CN105508732A - Pipeline rack - Google Patents

Pipeline rack Download PDF

Info

Publication number
CN105508732A
CN105508732A CN201510996677.XA CN201510996677A CN105508732A CN 105508732 A CN105508732 A CN 105508732A CN 201510996677 A CN201510996677 A CN 201510996677A CN 105508732 A CN105508732 A CN 105508732A
Authority
CN
China
Prior art keywords
vertical rod
vertical
pipe frame
pole
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510996677.XA
Other languages
Chinese (zh)
Other versions
CN105508732B (en
Inventor
姚剑峰
胡少军
崔宝宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Shipyard International Co Ltd
Original Assignee
Guangzhou Shipyard International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Shipyard International Co Ltd filed Critical Guangzhou Shipyard International Co Ltd
Priority to CN201510996677.XA priority Critical patent/CN105508732B/en
Publication of CN105508732A publication Critical patent/CN105508732A/en
Application granted granted Critical
Publication of CN105508732B publication Critical patent/CN105508732B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a pipeline rack which comprises two first upright tubes arranged in parallel at an interval and two second upright tubes arranged in parallel at an interval, wherein the first upright tubes and the second upright tubes are arranged in parallel at internals, longitudinal rods are respectively arranged at the tops of the two first upright tubes and the tops of the two second upright tubes, first cross beams used for supporting a pipeline is arranged between the first upright tubes and the second upright tubes, second cross rods used for supporting the pipeline are arranged between the two longitudinal rods, the two first upright tubes and the longitudinal rod form a passage for pedestrians to pass, and the two second upright tubes and the longitudinal rod also form a passage for pedestrians to pass. According to the invention, the passages for pedestrians to pass are formed by the upright tubes and the longitudinal rods, and a support surface for supporting the pipeline is formed by the first cross rods and the second cross rods, so that the whole pipeline rack not only can achieve an overhead pipeline, but also can isolate the pipeline from the pedestrians, thus reducing potential safety hazards.

Description

Pipe frame
Technical field
The present invention relates to a kind of pipeline support frock, particularly relate to a kind of Pipe frame.
Background technique
Various pipeline is there is in shipbuilding process, all pipelines all need built on stilts management, to ensure the handling safety in shipbuilding process, but when outfield operation, for there is no special extension null device, usually need to set up other gadgets such as scaffold and make somebody a mere figurehead for pipeline, and pipe joint and sectional area are often across walkway, pipeline is often across walkway, and personnel's walking is very inconvenient.
Summary of the invention
The object of the present invention is to provide a kind of Pipe frame, it can be arranged built on stilts for pipeline, pipeline and walkway can be separated again, be convenient to personnel and pass through, reduce potential safety hazard.
For reaching above-mentioned purpose, the present invention by the following technical solutions:
A kind of Pipe frame is provided, comprise the first vertical rod of two parallel interval and the second vertical rod of two parallel interval, described first vertical rod and described second vertical rod parallel interval are arranged, the top of the first vertical rod described in two, described in two, the top of the second vertical rod is provided with vertical pole, the first cross bar for supporting described pipeline is provided with between described first vertical rod and described second vertical rod, the second cross bar supporting described pipeline is provided with between vertical pole described in two, wherein, two described first vertical rods and described vertical pole, two described second vertical rods and described vertical pole are all formed with the passage that pedestrian passes through.
Preferably, be arranged in parallel between vertical pole described in two two described second cross bars, along both length directions are parallel and interval arranges four described first cross bars between described first vertical rod and described second vertical rod, wherein two the first cross bars lay respectively at the two ends of described first vertical rod, described second vertical rod.
As a kind of preferred version of Pipe frame, the spacing of the first vertical rod described in two is equal with the spacing of the second vertical rod described in two.
By arranging equal with the spacing of two second vertical rods by the spacing of two first vertical rods, the walkway even width that Pipe frame is formed can be made, ensureing that pedestrian can pass through normally.
As a kind of preferred version of Pipe frame, the top of described first vertical rod is upwards extended the first limited part, the top of described second vertical rod is upwards extended the second limited part, and described first limited part and described second limited part all protrude from described second cross bar and described vertical pole.
By arranging limited part, can prevent pipeline from dropping.
As a kind of preferred version of Pipe frame, described first vertical rod arranges multiple hook in interval along its length away from the side of described passage, described second vertical rod away from described passage side along its length also interval multiple hook is set.
By arranging hook, can be wound in after pipeline is finished and being wound around on hook.
As a kind of preferred version of Pipe frame, described hook comprises the supporting portion vertical with described first vertical rod or described second vertical rod, there is stop part the end of described supporting portion is upwards extended, described stop part perpendicular to described supporting portion, and and described first vertical rod or described second vertical rod interval arrange.
As a kind of preferred version of Pipe frame, described first vertical rod and described second vertical rod are also arranged the stiffening plate for strengthening described supporting portion, described stiffening plate is triangle tabular, a wherein right angle side of described stiffening plate is fixedly connected with described supporting portion, and another right angle side is fixedly connected with described first vertical rod or described second vertical rod.
By arranging stiffening plate, the intensity of hook can be increased, making hook can hang more pipeline, increase the storage ability of Pipe frame.
As a kind of preferred version of Pipe frame, the bottom of two described first vertical rods arranges the first pedal, and the bottom of two described second vertical rods arranges the second pedal.
By arranging pedal, whole Pipe frame can be made to form one and to close overall, strengthening the intensity of whole Pipe frame, prevent Pipe frame to be out of shape, be convenient to the movement of Pipe frame simultaneously.
As a kind of preferred version of Pipe frame, also comprise the first reinforcing bar and the second reinforcing bar, one end of described first reinforcing bar is connected with the described vertical pole being positioned at described first vertical rod top, the other end is connected with described first vertical rod, described first reinforcing bar is that angle is arranged with described first vertical rod and described vertical pole respectively, one end of described second reinforcing bar is connected with the described vertical pole being positioned at described second vertical rod top, the other end is connected with described second vertical rod, and described second reinforcing bar is that angle is arranged with described second vertical rod and described vertical pole respectively.
Preferably, one end that two described first reinforcing bars are connected with described vertical pole is set in distance, and one end that two described second reinforcing bars are connected with described vertical pole is set in distance.
As a kind of preferred version of Pipe frame, the top of described first vertical rod is provided with shrouding, and the top of described second vertical rod is also provided with shrouding.
As a kind of preferred version of Pipe frame, described first vertical rod, described second vertical rod, described vertical pole, described first cross bar, described second cross bar all adopt steel pipe to make.
Preferably, rust proof paint in the smooth rear spraying of described Pipe frame surface finish, the thickness of described rust proof paint is not less than 0.6mm.
Beneficial effect of the present invention: the passage that Pipe frame provided by the invention is passed through by vertical rod and vertical pole formation pedestrian, by forming at the first cross bar and the second cross bar the supporting surface supporting pipeline, make whole Pipe frame both can aerial pipeline, also pipeline and walkway can be separated, reduce potential safety hazard.
Accompanying drawing explanation
Fig. 1 is the schematic front view of the Pipe frame of the embodiment of the present invention.
Fig. 2 is the A-A cross-sectional schematic of Fig. 1.
Fig. 3 is the schematic side view of the Pipe frame of the embodiment of the present invention.
In Fig. 1 to 3:
1, the first vertical rod; 101, the first limited part; 2, the second vertical rod; 201, the second limited part; 3, vertical pole; 4, the first cross bar; 5, the second cross bar; 6, passage; 7, link up with; 71, supporting portion; 72, stop part; 8, stiffening plate; 9, the first pedal; 10, the second pedal; 11, the first reinforcing bar; 12, shrouding.
Embodiment
Technological scheme of the present invention is further illustrated by embodiment below in conjunction with accompanying drawing.
As shown in Figures 1 to 3, in an embodiment of the present invention, Pipe frame comprises the first vertical rod 1 of two parallel interval and the second vertical rod 2 of two parallel interval, first vertical rod 1 and the second vertical rod 2 parallel interval are arranged, the top of two first vertical rods 1, the top of two second vertical rods 2 are provided with vertical pole 3, the first cross bar 4 for supporting pipeline is provided with between first vertical rod 1 and the second vertical rod 2, the second cross bar 5 supporting pipeline is provided with between two vertical poles 3, wherein, two the first vertical rods 1 and vertical poles, 3, two the second vertical rods 2 and vertical pole 3 are all formed with the passage 6 that pedestrian passes through.Form by vertical rod and vertical pole 3 passage 6 that pedestrian passes through, by forming at the first cross bar 4 and the second cross bar 5 supporting surface supporting pipeline, making whole Pipe frame both can aerial pipeline, also pipeline and walkway can be separated, reduction potential safety hazard.
In the present embodiment, be arranged in parallel between two vertical poles 3 two the second cross bars 5, along both length directions are parallel and interval arranges four the first cross bars 4 between first vertical rod 1 and the second vertical rod 2, wherein two the first cross bars 4 lay respectively at the two ends of the first vertical rod 1, second vertical rod 2.The spacing of two first vertical rods 1 is equal with the spacing of two second vertical rods 2.By arranging equal with the spacing of two second vertical rods 2 by the spacing of two first vertical rods 1, the walkway even width that Pipe frame is formed can be made, ensureing that pedestrian can pass through normally.
The top of the first vertical rod 1 is upwards extended that the top of the first limited part 101, second vertical rod 2 is upwards extended has the second limited part 201, first limited part 101 and the second limited part 201 all to protrude from the second cross bar 4 and vertical pole 3.By arranging limited part, can prevent pipeline from dropping.
First vertical rod 1 away from passage 6 side along its length interval arrange the vertical rod 2 of multiple hook 7, second away from passage 6 side along its length also interval multiple hook 7 is set.By arranging hook 7, can be wound in after pipeline is finished and being wound around on hook 7.Hook 7 comprises the supporting portion 71 vertical with the first vertical rod 1 or the second vertical rod 2, has stop part 72 the end of supporting portion 71 is upwards extended, stop part 72 perpendicular to supporting portion 71, and and the first vertical rod 1 or the second vertical rod 2 interval arrange.First vertical rod 1 and the second vertical rod 2 are also arranged the stiffening plate 8 for strengthening supporting portion 71, stiffening plate 8 is in straight triangle tabular, and a wherein right angle side of stiffening plate 8 is fixedly connected with supporting portion 71, and another right angle side is fixedly connected with the first vertical rod 1 or the second vertical rod 2.By arranging stiffening plate 8, the intensity of hook 7 can be increased, making hook 7 can hang more pipeline, increase the storage ability of Pipe frame.
The bottom that the bottom of two the first vertical rods 1 arranges 9, two the second vertical rods 2 of the first pedal arranges the second pedal 10.By arranging pedal, whole Pipe frame can be made to form one and to close overall, strengthening the intensity of whole Pipe frame, prevent Pipe frame to be out of shape, be convenient to the movement of Pipe frame simultaneously.
Pipe frame also comprises the first reinforcing bar 11 and the second reinforcing bar (not shown), one end of first reinforcing bar 11 is connected with the vertical pole 3 being positioned at the first vertical rod 1 top, the other end is connected with the first vertical rod 1, first reinforcing bar 11 is arranged in angle with the first vertical rod 1 and vertical pole 3 respectively, one end of second reinforcing bar is connected with the vertical pole 3 being positioned at the second vertical rod 2 top, the other end is connected with the second vertical rod 2, and the second reinforcing bar is arranged in angle with the second vertical rod 2 and vertical pole 3 respectively.One end that two the first reinforcing bars 11 are connected with vertical pole 3 is set in distance, and one end that two the second reinforcing bars are connected with vertical pole 3 is set in distance.
The top of the first vertical rod 1 is provided with shrouding 12, and the top of the second vertical rod 2 is also provided with shrouding 12.
First vertical rod 1, second vertical rod 2, vertical pole 3, first cross bar 4, second cross bar 5 all adopt steel pipe to make.
Rust proof paint in the smooth rear spraying of Pipe frame surface finish, the thickness of rust proof paint is not less than 0.6mm.
It is to be understood that; above-mentioned embodiment is only preferred embodiment of the present invention and institute's application technology principle; in technical scope disclosed in this invention, the change that any those skilled in the art of being familiar with easily expect or replacement, all should be encompassed in protection scope of the present invention.

Claims (10)

1. a Pipe frame, it is characterized in that, comprise the first vertical rod of two parallel interval and the second vertical rod of two parallel interval, described first vertical rod and described second vertical rod parallel interval are arranged, the top of the first vertical rod described in two, described in two, the top of the second vertical rod is provided with vertical pole, the first cross bar for supporting described pipeline is provided with between described first vertical rod and described second vertical rod, the second cross bar supporting described pipeline is provided with between vertical pole described in two, wherein, two described first vertical rods and described vertical pole, two described second vertical rods and described vertical pole are all formed with the passage that pedestrian passes through.
2. Pipe frame according to claim 1, is characterized in that, the spacing of the first vertical rod described in two is equal with the spacing of the second vertical rod described in two.
3. Pipe frame according to claim 1, it is characterized in that, the top of described first vertical rod is upwards extended the first limited part, the top of described second vertical rod is upwards extended the second limited part, and described first limited part and described second limited part all protrude from described second cross bar and described vertical pole.
4. Pipe frame according to claim 1, it is characterized in that, described first vertical rod arranges multiple hook in interval along its length away from the side of described passage, described second vertical rod away from described passage side along its length also interval multiple hook is set.
5. Pipe frame according to claim 4, it is characterized in that, described hook comprises the supporting portion vertical with described first vertical rod or described second vertical rod, there is stop part the end of described supporting portion is upwards extended, described stop part perpendicular to described supporting portion, and and described first vertical rod or described second vertical rod interval arrange.
6. Pipe frame according to claim 5, it is characterized in that, described first vertical rod and described second vertical rod are also arranged the stiffening plate for strengthening described supporting portion, described stiffening plate is straight triangle tabular, a wherein right angle side of described stiffening plate is fixedly connected with described supporting portion, and another right angle side is fixedly connected with described first vertical rod or described second vertical rod.
7. the Pipe frame according to any one of claim 1 to 6, is characterized in that, the bottom of two described first vertical rods arranges the first pedal, and the bottom of two described second vertical rods arranges the second pedal.
8. the Pipe frame according to any one of claim 1 to 6, it is characterized in that, also comprise the first reinforcing bar and the second reinforcing bar, one end of described first reinforcing bar is connected with the described vertical pole being positioned at described first vertical rod top, the other end is connected with described first vertical rod, described first reinforcing bar is that angle is arranged with described first vertical rod and described vertical pole respectively, one end of described second reinforcing bar is connected with the described vertical pole being positioned at described second vertical rod top, the other end is connected with described second vertical rod, described second reinforcing bar is that angle is arranged with described second vertical rod and described vertical pole respectively.
9. the Pipe frame according to any one of claim 1 to 6, is characterized in that, the top of described first vertical rod is provided with shrouding, and the top of described second vertical rod is also provided with shrouding.
10. the Pipe frame according to any one of claim 1 to 6, is characterized in that, described first vertical rod, described second vertical rod, described vertical pole, described first cross bar, described second cross bar all adopt steel pipe to make.
CN201510996677.XA 2015-12-24 2015-12-24 Pipe frame Active CN105508732B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510996677.XA CN105508732B (en) 2015-12-24 2015-12-24 Pipe frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510996677.XA CN105508732B (en) 2015-12-24 2015-12-24 Pipe frame

Publications (2)

Publication Number Publication Date
CN105508732A true CN105508732A (en) 2016-04-20
CN105508732B CN105508732B (en) 2018-05-11

Family

ID=55716926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510996677.XA Active CN105508732B (en) 2015-12-24 2015-12-24 Pipe frame

Country Status (1)

Country Link
CN (1) CN105508732B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764066A (en) * 2017-01-23 2017-05-31 北京亚欧震达科技发展有限公司 A kind of aerial piping lane

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11141740A (en) * 1997-11-07 1999-05-28 Kumagai Gumi Co Ltd Method for transferring existing piping in cut and cover tunnel making work
CN202402792U (en) * 2011-12-31 2012-08-29 中建工业设备安装有限公司 Convenient-to-disassemble multifunctional portal frame for mounting large-aperture pipeline
CN203248122U (en) * 2013-03-13 2013-10-23 中国石油天然气集团公司 Concealed folding hydraulic pipeline support
KR20130136894A (en) * 2012-06-05 2013-12-13 김지성 A laundry drier have a hot wind drier
CN204057508U (en) * 2014-08-29 2014-12-31 广东新船重工有限公司 Retractable frame maked somebody a mere figurehead by a kind of pipeline

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11141740A (en) * 1997-11-07 1999-05-28 Kumagai Gumi Co Ltd Method for transferring existing piping in cut and cover tunnel making work
CN202402792U (en) * 2011-12-31 2012-08-29 中建工业设备安装有限公司 Convenient-to-disassemble multifunctional portal frame for mounting large-aperture pipeline
KR20130136894A (en) * 2012-06-05 2013-12-13 김지성 A laundry drier have a hot wind drier
CN203248122U (en) * 2013-03-13 2013-10-23 中国石油天然气集团公司 Concealed folding hydraulic pipeline support
CN204057508U (en) * 2014-08-29 2014-12-31 广东新船重工有限公司 Retractable frame maked somebody a mere figurehead by a kind of pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764066A (en) * 2017-01-23 2017-05-31 北京亚欧震达科技发展有限公司 A kind of aerial piping lane
CN106764066B (en) * 2017-01-23 2018-12-04 北京亚欧震达科技发展有限公司 A kind of aerial piping lane

Also Published As

Publication number Publication date
CN105508732B (en) 2018-05-11

Similar Documents

Publication Publication Date Title
CN105155828B (en) A kind of hoistable platform and its four column guide rail gantries
CN205022629U (en) Assembled storage rack is used to gas receiver
CN103569500B (en) A kind of protective device for Federal bumper
CN204096884U (en) Pipe unit suspension bracket
CN105508732A (en) Pipeline rack
CN105604241A (en) Steel-structure reinforced beam for construction
CN103085049A (en) Automobile cab assembling support
CN105951668A (en) Bottom die supporting system of long-piled wharf cast-in-place beam and construction method of bottom die supporting system
CN205295965U (en) Large -span continuous beam bridge strides existing station rotation construction and wraps protective structure entirely with hanging basket
CN103850185B (en) A kind of many truss-likes supper wide type hanging basket for bridge construction
CN104942188B (en) A kind of shield reinforced bar processing device
CN205804276U (en) A kind of bed die support system of the cast-in-place crossbeam of long piled wharf
CN204623801U (en) A kind of scaffold clamp
CN204895808U (en) L type hangs foot hand support
CN104276340A (en) Copper coil transport stand
CN107419915A (en) A kind of architectural engineering protection network
CN204042403U (en) A kind of section bar
CN204711063U (en) A kind of shield reinforced bar processing device
CN204162303U (en) The high-altitude operation platform of single-beam crane
CN203901120U (en) Steel plate shot blasting assistant bracket
CN205440406U (en) Handcart
CN204940519U (en) People's Cargo Lift cage buffer platform
CN202465126U (en) Tower crane draw rod bracket
CN202824270U (en) Steel tube straightening support for scaffold
CN102127884A (en) Multi-bearing cable freight cableway circulating rail

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant