the lower beam
(2) one end of end, the short vertical bar (7) is connect with the lower beam (2), the bottom of the other end and the upper room beam (3)
Connection;
The vertical bar further includes long vertical bar (8), and the long vertical bar (8) is located in the upper beam (1) and the lower beam (2)
Portion, the two long vertical bars (8) arranged in the vertical bars are symmetrical arranged, distinguish on the upper beam (1) and on the lower beam (2)
Equipped with upper bracket beam (9) and lower bracket beam (10), the part upper bracket beam (9) and the lower bracket beam (10) and the length are erected
Bar (8) is oppositely arranged.
2. aerial piping lane according to claim 1, which is characterized in that the long vertical bar (8) be located at the same side it is described
It is connected between upper room beam (3) by brace (11), between the adjacent long vertical bar (8) in the same side even by drag link (12)
It connects.
3. aerial piping lane according to claim 1, which is characterized in that the upper beam (1) and the upper room beam (3) it
Between, be fixedly connected respectively by beam folder (13) between the lower beam (2) and the lower room beam (4), the short vertical bar (7) and institute
State part (14) connection that is connected by a hinge respectively between Shang Wuliang (3) and the lower room beam (4).
4. aerial piping lane according to claim 1, which is characterized in that the supporting beam (5) is equipped with connector, the company
Fitting is at least one of tube bank, gantry or lock, and the supporting beam (5) is U-lag steel.
5. aerial piping lane according to claim 1, which is characterized in that the pedestrian (6) is steel grating, the steel grating
It is fixedly connected between the lower beam (2) by U-shaped hook (15).
6. aerial piping lane according to claim 1, which is characterized in that the upper beam (1) and the long vertical bar (8) and institute
It states between upper bracket beam (9), pass through respectively between the lower beam (2) and the long vertical bar (8) and the lower bracket beam (10)
Four-way connector (16) connection;
Divide between the upper beam (1) and the upper bracket beam (9), between the lower beam (2) and the lower bracket beam (10)
It Tong Guo not three-way connector (17) connection;
Pass through respectively between the long vertical bar (8) and the supporting beam (5), between the short vertical bar (7) and the supporting beam (5)
Two-way connector (18) connection.
7. aerial piping lane according to claim 1, which is characterized in that two adjacent supporting beams (5) of the same side it
Between horizontal distance be no more than 3 meters.
8. aerial piping lane according to claim 1, which is characterized in that the upper beam (1), the lower beam (2), described
The material of vertical bar, the supporting beam (5) and the pedestrian (6) is stainless steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710049734.2A CN106764066B (en) | 2017-01-23 | 2017-01-23 | A kind of aerial piping lane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710049734.2A CN106764066B (en) | 2017-01-23 | 2017-01-23 | A kind of aerial piping lane |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106764066A CN106764066A (en) | 2017-05-31 |
CN106764066B true CN106764066B (en) | 2018-12-04 |
Family
ID=58942206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710049734.2A Active CN106764066B (en) | 2017-01-23 | 2017-01-23 | A kind of aerial piping lane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106764066B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109268611B (en) * | 2018-08-20 | 2021-01-26 | 大唐环境产业集团股份有限公司 | Wet desulphurization outdoor comprehensive pipe frame pipeline anti-freezing device and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203099083U (en) * | 2013-02-26 | 2013-07-31 | 天津市鑫大远金属制品有限公司 | Pipe line protective clamping net |
CN203549115U (en) * | 2013-09-25 | 2014-04-16 | 江苏扬子江船厂有限公司 | Cable hanging device with workshop upright columns |
CN204216516U (en) * | 2014-10-29 | 2015-03-18 | 华信咨询设计研究院有限公司 | Anti-seismic base-supporting chute |
CN105508732A (en) * | 2015-12-24 | 2016-04-20 | 广船国际有限公司 | Pipeline rack |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040113025A1 (en) * | 2002-12-11 | 2004-06-17 | Sargent Nathan M. | Pipe supporting devices |
-
2017
- 2017-01-23 CN CN201710049734.2A patent/CN106764066B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203099083U (en) * | 2013-02-26 | 2013-07-31 | 天津市鑫大远金属制品有限公司 | Pipe line protective clamping net |
CN203549115U (en) * | 2013-09-25 | 2014-04-16 | 江苏扬子江船厂有限公司 | Cable hanging device with workshop upright columns |
CN204216516U (en) * | 2014-10-29 | 2015-03-18 | 华信咨询设计研究院有限公司 | Anti-seismic base-supporting chute |
CN105508732A (en) * | 2015-12-24 | 2016-04-20 | 广船国际有限公司 | Pipeline rack |
Also Published As
Publication number | Publication date |
---|---|
CN106764066A (en) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103711323B (en) | Utilize the anti-ceiling board construction method of portable tubular truss stage+module roofing | |
CN107558723B (en) | Method for manufacturing and installing hanging bracket of hanging basket for inclined roof | |
CN101775896B (en) | Rigid suspended scaffold for installing pipeline of steel roof equipment | |
CN205296869U (en) | Spatial grid structure thrustor that slides | |
CN110360488A (en) | Single storey industry workshop inner lighting system and laying method | |
CN103437283B (en) | A kind of hanging basket truss of energy rapid-assembling | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN106764066B (en) | A kind of aerial piping lane | |
CN105781096A (en) | Safety hanging basket for high-altitude operation and construction method thereof | |
KR20110014341A (en) | Tower ctane wall bracing with a safety fence | |
CN105625645A (en) | Construction method of suspension type steel-structured lighting skylight | |
KR20160080836A (en) | Foldable working way of soundproof and method for constructing this same | |
CN203669328U (en) | Quick-disassembly high-altitude working hanging basket | |
WO2020075511A1 (en) | Mobile scaffold installation method | |
CN207919351U (en) | Hanging basket | |
CN205476389U (en) | High altitude portable passes through bridge | |
CN205955164U (en) | Portable steel truss operation platform | |
CN213390229U (en) | A hang in midair piping lane for laying pipeline in room | |
CN210319572U (en) | Internal lighting system of single-layer industrial factory building | |
CN104818859B (en) | The installation method of orbit traffic overhead station operation platform | |
CN204002841U (en) | A kind of outrigger formula mobile formwork for support of tunnel wall pouring construction | |
CN109989357B (en) | Overhead working construction platform and box girder bridge building method | |
CN208023418U (en) | A kind of bridge construction anti-drop device | |
CN202834393U (en) | Structure for installing flue gas cleaning pipeline | |
CN205296908U (en) | Filling station's lightweight steel construction awning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||